Construction progress display device for building engineering construction

By designing a construction progress display device including placing components and supporting components, the problem of inability to effectively compare and analyze the daily construction progress in the prior art is solved, and the automatic replacement of the artboard and the portability and stability of the device are realized.

CN222955175UActive Publication Date: 2025-06-10DONGGUAN DONGZHENG CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421826398.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2025-06-10
Estimated Expiration
2034-07-31

AI Technical Summary

Technical Problem

The existing construction progress display device cannot effectively perform daily process comparison and analysis, which affects the efficiency of the device.

Method used

A construction progress display device including a frame, a placement assembly and a support assembly is designed. The placement assembly realizes automatic replacement of the artboard through sliding connection and spring drive, and the support assembly realizes adjustment of the placement frame height through the adjustment rod and the guide rod, and improves the portability and support stability of the device through the universal wheel.

Benefits of technology

Automatic replacement of the artboard is realized, wiping operation is avoided, and the convenience and efficiency of use at the construction site is improved; the adjustment of the supporting components and the design of the universal wheel make the device suitable for users of different heights, and improves the portability and use stability of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222955175U_ABST
    Figure CN222955175U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of constructional engineering tools, in particular to a construction progress display device for constructional engineering construction. The construction progress display device for building engineering construction comprises a frame body and a drawing board, and a placing assembly used for storing the drawing board is arranged in the frame body; the placement assembly comprises a placement frame, a partition plate is erected in the placement frame and can divide the interior of the placement frame into two independent spaces, one side wall of the placement frame is of an opening structure, and a push plate in sliding connection is erected on the side, close to the opening, in the placement frame. According to the construction progress display device for building engineering construction, a previous drawing board can be taken out to be stored, at the moment, under the driving of the acting force of the spring, the drawing board stored in the later period can be ejected outwards, replacement of the drawing board is achieved, previous writing display records do not need to be wiped, and the construction progress display device is convenient to use. Therefore, workers can conveniently carry out weekly work summary and comparison in the later period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering tools, in particular to a construction progress display device for construction engineering construction. Background Technique

[0002] Building construction refers to the production activities in the implementation stage of project construction, which is the construction process of various buildings. It includes foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction, etc. In the construction site of building construction, there is usually a project progress display device for intuitively displaying the completion progress and project information of the project, so that construction personnel and management personnel can understand it, so that the construction process can be better planned to ensure the smooth progress of construction and improve the overall construction efficiency of the construction site.

[0003] The existing display devices are generally single-sided display boards. During the later use process, when the construction progress record is displayed on a single day, when using it the next day, the record of the previous day needs to be wiped. And later when the staff needs to conduct a weekly summary and analyze the daily construction progress, the daily progress cannot be effectively compared and analyzed, which will affect the use of the device to a certain extent.

[0004] Therefore, it is necessary to provide a new construction progress display device for building engineering construction to solve the above technical problems. Content of the Utility Model

[0005] To solve the above technical problems, the utility model provides a construction progress display device for building engineering construction.

[0006] The construction progress display device for building engineering construction provided by the utility model includes: a frame body and a drawing board, and a placement component for storing the drawing board is arranged inside the frame body;

[0007] The placement component includes a placement frame, a partition is erected inside the placement frame, the partition can divide the interior of the placement frame into two independent spaces, one side wall of the placement frame is of an open structure, and a push board connected in a sliding manner is erected inside the placement frame close to the opening;

[0008] A plurality of drawing boards are provided, the outer wall of the drawing board abuts against and is slidably connected to the inner wall of the placement frame, and the drawing board is placed in the space inside the placement frame close to the opening;

[0009] Both sides inside the placement frame are provided with sliding grooves. A slider connected in a sliding manner is arranged inside the sliding groove. The end of the slider is fixedly connected to the outer wall of the push plate. A connecting piece is arranged at one end of the slider away from the push plate. A spring is arranged on one side of the connecting piece away from the opening. The end of the spring away from the connecting piece is connected to the outer wall of the placement frame. And a pull rod is arranged on one side of both connecting pieces away from the opening.

[0010] A support assembly for adjusting the height of the placement frame is arranged inside the frame body.

[0011] Preferably, the support assembly includes an adjusting rod and a guiding rod. The adjusting rod is rotatably arranged on one side inside the frame body. A turntable is arranged on the outer wall of the frame body. And the guiding rod is arranged on one side inside the frame body away from the adjusting rod.

[0012] Preferably, transfer plates are arranged on the outer walls of both the adjusting rod and the guiding rod. The inner wall of the transfer plate is in threaded connection with the outer wall of the adjusting rod. The inner wall of the transfer plate is in sliding connection with the outer wall of the guiding rod. And the outer wall of the transfer plate is fixedly connected to the outer wall of the placement frame.

[0013] Preferably, a lead screw connected in a threaded manner is inserted at the center of the bottom of the frame body. Convex rods connected in a sliding manner are inserted at the four corners of the bottom of the frame body. A connecting plate connected in a rotating manner is arranged at the bottom of the lead screw. The top of the connecting plate is fixedly connected to the bottom end of the convex rod. And universal wheels are arranged at the four corners of the bottom of the connecting plate.

[0014] Preferably, a number of uniformly distributed universal shells are arranged on both sides of the inner wall of the placement frame close to the opening. A universal ball connected in a rolling manner is arranged inside the universal shell. And the outer wall of the universal ball abuts against the outer wall of the drawing board.

[0015] Preferably, a placement groove is arranged at the bottom of the placement frame. A top cover is arranged at the top of the placement frame. A gap is left between one side of the outer wall of the top cover close to the opening of the placement frame and the placement frame. And the specification of the gap is the same as the thickness of the drawing board.

[0016] Compared with the related art, the construction progress display device for construction engineering provided by the present utility model has the following beneficial effects:

[0017] 1. Through the setting of the placement assembly, during use, the drawing board for writing and display can be placed. And in later use, when the construction progress display of one day is completed, the previous drawing board can be taken out for storage. At this time, under the drive of the spring force, the later stored drawing board can be pushed outwards to realize the replacement of the drawing board, without wiping the previous writing and display records. Thus, it is convenient for the staff to conduct weekly work summary and comparison later.

[0018] 2. Through the setting of the support assembly, the staff can adjust the height of the placement frame according to the needs of use during the later use of the utility model, so that staff of different heights can use it smoothly in the later use, thereby improving the portability of the device in the later use.

[0019] 3. The utility model arranges universal wheels inside the frame. During later use, the supporting state of the device can be changed by adjusting the contact state between the universal wheels and the ground. When the device needs to be transferred, the device can be supported by the universal wheels against the ground, which makes it convenient for the staff to push and transfer the device.

[0020] 4. When the utility model is in use, after the device is moved to a desired position, the universal wheels are stored inside the frame, so that the bottom of the frame can be against the ground, thereby increasing the contact area between the device and the ground, thereby improving the support stability of the device when in use. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 A structural schematic diagram of a preferred embodiment of a construction progress display device for building engineering construction provided by the utility model;

[0022] Figure 2 for Figure 1 The schematic diagram of the support assembly and placement assembly orientation structure shown;

[0023] Figure 3 for Figure 2 A schematic diagram of the structure of the placement frame and its components shown;

[0024] Figure 4 for Figure 1 A schematic structural diagram of the frame and its components as viewed from above.

[0025] Numbers in the figure: 1. frame; 2. supporting assembly; 21. adjusting rod; 211. turntable; 22. guide rod; 23. adapter plate; 3. placement assembly; 31. placement frame; 311. partition; 312. placement slot; 313. slide slot; 32. push plate; 321. slider; 33. top cover; 34. universal shell; 341. universal ball; 35. connecting piece; 351. spring; 352. pull rod; 4. drawing board; 5. connecting plate; 51. universal wheel; 52. protruding rod; 53. screw rod. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0027] The following will describe in detail the specific implementation of the present utility model in combination with specific embodiments.

[0028] Please refer to Figures 1 to 4 , a construction progress display device for construction engineering provided by an embodiment of the present utility model. The construction progress display device for construction engineering includes: a frame body 1 and a drawing board 4.

[0029] In an embodiment of the present utility model, please refer to Figure 1 , Figure 2 and Figure 3 , a placement component 3 for storing the drawing board 4 is provided inside the frame body 1; the placement component 3 includes a placement frame 31, a partition 311 is installed inside the placement frame 31, and the partition 311 can divide the interior of the placement frame 31 into two independent spaces. One side wall of the placement frame 31 is an open structure, and a push plate 32 connected in a sliding manner is installed inside the placement frame 31 near the opening; several drawing boards 4 are provided, the outer wall of the drawing board 4 abuts against and is slidably connected to the inner wall of the placement frame 31, and the drawing board 4 is placed in the space inside the placement frame 31 near the opening on one side; sliding grooves 313 are opened on both sides inside the placement frame 31, a slider 321 connected in a sliding manner is provided inside the sliding groove 313, the end of the slider 321 is fixedly connected to the outer wall of the push plate 32, a connecting piece 35 is provided at one end of the slider 321 away from the push plate 32, a spring 351 is provided on the side of the connecting piece 35 away from the opening, the end of the spring 351 away from the connecting piece 35 is connected to the outer wall of the placement frame 31, and a pull rod 352 is installed on the side of both connecting pieces 35 away from the opening.

[0030] It should be noted that: through the setting of the placement component 3, during use, the drawing board 4 for writing and display can be placed. In later use, when the construction progress display for one day is completed, the previous drawing board 4 can be taken out. After taking out the drawing board 4, the staff can insert the drawing board 4 into the other space inside the placement frame 31 from the top cover 33 for storage. At this time, driven by the force of the spring 351, the later stored drawing board 4 can be pushed outwards to realize the replacement of the drawing board 4, without wiping the previous writing and display records, which is convenient for the staff to compare the weekly work summaries later;

[0031] It should also be noted that: an LED light strip (not shown in the figure) is provided on the side wall of the placement frame 31 near the opening. Through the irradiation of the LED light strip, the drawing board 4 can be supplemented with light at night, which is more convenient for the staff to perform operations such as replacing the drawing board 4 at night.

[0032] In an embodiment of the present utility model, please refer to Figure 1 and Figure 2, a support assembly 2 for adjusting the height of the placement frame 31 is installed inside the frame body 1. The support assembly 2 includes an adjustment rod 21 and a guide rod 22. The adjustment rod 21 is rotatably installed on one side inside the frame body 1, and a turntable 211 is provided on the outer wall of the frame body 1. The guide rod 22 is installed on the side inside the frame body 1 away from the adjustment rod 21. Connecting plates 23 are provided on the outer walls of both the adjustment rod 21 and the guide rod 22. The inner wall of the connecting plate 23 is threadedly connected to the outer wall of the adjustment rod 21, the inner wall of the connecting plate 23 is slidably connected to the outer wall of the guide rod 22, and the outer wall of the connecting plate 23 is fixedly connected to the outer wall of the placement frame 31.

[0033] It should be noted that: through the setting of the support assembly 2, during the later use process, the staff can hold the turntable 211 to control the rotation of the adjustment rod 21 according to the needs of use. The rotating adjustment rod 21 can drive the connecting plate 23 to move through the threaded structure. At this time, the moving connecting plate 23 can drive the placement frame 31 to move synchronously, so as to realize the adjustment of the height of the placement frame 31. Therefore, staff of different heights can use it smoothly later, and the portability of the device during later use can be improved.

[0034] In an embodiment of the present invention, please refer to Figure 1 and Figure 4 , a screw rod 53 connected by threading is inserted into the center of the bottom of the frame body 1, and convex rods 52 connected by sliding are inserted into the four corners of the bottom of the frame body 1. A connecting plate 5 connected by rotation is provided at the bottom of the screw rod 53. The top of the connecting plate 5 is fixedly connected to the bottom end of the convex rod 52, and universal wheels 51 are provided at the four corners of the bottom of the connecting plate 5.

[0035] It should be noted that: by setting the universal wheels 51 inside the frame, during the later use process, the support state of the device can be changed by adjusting the contact state between the universal wheels 51 and the ground. When the device needs to be transferred, the device can be supported by the universal wheels 51 against the ground, so that it is convenient for the staff to push and transfer the device. After moving the device to the required position, by storing the universal wheels 51 inside the frame body 1, the bottom of the frame body 1 can be made to abut against the ground, so as to increase the contact area between the device and the ground. Therefore, the support stability of the device during use can be improved, and the later use effect of the device can be improved.

[0036] In an embodiment of the present invention, please refer to Figure 2 and Figure 3A plurality of uniformly distributed universal shells 34 are provided on both sides of the inner wall of the placing frame 31 near the opening, the inner wall of the universal shell 34 is provided with a rollingly connected universal ball 341, and the outer wall of the universal ball 341 is against the outer wall of the drawing board 4, a placing groove 312 is provided at the bottom of the placing frame 31, and a top cover 33 is provided on the top of the placing frame 31, and a gap is left between the outer wall of the top cover 33 near the opening of the placing frame 31 and the placing frame 31, and the specification of the gap is the same as the thickness of the drawing board 4.

[0037] It should be noted that: by providing a gap between the top cover 33 and the opening of the placement frame 31, when the staff member pushes the outer drawing board 4 upward, the gap can facilitate the drawing board 4 to slide upward from the inside of the placement frame 31. At the same time, through the setting of the top cover 33, the top cover 33 can also shield the drawing board 4 stored in the placement frame 31, and then when the staff member pushes the outer drawing board 4 upward, the shielding of the top cover 33 can prevent the subsequent stored drawing board 4 from connecting to the outer drawing board 4 and moving synchronously, thereby preventing the subsequent drawing board 4 from being dragged when the staff member takes the drawing board 4.

[0038] By providing the universal ball 341 , when the staff member moves the outer drawing board 4 , the universal ball 341 can reduce the friction during the movement of the drawing board 4 , thereby allowing the staff member to move the drawing board 4 more smoothly.

[0039] The working principle of the construction progress display device for building engineering construction provided by the utility model is as follows:

[0040] When the device is used later, when the staff needs to transfer the device, they can first control the screw rod 53 to rotate, and the rotating screw rod 53 can drive the connecting plate 5 to move downward inside the frame 1. When the connecting plate 5 moves downward, when the bottom of the universal wheel 51 contacts the ground, as the screw rod 53 continues to rotate, the frame 1 can be reversed and lifted upward to separate the bottom of the frame 1 from the ground. At this time, the staff can transfer the device while pushing the frame 1.

[0041] When the device is transferred to the desired position, the screw rod 53 can be reversely controlled to retract the universal wheel 51 until the universal wheel 51 moves into the frame 1, so that the bottom of the frame 1 is against the ground, thereby making the support of the frame 1 more stable;

[0042] After the placement of this device is completed, the staff can take out the water-based pen in the placement groove 312 as needed and record the construction progress on the outer wall of the drawing board 4. During this process, the staff can hold the turntable 211 and control the rotation of the adjusting rod 21. The rotating adjusting rod 21 can drive the placement frame 31 to move vertically on the outer wall of the guide rod 22 through the threaded structure, thereby realizing the adjustment of the height of the drawing board 4 inside the placement frame 31, making it more convenient for the staff to write during the recording;

[0043] After the work progress of a day is recorded, the staff can lift the drawing board 4 upward so that the drawing board 4 on the outside can slide out of the placement frame 31. After taking out the drawing board 4, the staff can insert the drawing board 4 into the other space inside the placement frame 31 from the top cover 33. During this process, the spring 351 can drive the push plate 32 to move through the connecting piece 35 and the slider 321 by its own acting force. The moving push plate 32 can push the drawing board 4 stored in the placement frame 31, thereby enabling the drawing board 4 to be reset and realizing the automatic replacement of the drawing board 4;

[0044] By replacing, storing and collecting the previous drawing board 4, the staff can compare the daily construction progress during the weekly summary in the later stage, so as to improve the use effect of this device in the later stage.

[0045] The above are only the embodiments of the present invention, and do not limit the patent scope of the present invention accordingly. Any equivalent structure or equivalent process transformation made by using the content of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, shall be equally included in the patent protection scope of the present invention.

Claims

1. A construction progress display device for construction engineering, characterized in that: include: A frame (1) and a drawing board (4), wherein a placement component (3) for storing the drawing board (4) is provided inside the frame (1); The placement assembly (3) comprises a placement frame (31), a partition (311) is arranged inside the placement frame (31), and the partition (311) can divide the interior of the placement frame (31) into two independent spaces. One side wall of the placement frame (31) is an open structure, and a slidingly connected push plate (32) is arranged on one side of the placement frame (31) close to the opening. A plurality of drawing boards (4) are provided, the outer walls of the drawing boards (4) abut against and are slidably connected to the inner walls of the placement frame (31), and the drawing boards (4) are placed in a space near an opening side inside the placement frame (31); Slide grooves (313) are provided on both sides of the placement frame (31), and a sliding block (321) is provided inside the slide groove (313). The end of the sliding block (321) is fixedly connected to the outer wall of the push plate (32). A connecting piece (35) is provided at one end of the sliding block (321) away from the push plate (32). A spring (351) is provided on the side of the connecting piece (35) away from the opening. The end of the spring (351) away from the connecting piece (35) is connected to the outer wall of the placement frame (31), and pull rods (352) are provided on the sides of the connecting pieces (35) away from the opening. A support assembly (2) for adjusting the height of the placement frame (31) is provided inside the frame (1).

2. The construction progress display device for construction engineering according to claim 1, characterized in that: The support assembly (2) comprises an adjusting rod (21) and a guide rod (22); the adjusting rod (21) is rotatably mounted on one side of the frame body (1); a turntable (211) is provided on the outer wall of the frame body (1); and the guide rod (22) is mounted on a side of the frame body (1) away from the adjusting rod (21).

3. The construction progress display device for construction engineering according to claim 2, characterized in that: An adapter plate (23) is provided on the outer walls of the adjusting rod (21) and the guide rod (22); the inner wall of the adapter plate (23) is threadedly connected to the outer wall of the adjusting rod (21); the inner wall of the adapter plate (23) is slidably connected to the outer wall of the guide rod (22); and the outer wall of the adapter plate (23) is fixedly connected to the outer wall of the placement frame (31).

4. The construction progress display device for construction engineering according to claim 1, characterized in that: A threaded screw rod (53) is inserted at the center of the bottom of the frame body (1), and slidably connected protruding rods (52) are inserted at the four corners of the bottom of the frame body (1). A rotatably connected connecting plate (5) is provided at the bottom of the screw rod (53), and the top of the connecting plate (5) is fixedly connected to the bottom end of the protruding rod (52), and universal wheels (51) are provided at the four corners of the bottom of the connecting plate (5).

5. The construction progress display device for construction engineering according to claim 1, characterized in that: A plurality of uniformly distributed universal shells (34) are provided on both sides of the inner wall of the placement frame (31) close to the opening, and the inner wall of the universal shell (34) is provided with a rolling-connected universal ball (341), and the outer wall of the universal ball (341) abuts against the outer wall of the drawing board (4).

6. The construction progress display device for construction engineering according to claim 1, characterized in that: The bottom of the placement frame (31) is provided with a placement groove (312), the top of the placement frame (31) is provided with a top cover (33), a gap is left between the outer wall of the top cover (33) close to the opening of the placement frame (31) and the placement frame (31), and the specification of the gap is the same as the thickness of the drawing board (4).