Mining lifting rope clamping device
By designing a mining lifting rope clamp with multiple component fastening and tightening mechanisms, the problem that existing rope clamps cannot stabilize the wire rope, achieving a more stable safety in the wire rope fixing and lifting process.
Patent Information
- Application Number
- CN202422087613.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2025-06-17
- Estimated Expiration
- 2034-08-27
AI Technical Summary
Due to the elasticity and compressibility of the silicone shell, the existing rope cradles for mines cannot be stably fixed, which affects the safety of the mine tank cage improvement.
A mining lifting rope clamping device is designed, using components such as the left fixing plate, the right fixing plate, the L-shaped positioning plate, the first fixing bolt and the nut. By tightening the second bolt, the pressure plate is driven downward, and combined with the tightening mechanism of the first fixing bolt and the nut, the wire rope is secondary tightened and fixed.
It achieves a more stable fixation of the wire rope, avoids the risk of the wire rope falling off, and improves the safety of the mine tank cage lifting process.
Smart Images

Figure CN222992040U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of rope clamping devices, in particular to a mine hoisting rope clamping device. Background Technique
[0002] The mine hoisting cage needs to use a rope clamping device to fix the steel wire rope for cage hoisting. The stability of the rope clamping device for fixing the steel wire rope is directly related to the safety of the cage hoisting process. For example, in a mine rope clamping device (application number: CN202223517169.3) disclosed in Chinese patent literature, the steel wire rope is fixed through a clamping groove body arranged in the middle of the first clamping block and the second clamping block. The clamping groove body is arranged vertically, and a silica gel shell is arranged in the clamping groove body. Although the silica gel shell protects the steel wire rope, the silica gel itself has elasticity and can also be compressed, resulting in the rope clamping device being unable to stably fix the steel wire rope and affecting the safety of mine cage hoisting.
[0003] Therefore, we propose a mine hoisting rope clamping device Content of the Utility Model
[0004] The purpose of the utility model is to provide a mine hoisting rope clamping device to solve the problems put forward in the above background technique.
[0005] To achieve the above purpose, the utility model provides the following technical scheme: a mine hoisting rope clamping device, including a left fixing plate, a right fixing plate, a steel wire rope, an L-shaped positioning plate, a first fixing bolt and a nut. A sphere is arranged at the bottom end of the steel wire rope. A pressing plate is arranged on the L-shaped positioning plate. A first arc-shaped groove is arranged on the left side of the right fixing plate. A second arc-shaped groove is arranged on the right side of the left fixing plate. Mounting holes matching with the first fixing bolt are arranged on both the left fixing plate and the right fixing plate. A third arc-shaped groove is arranged at the bottom of the pressing plate. A fourth arc-shaped groove is arranged on the L-shaped positioning plate. A second through hole is arranged at the right end of the third arc-shaped groove. A first through hole is arranged on the L-shaped positioning plate. A second fixing bolt is arranged in the first through hole. An installation opening is arranged at the bottom of the pressing plate. An installation groove is arranged at the top of the installation opening. A fixing block is arranged in the installation groove.
[0006] Preferably, the top of the L-shaped positioning plate is lower than the top of the pressing plate.
[0007] Preferably, the first fixing bolt passes through the mounting holes arranged on the left fixing plate and the right fixing plate and is connected with the nut.
[0008] Preferably, both the first arc-shaped groove and the second arc-shaped groove are arranged in an S shape.
[0009] Preferably, the second fixing bolt passes through the first through hole and the installation opening and is connected with the fixing block. Threaded holes matching with the second fixing bolt are arranged on the fixing block.
[0010] Preferably, the cross-sections of the installation groove and the fixing block are both square, and the height of the installation groove is greater than the thickness of the fixing block.
[0011] Compared with the prior art, the beneficial effects of the present utility model are as follows:
[0012] 1. Tighten the second bolt. The second bolt drives the pressing plate to move downward through the fixing block to press the steel wire rope. The nut is installed on the first fixing bolt. Pull the steel wire rope upward. After the pressing plate contacts the bottoms of the left fixing plate and the right fixing plate, tighten the nut. The second arc groove and the first arc groove provided on the left fixing plate and the right fixing plate press and fix the steel wire rope for the second time, thereby fixing the steel wire rope more firmly.
[0013] 2. When the pulling force on the steel wire rope is too large, the steel wire rope slides in the first arc groove and the second arc groove. The pressing plate and the L-shaped positioning plate will block the sphere provided at the bottom end of the steel wire rope. The steel wire rope pulls the pressing plate and the L-shaped positioning plate, and the steel wire rope pulls the pressing plate and the L-shaped fixing plate, so that the left fixing plate and the right fixing plate form a pressure on the pressing plate, thereby enabling the pressing plate to further press the steel wire rope, so that the device presses and fixes the steel wire rope, and the steel wire rope will not fall off, ensuring the safety of using the wire rope gripper. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 is a schematic structural diagram of the present utility model;
[0015] Figure 2 is a schematic installation structure diagram of the first fixing bolt of the present utility model;
[0016] Figure 3 is a schematic installation structure diagram of the pressing plate of the present utility model;
[0017] Figure 4 is a schematic structure diagram of the pressing plate and the L-shaped positioning plate of the present utility model.
[0018] In the figure: 1, left fixing plate; 2, right fixing plate; 3, steel wire rope; 4, L-shaped positioning plate; 5, sphere; 6, pressing plate; 7, first arc groove; 8, second arc groove; 9, first fixing bolt; 10, first nut; 11, installation hole; 12, third arc groove; 13, fourth arc groove; 14, first through hole; 15, second fixing bolt; 16, installation port; 17, installation groove; 18, fixing block; 19, second through hole. DETAILED DESCRIPTION OF THE EMBODIMENTS
[0019] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present invention without creative efforts shall fall within the protection scope of the present invention.
[0020] Please refer to Figures 1-4 , the present invention provides a technical solution: a mine hoisting rope clamping device, which includes a left fixing plate 1, a right fixing plate 2, a steel wire rope 3, an L-shaped positioning plate 4, a first fixing bolt 9 and a nut 10. A sphere 5 is arranged at the bottom end of the steel wire rope 3. A pressing plate 6 is arranged on the L-shaped positioning plate 4. A first arc groove 7 is arranged on the left side of the right fixing plate 2. A second arc groove 8 is arranged on the right side of the left fixing plate 1. Mounting holes 11 matching with the first fixing bolt 9 are arranged on both the left fixing plate 1 and the right fixing plate 2. A third arc groove 12 is arranged at the bottom of the pressing plate 6. A fourth arc groove 13 is arranged on the L-shaped positioning plate 4. A second through hole 19 is arranged at the right end of the third arc groove 12. A first through hole 14 is arranged on the L-shaped positioning plate 4. A second fixing bolt 15 is arranged in the first through hole 14. An installation opening 16 is arranged at the bottom of the pressing plate 6. An installation groove 17 is arranged at the top of the installation opening 16. A fixing block 18 is arranged in the installation groove 17. When the rope clamping device is in use, after the steel wire rope passes through the second arc groove 8 and the first arc groove 7 arranged on the left fixing plate 1 and the right fixing plate 2, and then passes through the second through hole 19, the third arc groove 12 and the fourth arc groove 13, the second fixing bolt 15 is passed through the first through hole 14 and the installation opening 16 to be connected with the fixing block 18. A threaded hole matching with the second fixing bolt 15 is arranged on the fixing block 18. The second bolt 15 is tightened. The second bolt 15 drives the pressing plate 6 to move downward through the fixing block 18 to press the steel wire rope 3. The first fixing bolt 9 is passed through the mounting holes 11 arranged on the left fixing plate 1 and the right fixing plate 2, and the nut 10 is installed on the first fixing bolt 9. The steel wire rope is pulled upward. After the pressing plate 6 contacts the bottoms of the left fixing plate 1 and the right fixing plate 2, the nut 10 is tightened. The second arc groove 8 and the first arc groove 7 arranged on the left fixing plate 1 and the right fixing plate 2 press and fix the steel wire rope 3 again, so as to fix the steel wire rope more firmly.
[0021] Wherein, the top of the L-shaped positioning plate 4 is lower than the top of the pressing plate 6. If the pulling force on the steel wire rope 3 is too large, the steel wire rope slides in the first arc groove 7 and the second arc groove 8. The pressing plate 6 and the L-shaped positioning plate 4 will block the sphere 5 arranged at the bottom end of the steel wire rope 3. The steel wire rope 3 pulls the pressing plate 6 and the L-shaped positioning plate 4, and the steel wire rope 3 pulls the pressing plate 6 and the L-shaped fixing plate 4, so that the left fixing plate 1 and the right fixing plate 2 form a pressure on the pressing plate 6, thereby enabling the pressing plate 6 to further press the steel wire rope 3, so that the device presses and fixes the steel wire rope, and the steel wire rope will not fall off, ensuring the safety of using the rope clamping device;
[0022] The first fixing bolt 9 passes through the mounting holes 11 provided on the left fixing plate 1 and the right fixing plate 2 and is connected to the nut 10. The first fixing bolt 9 passes through the mounting holes 11 and is connected to the nut 10. By tightening the screw nut 10, the left fixing plate 1 and the right fixing plate 2 press and fix the steel wire rope 3.
[0023] Both the first arc groove 7 and the second arc groove 8 are set in an S shape, increasing the contact area between the first arc groove 7 and the second arc groove 8 and the steel wire rope, and fixing the steel wire rope 3 more firmly.
[0024] The second fixing bolt 15 passes through the first through hole 14 and the mounting port 16 and is connected to the fixing block 18. The fixing block 18 is provided with a threaded hole that mates with the second fixing bolt 15. The cross sections of the mounting groove 17 and the fixing block 18 are both square. The height of the mounting groove 17 is greater than the thickness of the fixing block 18. When the steel wire rope 3 pulls the pressing plate 6 and the L-shaped fixing plate 4, causing the left fixing plate 1 and the right fixing plate 2 to exert pressure on the pressing plate 6, and thus when the pressing plate 6 further presses the steel wire rope 3, the fixing block 18 moves within the mounting groove 17, without affecting the further pressing and fixing of the steel wire rope 3 by the pressing plate 6.
[0025] Working principle: After the steel wire rope passes through the second arc groove 8 and the first arc groove 7 provided on the left fixing plate 1 and the right fixing plate 2, it then passes through the second through hole 19, the third arc groove 12, and the fourth arc groove 13. The second fixing bolt 15 passes through the first through hole 14 and the mounting port 16 and is connected to the fixing block 18. The fixing block 18 is provided with a threaded hole that mates with the second fixing bolt 15. By tightening the second bolt 15, the second bolt 15 drives the pressing plate 6 to move downward through the fixing block 18, pressing the steel wire rope 3. The first fixing bolt 9 passes through the mounting holes 11 provided on the left fixing plate 1 and the right fixing plate 2, and the nut 10 is installed on the first fixing bolt 9. By pulling the steel wire rope upward, after the pressing plate 6 contacts the bottoms of the left fixing plate 1 and the right fixing plate 2, the nut 10 is tightened. The second arc groove 8 and the first arc groove 7 provided on the left fixing plate 1 and the right fixing plate 2 perform secondary pressing and fixing on the steel wire rope 3, thereby fixing the steel wire rope more firmly.
[0026] Although the embodiments of the present invention have been shown and described, for those of ordinary skill in the art, it can be understood that various changes, modifications, substitutions, and variations can be made to these embodiments without departing from the principles and spirit of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A mining lifting rope clamp, comprising a left fixing plate (1), a right fixing plate (2), a steel wire rope (3), an L-shaped positioning plate (4), a first fixing bolt (9) and a nut (10), characterized in that: A sphere (5) is provided at the bottom end of the steel wire rope (3); a pressure plate (6) is provided on the L-shaped positioning plate (4); a first arc-shaped groove (7) is provided on the left side of the right fixing plate (2); a second arc-shaped groove (8) is provided on the right side of the left fixing plate (1); both the left fixing plate (1) and the right fixing plate (2) are provided with mounting holes (11) that match the first fixing bolt (9); a third arc-shaped groove (12) is provided at the bottom of the pressure plate (6); a fourth arc-shaped groove (13) is provided on the L-shaped positioning plate (4); a second through hole (19) is provided at the right end of the third arc-shaped groove (12); a first through hole (14) is provided on the L-shaped positioning plate (4); a second fixing bolt (15) is provided in the first through hole (14); a mounting opening (16) is provided at the bottom of the pressure plate (6); a mounting groove (17) is provided at the top of the mounting opening (16); a fixing block (18) is provided in the mounting groove (17).
2. A mining hoisting rope clamp according to claim 1, characterized in that: The top of the L-shaped positioning plate (4) is lower than the top of the pressing plate (6).
3. A mining hoisting rope clamp according to claim 1, characterized in that: The first fixing bolt (9) passes through mounting holes (11) provided on the left fixing plate (1) and the right fixing plate (2) and is connected to the nut (10).
4. A mining hoisting rope clamp according to claim 1, characterized in that: The first arc-shaped groove (7) and the second arc-shaped groove (8) are both arranged in an S shape.
5. A mining hoisting rope clamp according to claim 1, characterized in that: The second fixing bolt (15) passes through the first through hole (14) and the mounting opening (16) to be connected to the fixing block (18); the fixing block (18) is provided with a threaded hole matching the second fixing bolt (15).
6. A mining hoisting rope clamp according to claim 1, characterized in that: The mounting groove (17) and the fixing block (18) are both square in cross-section, and the height of the mounting groove (17) is greater than the thickness of the fixing block (18).
Citation Information
Patent Citations
Rope clamping device for mine
CN219388527U