Steam flowmeter mounting structure

By introducing clamps, mounting plates and positioning mechanisms into the steam flowmeter installation structure, combined with arc-shaped round grooves and bolt fixing, the problem of inaccurate installation of the steam flowmeter is solved and accurate vertical installation is achieved.

CN223064668UActive Publication Date: 2025-07-04QINGDAO WANRUN MEASUREMENT & CONTROL EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421960073.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2025-07-04
Estimated Expiration
2034-08-13

AI Technical Summary

Technical Problem

The lack of positioning components during pipeline installation leads to inaccurate installation.

Method used

The installation structure including pipes, clamps, mounting plates and positioning mechanisms is adopted. The vertical installation of the steam flowmeter is achieved through the verticality detection component and the positioning rod, and fixed by arcuate round grooves and bolts.

Benefits of technology

Accurate vertical installation of steam flowmeters is achieved, improving installation accuracy and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223064668U_ABST
    Figure CN223064668U_ABST
Patent Text Reader

Abstract

The utility model discloses a steam flow meter installation structure, which relates to the technical field of steam flow meters and comprises two groups of pipelines, an installation pipe is detachably installed between the two groups of pipelines, a steam flow meter is arranged at the upper end of the installation pipe, a clamp is detachably installed above the pipelines, and the steam flow meter is arranged in the installation pipe. A mounting plate is fixedly mounted at the upper end of the hoop, and a positioning mechanism is arranged above the mounting plate. According to the utility model, the hoop is placed above the pipeline, the position of the hoop is rotatably adjusted by observing the scale of the verticality detection assembly, the hoop is vertically installed above the pipeline at 90 degrees, and then the installation pipe is rotated to insert the positioning part of the positioning rod into the positioning block, so that the vertical installation of the installation pipe is completed. At the moment, bolts are inserted into the first arc-shaped circular groove and the second arc-shaped circular groove in a matched mode for fixing, and vertical installation of the steam flowmeter is completed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of steam flowmeters, in particular to an installation structure of a steam flowmeter. Background Technique

[0002] Steam is a widely used heat-carrying working medium and an important secondary energy source. The measurement of steam flow has a large scale and wide range, and is of great significance for strengthening management, fair trade, energy conservation, and improving economic benefits.

[0003] In the prior art, the installation of a steam flowmeter needs to be perpendicular to the pipeline. When installed manually, there is no positioning component, which is prone to the problem of inaccurate installation. Content of the Utility Model

[0004] In order to overcome the above-mentioned defects existing in the prior art, the utility model provides an installation structure of a steam flowmeter.

[0005] The technical solution adopted by the utility model to solve its technical problems is: an installation structure of a steam flowmeter, including pipelines. There are two groups of the pipelines, and an installation pipe is detachably installed between the two groups of pipelines. A steam flowmeter is arranged at the upper end of the installation pipe. A clamp is detachably installed above the pipelines, and an installation plate is fixedly installed at the upper end of the clamp. A positioning mechanism is arranged above the installation plate.

[0006] Further, a first flange is arranged on one side of the pipeline, and a number of first arc-shaped circular grooves are arranged on the first flange.

[0007] Further, second flanges are arranged on both sides of the installation pipe, and a number of second arc-shaped circular grooves are arranged on the second flanges.

[0008] Further, the second arc-shaped circular groove and the first arc-shaped circular groove can be cooperatively installed, and bolts are inserted between them for fixation.

[0009] Further, the positioning mechanism includes an installation frame and a positioning rod. A verticality detection component is arranged on the installation frame, and a positioning block is fixedly installed at the left end of the installation frame.

[0010] Further, the positioning rod is fixedly installed at the upper end of the second flange, and a positioning part is arranged on the positioning rod. The positioning part is inserted into the interior of the positioning block and is cooperatively installed with the positioning block.

[0011] The beneficial effects of the present utility model are as follows: By placing the clamp above the pipeline, observing the scale of the verticality detection component, rotating and adjusting the position of the clamp, installing the clamp vertically above the pipeline at 90°, then rotating the installation pipe to insert the positioning part of the positioning rod into the inside of the positioning block to complete the vertical installation of the installation pipe. At this time, the first arc-shaped circular groove and the second arc-shaped circular groove are cooperatively inserted with bolts for fixation to complete the vertical installation of the steam flowmeter. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] The present utility model will be further described below in conjunction with the drawings and embodiments.

[0013] Figure 1 is the front view of the present utility model;

[0014] Figure 2 is the partial enlarged view of the present utility model;

[0015] Figure 3 is the side view of the first flange of the present utility model;

[0016] Figure 4 is the side view of the second flange of the present utility model.

[0017] In the figure: 1. Pipeline, 2. First flange, 21. First arc-shaped circular groove, 3. Installation pipe, 4. Second flange, 41. Second arc-shaped circular groove, 5. Clamp, 6. Installation plate, 7. Installation frame, 8. Verticality detection component, 9. Positioning block, 10. Positioning rod, 101. Positioning part. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0018] In order to more clearly illustrate the technical solutions of the present utility model, the present utility model will be further described below in conjunction with the drawings. Obviously, the following described drawings are only one embodiment of the present utility model. For those of ordinary skill in the art, without creative efforts, other embodiments obtained based on this drawing and embodiment all fall within the protection scope of the present utility model.

[0019] As Figure 1 shown, the present utility model includes a pipeline 1. There are two groups of the pipelines 1, and an installation pipe 3 is detachably installed between the two groups of pipelines 1. A steam flowmeter is arranged at the upper end of the installation pipe 3. A first flange 2 is arranged on one side of the pipeline 1. A number of first arc-shaped circular grooves 21 are arranged on the first flange 2. Second flanges 4 are arranged on both sides of the installation pipe 3. A number of second arc-shaped circular grooves 41 are arranged on the second flanges 4. The second arc-shaped circular grooves 41 can be cooperatively installed with the first arc-shaped circular grooves 21, and bolts are inserted between them for fixation.

[0020] As Figures 1 to 4As shown in the figure, a clamp 5 is detachably installed above the pipeline 1. An installation plate 6 is fixedly installed at the upper end of the clamp 5. A positioning mechanism is arranged above the installation plate 6. The positioning mechanism includes an installation frame 7 and a positioning rod 10. A verticality detection component 8 is arranged on the installation frame 7. A positioning block 9 is fixedly installed at the left end of the installation frame 7. The positioning rod 10 is fixedly installed at the upper end of the second flange 4. A positioning portion 101 is arranged on the positioning rod 10. The positioning portion 101 is inserted into the interior of the positioning block 9 and is installed in cooperation with the positioning block 9.

[0021] When the utility model is in use, the clamp 5 is placed above the pipeline 1. By observing the scale of the verticality detection component 8, the position of the clamp 5 is rotated and adjusted, and the clamp 5 is vertically installed above the pipeline 1 at 90°. Then, by rotating the installation pipe 3, the positioning portion 101 of the positioning rod 10 is inserted into the interior of the positioning block 9 to complete the vertical installation of the installation pipe 3. At this time, the first arc-shaped circular groove 21 and the second arc-shaped circular groove 41 are inserted with bolts for fixation to complete the vertical installation of the steam flowmeter.

[0022] The above embodiments are only exemplary embodiments of the utility model and are not used to limit the utility model. The protection scope of the utility model is defined by the claims. Those skilled in the art can make various modifications or equivalent replacements to the utility model within the essence and protection scope of the utility model, and such modifications or equivalent replacements should also be regarded as falling within the protection scope of the utility model.

Claims

1. A steam flowmeter installation structure, including two groups of pipes (1), characterized in that: An installation pipe (3) is detachably installed between two groups of the pipes (1). A steam flowmeter is arranged at the upper end of the installation pipe (3). A clamp (5) is detachably installed above the pipe (1). An installation plate (6) is fixedly installed at the upper end of the clamp (5). A positioning mechanism is arranged above the installation plate (6).

2. The installation structure of a steam flowmeter according to claim 1, wherein A first flange (2) is arranged on one side of the pipe (1). A plurality of groups of first arc-shaped circular grooves (21) are arranged on the first flange (2).

3. The installation structure of a steam flowmeter according to claim 2, characterized in that, Second flanges (4) are arranged on both sides of the installation pipe (3). A plurality of groups of second arc-shaped circular grooves (41) are arranged on the second flanges (4).

4. A steam flowmeter installation structure according to claim 3, characterized in that, The second arc-shaped circular groove (41) can be cooperatively installed with the first arc-shaped circular groove (21), and bolts are inserted between the two for fixation.

5. The installation structure of a steam flowmeter according to claim 4, characterized in that, The positioning mechanism comprises an installation frame (7) and a positioning rod (10). A verticality detection assembly (8) is arranged on the installation frame (7). A positioning block (9) is fixedly installed at the left end of the installation frame (7).

6. The installation structure of a steam flowmeter according to claim 5, characterized in that, The positioning rod (10) is fixedly installed at the upper end of the second flange (4). A positioning portion (101) is arranged on the positioning rod (10). The positioning portion (101) is inserted into the inside of the positioning block (9) and is cooperatively installed with the positioning block (9).