Fabricated building construction platform
Through the prefabricated construction platform, the problem of insufficient load-bearing capacity and stability is solved through the prefabricated construction platform, using components such as fixed anchors, load-bearing columns and cranes, and a construction platform for rapid construction is realized, which improves safety and efficiency.
Patent Information
- Application Number
- CN202420730428.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-10
- Publication Date
- 2025-07-08
- Estimated Expiration
- 2034-04-10
AI Technical Summary
The existing building construction platforms have poor load-bearing capacity and insufficient stability, which are prone to damage during load load, and pose safety hazards.
The prefabricated design adopts a fixed anchor to fix the base on the ground, connects the load-bearing columns and stabilizers, and combines the crane and cable system to achieve a construction platform for rapid construction and dismantling.
It improves the load-bearing capacity and stability of the construction platform, ensures safety, facilitates rapid establishment and disassembly, and is suitable for temporary construction sites.
Smart Images

Figure CN223075120U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to an assembled building construction platform. Background Technique
[0002] Building construction refers to the production activities in the implementation stage of project construction, which is the construction process of various buildings. It can also be said to be the process of turning the various lines on the design drawings into physical objects at the designated location. When carrying out building construction, various tools are needed to assist construction workers in construction operations, thus called a building construction platform. After the construction platform is used, it needs to be removed in time, and an assembled building construction platform is required.
[0003] For the existing patent with the publication number CN219411724U and the name "Building Construction Platform", the utility model relates to a building construction platform, belonging to the technical field of building construction protection equipment. It includes an operating platform, a guardrail is arranged on the outer periphery of the operating platform, the lower part of the operating platform is connected to a support plate through a telescopic device, a rain cover is arranged on the operating platform, and a recycling device is arranged under the operating platform; the rain cover includes a first baffle and a second baffle, the second baffle is slidably connected to the first baffle, the bottom of the first baffle is provided with a first leg, the first baffle is connected to the operating platform through the leg, and a second leg is arranged on the operating platform corresponding to the second baffle. This utility model avoids personnel being injured by falling objects from a height and ensures the safety of the operators on the platform.
[0004] In the above device, the lower part of the operating platform is connected to the support plate through a telescopic device. This telescopic device facilitates the lifting and lowering of the operating platform, but has poor load-bearing capacity, and the overall stability of the device is poor. When the load is relatively high, the telescopic device is prone to damage and failure, resulting in personnel safety accidents and cannot well meet people's usage requirements. In view of the above situation, technological innovation is carried out on the basis of the existing construction platform. Content of the Utility Model
[0005] The purpose of the utility model is to provide an assembled building construction platform to solve the problems put forward in the above background technique.
[0006] To achieve the above purpose, the utility model provides the following technical solution: An assembled building construction platform includes a base and load-bearing columns. A fixed anchor is arranged below the base, and the fixed anchor is welded to the base. The load-bearing columns are arranged above the base, and a ladder is welded to the inner side surface of the load-bearing columns. A slot is arranged below the interior of the load-bearing columns, and a plug is welded above the load-bearing columns. A stabilizing member is arranged on the outer side surface of the load-bearing columns, and a connecting rod is arranged inside the stabilizing member.
[0007] Furthermore, butterfly nuts are installed at both ends of the connecting rod, and the butterfly nuts are threadedly connected to the connecting rod. The butterfly nuts facilitate the installation and disassembly by the operating workers.
[0008] Furthermore, a top column is provided above the plug, and a construction platform is installed above the top column.
[0009] Furthermore, a fence is welded above the construction platform, and a front gate is provided at the front end of the fence. When construction workers climb onto the construction platform from the ladder, they can open the front gate to enter.
[0010] Furthermore, a hoist is provided outside the fence, and a hoisting assembly is installed below the top of the hoist. The motor on the hoist drives the conveyor belt to move, and the center of gravity of the stable hoisting of the hoist does not deviate from the range of the base.
[0011] Furthermore, the hoisting assembly includes a conveyor belt and a motor, and a motor is installed on the right side of the conveyor belt.
[0012] Furthermore, the hoisting assembly further includes a roller and a lifting cable. A roller is provided at the front end of the conveyor belt, and the lifting cable is wrapped around the periphery of the roller. The roller rotates to wind up the lifting cable, and the hook at the end of the lifting cable is convenient for hooking materials.
[0013] Furthermore, a rear gate is provided at the rear end of the fence, and the rear gate is rotatably connected to the fence. When hoisting materials, the rear gate can be opened to facilitate the transfer of materials onto the construction platform.
[0014] Compared with the prior art, the beneficial effects of the present utility model are as follows: The slots under the four load-bearing columns are inserted onto the plugs at the four corners of the base. One of the load-bearing columns is equipped with a ladder. Screws are welded at the head and tail of each load-bearing column. The screw holes of the stabilizing members are respectively sleeved onto the screws of the two load-bearing columns, and then tightened with wing nuts. The two stabilizing members are fixed by a connecting rod and tightened with wing nuts, which is convenient for quickly establishing a temporary construction platform on the construction site. The motor on the hoist drives the conveyor belt to move, the roller rotates to wind up the lifting cable, and the hook at the end of the lifting cable is convenient for hooking materials;
[0015] 1. The present utility model fixes the base to the ground through fixed anchors. The slots under the four load-bearing columns are inserted onto the plugs at the four corners of the base. One of the load-bearing columns is equipped with a ladder. Screws are welded at the head and tail of each load-bearing column. The screw holes of the stabilizing members are respectively sleeved onto the screws of the two load-bearing columns, and then tightened with wing nuts. The two stabilizing members are fixed by a connecting rod and tightened with wing nuts. If the height needs to be increased, the above operations can be repeated on the load-bearing columns of the first layer to increase the height. Finally, the load-bearing columns at the top are replaced with top columns and the operations are repeated to complete the installation of the bottom frame of the platform, which is convenient for quickly establishing a temporary construction platform on the construction site and is convenient for disassembly and storage;
[0016] 2. The utility model installs the construction platform above the top column through screws. The fence prevents construction workers from falling from the construction platform. When construction workers climb onto the construction platform from the ladder, they can open the front fence door to enter. When hoisting materials, they can open the rear fence door to facilitate the transfer of materials onto the construction platform. When hoisting materials, the motor on the hoisting frame drives the conveyor belt to move, and the roller rotates to wind up the lifting cable. The hook at the end of the lifting cable is convenient for hooking the materials. When the materials are hoisted to the top, open the rear fence door to pull the materials onto the construction platform, which is convenient and labor-saving. Description of the Drawings
[0017] Figure 1 It is a three-dimensional structural schematic diagram of an assembled building construction platform of the utility model;
[0018] Figure 2 It is a partial three-dimensional structural schematic diagram of the hoisting component of an assembled building construction platform of the utility model;
[0019] Figure 3 It is a partial sectional structural schematic diagram of the load-bearing column of an assembled building construction platform of the utility model.
[0020] In the figure: 1, base; 2, fixed anchor; 3, load-bearing column; 4, ladder; 5, top column; 6, slot; 7, plug; 8, stabilizer; 9, connecting rod; 10, wing nut; 11, construction platform; 12, fence; 13, front fence door; 14, hoisting frame; 15, hoisting component; 1501, conveyor belt; 1502, motor; 1503, roller; 1504, lifting cable; 16, rear fence door. Detailed Embodiment
[0021] As Figure 1 and Figure 3As shown in the figure, a prefabricated building construction platform includes a base 1 and load-bearing columns 3. A fixed anchor 2 is provided below the base 1, and the fixed anchor 2 is welded to the base 1. The load-bearing columns 3 are arranged above the base 1, and a ladder 4 is welded to the inner side of the load-bearing columns 3. A slot 6 is provided below the interior of the load-bearing columns 3, and a plug 7 is welded above the load-bearing columns 3. A stabilizer 8 is arranged on the outer side of the load-bearing columns 3, and a connecting rod 9 is arranged inside the stabilizer 8. Butterfly nuts 10 are installed at both ends of the connecting rod 9, and the butterfly nuts 10 are threadedly connected to the connecting rod 9. The base 1 is fixed to the ground through the fixed anchor 2. The slots 6 at the lower parts of the four load-bearing columns 3 are inserted onto the plugs 7 at the four corners of the base 1. One of the load-bearing columns 3 with a ladder 4 is used. Screws are welded to the head and tail of each load-bearing column 3. The screw holes of the stabilizers 8 are respectively sleeved onto the screws of the two load-bearing columns 3, and then the butterfly nuts 10 are tightened. The two stabilizers 8 are fixed through the connecting rod 9 and tightened with the butterfly nuts 10. If the height needs to be increased, the above operation can be repeated on the load-bearing columns 3 of the first layer to increase the height. Finally, the load-bearing columns 3 are replaced with top columns 5 at the top and the operation is repeated to complete the installation of the bottom frame of the platform, which is convenient for quickly establishing a temporary construction platform on the construction site and is convenient for disassembly and storage.
[0022] As Figure 1 and Figure 2 shown, a top column 5 is provided above the plug 7, and a construction platform 11 is installed above the top column 5. A fence 12 is welded above the construction platform 11, and a front fence door 13 is provided at the front end of the fence 12. A hoisting frame 14 is arranged outside the fence 12, and a hoisting component 15 is installed below the top of the hoisting frame 14. The hoisting component 15 includes a transmission belt 1501 and a motor 1502, and the motor 1502 is installed on the right side of the transmission belt 1501. The hoisting component 15 further includes a roller 1503 and a lifting cable 1504, and the roller 1503 is arranged at the front end of the transmission belt 1501. The lifting cable 1504 is wrapped around the periphery of the roller 1503. A rear fence door 16 is provided at the rear end of the fence 12, and the rear fence door 16 is rotatably connected to the fence 12. The construction platform 11 is installed above the top column 5 through screws. The fence 12 prevents construction workers from falling from the construction platform 11. When construction workers climb onto the construction platform 11 from the ladder 4, the front fence door 13 can be opened to enter. When hoisting materials, the rear fence door 16 can be opened to facilitate moving the materials onto the construction platform 11. When hoisting materials, the motor 1502 on the hoisting frame 14 drives the transmission belt 1501 to move, the roller 1503 rotates to wind up the lifting cable 1504, and the hook at the end of the lifting cable 1504 is convenient for hooking the materials. When the materials are hoisted to the top, the rear fence door 16 is opened to pull the materials onto the construction platform 11, which is convenient and labor-saving.
[0023] Working principle: When using this prefabricated building construction platform, first, fix the base 1 to the ground through the fixed anchor 2. Insert the slots 6 under the four load-bearing columns 3 onto the plugs 7 at the four corners of the base 1. One of the load-bearing columns 3 is equipped with a ladder 4. Screws are welded at the head and tail of each load-bearing column 3. Put the screw holes of the stabilizer 8 onto the screws of the two load-bearing columns 3 respectively, and then tighten with the wing nut 10. The two stabilizers 8 are fixed by the connecting rod 9 and tightened with the wing nut 10. If the height needs to be increased, repeat the above operation on the load-bearing columns 3 of the first layer to increase the height. Finally, replace the load-bearing column 3 with the top column 5 at the top and repeat the operation to complete the installation of the bottom frame of the platform, which is convenient for quickly establishing a temporary construction platform on the construction site, and is convenient for disassembly and storage. Install the construction table 11 above the top column 5 through screws. The fence 12 prevents construction workers from falling from the construction table 11. When construction workers climb onto the construction table 11 from the ladder 4, they can open the front gate 13 to enter. When hoisting materials, open the rear gate 16 to facilitate the transfer of materials onto the construction table 11. When hoisting materials, the motor 1502 on the crane 14 drives the conveyor belt 1501 to move, and the roller 1503 rotates to wind up the lifting cable 1504. The hook at the end of the lifting cable 1504 is convenient for hooking materials. When the materials are hoisted to the top, open the rear gate 16 to pull the materials onto the construction table 11, which is convenient and labor-saving.
Claims
1. An assembled building construction platform, comprising a base (1) and load-bearing columns (3), characterized in that, A fixing anchor (2) is provided below the base (1), and the fixing anchor (2) is welded to the base (1). The load-bearing column (3) is arranged above the base (1), and a ladder (4) is welded to the inner side of the load-bearing column (3). A slot (6) is provided below the interior of the load-bearing column (3), and a plug (7) is welded above the load-bearing column (3). A stabilizer (8) is arranged on the outer side of the load-bearing column (3), and a connecting rod (9) is arranged inside the stabilizer (8).
2. The prefabricated building construction platform according to claim 1, characterized in that, Butterfly nuts (10) are installed at both ends of the connecting rod (9), and the butterfly nuts (10) are threadedly connected to the connecting rod (9).
3. An assembled building construction platform according to claim 1, characterized in that, A top column (5) is arranged above the plug (7), and a construction platform (11) is installed above the top column (5).
4. The prefabricated building construction platform according to claim 3, characterized in that A fence (12) is welded above the construction platform (11), and a front gate (13) is arranged at the front end of the fence (12).
5. The prefabricated building construction platform according to claim 4, characterized in that, A lifting frame (14) is arranged outside the fence (12), and a lifting assembly (15) is installed below the top of the lifting frame (14).
6. The prefabricated building construction platform according to claim 5, wherein, The lifting assembly (15) includes a transmission belt (1501) and a motor (1502), and the motor (1502) is installed on the right side of the transmission belt (1501).
7. The prefabricated building construction platform according to claim 6, characterized in that, The lifting assembly (15) further includes a winding roller (1503) and a suspension cable (1504). The winding roller (1503) is arranged at the front end of the transmission belt (1501), and the suspension cable (1504) is wrapped around the periphery of the winding roller (1503).
8. An assembled building construction platform according to claim 4, characterized in that, A rear gate (16) is arranged at the rear end of the fence (12), and the rear gate (16) is rotatably connected to the fence (12).
Citation Information
Patent Citations
Building construction platform
CN219411724U