Upper template mounting auxiliary device for side wall layered construction joints
Through the upper formwork installation auxiliary device for the side wall layered construction joints, the upper formwork is fixed by square wood and pulling screws, the problems of lax joints and low construction efficiency in the installation of layered construction joints are solved, and efficient concrete pouring quality and construction speed are achieved.
Patent Information
- Application Number
- CN202422152675.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2025-07-11
- Estimated Expiration
- 2034-09-03
AI Technical Summary
During the installation of layered construction joint formwork, the problems of lax joints and low construction efficiency lead to concrete pouring quality problems such as slurry leakage, honeycombs, erratic tables and holes, and the traditional construction speed is slow.
The upper formwork installation auxiliary device for the side wall layered construction joint is adopted, and the upper formwork is fixed using square wood and pulling screws to ensure that the upper formwork is fully fitted with the lower concrete surface. Through the fitting of the square wood installation notch and pulling screws, the stable installation of the upper formwork is achieved.
The upper formwork and the lower concrete surface are fully fitted, avoiding the quality of concrete pouring, improving construction efficiency and construction speed, and saving construction period and labor costs.
Smart Images

Figure CN223088900U_ABST
Abstract
Description
Technical Field:
[0001] The utility model relates to the technical field of formwork installation, and more specifically, to an upper formwork installation auxiliary device for a side wall layered construction joint. Background Art:
[0002] In engineering construction, more and more cases require compartmentalized and layered pouring. During the layering process, when installing the formwork of the upper bin number, artificial splicing of the formwork is often carried out at the joint position, which is extremely easy to cause loose joints with gaps, the formwork not being fully attached to the lower-layer concrete, affecting subsequent concrete pouring, resulting in slurry leakage, honeycombing and stepped joints on the concrete surface, and in severe cases, holes and exposed reinforcement, etc. Moreover, the traditional construction method has an extremely slow construction speed, so a formwork installation auxiliary device is needed to avoid the above situations. Summary of the Utility Model:
[0003] In view of the above problems, the purpose of the utility model is to provide a formwork installation auxiliary device to solve the problems of loose joints and low construction efficiency during the installation of the layered construction joint formwork.
[0004] To achieve the above purpose, the utility model adopts the following technical solutions:
[0005] The utility model provides an upper formwork installation auxiliary device for a side wall layered construction joint. The device includes square timbers, tie bolts, and upper bin number formworks. Multiple square timbers are arranged along the same horizontal line on the side surface of the lower-layer concrete. The tie bolts are arranged on the lower-layer concrete, and multiple tie bolts are arranged along the same horizontal line on the side surface of the lower-layer concrete. An installation notch penetrating horizontally along the transverse direction of the square timber is opened at one corner on one side of a single square timber. One side of the installation notch of the square timber is closely attached to the side surface of the lower-layer concrete, and the installation notch faces upward, forming an empty groove with the side surface of the lower-layer concrete. The opening of the empty groove is horizontally upward. A through hole directly matching the tie bolt is arranged in the middle of the square timber and below the installation notch of the square timber. The tie bolt passes through the through hole in the middle of the square timber to fix the square timber on the side wall of the lower-layer concrete. The upper bin number formwork is vertically inserted into the empty groove formed by multiple installation notches of the square timbers and the side surface of the lower-layer concrete and clamped, and the upper bin number formwork is closely attached to the side surface of the lower-layer concrete.
[0006] The square timber is of a cuboid structure, horizontally arranged transversely. An installation notch penetrating along the length direction of the cuboid structure and opening upward is opened at one corner on the side of the cuboid structure close to the side wall of the lower-layer concrete.
[0007] The sizes of all the square timber structures are the same, the sizes of the installation notches opened thereon are the same, and the positions and sizes of the through holes opened thereon are the same.
[0008] The cross-section of the installation notch opened on the square timber is L-shaped, and the cross-section of the empty groove formed by the L-shaped installation notch and the side surface of the lower-layer concrete is U-shaped.
[0009] The width of the installation notch on each square timber is the same as the thickness of the upper bin number template, that is, the width of the empty groove formed by the installation notch of each square timber and the side of the lower-layer concrete is the same as the thickness of the upper bin number template, and the upper bin number template is clamped into it.
[0010] The depths of the installation notches on each square timber are the same, and the depth of the installation notch can be adjusted according to the size change of the upper bin number template.
[0011] The tension bolts used are the existing tension bolts in the top row of the lower-layer concrete.
[0012] The tension bolts pass through the through holes in the middle of the square timbers and the washers, and the square timbers are fixed on the side wall of the lower-layer concrete through nuts.
[0013] The upper bin number template is a rectangular plate-like structure.
[0014] Compared with the prior art, the utility model has the following beneficial effects:
[0015] The utility model has a simple structure, convenient raw material selection, and no operation difficulty. When installing the upper bin number template, it can ensure that the upper bin number template is completely attached to the lower-layer concrete surface, with a tight joint, avoiding the occurrence of concrete pouring quality problems such as honeycombing and offset. Compared with the traditional template installation, the utility model has a simpler construction procedure, higher construction efficiency, and saves the construction period and labor costs. Description of the drawings:
[0016] Figure 1 is the front view of the utility model;
[0017] Figure 2 is the side view of the utility model;
[0018] Figure 3 is the top view of the utility model.
[0019] Reference numerals in the drawings:
[0020] 1 - square timber, 2 - tension bolt, 3 - upper bin number template, 4 - lower-layer concrete, 5 - stratified joint. Specific embodiments:
[0021] The following further describes the utility model in combination with specific embodiments. The specific embodiments are a further explanation of the principle of the utility model and do not limit the utility model in any way. The technologies identical or similar to the utility model do not exceed the protection scope of the utility model.
[0022] See Figures 1-3, the present utility model provides an auxiliary device for installing the upper formwork of the side wall stratified construction joint. The device includes a square timber 1, a tie rod 2, and an upper bin formwork 3. Multiple square timbers 1 are arranged along the same horizontal line on the side surface of the lower layer of concrete 4. One corner on one side of a single square timber 1 is provided with an installation notch that penetrates horizontally along the transverse direction of the square timber 1 with a certain depth, and the opening of the installation notch faces upward. The width of the installation notches on each square timber 1 is the same as the thickness of the upper bin formwork 3 to be installed, and the depth of the installation notches on each square timber 1 is the same, and the depth of the installation notch can be adjusted according to the size change of the upper bin formwork 3 to be installed. In this embodiment, the square timber 1 is of a cuboid structure and is horizontally arranged transversely. One corner on the side of the cuboid structure close to the side wall of the lower layer of concrete 4 is provided with an installation notch that penetrates along the length direction of the cuboid structure and has an upward opening. One side of the installation notch of the square timber 1 is closely attached to the side surface of the lower layer of concrete 4, forming an empty groove with the side surface of the lower layer of concrete 4. The opening of the empty groove is horizontally upward. The empty groove is used to support the upper bin formwork 3 to be installed above, hold the upper bin formwork 3 from the bottom, and ensure that the upper bin formwork 3 will not slip downward. In this embodiment, the structures and sizes of each square timber 1 are the same, and the structures and sizes of the installation notches opened thereon are the same. The cross-section of the installation notch opened on the square timber 1 is L-shaped, and the cross-section of the empty groove formed by the L-shaped installation notch and the side surface of the lower layer of concrete 4 is U-shaped. The width of the empty groove formed by the installation notch of each square timber 1 and the side surface of the lower layer of concrete 4 is the same as the thickness of the upper bin formwork 3, so that the upper bin formwork 3 can be clamped into it. A through hole directly matching the tie rod 2 is provided in the middle of the square timber 1 and below the installation notch of the square timber 1. The positions and structural sizes of the through holes opened on each square timber 1 are the same. The tie rod 2 is arranged on the lower layer of concrete 4. Multiple tie rods 2 are arranged along the same horizontal line on the side surface of the lower layer of concrete 4. The top row of existing tie rods on the lower layer of concrete 4 is used, and no new ones need to be set. The tie rod 2 passes through the through hole in the middle of the square timber 1 and the washer, and the square timber 1 is fixed on the side wall of the lower layer of concrete 4 through a nut. The upper bin formwork 3 is of a rectangular plate-like structure. The upper bin formwork 3 is vertically inserted downward into the empty grooves formed by the installation notches of multiple square timbers 1 and the side surface of the lower layer of concrete 4 and clamped tightly, so that the upper bin formwork 3 is closely attached to the side surface of the lower layer of concrete 4.
[0023] During operation, when the formwork of the lower bin is removed, the top row of tie rods 2 is retained; then a hole is drilled in the middle of the square timber 1 and an installation notch is opened at one corner. The existing tie rod 2 is used to firmly fix the square timber 1 on the side wall of the lower layer of concrete 4. The opening of the installation notch on the square timber 1 faces upward and is closely attached to the side wall of the lower layer of concrete 4, forming an empty groove with an upward horizontal opening with the side wall of the lower layer of concrete 4. The upper bin formwork 3 is vertically inserted downward into the empty groove and clamped tightly, so that the upper bin formwork 3 is closely attached to the side surface of the lower layer of concrete 4, ensuring that the joint between the upper bin formwork 3 and the lower layer of concrete surface is tight, and then continue to install the formwork upward.
Claims
1. An auxiliary device for installing the upper formwork of a stratified construction joint of a side wall, characterized in that: The device includes square timbers (1), tie bolts (2), and upper bin number templates (3); multiple square timbers (1) are arranged along the same horizontal line on the side of the lower-layer concrete (4), the tie bolts (2) are arranged on the lower-layer concrete (4), and multiple tie bolts (2) are arranged along the same horizontal line on the side of the lower-layer concrete (4); an installation notch penetrating in the transverse direction of the square timber (1) is opened at one corner on one side of a single square timber (1), one side of the installation notch of the square timber (1) is closely attached to the side of the lower-layer concrete (4), and the installation notch faces upward, forming an empty groove with the side of the lower-layer concrete (4), and the opening of the empty groove is horizontally upward; a through hole directly matching the tie bolt (2) is arranged in the middle of the square timber (1) and below the installation notch of the square timber (1), and the tie bolt (2) passes through the through hole in the middle of the square timber (1) to fix the square timber (1) on the side wall of the lower-layer concrete (4); the upper bin number template (3) is vertically inserted into the empty groove formed by multiple installation notches of the square timbers (1) and the side of the lower-layer concrete (4) and clamped, and the upper bin number template (3) is closely attached to the side of the lower-layer concrete (4).
2. The upper formwork installation auxiliary device for the side wall layered construction joint according to claim 1, characterized in that: The square timber (1) is of a cuboid structure, horizontally arranged transversely, and an installation notch penetrating in the length direction of the cuboid structure and opening upward is opened at one corner on the side of the cuboid structure close to the side wall of the lower-layer concrete (4).
3. The upper formwork installation auxiliary device for the side wall layered construction joint according to claim 1, characterized in that: The square timbers (1) are of the same structural size, the installation notches opened thereon are of the same structural size, and the positions and structural sizes of the through holes opened thereon are the same.
4. The upper formwork installation auxiliary device for the side wall layered construction joint according to claim 1, characterized in that: The cross-section of the installation notch opened on the square timber (1) is L-shaped, and the cross-section of the empty groove formed by the L-shaped installation notch and the side of the lower-layer concrete (4) is U-shaped.
5. The upper formwork installation auxiliary device for the side wall layered construction joint according to claim 1, characterized in that: The width of the installation notch on the square timber (1) is the same as the thickness of the upper bin number template (3), that is, the width of the empty groove formed by the installation notch of the square timber (1) and the side of the lower-layer concrete (4) is the same as the thickness of the upper bin number template (3), and the upper bin number template (3) is clamped therein.
6. The upper formwork installation auxiliary device for the side wall layered construction joint according to claim 1, characterized in that: The depths of the installation notches on the square timbers (1) are the same, and the depth of the installation notch can be adjusted according to the size change of the upper bin number template (3).
7. The upper formwork installation auxiliary device for the side wall layered construction joint according to claim 1, characterized in that: The tie bolts (2) adopt the existing tie bolts in the top row of the lower-layer concrete (4).
8. The upper formwork installation auxiliary device for the side wall layered construction joint according to claim 1, characterized in that: The tie bolts (2) pass through the through holes in the middle of the square timbers (1) and the washers, and the square timbers (1) are fixed on the side wall of the lower-layer concrete (4) through nuts.
9. The upper formwork installation auxiliary device for the side wall layered construction joint according to claim 1, wherein: The upper bin number template (3) is of a rectangular plate-like structure.