Novel hook portal crane
By adding lightning protection devices and power supply systems to hook gantry cranes, the lightning strike problem in thunderstorms is solved, efficient and reliable operation capabilities are achieved in limited factory space, and the lightning protection performance and operating space of the equipment are improved.
Patent Information
- Application Number
- CN202422442378.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2025-08-01
- Estimated Expiration
- 2034-10-10
AI Technical Summary
Existing hook gantry cranes are prone to lightning strikes in thunderstorms, causing low-voltage side circuit burning and failure, affecting construction progress, and operating within limited plant space.
A new hook gantry crane was designed, including components such as gantry, platform, driver's room, control room, etc., and lightning protection devices and power supply systems were added. The structure was compact and suitable for efficient operation in limited spaces.
It improves the lightning protection performance of hook gantry cranes, reduces the risk of lightning strikes, increases the effective working space and lifting height in the factory, and improves the reliability and operating efficiency of the equipment in thunderstorms.
Smart Images

Figure CN223175696U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of cranes, in particular to a new type of hook gantry crane. Background Art
[0002] Gantry cranes are transportation equipment for large-tonnage equipment and materials in domestic railway bureaus and are widely used in each railway bureau. Since there is currently no lightning protection and grounding device for gantry cranes, when encountering heavy rain during use, construction usually stops, extending the construction period. During construction and testing in thunderstorm weather, gantry cranes have been struck by lightning and lightning has been introduced into the power distribution room, causing faults such as the burning of the low-voltage side circuit, which has attracted domestic attention.
[0003] A hook gantry crane is a gantry crane with a hook as the main lifting tool. It mainly consists of cylindrical wheels, buffers, block brakes, steel ropes, cast pulleys, cast drums, etc. Some equipment is also equipped with a variety of special hook tools for special operations. In hydropower stations, it can be used not only for installation operations but also for hoisting and opening and closing valves; in container terminals, it is used for stacking or directly loading and transporting containers; in shipyards, it is used for assembling the hull on the shipbuilding berth. There are usually two lifting trolleys, one equipped with two main hooks and the other equipped with one main hook and one auxiliary hook to facilitate the flipping and hoisting of large hull segments.
[0004] The hook gantry crane has a large span and lifting capacity, is suitable for operating across several containers. In addition, it has a compact structure, light weight, energy-saving, and low noise, and is suitable for operating in a limited factory building space. Content of the Utility Model
[0005] The purpose of the utility model is to provide a new type of hook gantry crane with a compact structure and light weight, which is suitable for operating in a limited factory building space. It can not only get closer to the front operation but also has a higher lifting height, effectively increasing the working space of the existing factory building.
[0006] The utility model provides a new type of hook gantry crane, including a gantry. A tonnage plate is provided on the gantry. A platform is provided above the gantry. A lifting trolley is provided in the middle above the gantry. A driver's cab is provided on the right side below the gantry. A control room is provided on one side of the driver's cab. A trolley limit device is provided on one side of the gantry. A wind and lightning measurement device is provided on one side of the lifting trolley. A traveling bogie is provided below the gantry. A large vehicle anchoring device is provided in the middle of the traveling bogie. A container lifting tool is provided directly below the gantry. The control room includes an electrical room and a management room. A welded anchoring pit is provided below the large vehicle anchoring device.
[0007] Preferably, the number of tonnage plates is two, and the tonnage plates are respectively located on the front and back of the platform.
[0008] Preferably, the number of the traveling bogies is four.
[0009] Preferably, the gantry is provided with a trolley power supply and a crab power supply. The trolley power supply is located on one side of the gantry, and the crab power supply is located above the gantry.
[0010] Preferably, the number of the welding anchor pits is four.
[0011] Preferably, a ladder is provided under the platform, and a railing is provided above the platform.
[0012] Preferably, the electrical room is located on the left side of the management room, and the electrical room and the management room are at the same horizontal height.
[0013] Therefore, the present utility model adopts the above-mentioned new type of hook gantry crane, which has a compact structure and is light in weight, and is suitable for operating in a limited factory building space. It can not only get closer to the front operation, but also has a higher lifting height, effectively increasing the effective working space of the existing factory building.
[0014] Next, through the drawings and embodiments, the technical solution of the present utility model will be further described in detail. Brief Description of the Drawings
[0015] Figure 1 is an overall schematic diagram of a new type of hook gantry crane of the present utility model;
[0016] Figure 2 is a schematic diagram of the heat dissipation part of a new type of hook gantry crane of the present utility model;
[0017] Figure 3 is a schematic diagram of the first heat dissipation port of a new type of hook gantry crane of the present utility model.
[0018] Reference Signs
[0019] 1. trolley power supply; 2. crab power supply; 3. gantry; 4. crab; 5. tonnage plate; 6. platform; 7. driver's cab; 8. electrical room; 9. crab limit device; 10. anemometer and lightning protection device; 11. traveling bogie; 12. trolley anchor device; 13. container spreader; 14. management room; 15. welding anchor pit. Detailed Description of the Preferred Embodiments
[0020] The technical solution of the present utility model will be further described below through the drawings and embodiments.
[0021] Unless otherwise defined, the technical terms or scientific terms used in this utility model shall have the ordinary meanings understood by those with ordinary skills in the field to which this utility model belongs. The "first", "second" and similar terms used in this utility model do not denote any order, quantity or importance, but are only used to distinguish different components. Words such as "including" or "comprising" mean that the elements or objects appearing before this word cover the elements or objects listed after this word and their equivalents, without excluding other elements or objects. Words such as "connected" or "coupled" are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Upper", "lower", "left", "right", etc. are only used to represent relative position relationships. When the absolute position of the object being described changes, the relative position relationship may also change accordingly.
[0022] Embodiment 1
[0023] As Figures 1 - 3 shown, a new type of hook gantry crane of the present utility model includes a gantry 3. There are a trolley power supply 1 and a crab power supply 2 provided on the gantry 3. The trolley power supply 1 is located on one side of the gantry 3, and the crab power supply 2 is located above the gantry 3. There is a tonnage plate 5 provided on the gantry 3, and a platform 6 is provided above the gantry 3. There is a ladder below the platform 6, and a railing is provided above the platform 6. The number of tonnage plates 5 is two, and the tonnage plates 5 are respectively located on the front and back of the platform 6. A crab 4 is provided in the middle above the gantry 3, and a driver's cab 7 is provided on the right side below the gantry 3. There is a control room on one side of the driver's cab 7, and a trolley limit device 9 is provided on one side of the gantry 3. A wind and lightning measuring device 10 is provided on one side of the crab 4. There are traveling bogies 11 provided below the gantry 3, and the number of traveling bogies 11 is four. There is a trolley anchoring device 12 in the middle of the traveling bogies 11, and a container spreader 13 is provided directly below the gantry 3. The control room includes an electrical room 8 and a management room 14. The electrical room 8 is located on the left side of the management room 14, and the electrical room 8 and the management room 14 are at the same horizontal height. There is a welded anchoring pit 15 provided below the trolley anchoring device 12. The number of welded anchoring pits 15 is four.
[0024] Therefore, the present utility model adopts the above-mentioned new type of hook gantry crane, which has a compact structure and light weight, and is suitable for operating in a limited factory building space. It can not only get closer to the front operation, but also has a higher lifting height, effectively increasing the effective working space of the existing factory building.
[0025] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit them. Although the present invention has been described in detail with reference to the preferred embodiments, those of ordinary skill in the art should understand that they can still modify or equivalently replace the technical solutions of the present invention, and these modifications or equivalent replacements cannot make the modified technical solutions deviate from the spirit and scope of the technical solutions of the present invention.
Claims
1. A new type of hook gantry crane, characterized in that, It includes a gantry, on which a tonnage plate is provided. Above the gantry, there is a platform. In the middle above the gantry, there is a hoisting trolley. On the right side below the gantry, there is a driver's cab. On one side of the driver's cab, there is a control room. On one side of the gantry, there is a trolley limit device. On one side of the hoisting trolley, there is a wind and lightning protection device. Below the gantry, there are traveling bogies. In the middle of the traveling bogies, there is a large vehicle anchoring device. Right below the gantry, there is a container spreader. The control room includes an electrical room and a management room. Below the large vehicle anchoring device, there is a welding anchoring pit.
2. The novel hook gantry crane according to claim 1, characterized in that, The number of the tonnage plates is two, and the tonnage plates are respectively located on the front and back of the platform.
3. A novel hook gantry crane according to claim 1, characterized in that, The number of the traveling bogies is four.
4. A new type of hook gantry crane according to claim 1, characterized in that, On the gantry, there is large vehicle power supply and trolley power supply. The large vehicle power supply is located on one side of the gantry, and the trolley power supply is located above the gantry.
5. A novel hook gantry crane according to claim 1, characterized in that, The number of the welding anchoring pits is four.
6. A novel hook gantry crane according to claim 1, characterized in that, Below the platform, there is a ladder, and above the platform, there is a railing.
7. A novel hook gantry crane according to claim 1, characterized in that, The electrical room is located on the left side of the management room, and the electrical room and the management room are at the same horizontal height.