Blowing device for bromine production purge tower
By adopting two sets of spray parts and hydraulic cylinder design in the bromine production purge tower, the bromine yield and quality problems caused by the brine spray head design in the prior art are solved, and a more efficient free bromine blowing and centralized blowing effect is achieved.
Patent Information
- Application Number
- CN202421889968.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2025-08-12
- Estimated Expiration
- 2034-08-06
AI Technical Summary
In the prior art, the nozzle design of the bromine production purge tower results in low blowing efficiency of free bromine in the brine, and the inability to effectively concentrate spraying the brine, affecting the bromine yield and quality.
Two sets of spraying components arranged up and down are adopted, including spraying discs and gas collection discs, combined with hydraulic cylinders and air guide cylinder designs, the atomized brine is concentrated between the air collection cover and ventilation straight tube through the water collection discs and gas collection discs of the spraying components, and the brine is isolated through the water circulation network pipe and baffle to improve the blowing efficiency.
The free bromine blowing efficiency in the brine is improved, the influence of brine mixing is reduced, and the yield and quality of bromine are further improved.
Smart Images

Figure CN223213870U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to an air blowing device for a bromine production purge tower, belonging to the technical field of bromine production. Background Art
[0002] Bromine is a key chemical raw material and a major component of the marine chemical industry. The diverse range of inorganic bromides, bromates, and bromine-containing organic compounds derived from it holds special value in the national economy and scientific and technological development. With the development of the national economy and the continuous development of bromine-based products, the importance of bromine has become increasingly prominent, and its production has continued to expand, with continued growth. In recent years, in particular, the technology for extracting bromine from underground brine and concentrated seawater has seen rapid progress, utilizing advanced domestic and international technologies.
[0003] Authorization publication number CN205398109U discloses a nozzle for a bromine blow-out tower, comprising a brine pipe, a blow-out tower, and a nozzle. A brine inlet is provided on the upper sidewall of the blow-out tower, connected to the brine pipe. A main pipe connected to the brine inlet is provided within the blow-out tower, and the nozzle is mounted on the main pipe. The nozzle comprises a connecting portion, a nozzle body, and a nozzle. The upper portion of the connecting portion is connected to the main pipe via a tee, and the lower portion of the connecting portion is connected to the nozzle body. The nozzle body is provided with at least one nozzle at its bottom. This ensures uniform brine spraying within the blow-out tower, facilitating the removal of free bromine and improving bromine yield and quality.
[0004] While the aforementioned patent can achieve the removal of free bromine, the simple nozzle and single-layer spray layer used to spray brine do not effectively guarantee the removal of free bromine from the brine. Furthermore, the inability to centrally spray the atomized brine results in low efficiency in removing free bromine from the brine.
[0005] In summary, the existing technology obviously has inconveniences and defects in actual use, so it is necessary to improve it. Summary of the Invention
[0006] The technical problem to be solved by the utility model is to provide an air blowing device for a bromine production purge tower, which can effectively improve the efficiency of blowing out free bromine, in view of the above shortcomings.
[0007] An optimized solution, an air blowing device for a bromine production purge tower, comprising a purge tower body, a brine collection box provided at the lower portion of the purge tower body, a hydraulic cylinder fixedly and symmetrically provided at the upper portion of the brine collection box, the piston rod of the hydraulic cylinder being fixedly connected to the outer wall of the purge tower body, and the lower portion of the purge tower body being slidably disposed in the inner cavity of the brine collection box via the hydraulic cylinder;
[0008] An air guide cylinder is fixedly provided at the bottom of the inner cavity of the brine collection box, and the air guide cylinder is tightly fitted into the bottom inner cavity of the purge tower body;
[0009] The lower part of the purge tower body is provided with a water network pipe, which is set with the air guide cylinder and is sleeved on the middle and lower outer wall of the air guide cylinder;
[0010] An air inlet pipe is provided at the bottom of the brine collection box, the air inlet pipe is connected to the air guide cylinder, the upper part of the air guide cylinder is connected to a one-way air valve, and the one-way air valve is provided in the inner cavity of the purge tower body;
[0011] The upper part of the brine collection box is provided with a sealing sleeve, the inner cavity fixed sleeve of the sealing sleeve is provided with a sealing rubber sleeve, and the sealing rubber sleeve is tightly fitted and slidably arranged on the outer wall of the purge tower body;
[0012] A baffle is provided on the upper part of the inner cavity of the brine collection box, the baffle is arranged parallel to the upper part of the air guide cylinder, and the water network pipe and the baffle are slidably arranged through the baffle;
[0013] The upper side wall of the brine collection box is provided with a sewage pipe, and the sewage pipe is arranged on the upper part of the baffle.
[0014] Furthermore, the inner cavity of the purge tower body is fixed with two groups of spraying components, which are arranged in the inner cavity of the purge tower body in sequence from top to bottom, and the spraying components in the lower part of the inner cavity of the purge tower body are arranged on the upper part of the air guide cylinder.
[0015] Furthermore, the spraying component includes a spray plate, a water collecting plate and an air collecting plate. The air collecting plate is arranged at the lower part of the water collecting plate, and the spray plate is arranged at the upper part of the air collecting plate.
[0016] Furthermore, the water collecting tray and the gas collecting tray are conical tray structures, the mouth of the water collecting tray is arranged toward the upper part of the purge tower body, and the mouth of the gas collecting tray is arranged toward the lower part of the purge tower body.
[0017] Furthermore, the bottom wall of the water collecting tray is connected to an air collecting hood, which is a truncated cone-shaped tube structure. The bottom wall of the air collecting tray is connected to a straight ventilation pipe, and the mouth of the straight ventilation pipe is inserted into the inner cavity of the air collecting hood.
[0018] Furthermore, the outer edges of the openings of the water collecting tray and the gas collecting tray are fixedly connected to the inner wall of the purge tower body through a fixing ring, and the fixing ring of the gas collecting tray is provided with a plurality of evenly distributed through holes.
[0019] Furthermore, the purge tower body is composed of a plurality of tubes connected and fixedly connected by flanges and bolts, and the water collecting tray and the gas collecting tray are fixedly arranged in the tubes.
[0020] Furthermore, a water pump is symmetrically provided on the upper part of the brine collection box, and the water pump is connected to the spray plate pipeline through a hose;
[0021] The water pump pipeline is connected with a water pumping pipe, and the end of the water pumping pipe is arranged at the bottom of the inner cavity of the brine collection box.
[0022] Furthermore, a water inlet pipe is provided at the upper portion of one side wall of the brine collection box, and a drain pipe is provided at the lower portion of the other side wall of the brine collection box.
[0023] Furthermore, an exhaust pipe is provided on the upper portion of the purge tower body.
[0024] Compared with the prior art, the present invention has the following advantages after adopting the above technical solution:
[0025] 1. Two sets of spraying parts are set up upper and lower to improve the spraying efficiency;
[0026] 2. The brine in the lower part of the brine collection box is separated from the brine that has been blown and sprayed by a baffle to prevent the brine from mixing, thereby reducing the free bromine content in the brine and affecting the blowing effect;
[0027] 3. The water collecting tray and air collecting tray of the spraying component can fully concentrate the atomized brine between the air collecting hood and the ventilation straight pipe, and blow it in a concentrated manner to further improve the blowing effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 This is a schematic diagram of the main structure of the air blowing device for the bromine production purge tower of the utility model;
[0029] Figure 2 This is a schematic diagram of the main structure of the air blowing device for the bromine production purge tower of the utility model from another angle;
[0030] Figure 3 yes Figure 1 Schematic diagram of the cross-section structure;
[0031] Figure 4 yes Figure 2 Schematic diagram of the cross-section structure;
[0032] In the figure, 1-purge tower body, 2-brine collection box, 3-hydraulic cylinder, 4-air guide cylinder, 5-water network pipe, 6-air inlet pipe, 7-one-way air valve, 8-sealing sleeve, 9-sealing rubber sleeve, 10-spraying component, 11-spray plate, 12-water collecting plate, 13-air collecting plate, 14-air collecting hood, 15-ventilation straight pipe, 16-fixing ring, 17-bobbin, 18-water pump, 19-hose, 20-water suction pipe, 21-water inlet pipe, 22-drain pipe, 23-exhaust pipe, 24-baffle, 25-sewage pipe. DETAILED DESCRIPTION
[0033] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, the specific implementation methods of the present invention are now described with reference to the accompanying drawings.
[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0035] In the description of this utility model, it should be understood that the terms "upper," "lower," "top," and "bottom" and the like, indicating positions or positional relationships, are based on the positions or positional relationships shown in the accompanying drawings and are intended solely to facilitate the description of this utility model and simplify the description. They are not intended to indicate or imply that the positions or components referred to must have a specific orientation, be constructed, or operate in a specific orientation. Therefore, they should not be construed as limitations of this utility model. Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.
[0036] Examples, such as Figure 1 、 2 , 3 and 4, the utility model provides an air blowing device for a bromine production purge tower, comprising a purge tower body 1, a brine collecting box 2 being provided at the lower portion of the purge tower body 1, a hydraulic cylinder 3 being fixedly and symmetrically provided at the upper portion of the brine collecting box 2, a piston rod of the hydraulic cylinder 3 being fixedly connected to the outer wall of the purge tower body 1, and the lower portion of the purge tower body 1 being slidably provided in the inner cavity of the brine collecting box 2 via the hydraulic cylinder 3;
[0037] The bottom of the inner cavity of the brine collection box 2 is fixed with an air guide cylinder 4, which is tightly inserted into the bottom inner cavity of the purge tower body 1;
[0038] The lower part of the purge tower body 1 is provided with a water network pipe 5, which is set with the air guide cylinder 4, and the water network pipe 5 is set on the middle and lower outer wall of the air guide cylinder 4;
[0039] The bottom of the brine collection box 2 is provided with an air inlet pipe 6, which is connected to the air guide cylinder 4. The upper part of the air guide cylinder 4 is connected to a one-way air valve 7, which is provided in the inner cavity of the purge tower body 1.
[0040] A sealing sleeve 8 is provided on the upper portion of the brine collecting box 2 , and a sealing rubber sleeve 9 is fixedly provided on the inner cavity of the sealing sleeve 8 . The sealing rubber sleeve 9 is tightly fitted and slidably arranged on the outer wall of the purge tower body 1 .
[0041] The inner cavity of the purge tower body 1 is fixed with two groups of spraying components 10, which are arranged in the inner cavity of the purge tower body 1 in sequence from top to bottom. The spraying component 10 in the lower part of the inner cavity of the purge tower body 1 is arranged on the upper part of the air guide cylinder 4.
[0042] The spraying component 10 includes a spray plate 11, a water collecting plate 12 and an air collecting plate 13. The lower surface of the spray plate 11 is provided with multiple evenly distributed atomizing nozzles, the air collecting plate 13 is arranged at the lower part of the water collecting plate 12, and the spray plate 11 is arranged at the upper part of the air collecting plate 13.
[0043] The water collecting tray 12 and the air collecting tray 13 are conical tray structures. The mouth of the water collecting tray 12 is arranged toward the upper part of the purge tower body 1, and the mouth of the air collecting tray 13 is arranged toward the lower part of the purge tower body 1.
[0044] The bottom wall of the water collecting tray 12 is connected to an air collecting hood 14 , which is a truncated cone-shaped tube structure. The bottom wall of the air collecting tray 13 is connected to a ventilation straight pipe 15 , the mouth of which is inserted into the inner cavity of the ventilation straight pipe 15 .
[0045] The outer edges of the openings of the water collecting tray 12 and the gas collecting tray 13 are fixedly connected to the inner wall of the purge tower body 1 through a fixing ring 16 . The fixing ring 16 of the gas collecting tray 13 is provided with a plurality of evenly distributed through holes.
[0046] The purge tower body 1 is composed of a plurality of tubes 17 connected and fixedly connected by flanges and bolts, and the water collecting tray 12 and the gas collecting tray 13 are fixedly arranged in the tubes 17 .
[0047] A water pump 18 is symmetrically provided on the upper portion of the brine collection tank 2, and the water pump 18 is connected to the spray plate 11 through a hose 19;
[0048] The water pump 18 is connected to a water pumping pipe 20 , and the end of the water pumping pipe 20 is arranged at the bottom of the inner cavity of the brine collection box 2 .
[0049] A water inlet pipe 21 is connected to the upper portion of one side wall of the brine collection box 2 , and a drain pipe 22 is provided at the lower portion of the other side wall of the brine collection box 2 .
[0050] An exhaust pipe 23 is provided on the upper portion of the purge tower body 1 .
[0051] The baffle 24 is provided on the upper part of the inner cavity of the brine collection box 2. The baffle 24 is arranged parallel to the upper part of the air guide cylinder 4. The water network pipe 5 is slidably arranged to penetrate the baffle 24.
[0052] The water inlet pipe 21 is arranged at the lower part of the baffle 24;
[0053] The upper side wall of the brine collection box 2 is provided with a sewage pipe 25 , and the sewage pipe 25 is arranged on the upper part of the baffle 24 .
[0054] The working principle of this utility model:
[0055] Fill the brine collection tank 2 with 70% brine so that the water level is maintained at the lower part of the air guide cylinder 4. Start the water pump 18 to pass the brine in the brine collection tank 2 into the spray plate 11. Use the atomizing nozzle of the spray plate 11 to atomize the brine and spray it into the inner cavity of the purge tower body 1.
[0056] Air enters the air cylinder 4 through the air inlet pipe 6. As the air in the air cylinder 4 increases, the air pressure in the air cylinder 4 increases. Then, the air in the air cylinder 4 is discharged into the inner cavity of the purge tower body 1 at a constant pressure through the one-way air valve 7.
[0057] The air enters the air collecting hood 14 through the two groups of spraying components 10, the air collecting tray 13 and the ventilation straight pipe 15. At the same time, the atomized brine enters the air collecting hood 14 from the water collecting tray 12. The air sprays the atomized brine in a concentrated manner.
[0058] The remaining brine enters the inner cavity between the air guide cylinder 4 and the purge tower body 1 through the through hole of the fixing ring 16 on the outer edge of the gas collecting plate 13;
[0059] The hydraulic cylinder 3 is started, and the hydraulic cylinder 3 lifts the purge tower body 1, so that the water network pipe 5 is placed on the upper part of the air guide cylinder 4. The remaining brine enters the baffle 24 on the upper part of the inner cavity of the brine collection box 2 through the water network pipe 5, and is then discharged through the sewage pipe 25 without mixing with the brine in the brine collection box 2.
[0060] It should be noted that, in this document, relational terms such as first and second, etc., are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion, so that an article or device comprising a series of elements includes not only those elements, but also other elements not explicitly listed, or elements inherent to such article or device. In the absence of further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of other identical elements in the article or device comprising the aforementioned elements.
[0061] This document uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only intended to help you understand the core concept of the present invention. It should be noted that those skilled in the art can make various improvements and modifications to the present invention without departing from the principles of the present invention, and such improvements and modifications also fall within the scope of protection of the claims of the present invention.
Claims
1. A purge tower blowing device for bromine production, characterized by: The invention comprises a purge tower body (1), a brine collecting box (2) is provided at the lower part of the purge tower body (1), a hydraulic oil cylinder (3) is fixedly and symmetrically provided at the upper part of the brine collecting box (2), a piston rod of the hydraulic oil cylinder (3) is fixedly connected to the outer wall of the purge tower body (1), and the lower part of the purge tower body (1) is slidably arranged in the inner cavity of the brine collecting box (2) through the hydraulic oil cylinder (3); An air guide cylinder (4) is fixedly provided at the bottom of the inner cavity of the brine collection box (2), and the air guide cylinder (4) is tightly fitted and inserted into the bottom inner cavity of the purge tower body (1); The lower part of the purge tower body (1) is provided with a water network pipe (5), the water network pipe (5) and the air guide cylinder (4) are set together, and the water network pipe (5) is set on the middle and lower outer wall of the air guide cylinder (4); An air inlet pipe (6) is provided at the bottom of the brine collection box (2), the air inlet pipe (6) is connected to the air guide cylinder (4), the upper part of the air guide cylinder (4) is connected to a one-way air valve (7), and the one-way air valve (7) is provided in the inner cavity of the purge tower body (1); The upper portion of the brine collection box (2) is provided with a sealing sleeve (8), the inner cavity fixed sleeve of the sealing sleeve (8) is provided with a sealing rubber sleeve (9), and the sealing rubber sleeve (9) is tightly fitted and slidably arranged on the outer wall of the purge tower body (1); A baffle (24) is provided on the upper portion of the inner cavity of the brine collection box (2), the baffle (24) is arranged parallel to the upper portion of the air guide cylinder (4), and the water network pipe (5) and the baffle (24) are slidably arranged to penetrate; The upper side wall of the brine collection box (2) is provided with a sewage pipe (25), and the sewage pipe (25) is arranged on the upper part of the baffle (24).
2. The air blowing device for the bromine production purge tower according to claim 1, wherein: The inner cavity of the purge tower body (1) is fixed with two groups of spraying components (10), and the two groups of spraying components (10) are arranged in the inner cavity of the purge tower body (1) in sequence from top to bottom. The spraying component (10) at the lower part of the inner cavity of the purge tower body (1) is arranged on the upper part of the air guide cylinder (4).
3. The air blowing device for the bromine production purge tower according to claim 2, wherein: The spraying component (10) comprises a spray plate (11), a water collecting plate (12) and an air collecting plate (13); the air collecting plate (13) is arranged at the bottom of the water collecting plate (12), and the spray plate (11) is arranged at the top of the air collecting plate (13).
4. The air blowing device for the bromine production purge tower according to claim 3, wherein: The water collecting tray (12) and the gas collecting tray (13) are conical tray structures. The mouth of the water collecting tray (12) is arranged toward the upper part of the purge tower body (1), and the mouth of the gas collecting tray (13) is arranged toward the lower part of the purge tower body (1).
5. The air blowing device for the bromine production purge tower according to claim 3, wherein: The bottom wall of the water collecting tray (12) is connected to an air collecting hood (14), which is a truncated cone-shaped tube structure. The bottom wall of the air collecting tray (13) is connected to a ventilation straight pipe (15), and the mouth of the ventilation straight pipe (15) is inserted into the inner cavity of the air collecting hood (14).
6. The air blowing device for the bromine production purge tower according to claim 3, wherein: The outer edges of the openings of the water collecting tray (12) and the gas collecting tray (13) are fixedly connected to the inner wall of the purge tower body (1) via a fixing ring (16), and the fixing ring (16) of the gas collecting tray (13) is provided with a plurality of evenly distributed through holes.
7. The air blowing device for the bromine production purge tower according to claim 6, wherein: The purge tower body (1) is composed of a plurality of tubes (17) connected and fixedly connected by flanges and bolts, and the water collecting tray (12) and the gas collecting tray (13) are fixedly arranged in the tubes (17).
8. The air blowing device for a bromine production purge tower according to claim 1, wherein: A water pump (18) is symmetrically provided on the upper portion of the brine collection box (2), and the water pump (18) is connected to the spray plate (11) through a hose (19); The water pump (18) pipeline is connected to a water pump (20), and the end of the water pump (20) is arranged at the bottom of the inner cavity of the brine collection box (2).
9. The air blowing device for a bromine production purge tower according to claim 1, wherein: An upper portion of one side wall of the brine collection box (2) is connected to a water inlet pipe (21), and a lower portion of the other side wall of the brine collection box (2) is provided with a drain pipe (22).
10. The air blowing device for a bromine production purge tower according to claim 1, characterized in that: An exhaust pipe (23) is provided on the upper portion of the purge tower body (1).
Citation Information
Patent Citations
A shower nozzle for bromine blows off tower
CN205398109U