Utility tunnel with maintenance riding track

By designing a comprehensive pipeline corridor with maintenance of horse roads assembled with detachable components, the problems of long construction cycle and inconvenient maintenance are solved, rapid construction and efficient maintenance are achieved, and construction efficiency and maintenance quality are improved.

CN223226675UActive Publication Date: 2025-08-15BEIJING YAOU ZHENDA SCI & TECH DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422583894.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-25
Publication Date
2025-08-15
Estimated Expiration
2034-10-25

AI Technical Summary

Technical Problem

The existing comprehensive pipeline corridor has a long construction cycle, high cost, and inconvenient maintenance, and lacks special and efficient maintenance channels.

Method used

A comprehensive pipe corridor with an inspection horse path is designed, and it is assembled with detachable components, including installation channels, upper support blocks, inspection components, inspection platforms, columns and beams, etc., and is connected by locking parts to achieve rapid assembly and efficient inspection.

Benefits of technology

It shortens the construction cycle, reduces interference to urban life, reduces economic costs, improves maintenance efficiency and quality, and enhances the self-weight and light load characteristics and load carrying capacity of the pipeline corridor.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223226675U_ABST
    Figure CN223226675U_ABST
Patent Text Reader

Abstract

The utility model provides a utility tunnel with a maintenance riding track, which comprises a mounting channel, an upper support block is detachably fixed on the side wall of the mounting channel close to the top wall of the mounting channel through a locking piece, a mounting component is arranged on the upper support block, a maintenance component is arranged on the upper support block, and the maintenance riding track is arranged on the maintenance component. A lower supporting block is detachably fixed to the position, corresponding to the mounting assembly, of the side wall of the mounting channel through a locking piece, an overhauling platform is fixed to the side, away from the mounting channel, of the lower supporting block, and a top frame is detachably fixed to the position, close to the top, in the mounting channel through a locking piece. A stand column is detachably fixed to the position, close to the maintenance platform, of the bottom face of the top frame through a locking piece, and a cross beam is detachably fixed to the position between the stand column and the installation channel through a locking piece. All the components can be assembled together in a detachable mode, the construction speed of the pipe gallery is increased, and meanwhile, due to the overhaul assembly on the top of the pipe gallery, workers can overhaul all professional pipelines conveniently.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of integrated pipe corridors, in particular to an integrated pipe corridor with an inspection and repairing horseway. Background Art

[0002] A comprehensive pipeline corridor is an integrated corridor for urban underground pipelines, that is, a tunnel space is built underground in the city, which integrates various engineering pipelines such as electricity, communications, gas, heating, water supply and drainage. It is equipped with special inspection ports, lifting ports and monitoring systems, and adopts one-time excavation and centralized construction to avoid repeated excavation of the same section, thereby improving the aesthetic effect of the city. The pipelines in the comprehensive pipeline corridor are compactly and reasonably arranged, effectively utilizing the urban underground space and saving urban land resources.

[0003] In the existing technology, with the development of cities, the laying and management of various professional pipelines are becoming increasingly complex. Traditional pipeline corridor construction has problems such as long construction period, high cost, and great impact on urban traffic and environment. In addition, the existing pipeline corridor may be insufficient in terms of maintenance convenience and lacks special and efficient maintenance channels. Therefore, a comprehensive pipeline corridor with a maintenance horseway is proposed to solve the above problems. Utility Model Content

[0004] The technical problem to be solved by the present invention is: in view of the defects of the existing technology, a comprehensive pipeline corridor with an inspection horseway is provided, which has the advantages of short construction period and efficient maintenance, and solves the problems of long construction period and inability to efficiently maintain.

[0005] In order to solve the above-mentioned technical problems, the utility model adopts the following technical solutions: an integrated pipe gallery with an inspection walkway, comprising an installation channel, an upper support block is detachably fixed to the side wall of the installation channel near its top wall by a locking piece, an installation component is provided on the upper support block, an inspection component is provided on the upper support block, a lower support block is detachably fixed to the corresponding installation component on the side wall of the installation channel by a locking piece, an inspection platform is fixed to the side of the lower support block away from the installation channel, a top frame is detachably fixed to the position near the top in the installation channel by a locking piece, a column is detachably fixed to the bottom surface of the top frame near the inspection platform by a locking piece, and a beam is detachably fixed to the position between the column and the installation channel by a locking piece.

[0006] Preferably, the mounting assembly includes two side panels and several connecting plates, the two side panels are detachably fixed to the lower surface of the upper support block by locking members, the connecting plates are detachably fixed between the two side panels by locking members, several connecting plates are vertically evenly spaced between the two side panels, and the top surface of the connecting plates is detachably fixed with a fixing member by a locking member.

[0007] Preferably, the plurality of connecting plates are symmetrically divided into upper connecting plates and lower connecting plates along the central axis of the side plates, the fixing members on the upper connecting plates are mounting frames, and the fixing members on the lower connecting plates are arc-shaped clamps.

[0008] Preferably, the inspection assembly includes two connecting blocks and several support plates, the two connecting blocks are detachably fixed on the upper support block by locking members, the several support plates are detachably fixed between the two connecting blocks by locking members, and two adjacent support plates abut against each other.

[0009] Preferably, a plurality of vertical plates are provided on the connection block at equal intervals in the longitudinal direction. The vertical plates are detachably fixed to the connection block via locking members, and a horizontal plate is detachably fixed between two adjacent vertical plates via locking members.

[0010] Preferably, there are a plurality of upper support blocks, which are longitudinally distributed in the installation channel, and the connecting block is fixed on two adjacent upper support blocks.

[0011] Preferably, a plurality of reinforcement blocks are provided in the top frame.

[0012] Preferably, there are several columns, and the columns are distributed at equal intervals in the longitudinal direction, and two adjacent columns are connected by cables.

[0013] Preferably, the locking member is a bolt fixing member.

[0014] Preferably, a groove is provided on the side wall of the installation channel corresponding to the top frame, and the top frame is fixed in the groove by bolt fixing members.

[0015] The present invention adopts the above technical solution, and compared with the prior art, has the following technical effects:

[0016] (1) The various components of the integrated pipe corridor with an inspection road can be assembled together in a detachable manner and can be assembled quickly, which greatly improves the construction speed of the pipe corridor and reduces the interference with urban life. In addition, since the components are detachably assembled, they can be replaced when a component is damaged, reducing economic costs.

[0017] (2) The integrated pipe corridor with maintenance walkway facilitates the staff to carry out timely and effective maintenance of various professional pipelines through the maintenance components installed on the top of the pipe corridor. The maintenance components on the top provide the staff with a convenient and safe maintenance path, thereby improving the maintenance efficiency and quality.

[0018] (3) The components of the integrated pipeline corridor with maintenance walkway are made of suitable lightweight and high-strength materials, which effectively reduces the weight of the pipeline corridor and realizes the characteristics of light weight and heavy load. The increased load-bearing capacity ensures the safe operation of various pipelines. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a front structural diagram of a comprehensive pipe gallery with an inspection walkway according to the utility model;

[0020] Figure 2 This is a right-side structural schematic diagram of a comprehensive pipe gallery with an inspection walkway according to the present utility model;

[0021] Figure 3 This is a schematic diagram of the top view of a comprehensive pipe gallery with an inspection walkway according to the utility model;

[0022] Figure 4 The utility model is a schematic diagram of the installation component structure in a comprehensive pipe gallery with an inspection walkway.

[0023] In the figure: 1 installation channel, 2 upper support block, 3 lower support block, 4 maintenance assembly, 401 connecting block, 402 support plate, 403 vertical plate, 404 horizontal plate, 5 maintenance platform, 6 installation assembly, 601 side plate, 602 connecting plate, 603 fixing parts, 7 columns, 8 beams, 9 top frame, 10 reinforcement block, 11 cable, 12 groove. DETAILED DESCRIPTION

[0024] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0025] Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making any creative work shall fall within the scope of protection of the present invention.

[0026] Example 1:

[0027] See also Figure 1-4 In this embodiment, a comprehensive pipe gallery with an inspection horseway includes an installation channel 1, and an upper support block 2 is detachably fixed to the side wall of the installation channel 1 near its top wall through a locking piece. The upper support block 2 is provided with an installation component 6, and the upper support block 2 is provided with an inspection component 4. The lower support block 3 is detachably fixed to the corresponding installation component 6 on the side wall of the installation channel 1 through a locking piece, and an inspection platform 5 is fixed on the side of the lower support block 3 away from the installation channel 1. A top frame 9 is detachably fixed to the top of the installation channel 1 through a locking piece, and a column 7 is detachably fixed to the bottom surface of the top frame 9 near the inspection platform 5 through a locking piece. A crossbeam 8 is detachably fixed to the position between the column 7 and the installation channel 1 through a locking piece.

[0028] When in use, the various components that make up the integrated pipe corridor are detachably fixed in the installation channel 1. When the construction workers assemble the various components together, the time used is greatly shortened compared to the traditional construction method in the existing technology. Because the construction time is shortened, the impact on urban traffic during construction can also be minimized. At the same time, because the various components are fixed together in a detachable manner, when a component is damaged, only the component needs to be replaced, saving economic costs. After the construction of the pipe corridor is completed, various professional pipelines are set up inside it. Through the cooperation of the maintenance component 4 and the maintenance platform 5, the staff can be more comprehensive when repairing the various professional pipelines, so as to improve the maintenance effect.

[0029] This integrated pipeline corridor uses prefabricated components connected in a detachable manner to ensure that the components can be assembled quickly. Each component is made of suitable lightweight and high-strength materials, achieving the characteristics of light weight and heavy load, enhancing the integrity and stability of the pipeline corridor and extending its service life.

[0030] Example 2:

[0031] The basic content is the same as Example 1, except that:

[0032] See also Figure 2-3 The maintenance component 4 in this embodiment includes two connecting blocks 401 and several support plates 402. The two connecting blocks 401 are detachably fixed to the upper support block 2 by locking members. Several support plates 402 are detachably fixed between the two connecting blocks 401 by locking members, and two adjacent support plates 402 abut against each other. A plurality of vertical plates 403 are arranged on the connecting block 401 at equal intervals in the longitudinal direction. The vertical plates 403 are detachably fixed to the connecting block 401 by locking members. A horizontal plate 404 is detachably fixed between two adjacent vertical plates 403 by locking members. The number of upper support blocks 2 is several, and the several upper support blocks 2 are longitudinally distributed in the installation channel 1. The connecting block 401 is fixed to two adjacent upper support blocks 2.

[0033] When in use, the inspection component 4 is set on the upper support plate 402 to provide the installation component 6 with an inspection runway at its top, so as to facilitate the staff to carry out timely and effective inspection and maintenance of the various professional pipelines in the installation component 6. With the cooperation of the inspection component 4 and the inspection platform 5, the various professional pipelines in the installation component 6 can be fully inspected from the top and side of the installation component 6.

[0034] Through the layout of the maintenance component 4, it can be closely integrated with the main body of the pipeline corridor. The maintenance component 4 located at the top of the pipeline corridor provides a convenient and safe maintenance path for the staff, thereby improving the maintenance efficiency and quality.

[0035] Example 3:

[0036] The basic content is the same as Example 1, except that:

[0037] See also Figure 4 The mounting assembly 6 in this embodiment includes two side panels 601 and a plurality of connecting panels 602. The two side panels 601 are detachably fixed to the lower surface of the upper support block 2 by locking members. The connecting panel 602 is detachably fixed between the two side panels 601 by locking members. The plurality of connecting panels 602 are vertically evenly spaced between the two side panels 601. The top surface of the connecting panel 602 is detachably fixed with a fixing member 603 by a locking member. The plurality of connecting panels 602 are symmetrically divided into an upper connecting panel 602 and a lower connecting panel 602 along the central axis of the side panel 601. The fixing member 603 on the upper connecting panel 602 is a mounting frame, and the fixing member 603 on the lower connecting panel 602 is an arc-shaped clamp.

[0038] When in use, the multiple connecting plates 602 can be set up to divide the installation component 6 into different areas to facilitate the installation of different types of pipelines. At the same time, the fixing parts 603 can also adapt to different types of pipelines, so that the layout planning of professional pipelines is reasonable, and each professional pipeline can be arranged in the pipeline corridor more reasonably and orderly, which promotes the centralized management and comprehensive utilization of each professional pipeline and improves the utilization efficiency of space.

[0039] Example 4:

[0040] The basic content is the same as Example 1, except that:

[0041] See also Figure 1 In this embodiment, a plurality of reinforcing blocks 10 are provided in the top frame 9 , the number of columns 7 is several, and the columns 7 are distributed at equal intervals in the longitudinal direction, and two adjacent columns 7 are connected by cables 11 .

[0042] By setting the reinforcing block 10 inside the top frame 9, the strength of the top frame 9 can be improved. At the same time, the strength of the column 7 can also be improved under the action of the cable 11. Under the action of the reinforcing block 10 and the cable 11, the integrity and stability of the pipeline corridor are enhanced, and the service life is extended.

[0043] Example 5:

[0044] The basic content is the same as Example 1, except that:

[0045] See also Figure 1 In this embodiment, the locking member is a bolt fixing member 603 , and a groove 12 is provided on the side wall of the installation channel 1 corresponding to the top frame 9 , and the top frame 9 is fixed in the groove 12 by the bolt fixing member 603 .

[0046] When in use, the components are fixed together by bolt fasteners 603. Under the action of the bolts, the components can be quickly assembled, which greatly improves the construction speed of the pipeline corridor and reduces interference with urban life.

[0047] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified or limited, the terms "mounted," "connected," and "connected" should be understood in a broad sense, and may refer to mechanical or electrical connections, internal communication between two components, or direct connection. "Up," "down," "left," and "right" are only used to indicate relative positional relationships. When the absolute positions of the objects being described change, the relative positional relationships may also change.

[0048] Secondly, the drawings of the embodiments disclosed in the present invention only involve structures related to the embodiments disclosed in the present invention. Other structures can refer to common designs. In the absence of conflicts, the same embodiment and different embodiments of the present invention can be combined with each other.

[0049] Finally, the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A comprehensive pipe gallery with an inspection bridleway, including an installation channel, characterized by: An upper support block is detachably fixed to the side wall of the installation channel near its top wall by a locking piece, and a mounting assembly is provided on the upper support block, and an inspection assembly is provided on the upper support block. A lower support block is detachably fixed to the corresponding mounting assembly on the side wall of the installation channel by a locking piece, and an inspection platform is fixed to the side of the lower support block away from the installation channel, and a top frame is detachably fixed to the top of the installation channel by a locking piece, and a column is detachably fixed to the bottom surface of the top frame near the inspection platform by a locking piece, and a beam is detachably fixed to the position between the column and the installation channel by a locking piece.

2. The integrated pipe gallery with an inspection bridleway according to claim 1 is characterized in that: The mounting assembly includes two side panels and several connecting panels. The two side panels are detachably fixed to the lower surface of the upper support block by locking members. The connecting panel is detachably fixed between the two side panels by locking members. Several connecting panels are vertically evenly spaced between the two side panels. The top surface of the connecting panel is detachably fixed with a fixing member by a locking member.

3. The integrated pipe gallery with an inspection bridleway according to claim 2 is characterized in that: The connecting plates are symmetrically divided into upper connecting plates and lower connecting plates along the central axis of the side plates. The fixing parts on the upper connecting plates are mounting brackets, and the fixing parts on the lower connecting plates are arc-shaped clamps.

4. The integrated pipe gallery with an inspection bridleway according to claim 1 is characterized in that: The inspection assembly includes two connecting blocks and several support plates. The two connecting blocks are detachably fixed on the upper support block through locking pieces. The several support plates are detachably fixed between the two connecting blocks through locking pieces, and two adjacent support plates abut against each other.

5. The integrated pipe gallery with an inspection bridleway according to claim 4 is characterized in that: A plurality of vertical plates are arranged on the connecting block at equal intervals in the longitudinal direction. The vertical plates are detachably fixed to the connecting block through locking members. A horizontal plate is detachably fixed between two adjacent vertical plates through locking members.

6. The integrated pipe gallery with an inspection bridleway according to claim 4 is characterized in that: There are a plurality of upper support blocks, which are longitudinally distributed in the installation channel, and the connecting block is fixed on two adjacent upper support blocks.

7. The integrated pipe gallery with an inspection bridleway according to claim 1 is characterized in that: A plurality of reinforcement blocks are arranged in the top frame.

8. The integrated pipe gallery with an inspection bridleway according to claim 1 is characterized in that: There are a plurality of columns, and the columns are distributed at equal intervals in the longitudinal direction, and two adjacent columns are connected by cables.

9. The integrated pipe gallery with an inspection bridleway according to claim 1 is characterized in that: The locking member is a bolt fixing member.

10. The integrated pipe gallery with an inspection bridleway according to claim 9, characterized in that: A groove is provided on the side wall of the installation channel corresponding to the top frame, and the top frame is fixed in the groove by a bolt fixing member.