Railway trestle ladder and crane pipe interlocking device
By designing railway stair escalator and crane pipe interlocking device, the transmission device and positioning detector are used to achieve automatic adsorption and separation of crane pipes and trains, the problem of crane pipe damage caused by manual operation errors is solved, and the safety and stability of the oil transfer process are improved.
Patent Information
- Application Number
- CN202422210228.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2025-08-19
- Estimated Expiration
- 2034-09-10
AI Technical Summary
After the oil transfer is completed, the existing railway oil tanker trucks are easily negligent when manually separating the crane pipe, causing the crane pipe to be broken, affecting subsequent oil transfer.
A railway stair escalator and crane pipe interlocking device is designed. Through transmission devices, fixing devices and positioning detectors, the adsorption and separation of crane pipes and trains are automatically controlled to ensure stable connection of crane pipes during oil transportation.
The automatic control of crane pipes during oil transportation is realized, which avoids damage to crane pipes caused by manual operation errors, and improves the safety and stability of oil transportation.
Smart Images

Figure CN223239774U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of crane pipe oil transportation, in particular to a medicinal mixer. Background Art
[0002] Railway and highway oil loading and unloading crane pipes are mainly used as special equipment for loading and unloading fluids in railway tank cars and highway tank trucks.
[0003] Existing railway tank cars are connected to transport oil through crane pipes, but after the oil is transported, they are separated manually. Sometimes due to negligence of workers, the crane pipes are not separated in time, resulting in the crane pipes being pulled apart, which affects subsequent oil transportation. Utility Model Content
[0004] The purpose of this utility model is to provide a railway trestle escalator and crane pipe interlocking device to solve the above problems existing in the prior art.
[0005] Technical solution: A railway trestle escalator and crane pipe interlocking device, comprising a support frame, a transmission device is provided on the support frame, and an output end of the transmission device is in transmission connection with a fixing device;
[0006] The fixing device includes a fixing frame, a fixing arm and a connecting mechanism, the fixing frame is in transmission connection with the transmission device, one end of the fixing arm is fixedly connected to the fixing frame, and the other end is fixedly connected to the connecting mechanism;
[0007] The connecting mechanism includes a fixing plate, a suction plate and a positioning detector. The fixing plate is fixedly connected to the fixing arm. The suction plate is arranged on the fixing plate. The positioning detector is opposite to the suction plate.
[0008] In a further embodiment, the transmission device includes a transmission motor, a rotating rod and a ring, the transmission motor is fixedly mounted on the support frame, the rotating rod is transmission-connected to the output end of the transmission motor, the ring is sleeved on the rotating rod, and the ring is fixedly connected to the fixed frame.
[0009] In a further embodiment, an external thread is provided on the surface of the rotating rod, an internal thread is provided inside the collar, and the rotating rod is threadedly adapted to the collar.
[0010] In a further embodiment, the fixed arm includes a rotating seat, a first connecting arm, a second connecting arm and a folding arm, the rotating seat is fixedly connected to the fixed frame, the rotating seat, the first connecting arm, the second connecting arm and the folding arm are connected in sequence, and the folding arm is fixedly connected to the fixing device.
[0011] In a further embodiment, a positioning mechanism is provided at the connection between the folding arm and the second connecting arm, and the positioning mechanism includes a limit frame, a clamping frame and a position detector. The limit frame is fixedly mounted on the folding arm, the clamping frame is fixedly mounted on the limit frame, and the position detector is arranged on the side of the limit frame.
[0012] In a further embodiment, an annular hole is provided on the top of the limiting frame to match the size of the crane pipe. Beneficial effects
[0013] When the train arrives under the support frame, the rotating seat controls the connecting arm to rotate, and the connecting mechanism faces the trestle escalator and is fixed to the train by the suction plate. After suction, the positioning detector determines whether it is sucked tightly, and the crane pipe gun head passes through the annular hole at the limit frame and is clamped with the clamping frame, and the position detector detects whether the clamping position of the gun head meets the clamping requirements. When the clamping requirements are met, the crane pipe transports oil. After the oil transportation is completed, the gun head is pulled out of the limit frame. After the position detector detects that the gun head has left, it transmits a signal to the positioning detector, and then the suction plate no longer adsorbs the train. This method effectively avoids damage to the crane pipe caused by external force due to manual forgetting to pull out the crane pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a three-dimensional view of the present invention.
[0015] Figure 2 It is a side view of the present utility model.
[0016] Figure 3 It is a front view of the present utility model.
[0017] Figure 4 It is a structural view of the positioning mechanism of the present utility model.
[0018] The accompanying drawings are marked as follows: 1. Transmission motor; 2. Fixed arm; 3. Ring; 4. Fixed frame; 5. Rotating rod; 6. Support frame; 7. Connecting mechanism; 8. Folding arm; 9. Positioning mechanism; 10. Second connecting arm; 11. First connecting arm; 12. Rotating seat; 13. Adsorption disk; 14. Fixed plate; 15. Positioning detector; 16. Limiting frame; 17. Position detector; 18. Card frame. DETAILED DESCRIPTION
[0019] In the following description, numerous specific details are given in order to provide a more thorough understanding of the present invention.
[0020] It will be apparent, however, to one skilled in the art that the present invention may be practiced without one or more of these details.
[0021] In other examples, in order to avoid confusion with the present invention, some technical features well known in the art are not described.
[0022] like Figure 1-Figure 4 As shown, a railway trestle escalator and crane pipe interlocking device consists of a transmission motor 1, a fixed arm 2, a collar 3, a fixed frame 4, a rotating rod 5, a support frame 6, a connecting mechanism 7, a folding arm 8, a positioning mechanism 9, a second connecting arm 10, a first connecting arm 11, a rotating seat 12, a suction disk 13, a fixed plate 14, a positioning detector 15, a limit frame 16, a position detector 17, and a clamping frame 18.
[0023] A transmission device is provided on the support frame 6, and an output end of the transmission device is transmission-connected to the fixing device;
[0024] The fixing device includes a fixing frame 4, a fixing arm 2 and a connecting mechanism 7. The fixing frame 4 is transmission-connected to the transmission device. One end of the fixing arm 2 is fixedly connected to the fixing frame 4, and the other end is fixedly connected to the connecting mechanism 7.
[0025] The connecting mechanism 7 includes a fixed plate 14 , a suction disc 13 and a positioning detector 15 . The fixed plate 14 is fixedly connected to the fixed arm 2 . The suction disc 13 is arranged on the fixed plate 14 . The positioning detector 15 is opposite to the suction disc 13 .
[0026] The transmission device includes a transmission motor 1, a rotating rod 5 and a collar 3. The transmission motor 1 is fixedly mounted on a support frame 6. The rotating rod 5 is in transmission connection with the output end of the transmission motor 1. The collar 3 is sleeved on the rotating rod 5 and fixedly connected to the fixing frame 4.
[0027] The surface of the rotating rod 5 is provided with an external thread, and the interior of the collar 3 is provided with an internal thread, and the rotating rod 5 is thread-matched with the collar 3. Through the thread engagement transmission, the transmission process is more stable.
[0028] The fixed arm 2 includes a rotating base 12, a first connecting arm 11, a second connecting arm 10, and a folding arm 8. The rotating base 12 is fixedly connected to the fixed frame 4. The rotating base 12, the first connecting arm 11, the second connecting arm 10, and the folding arm 8 are connected in sequence. The folding arm 8 is fixedly connected to the fixing device. The rotating base 12 and the first connecting arm 11 rotate in conjunction, allowing for position and direction adjustment according to actual usage, thereby enhancing practicality.
[0029] A positioning mechanism 9 is provided at the connection between the folding arm 8 and the second connecting arm 10. The positioning mechanism 9 includes a limit frame 16, a clamping frame 18, and a position detector 17. The limit frame 16 is fixedly mounted on the folding arm 8, the clamping frame 18 is fixedly mounted on the limit frame 16, and the position detector 17 is provided on the side of the limit frame 16. The position detector 17 detects whether the crane pipe is in place to ensure the safety of oil transportation.
[0030] The top of the limit frame 16 is provided with an annular hole adapted to the size of the crane pipe. The crane pipe is clamped by the limit frame 16, which makes it more stable during oil transportation and prevents oil from spilling and wasting resources.
[0031] How it works
[0032] When the train arrives under the support frame 6, the rotating seat 12 controls the connecting arm to rotate, and the connecting mechanism 7 faces the trestle escalator and is fixed to the train by the suction plate 13. After being sucked, it is determined whether it is sucked tightly through the positioning detector 15, and the crane pipe gun head passes through the annular hole at the limit frame 16 and is clamped with the clamping frame 18, and the position detector 17 is used to detect whether the clamping position of the gun head meets the clamping requirements. When the clamping requirements are met, the crane pipe transports oil. After completing the oil transportation, the gun head is pulled out of the limit frame 16. After the position detector 17 detects that the gun head has left, it transmits a signal to the positioning detector 15, and then the suction plate 13 no longer adsorbs the train; this method effectively avoids damage to the crane pipe caused by external force due to manual forgetting to pull out the crane pipe.
[0033] In the description of this utility model, unless otherwise expressly specified or limited, the terms "installed," "connected," "connected," and "fixed" should be understood in a broad sense. For example, they can refer to fixed connection, detachable connection, or integration; mechanical connection or electrical connection; direct connection or indirect connection through an intermediate medium; internal communication between two components or interaction between two components. Those skilled in the art will understand the specific meanings of the above terms in this utility model based on the specific circumstances.
[0034] The standard parts used in this utility model can all be purchased from the market, and special-shaped parts can be customized according to the description in the specification and the drawings. The specific connection methods of each part adopt conventional means such as mature bolts, rivets, welding, etc. in the existing technology. The machinery, parts and equipment all adopt conventional models in the existing technology, and the circuit connection adopts the conventional connection method in the existing technology, which will not be described in detail here.
[0035] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A railway trestle escalator and crane pipe interlocking device, comprising a support frame (6), characterized in that: A transmission device is provided on the support frame (6), and an output end of the transmission device is in transmission connection with the fixing device; The fixing device comprises a fixing frame (4), a fixing arm (2) and a connecting mechanism (7); the fixing frame (4) is connected to the transmission device in a transmission manner; one end of the fixing arm (2) is fixedly connected to the fixing frame (4), and the other end is fixedly connected to the connecting mechanism (7); The connecting mechanism (7) comprises a fixed plate (14), an adsorption disk (13) and a positioning detector (15); the fixed plate (14) is fixedly connected to the fixed arm (2); the adsorption disk (13) is arranged on the fixed plate (14); and the positioning detector (15) is positioned opposite to the adsorption disk (13).
2. A railway trestle escalator and crane pipe interlocking device as claimed in claim 1, characterized in that: The transmission device comprises a transmission motor (1), a rotating rod (5) and a collar (3); the transmission motor (1) is fixedly mounted on the support frame (6); the rotating rod (5) is transmission-connected to the output end of the transmission motor (1); the collar (3) is sleeved on the rotating rod (5), and the collar (3) is fixedly connected to the fixing frame (4).
3. A railway trestle escalator and crane pipe interlocking device as claimed in claim 2, characterized in that: The surface of the rotating rod (5) is provided with an external thread, the interior of the collar (3) is provided with an internal thread, and the rotating rod (5) and the collar (3) are thread-matched.
4. A railway trestle escalator and crane pipe interlocking device as claimed in claim 1, characterized in that: The fixed arm (2) comprises a rotating seat (12), a first connecting arm (11), a second connecting arm (10) and a folding arm (8); the rotating seat (12) is fixedly connected to the fixed frame (4); the rotating seat (12), the first connecting arm (11), the second connecting arm (10) and the folding arm (8) are connected in sequence; and the folding arm (8) is fixedly connected to the fixing device.
5. A railway trestle escalator and crane pipe interlocking device as claimed in claim 4, characterized in that: A positioning mechanism (9) is provided at the connection between the folding arm (8) and the second connecting arm (10), and the positioning mechanism (9) comprises a limit frame (16), a clamping frame (18) and a position detector (17). The limit frame (16) is fixedly mounted on the folding arm (8), the clamping frame (18) is fixedly mounted on the limit frame (16), and the position detector (17) is provided on the side of the limit frame (16).
6. A railway trestle escalator and crane pipe interlocking device as claimed in claim 5, characterized in that: The top of the limiting frame (16) is provided with an annular hole adapted to the size of the crane pipe.