Support and hanger fixing structure of fire-fighting spraying pipeline in modular house

By adopting a support hanger structure with roof beams and steel plate bends in a modular house, and using C-shaped steel to connect the snap assembly with self-tapping nails and screws, the problems of fire-spray pipe loosening and ceiling plate packaging are solved, achieving high-strength and flexible pipeline installation.

CN223242274UActive Publication Date: 2025-08-19CHANGSHU YAHGEE MODULAR BUILDING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422894025.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-27
Publication Date
2025-08-19
Estimated Expiration
2034-11-27

AI Technical Summary

Technical Problem

Fire sprinkler pipes in modular houses are prone to loosening and affecting the ceiling panel packaging. The existing fixing methods have problems of inaccurate positioning and insufficient strength.

Method used

The support and hanger structure is adopted with multiple top beams and steel plate bends, and the snap assembly is connected with C-shaped steel and self-tapping nails and screws. The strength is increased by embedded steel plates, and the pipeline support and hanger is allowed to be installed at any position after the ceiling is completed.

Benefits of technology

The high strength and flexibility of the support hanger are achieved, reducing the impact on the upper and lower processes, ensuring the stable installation of the pipe and the integrity of the ceiling panel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223242274U_ABST
    Figure CN223242274U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of modular houses, and particularly relates to a supporting and hanging frame fixing structure of a fire-fighting spraying pipeline in a modular house, which comprises a plurality of top beams and steel plate bending pieces, the bottoms of the top beams are fixedly connected with fireproof ceilings, and the steel plate bending pieces are fixedly welded between two adjacent top beams. C-shaped steel is arranged at the bottom of the fireproof ceiling, the C-shaped steel is connected with the steel plate bending piece through a plurality of self-tapping screws, the bottom of the C-shaped steel is connected with a buckle assembly through a plurality of screws, and the screws are sleeved with fastening nuts and spring nuts in a threaded mode. The welding steel plate is pre-buried at the top in the range of the support hanger in advance, the lower part of the ceiling penetrates through the C-shaped steel, the ceiling and the pre-buried steel plate at the top through the self-tapping and self-drilling nails, so that the strength is greatly improved, and the positioning size of the bracket can be randomly adjusted in a C-shaped steel rail; the problems of inaccurate positioning, insufficient strength and influence on the next process in the prior art are effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of modular houses, in particular to a support and hanger fixing structure of a fire sprinkler pipe in a modular house. Background Art

[0002] Modular houses have gradually begun to come into people's view, but most people are still not very clear about the concept of modular houses. The so-called modular houses are to divide the components of the house into different functional modules, and use standardized, modular and universal production to realize factory manufacturing. The house can be assembled on site anytime and anywhere, and the whole process only takes a few hours to complete.

[0003] Currently, there are two types of fire sprinkler pipes in modular buildings:

[0004] a. Using a combination of umbrella-shaped nails and screws to hold the ceiling panels in place is a simple and quick method. However, sprinkler pipes are generally made of galvanized steel pipes, which are heavy and insufficient for the ceiling's load-bearing capacity. Furthermore, welding steel plates above the ceiling for reinforcement also presents another problem: the umbrella-shaped nails need to be drilled through the ceiling to extend above the ceiling. Due to the special nature of modular buildings, these nails may become loose and shaky during transportation.

[0005] b. Pre-welding screws on the top beam of the box to serve as sprinkler pipe supports and hangers has significant drawbacks. First, pre-welding can inevitably lead to box deformation and construction errors, causing the fixing points to shift, and even affecting pipe installation. Second, if the screws are too long, it will affect the sealing of the ceiling panels. Utility Model Content

[0006] The purpose of the present invention is to solve the problem in the above background technology that the fire sprinkler pipes are easy to loosen and affect the packaging of the ceiling panels, and to propose a support and hanger fixing structure for the fire sprinkler pipes in a modular house.

[0007] In order to achieve the above purpose, the present invention adopts the following technical solutions:

[0008] The support and hanger fixing structure of the fire sprinkler pipe in the modular house includes multiple top beams and steel plate bending parts. The bottom of the top beam is fixedly connected to the fireproof ceiling. The steel plate bending parts are fixedly welded between two adjacent top beams. The bottom of the fireproof ceiling is provided with C-shaped steel. The C-shaped steel is connected to the steel plate bending parts through multiple self-tapping screws. The bottom of the C-shaped steel is connected to a snap assembly through multiple screws. The screws are threaded with fastening nuts and spring nuts.

[0009] Preferably, the bottom of the steel plate bending part is arranged horizontally with the bottom of the top beam.

[0010] Preferably, the fireproof ceiling is made of waterproof gypsum board.

[0011] Preferably, the buckle assembly is a pipe saddle-shaped buckle, and a flat washer is inserted between the pipe saddle-shaped buckle and the fastening nut.

[0012] Preferably, the buckle assembly is a pipe elevator, and a washer gasket is inserted between the pipe elevator and the C-shaped steel.

[0013] Preferably, the self-tapping screw is an external hexagonal dovetail self-tapping screw.

[0014] Compared with the prior art, the present invention has the following beneficial effects:

[0015] 1. In the present invention, a steel plate is pre-embedded and welded at the top of the support bracket range, and self-drilling nails are used to penetrate the C-shaped steel, ceiling and top pre-embedded steel plate at the bottom of the ceiling. This method greatly improves the strength, and the bracket can be arbitrarily adjusted in the C-shaped steel track. The positioning size is effectively solved. Various problems in the previous practice such as inaccurate positioning, insufficient strength and influence on the next process.

[0016] 2. The fixed structure of this utility model allows for installation of pipe supports and hangers at any location after the ceiling is completed, offering greater flexibility and minimizing impact on both previous and subsequent processes. Regarding the supports and hangers themselves, this method is more secure and flexible, and can accommodate installation of various pipe supports and hangers in addition to fire sprinkler pipes by adjusting the various fasteners. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a schematic structural diagram of the support and hanger fixing structure for fire sprinkler pipes in a modular house proposed in Example 1 of the present utility model;

[0018] Figure 2 This is a structural schematic diagram of the support and hanger fixing structure of the fire sprinkler pipe in the modular house proposed in Example 2 of the present utility model.

[0019] In the figure: 1 top beam, 2 bent steel plate, 3 fireproof ceiling, 4 C-shaped steel, 5 self-tapping screws, 6 screws, 7 fastening nuts, 8 pipe saddle clips, 9 flat washers, 10 pipe hanging clips, 11 washers, 12 spring nuts, 13 sprinkler pipes. DETAILED DESCRIPTION

[0020] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0021] Example 1:

[0022] Reference Figure 1The support and hanger fixing structure of the fire sprinkler pipe in the modular house includes multiple top beams 1 and steel plate bending parts 2. The bottom of the steel plate bending part 2 is arranged horizontally with the bottom of the top beam 1. The bottom of the top beam 1 is fixedly connected to the fireproof ceiling 3, and the fireproof ceiling 3 is made of waterproof gypsum board.

[0023] In this embodiment, the steel plate bending part 2 is fixedly welded between two adjacent top beams 1, and a C-shaped steel 4 is provided at the bottom of the fireproof ceiling 3. The C-shaped steel 4 is connected to the steel plate bending part 2 by a plurality of self-tapping screws 5. The self-tapping screws 5 are external hexagonal dovetail self-tapping screws.

[0024] In this embodiment, the bottom of the C-shaped steel 4 is connected to a snap assembly through multiple screws 6. The snap assembly is a pipe saddle-shaped snap 8. A flat washer 9 is inserted between the pipe saddle-shaped snap 8 and the fastening nut 7. The fastening nut 7 and the spring nut 12 are threadedly sleeved on the screw 6.

[0025] In this embodiment, by pre-embedding and welding steel plates at the top of the support bracket range in advance, self-drilling and self-tapping nails are used to penetrate the C-shaped steel, ceiling and top pre-embedded steel plates at the bottom of the ceiling. This method greatly improves the strength, and the bracket can adjust the positioning size arbitrarily within the C-shaped steel track; it effectively solves the various problems of inaccurate positioning, insufficient strength and impact on the next process in previous practices.

[0026] Example 2:

[0027] Reference Figure 2 The support and hanger fixing structure of the fire sprinkler pipe in the modular house includes multiple top beams 1 and steel plate bending parts 2. The bottom of the steel plate bending part 2 is arranged horizontally with the bottom of the top beam 1. The bottom of the top beam 1 is fixedly connected to the fireproof ceiling 3, and the fireproof ceiling 3 is made of waterproof gypsum board.

[0028] In this embodiment, the steel plate bending part 2 is fixedly welded between two adjacent top beams 1, and a C-shaped steel 4 is provided at the bottom of the fireproof ceiling 3. The C-shaped steel 4 is connected to the steel plate bending part 2 by a plurality of self-tapping screws 5. The self-tapping screws 5 are external hexagonal dovetail self-tapping screws.

[0029] In this embodiment, the bottom of the C-shaped steel 4 is connected to a snap assembly through multiple screws 6. The snap assembly is a pipe hanger 10. A washer gasket 11 is inserted between the pipe hanger 10 and the C-shaped steel 4. A fastening nut 7 and a spring nut 12 are threadedly sleeved on the screw 6.

[0030] In this embodiment, the specific construction steps include:

[0031] Step 1: After the ceiling construction is completed, cut the finished C-shaped steel 4 to the appropriate size according to the design drawings, position it according to the drawings, and use the hexagonal dovetail self-tapping screws 5 to pass the C-shaped steel 4 through the ceiling and the steel plate bending parts to fix it firmly.

[0032] Step 2: According to the support and hanger form, confirm the required number of spring nuts 12. For example, the pipe saddle clip 8 requires two spring nuts 12, while the pipe elevator 10 only requires one spring nut 12. Connect the spring nuts 12, washer 11, pipe saddle clip 8 or pipe elevator 10, flat washer 9, and fastening nut 7 with the screw 6 in the order shown in the drawing and tighten them.

[0033] Step 3: Place the sprinkler pipe 13 in the finished hanger. If the installation space is limited, you can first arrange the pipe and temporarily fix it. After the pipe is installed, tighten the fasteners to complete the installation.

[0034] The above is only a preferred specific implementation method of the present invention, but the protection scope of the present invention is not limited to this. Any technician familiar with the technical field within the technical scope disclosed by the present invention can make equivalent replacements or changes based on the technical solution and utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A support and hanger fixing structure for fire sprinkler pipes in a modular house, comprising a plurality of top beams (1) and steel plate bending parts (2), characterized in that: The bottom of the top beam (1) is fixedly connected to a fireproof ceiling (3), the steel plate bending part (2) is fixedly welded between two adjacent top beams (1), the bottom of the fireproof ceiling (3) is provided with a C-shaped steel (4), the C-shaped steel (4) is connected to the steel plate bending part (2) through a plurality of self-tapping screws (5), the bottom of the C-shaped steel (4) is connected to a snap assembly through a plurality of screws (6), and a fastening nut (7) and a spring nut (12) are threadedly sleeved on the screw (6).

2. The support and hanger fixing structure for fire sprinkler pipes in a modular house according to claim 1, characterized in that: The bottom of the steel plate bending part (2) is arranged horizontally with the bottom of the top beam (1).

3. The support and hanger fixing structure for fire sprinkler pipes in a modular house according to claim 1, characterized in that: The fireproof ceiling (3) is made of waterproof gypsum board.

4. The support and hanger fixing structure for fire sprinkler pipes in a modular house according to claim 1, characterized in that: The buckle assembly is a pipe saddle-shaped buckle (8), and a flat washer (9) is inserted between the pipe saddle-shaped buckle (8) and the fastening nut (7).

5. The support and hanger fixing structure for fire sprinkler pipes in a modular house according to claim 1, characterized in that: The buckle assembly is a pipe hanging clip (10), and a washer gasket (11) is inserted between the pipe hanging clip (10) and the C-shaped steel (4).

6. The support and hanger fixing structure for fire sprinkler pipes in a modular house according to claim 1, characterized in that: The self-tapping screw (5) is an external hexagonal dovetail self-tapping screw.