Cable ground support

Through the modular cable above-ground bracket composed of H-shaped steel columns and support structures, the construction efficiency and maintenance convenience of cable laying in confined spaces are solved, and a compact structure and low-cost cable laying solution is realized.

CN223246247UActive Publication Date: 2025-08-19LIAONING ELECTRIC POWER RECONNAISSANCE & DESIGN INST +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422497876.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-16
Publication Date
2025-08-19
Estimated Expiration
2034-10-16

AI Technical Summary

Technical Problem

The existing cable laying methods are difficult to meet the needs of construction efficiency and maintenance convenience in areas with restricted spaces and strict environmental protection requirements. The traditional buried and cable tunneling methods have problems such as complex operation, high cost and large environmental damage.

Method used

Modular cable above-ground bracket composed of H-shaped steel columns, support angle steel, bracket channel steel and fireproof sunshade cover plates form a multi-layer cable laying space, with a compact structure and a small footprint, which simplifies the construction process and facilitates maintenance.

Benefits of technology

It realizes efficient cable laying in confined spaces, shortens construction cycles, reduces operating costs, improves maintenance convenience, and reduces environmental impact.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223246247U_ABST
    Figure CN223246247U_ABST
Patent Text Reader

Abstract

The utility model discloses a cable overground support which comprises a plurality of H-shaped steel columns, the H-shaped steel columns are arranged at intervals along the laying direction of a cable, the adjacent H-shaped steel columns are fixedly connected through supporting angle steel, each H-shaped steel column is connected with a plurality of support channel steels at intervals from top to bottom, the support channel steels are fixedly connected with fireproof laminates, and the fireproof laminates are connected with the H-shaped steel columns. The multi-layer cable laying device is used for forming a multi-layer cable laying space, and the top and the side portions of the multi-layer cable laying space are fixedly connected with fireproof sunshade cover plates. The overground cable support is compact in structure and small in occupied area, better meets the requirements of cable engineering in limited space, adopts modular design, not only simplifies the construction process and shortens the construction period, but also enables later maintenance to be more convenient, and effectively reduces the overall operation cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of electric power engineering, and in particular provides a cable ground bracket. Background Art

[0002] In the construction of cable projects, cables are usually laid underground, which often shows some limitations when dealing with space and environmental challenges. There is still much room for improvement in effectively utilizing limited space, reducing the impact on the natural environment, and improving construction and maintenance efficiency.

[0003] For example: although direct burial of cables saves materials and labor, the covering soil needs to be dug up for maintenance, resulting in complicated operations and low efficiency when maintenance is required; although cable tunnels are relatively convenient for maintenance and inspection, the one-time investment is large, the excavation area is large during construction, and the damage to the surrounding environment is greater.

[0004] In addition, in some factory areas, power plants, substations and other areas with complex construction conditions and many underground obstacles, cables cannot be laid underground. Therefore, providing a cable ground bracket with a reasonable structure and easy installation has become an urgent problem to be solved. Utility Model Content

[0005] In view of this, an object of the present invention is to provide a cable ground bracket to solve the problems existing in the prior art.

[0006] The technical solution provided by the utility model is: a cable ground bracket, comprising a plurality of H-shaped steel columns, wherein the H-shaped steel columns are arranged at intervals along the laying direction of the cable, and adjacent H-shaped steel columns are fixedly connected by supporting angle steels, and each H-shaped steel column is spaced from top to bottom and connected to a plurality of bracket channel steels, and the bracket channel steels are fixedly connected to fireproof layer plates to form a multi-layer cable laying space, and the top and sides of the multi-layer cable laying space are fixedly connected to fireproof sunshade covers.

[0007] Preferably, connecting angle steels are connected to both side edges of the H-shaped steel column via bolts, and the supporting angle steels are connected to the H-shaped steel column via the connecting angle steels.

[0008] Further preferably, the supporting angle steels are cross-connected between adjacent H-shaped steel columns, and the overlapping positions are connected by bolts and matching supporting pads.

[0009] Further preferably, the bracket channel steel is connected to an open end of one side of the H-shaped steel column through a bracket angle steel, the bracket channel steel is welded to the bracket angle steel, and the bracket angle steel is bolted to the H-shaped steel column.

[0010] Further preferably, both sides of the bracket channel steel are connected to both sides of the H-shaped steel column by bolts through a bracket pad and a bracket stiffening plate.

[0011] Further preferably, an end connecting plate is welded to the end of the bracket channel steel, and the end connecting plate is bolted to the fireproof sunshade cover.

[0012] Further preferably, the fireproof sunshade cover is connected to the support channel steel located on the uppermost layer by bolts.

[0013] Further preferably, the corners of the fireproof sunshade cover are fixedly connected to the cover protection angle steel.

[0014] Further preferably, a footing stiffening plate and a footing base plate are welded to the bottom of the H-shaped steel column.

[0015] The cable ground bracket provided by the utility model is assembled from H-shaped steel columns, supporting angle steels, bracket channel steels, fireproof layers and fireproof sunshade covers. It has a compact structure and occupies a small area, which better meets the needs of cable projects in confined spaces. The modular design not only simplifies the construction process and shortens the construction period, but also makes later maintenance more convenient, effectively reducing the overall operating costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The present invention will be further described in detail below with reference to the accompanying drawings and embodiments:

[0017] Figure 1 This is an elevation view of the cable ground bracket provided by the utility model;

[0018] Figure 2 for Figure 1 Section 1-1 in;

[0019] Figure 3 This is a schematic diagram of the connection between the H-shaped steel column, the base stiffener plate and the base plate;

[0020] Figure 4 This is a schematic diagram of the connection between the H-shaped steel column and the supporting angle steel;

[0021] Figure 5 This is a connection diagram of the bracket angle steel, bracket channel steel, and end connecting plate. DETAILED DESCRIPTION

[0022] The present invention will be further explained below in conjunction with specific implementation plans, but the present invention is not limited thereto.

[0023] In order to cope with the complex situations encountered in modern cable engineering construction, especially in areas such as factories, power plants, substations, where the paths are tight, there are many underground obstacles, underground laying cannot be adopted, and environmental protection requirements are relatively strict, the traditional cable laying method is difficult to meet the engineering needs, such as Figures 1 to 5 As shown, the utility model provides a cable ground support, comprising a plurality of H-shaped steel columns 1, wherein the H-shaped steel columns 1 are spaced apart along the laying direction of the cable 20, and adjacent H-shaped steel columns 1 are fixedly connected by supporting angle steels 5, and each H-shaped steel column 1 is spaced apart from top to bottom and connected to a plurality of support channel steels 3, and the support channel steels 3 are fixedly connected to fireproof layers 7 to form a multi-layer cable laying space, and the top and sides of the multi-layer cable laying space are fixedly connected to fireproof sunshade covers 8, Figure 1 The serial number 30 in FIG. 1 represents the return line.

[0024] The cable ground support is assembled from H-shaped steel columns, supporting angle steels, support channel steels, fireproof layers and fireproof sunshade covers. It has a compact structure and occupies a small area, which better meets the needs of cable projects in confined spaces. The modular design not only simplifies the construction process and shortens the construction period, but also makes subsequent maintenance more convenient, effectively reducing overall operating costs.

[0025] As an improvement of the technical solution, Figure 1 、 Figure 2 As shown, connecting angle steels 4 are connected to both sides of the H-shaped steel column 1 through bolts, and the supporting angle steels 5 are connected to the H-shaped steel column 1 through the connecting angle steels 4.

[0026] As an improvement of the technical solution, Figure 4 As shown, the support angle steels 5 are cross-connected between adjacent H-shaped steel columns 1, and the overlapping positions are connected by bolts and matching support pads (not shown in the figure).

[0027] As an improvement of the technical solution, Figure 2 As shown, the bracket channel steel 3 is connected to an open end of one side of the H-shaped steel column 1 through a bracket angle steel 2. The bracket channel steel 3 is welded to the bracket angle steel 2, and the bracket angle steel 2 is bolted to the H-shaped steel column 1.

[0028] As an improvement of the technical solution, Figure 2 As shown, both sides of the bracket channel steel 3 are connected to both sides of the H-shaped steel column 1 through bracket pads 13 and bracket stiffening plates 10 by bolts.

[0029] As an improvement of the technical solution, Figure 1 、 Figure 5 As shown, an end connecting plate 9 is welded to the end of the bracket channel steel 3, and the end connecting plate 9 is bolted to the fireproof sunshade cover 8.

[0030] As an improvement of the technical solution, Figure 1 As shown, the fireproof sunshade cover 8 is connected to the support channel steel 3 located on the uppermost layer by bolts.

[0031] As an improvement of the technical solution, Figure 1 As shown, the corners of the fireproof sunshade cover 8 are fixedly connected to the cover protection angle steel 6.

[0032] As an improvement of the technical solution, Figure 3 As shown, a footing stiffening plate 11 and a footing base plate 12 are welded to the bottom of the H-shaped steel column 1, and the footing base plate is used to be connected to the top surface of the completed foundation.

[0033] The following is the production process of the cable ground bracket:

[0034] Production stage: After the various components of the cable ground support are processed in the factory, they are transported to the construction site for assembly. The support angle steel 2 is welded to the end of the support channel steel 3, and the base stiffener 11 and the base seat plate 12 are welded to the end of the H-shaped steel column 1; the end connecting plate 9 is welded to the end of the support channel steel 3; except that the support channel steel 3 is made of austenitic stainless steel (304), all steel components should be hot-dip galvanized for corrosion protection; the material and specifications of the bridge frame components meet the design and standard requirements, and the components, bolts, washers, etc. are fully equipped for easy installation.

[0035] Construction stage: The welded assembly of H-shaped steel column 1, footing stiffener 11 and footing seat 12 is fixed to the top surface of the completed foundation by bolts, and the connecting angle steel 4 and supporting angle steel 5 are fixed by bolts according to the Figure 4 Fixed between adjacent H-shaped steel columns 1, fix the welded assembly of the bracket angle steel 2, the bracket channel steel 3 and the end connecting plate 9 to the H-shaped steel column 1 with bolts, fix the bracket stiffening plate 10, the bracket pad 13 and the support pad in the corresponding position with bolts, fix the fireproof layer plate 7 to the bracket channel steel 3 with bolts, lay the cable 20 on the fireproof layer plate 7, fix the fireproof sunshade cover plate 8 to the bracket channel steel 3 and the end connecting plate 9 with bolts, fix the cover plate protection angle steel 6 to the fireproof sunshade cover plate 8, tighten the nut with a wrench, and complete the installation of the cable ground bracket structure.

[0036] The specific implementation methods of the present invention are written in a progressive manner, emphasizing the differences between the various implementation methods, and similar parts can be referenced to each other.

[0037] The embodiments of the present invention are described in detail above with reference to the accompanying drawings. However, the present invention is not limited to the above embodiments. Various changes can be made within the scope of knowledge possessed by ordinary technicians in this field without departing from the purpose of the present invention.

Claims

1. A cable ground bracket, characterized in that: The invention comprises a plurality of H-shaped steel columns (1), wherein the H-shaped steel columns (1) are arranged at intervals along the laying direction of the cable (20), and adjacent H-shaped steel columns (1) are fixedly connected by supporting angle steels (5), and each H-shaped steel column (1) is spaced from top to bottom and connected to a plurality of bracket channel steels (3), and the bracket channel steels (3) are fixedly connected to fireproof layers (7) to form a multi-layer cable laying space, and the top and sides of the multi-layer cable laying space are fixedly connected to fireproof sunshade covers (8).

2. The cable ground bracket according to claim 1, characterized in that: Both sides of the H-shaped steel column (1) are connected with connecting angle steels (4) via bolts, and the supporting angle steels (5) are connected to the H-shaped steel column (1) via the connecting angle steels (4).

3. The cable ground bracket according to claim 1, characterized in that: The supporting angle steels (5) are cross-connected between adjacent H-shaped steel columns (1), and the overlapping positions are connected by bolts and matching supporting pads.

4. The cable ground bracket according to claim 1, characterized in that: The bracket channel steel (3) is connected to an open end of one side of the H-shaped steel column (1) through a bracket angle steel (2); the bracket channel steel (3) and the bracket angle steel (2) are welded; and the bracket angle steel (2) and the H-shaped steel column (1) are bolted.

5. The cable ground bracket according to claim 1, characterized in that: Both sides of the bracket channel steel (3) are connected to both sides of the H-shaped steel column (1) through bracket pads (13) and bracket stiffening plates (10) by bolts.

6. The cable ground bracket according to claim 1, characterized in that: An end connecting plate (9) is welded to the end of the bracket channel steel (3), and the end connecting plate (9) is bolted to the fireproof sunshade cover plate (8).

7. The cable ground bracket according to claim 1, characterized in that: The fireproof sunshade cover plate (8) is connected to the bracket channel steel (3) located on the uppermost layer via bolts.

8. The cable ground bracket according to claim 1, characterized in that: The corners of the fireproof sunshade cover plate (8) are fixedly connected to the cover plate protection angle steel (6).

9. The cable ground bracket according to claim 1, characterized in that: A footing stiffening plate (11) and a footing seat plate (12) are welded to the bottom of the H-shaped steel column (1).