Combined type trash holding and isolating device for deepwater construction water area
Through a combined sewage isolation device, a stable sewage isolation structure is formed using steel pipe piles, steel sheet piles and geotextiles, which solves the problem of diffusion of suspended particles and oil pollution in deep-water construction waters, and achieves the effect of rapid installation and environmental protection.
Patent Information
- Application Number
- CN202422016287.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2025-08-22
- Estimated Expiration
- 2034-08-19
AI Technical Summary
In deep-water construction waters, traditional sewage blocking devices cannot effectively isolate suspended particles in the water and prevent the spread of oil pollution, and there are also safety hazards and water quality deterioration problems.
A combined sewage isolation device is adopted to set up steel pipe piles and steel sheet piles at intervals to form sewage isolation keels, and geotextiles are laid inside and outside and inflatable oil fences are set up, combining the support units of steel pipe piles and steel sheet piles to ensure the stability of the device and the water connectivity.
It has achieved rapid installation, reduced pollution spread, resisted wave power, ensured internal and external connection of water, reduced diffusion of silt particles and oil pollution, and improved construction safety and environmental protection effect.
Smart Images

Figure CN223255931U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of water-related construction of municipal engineering and water conservancy projects, and in particular to a combined pollution-blocking and isolating device used in deep-water construction areas. Background Art
[0002] During water-related construction of municipal and water conservancy projects, sediment and other particles are easily generated due to disturbances from underwater excavation or leakage from construction machinery, which affects the water quality outside the construction area. Traditionally, if surface oil booms are used, they can only intercept pollutants on the surface of the water body and cannot isolate the diffusion of suspended particles in the water. If fully enclosed temporary retaining walls are used, the water bodies inside and outside the construction area will be disconnected, causing a sharp deterioration in the water quality of the construction area. After the retaining walls are removed, the water quality of water bodies outside the area will be directly impacted. When operating in deep-water construction areas, due to the effect of surge forces, the direct use of steel sheet piles for isolation is prone to safety hazards due to insufficient rigidity. In deep-water areas where water quality protection requirements are high, it is necessary to consider safe, reliable, economical, and easy-to-construct pollution isolation devices. Summary of the Invention
[0003] The purpose of this utility model is to provide a combined pollution-blocking and isolation device for deep-water construction waters, which has sufficient bearing capacity to resist the wave force borne by the device, and isolates the mud and sand particles in the construction area from entering the external water body while ensuring the connection between the internal and external water bodies in the construction area. At the same time, an inflatable oil boom is additionally provided to prevent the spread of oil pollution on the surface of the water body.
[0004] In order to achieve the above-mentioned purpose, the utility model provides a combined pollution-blocking and isolation device for deep-water construction waters, wherein steel pipe piles are arranged at intervals in the device, and the steel pipe piles are driven into the soil layer below the water bottom by piling equipment and fixed; the tops of the steel pipe piles of the device are welded and connected by left and right steel purlins to form a steel sheet pile guide bracket; the steel sheet piles of the device are driven into the soil layer below the water bottom by piling equipment in the guide bracket and fixed, and the steel sheet piles are overlapped with large locks, and a pollution-blocking and isolation keel is formed by combining the steel pipe piles, steel sheet piles and steel purlins on the pile tops; the device lays geotextiles inside and outside the combined pollution-blocking and isolation keel to form a skin, and the geotextiles are pressed and fixed on both sides of the water bottom with environmentally friendly geosand bags; the device sets an inflatable oil boom in the waters outside the construction area, and the oil booms are fixed to the purlins with nylon ropes at intervals.
[0005] Furthermore, steel pipe piles are arranged at intervals and driven into the soil layer below the water bottom by piling equipment to be fixed, ensuring that the steel pipe piles have sufficient bearing capacity to withstand the wave force borne by the device.
[0006] Furthermore, the top of the steel pipe pile is connected by welding the left and right steel purlins to form a steel sheet pile guide bracket, which ensures the positioning and flatness accuracy of the steel sheet pile and restrains the deformation of the top of the steel sheet pile.
[0007] Furthermore, the steel sheet piles are driven into the soil layer below the water bottom in the guide bracket by the piling equipment and fixed. The steel sheet piles are overlapped with large locks to ensure the connection between the water bodies inside the construction area and the water bodies outside the construction area. The pollution isolation keel is formed by the combination of steel pipe piles, steel sheet piles and pile top steel purlins to ensure the overall stability of the keel to withstand the wave force it is subjected to.
[0008] Furthermore, geotextiles are laid inside and outside the combined pollution-blocking isolation keel to form a skin, which ensures the connection between the water inside the construction area and the water body outside the construction area while isolating the mud and sand particles in the construction area from entering the external water body. The geotextile is fixed at the top of the pile with steel wire, and the geotextile is fixed on both sides of the bottom of the water with environmentally friendly geosand bags.
[0009] Furthermore, in the above-mentioned combined pollution isolation device for deep-water construction waters, an inflatable oil boom is set in the waters outside the construction area, and the oil boom is fixed to the purlin with nylon ropes at intervals to prevent the spread of oil pollution on the surface of the water.
[0010] The diameter of the steel pipe piles and the model of the steel sheet piles of the device are determined according to calculations; the model of the steel purlin at the pile top is channel steel 36a; the unit area mass of the geotextile is 300g / m2; the top elevation of the steel pipe piles and steel sheet piles is 500mm higher than the high water level elevation; the applicable water area has a water depth of less than 12m.
[0011] The utility model has the following beneficial effects and improvements:
[0012] The support units of the steel pipe piles and steel sheet piles in the combined pollution-blocking isolation device of the utility model can be finished components or universal products, which do not require excessive on-site cutting and production, are quick and convenient to install, and can achieve the requirements of flatness precision control. While ensuring the connection of water bodies inside and outside the area, it greatly reduces the pollution of particles in the construction area to the external water body. At the same time, it can resist the action of wave forces and ensure the stability of the device. It has good applicability in the environmental protection of water-related construction in municipal engineering and water conservancy projects. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0014] Figure 1 It is a plan view of the combined trash isolation device according to an embodiment of the present utility model.
[0015] Figure 2 It is a cross-sectional view of a cover device according to a preferred embodiment of the present utility model.
[0016] Description of reference numerals:
[0017] 1-Steel pipe piles, 2-Steel sheet piles, 3-Pile top steel purlins, 4-Geotextiles, 5-Environmentally friendly geotextile sandbags, 6-Inflatable oil booms, 7-Waters within the construction area, 8-Waters outside the construction area. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0019] In the following description, reference is made to “some embodiments”, which describes a subset of all possible embodiments, but it is understood that “some embodiments” may be the same subset or different subsets of all possible embodiments and may be combined with each other without conflict.
[0020] If similar descriptions of "first / second" appear in the application documents, the following explanation is added. In the following description, the terms "first\second\third" are used to distinguish similar objects and do not represent a specific order of the objects. It can be understood that "first\second\third" can be interchanged with a specific order or sequence where permitted, so that the embodiments of the present application described herein can be implemented in an order other than that illustrated or described herein.
[0021] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by those skilled in the art to which this application pertains. The terms used herein are for the purpose of describing the embodiments of this application only and are not intended to limit this application.
[0022] Please refer to Figure 1 、 Figure 2The present embodiment discloses a combined pollution-blocking and isolation device for deepwater construction waters, wherein steel pipe piles 1 are arranged at intervals, and the steel pipe piles 1 are driven into the soil layer below the water bottom by a pile driving device and fixed; the tops of the steel pipe piles 1 are welded and connected by left and right steel purlins 3 to form a guide bracket; steel sheet piles 2 are driven into the soil layer below the water bottom by a pile driving device within the guide bracket and fixed, and the steel sheet piles 2 are overlapped with large locks to ensure that the water body 7 inside the construction area and the water body 8 outside the construction area are connected, and the pollution-blocking and isolation keel is formed by combining the steel pipe piles 1, the steel sheet piles 2 and the steel purlins 3 on the pile tops; geotextiles 4 are laid inside and outside the combined pollution-blocking and isolation keel to form a skin, and the geotextiles 4 are pressed and fixed on both sides of the water bottom with environmentally friendly geosand bags 5; the device sets inflatable oil booms 6 in the water area outside the construction area, and the oil booms 6 are fixed to the steel purlins 3 at intervals with nylon ropes.
[0023] Optionally, in the above-mentioned combined pollution-blocking isolation device for deep-water construction waters, steel pipe piles 1 are arranged at intervals, and the steel pipe piles 1 are driven into the soil layer below the bottom of the water by piling equipment to ensure that the steel pipe piles 1 have sufficient bearing capacity to withstand the wave force borne by the device.
[0024] Optionally, in the above-mentioned combined pollution-blocking isolation device for deep-water construction waters, the top of the steel pipe pile 1 is welded and connected with the left and right steel purlins 3 to form a guide bracket, thereby ensuring the positioning and flatness accuracy of the steel sheet pile 2 and restraining the deformation of the top of the steel sheet pile 2.
[0025] Optionally, in the above-mentioned combined pollution-blocking and isolation device for deep-water construction waters, the steel sheet piles 2 are driven into the soil layer below the water bottom in the guide bracket by the piling equipment and fixed, and the steel sheet piles 2 are overlapped with large locks to ensure that the water bodies 7 inside the construction area and the water bodies 8 outside the construction area are connected, and the pollution-blocking and isolation keel is formed by the combination of steel pipe piles 1, steel sheet piles 2 and pile top steel purlins 3 to ensure the overall stability of the keel to resist the wave force it is subjected to.
[0026] Optionally, in the above-mentioned combined pollution-blocking and isolation device for deep-water construction waters, a geotextile 4 is laid inside and outside the combined pollution-blocking and isolation keel to form a skin, which can isolate the mud and sand particles in the construction area from entering the external water body while ensuring the connection between the water body 7 inside the construction area and the water body 8 outside the construction area. The geotextile 4 is fixed at the top of the pile with steel wire, and the geotextile 4 is pressed and fixed on both sides of the water bottom with environmentally friendly geosand bags 5.
[0027] Optionally, in the above-mentioned combined pollution isolation device for deep-water construction waters, an inflatable oil boom 6 is set in the water area 8 outside the construction area, and the oil boom 6 is fixed to the steel purlin 3 with nylon ropes at intervals to prevent the spread of oil pollution on the surface of the water body.
[0028] To sum up, the utility model provides a combined pollution-blocking and isolation device for deep-water construction waters. The support units of the steel pipe piles and steel sheet piles of the utility model can adopt finished components or general products, do not require too much on-site cutting and production, are quick and convenient to install, and can achieve the requirements of flatness precision control. While ensuring the connection between the water bodies inside and outside the area, it greatly reduces the pollution of particles in the construction area to the external water body. At the same time, it can resist the action of wave forces and ensure the stability of the device. It has good applicability in the environmental protection of water-related construction of municipal engineering and water conservancy projects.
[0029] Although the embodiments of the present invention have been shown and described above, it should be understood that the above embodiments are illustrative and should not be construed as limiting the present invention. Persons skilled in the art may make changes, modifications, substitutions, and variations to the above embodiments within the scope of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included within the scope of protection of the present invention.
Claims
1. A combined pollution isolation device for deep water construction waters, characterized in that: The device is provided with steel pipe piles at intervals, which are driven into the soil layer below the bottom of the water by piling equipment and fixed; the tops of the steel pipe piles of the device are welded and connected by left and right steel purlins to form a steel sheet pile guide bracket; the steel sheet piles of the device are driven into the soil layer below the bottom of the water by piling equipment in the guide bracket and fixed, and the steel sheet piles are overlapped with large locks, and the steel pipe piles, steel sheet piles and pile top steel purlins are combined to form a pollution isolation keel; the device lays geotextiles inside and outside the combined pollution isolation keel to form a skin, and the geotextiles are pressed and fixed on both sides of the bottom of the water with environmentally friendly geosand bags; the device sets inflatable oil booms in the waters outside the construction area, and the oil booms are fixed to the purlins with nylon ropes at intervals.
2. A combined pollution-blocking and isolation device for deepwater construction waters according to claim 1, characterized in that: Steel pipe piles are set at intervals and driven into the soil below the bottom of the water by piling equipment to ensure that the steel pipe piles have sufficient bearing capacity to withstand the wave force borne by the device.
3. The combined pollution isolation device for deep water construction waters according to claim 1, characterized in that: The top of the steel pipe pile is connected by welding the left and right steel purlins to form a steel sheet pile guide bracket, so as to ensure the positioning and flatness accuracy of the steel sheet pile and restrain the deformation of the top of the steel sheet pile.
4. The combined pollution isolation device for deep water construction waters according to claim 1, characterized in that: The steel sheet piles are driven into the soil layer below the water bottom by piling equipment in the guide bracket and fixed. The steel sheet piles are overlapped with large locks to connect the water inside the construction area with the water outside the construction area. The pollution isolation keel is formed by the combination of steel pipe piles, steel sheet piles and pile top steel purlins to ensure the overall stability of the keel to resist the wave force it is subjected to.
5. The combined pollution isolation device for deep water construction waters according to claim 1, characterized in that: Geotextiles are laid inside and outside the combined pollution-blocking isolation keel to form a skin, which ensures the connection between the water bodies inside the construction area and the water bodies outside the construction area while isolating the mud and sand particles in the construction area from entering the external water body. The geotextile is fixed at the top of the pile with steel wire, and the geotextile is fixed on both sides of the bottom of the water with environmentally friendly geosand bags.
6. A combined pollution isolation device for deepwater construction waters according to any one of claims 1 to 5, characterized in that: In the above-mentioned device, an inflatable oil boom is set up in the waters outside the construction area. The boom is fixed to the purlins with nylon ropes at intervals to prevent the spread of oil pollution on the surface of the water.