Concrete pipe pile pulling-out device

By introducing an automatic cleaning system with high-pressure nozzles and cleaning rings into the concrete pipe pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile-pile

CN223256750UActive Publication Date: 2025-08-22SHAANXI ZHUHENGTAI PIPE PILE CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202422857317.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-22
Publication Date
2025-08-22
Estimated Expiration
2034-11-22

AI Technical Summary

Technical Problem

After the existing concrete pipe pile-pile-excavation device is used, soil and debris are prone to adhere to the surface of the drill rod, resulting in reduced construction efficiency, accelerated wear and safety hazards.

Method used

A concrete pipe pile-out device is designed, equipped with an automatic cleaning system, including a high-pressure nozzle and cleaning ring, used to rinse the soil and debris on the surface of the drill rod, and ensure the stability of the device through a fixed structure to prevent splash contamination and damage.

Benefits of technology

Improve construction efficiency, extend the service life of the drill rod, reduce the replacement frequency caused by wear and corrosion, and ensure construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223256750U_ABST
    Figure CN223256750U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of tubular pile digging, and discloses a concrete tubular pile digging device which comprises two moving frames, the top ends of the interiors of the two moving frames are slidably connected with the same lifting plate, the interior of the lifting plate is rotatably connected with a drilling shaft, and the outer surface of the drilling shaft is fixedly connected with blades. And the bottom end of the drill shaft is fixedly connected with a drill bit. According to the concrete pipe pile digging device, after pile digging operation is finished, a drill shaft, blades and a drill bit can be automatically cleaned immediately, water flow sprayed out of a high-pressure nozzle can effectively wash away soil and chippings on the surface of a drill rod, additional weight and resistance caused by attachments to the drill rod are avoided, smoothness of vertical movement of a lifting plate is guaranteed, and the service life of the drill rod is prolonged. Therefore, the construction efficiency is improved, meanwhile, the service life of the drill rod is prolonged through cleaning work, the replacement frequency caused by abrasion and corrosion is reduced, and the cleaning ring not only has a cleaning function, but also can play a role in preventing soil from splashing in the pile digging process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of pipe pile driving, and in particular to a concrete pipe pile driving device. Background Art

[0002] Pipe pile excavation refers to the operation of excavating the interior to remove a certain layer of soil or filling materials during the construction of pipe piles.

[0003] An existing patent (publication number: CN215759024U) discloses a device for driving concrete pipe piles in construction projects. The device includes a motor and a drill rod, which are fixedly connected to the motor. The device also features a frame located atop the drill rod and rotatably connected to it. The frame is rotatably connected to an adjustment member, which is hingedly connected to a connecting member, which is slidably connected to a stopper. The beneficial effects of this device include reduced labor, improved work efficiency, and enhanced construction safety.

[0004] During the use of the above device, labor is reduced, work efficiency is improved, and construction operation safety is high. After the pile is driven, the drill rod (surface is often covered with a large amount of mud and debris. These attachments are not only difficult to clean, but also have an adverse effect on the subsequent pile driving operation. On the one hand, the mud and debris attached to the surface of the drill rod increase the weight and resistance of the drill rod, making it difficult to move the lifting plate up and down, thereby affecting construction efficiency; on the other hand, the attachments may also cause wear and corrosion to the surface of the drill rod, shortening its service life. Utility Model Content

[0005] In view of the shortcomings of the existing technology, the present application provides a concrete pipe pile driving device, which has the advantages of being easy to clean and solves the problems raised in the background technology.

[0006] To achieve the above-mentioned objectives, the present application provides the following technical solution: a concrete pipe pile driving device, comprising two mobile frames, wherein the top ends of the two mobile frames are slidably connected to a same lifting plate, the lifting plate is internally rotatably connected to a drill shaft, the outer surface of the drill shaft is fixedly connected to a blade, and the bottom end of the drill shaft is fixedly connected to a drill bit;

[0007] A group of supporting ribs are fixedly connected to the bottom ends of the two movable frames, and a same cleaning ring is fixedly connected between the two groups of supporting ribs. The inner wall of the cleaning ring is fixedly connected to multiple high-pressure nozzles, and the bottom end of the drill shaft is located inside the cleaning ring.

[0008] Through the above scheme, the drill shaft, blades and drill bit can be automatically cleaned immediately after the pile driving operation is completed. The water flow sprayed by the high-pressure nozzle can effectively wash away the dirt and debris on the surface of the drill rod, avoiding the extra weight and resistance of the attachments to the drill rod, ensuring the smooth up and down movement of the lifting plate, thereby improving construction efficiency. At the same time, the cleaning work also extends the service life of the drill rod and reduces the frequency of replacement due to wear and corrosion. The cleaning ring not only has a cleaning function, but also can play a protective role in the soil splashing during the pile driving process. When the drill bit penetrates deep into the pipe pile for pile driving, the generated soil and debris are easy to splash, and the setting of the cleaning ring can effectively block these splashes to prevent them from polluting the construction environment or injuring construction workers. The mobile frame can be firmly fixed to the ground through the design of fixed plates and fixed nails, avoiding safety hazards caused by the self-movement of the mobile frame during the pile driving process.

[0009] Furthermore, a threaded rod is rotatably connected between the inner top wall and the inner bottom wall of each movable frame, and the lifting plate is threadedly connected to the two threaded rods.

[0010] Through the above solution, the purpose of moving the lifting plate up and down can be achieved by setting the threaded rod.

[0011] Furthermore, the two movable frames are fixedly connected to each other at their bottom ends with fixed plates on their sides that are away from each other, and each of the fixed plates has a fixing nail slidably inserted into its interior.

[0012] Through the above solution, by providing the fixing nails, the purpose of fixing the movable frame can be achieved, thereby preventing the movable frame from moving on its own during the pile excavation process.

[0013] Furthermore, the outer surface of the cleaning ring is fixedly connected to a connecting pipe.

[0014] Through the above solution, the provision of the connecting pipe facilitates the user to connect with the external water supply pipe.

[0015] Furthermore, a U-shaped frame is fixedly connected to the upper surface of the lifting plate, a first motor is fixedly installed inside the U-shaped frame, and an output end of the first motor is fixedly connected to the top end of the drill shaft.

[0016] Through the above solution, the first motor is provided to provide power for the rotation of the rotating shaft.

[0017] Furthermore, a second motor is installed on the top of each of the two movable frames, and the output ends of the two second motors are fixedly connected to the threaded rods adjacent thereto.

[0018] Through the above solution, by setting the second motor, it is possible to provide power for the rotation of the drill shaft.

[0019] Furthermore, a control host is installed on the front side of the bottom end of the movable frame on the left side, and the first motor and the second motor are both electrically connected to the control host.

[0020] Through the above solution, the purpose of controlling the first motor and the second motor can be achieved by controlling the settings of the host.

[0021] Furthermore, the drill shaft, blades and drill bit are all made of wear-resistant alloy material.

[0022] Through the above solution, the pile driving device has good wear resistance and corrosion resistance, can maintain a good working state during long-term work, and extends the service life of the pile driving device.

[0023] Compared with the existing technology, the technical solution of this application has the following beneficial effects:

[0024] The device can automatically clean the drill shaft, blades and drill bit immediately after the pile driving operation is completed. The water flow sprayed by the high-pressure nozzle can effectively wash away the dirt and debris on the surface of the drill rod, avoiding the extra weight and resistance of the attachments on the drill rod, ensuring the smooth up and down movement of the lifting plate, thereby improving construction efficiency. At the same time, the cleaning work also extends the service life of the drill rod and reduces the replacement frequency due to wear and corrosion. The cleaning ring not only has a cleaning function, but also can play a protective role in the soil splashing during the pile driving process. When the drill bit penetrates deep into the pipe pile for pile driving, the generated dirt and debris are easy to splash, and the setting of the cleaning ring can effectively block these splashes to prevent them from polluting the construction environment or injuring construction workers. The mobile frame can be firmly fixed to the ground through the design of the fixed plate and the fixed nails, avoiding the safety hazard caused by the self-movement of the mobile frame during the pile driving process. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 A three-dimensional diagram of the overall structure of this application Figure 1 ;

[0026] Figure 2 A three-dimensional diagram of the overall structure of this application Figure 2 ;

[0027] Figure 3 This is a front view of the overall structure of this application;

[0028] Figure 4 Cleaning ring structure diagram for this application.

[0029] In the picture:

[0030] 1. Mobile frame; 2. Lifting plate; 3. Drill shaft; 4. Blade; 5. Drill bit; 6. Support ribs; 7. Cleaning ring; 8. High-pressure nozzle; 9. Threaded rod; 10. Fixed plate; 11. Fixing pin; 12. Connecting pipe; 13. U-shaped frame; 14. First motor; 15. Second motor; 16. Control unit. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of this application to clearly and completely describe the technical solutions in the embodiments of this application. Obviously, the embodiments described are only part of the embodiments of this application, not all of the embodiments. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of this application.

[0032] See also Figure 1 、 Figure 2 and Figure 3 The top of the two mobile frames 1 is slidably connected to the same lifting plate 2, and the internal rotation of the lifting plate 2 is connected to the drill shaft 3. The outer surface of the drill shaft 3 is fixedly connected to the blade 4, and the bottom end of the drill shaft 3 is fixedly connected to the drill bit 5. Through the arrangement of the drill bit 5 and the blade 4, the purpose of digging the pipe pile can be achieved. A threaded rod 9 is rotatably connected between the inner top wall and the inner bottom wall of each mobile frame 1. The lifting plate 2 is threadedly connected to the two threaded rods 9. Through the arrangement of the threaded rod 9, the up and down movement of the lifting plate 2 can be achieved. The drill shaft 3, blade 4 and drill bit 5 are all made of wear-resistant alloy material with good wear resistance and corrosion resistance. They can maintain a good working condition during long-term work, thereby extending the service life of the pile-driving device.

[0033] See also Figure 1 、 Figure 2 and Figure 4 The bottom ends of the two mobile frames 1 are fixedly connected to a group of supporting ribs 6, and the same cleaning ring 7 is fixedly connected between the two groups of supporting ribs 6. The inner wall of the cleaning ring 7 is fixedly connected with multiple high-pressure nozzles 8. The bottom end of the drill shaft 3 is located inside the cleaning ring 7. Through the setting of the high-pressure nozzle 8, the purpose of cleaning the blade 4 can be achieved. The outer surface of the cleaning ring 7 is fixedly connected with a connecting pipe 12. The setting of the connecting pipe 12 facilitates the user to connect to the external water supply pipe.

[0034] See also Figure 1 、 Figure 2 and Figure 3The two movable frames 1 are fixedly connected to a fixed plate 10 on the sides away from each other at the bottom ends thereof, and a fixing nail 11 is slidably inserted into the interior of each fixing plate 10. By setting the fixing nail 11, the movable frame 1 can be fixed to avoid the movable frame 1 from moving on its own during the pile-pulling process.

[0035] See also Figure 1 、 Figure 2 and Figure 3 The upper surface of the lifting plate 2 is fixedly connected to a U-shaped frame 13, and a first motor 14 is fixedly installed inside the U-shaped frame 13. The output end of the first motor 14 is fixedly connected to the top of the drill shaft 3. Through the setting of the first motor 14, it can provide power for the rotation of the rotating shaft. The top of the two mobile frames 1 are both installed with a second motor 15, and the output ends of the two second motors 15 are fixedly connected to the threaded rod 9 close to them. Through the setting of the second motor 15, it can provide power for the rotation of the drill shaft 3. A control host 16 is installed on the front of the bottom end of the mobile frame 1 on the left. The first motor 14 and the second motor 15 are both electrically connected to the control host 16. Through the setting of the control host 16, the purpose of controlling the first motor 14 and the second motor 15 can be achieved.

[0036] A concrete pipe pile driving device in this embodiment can automatically clean the drill shaft 3, blades 4 and drill bit 5 immediately after the pile driving operation is completed. The water flow sprayed by the high-pressure nozzle 8 can effectively wash away the dirt and debris on the surface of the drill rod, avoiding the additional weight and resistance of the attachments on the drill rod, ensuring the smooth up and down movement of the lifting plate 2, thereby improving construction efficiency. At the same time, the cleaning work also extends the service life of the drill rod and reduces the replacement frequency due to wear and corrosion. The cleaning ring 7 not only has a cleaning function, but also plays a role in protecting the pile from splashing. When the drill bit 5 penetrates deep into the pipe pile to drive the pile, the generated dirt and debris are easy to splash, and the setting of the cleaning ring 7 can effectively block these splashes, preventing them from polluting the construction environment or injuring construction workers. The mobile frame 1 can be firmly fixed to the ground through the design of the fixing plate 10 and the fixing nails 11, avoiding the safety hazards caused by the self-movement of the mobile frame 1 during the pile driving process.

[0037] The working principle of the above embodiment is as follows: first, the two mobile frames 1 are firmly fixed to the ground by the fixing plates 10 and the fixing nails 11 to ensure stability during the pile-digging process. Then, the user connects the external water supply pipe to the cleaning ring 7 through the connecting pipe 12 to prepare for the subsequent cleaning work. Next, the control host 16 is started, and the control host 16 sends instructions to the first motor 14 and the second motor 15. After receiving the instructions, the first motor 14 starts to work, and its output end drives the drill shaft 3 to rotate inside the lifting plate 2. At the same time, the output end of the second motor 15 is connected to the threaded rod 9, driving the threaded rod 9 to rotate, and then drives the lifting plate 2 up and down through the threaded connection. In this way, the drill shaft 3, the blade 4 and the drill bit 5 are driven by the lifting plate 2 to penetrate into the concrete pipe pile to perform pile-digging operations. During the piling process, the rotation of the drill bit 5 and the stirring of the blades 4 will generate a large amount of dirt and debris. At this time, the setting of the cleaning ring 7 plays a key role. The cleaning ring 7 can not only effectively block the flying dirt and debris to prevent them from polluting the construction environment or injuring the construction workers, but also automatically clean the drill shaft 3, blades 4 and drill bit 5 immediately after the piling operation is completed through the high-pressure nozzle 8 fixedly connected to its inner wall. In order to clean, the user only needs to connect the external water supply pipe to the cleaning ring 7 through the connecting pipe 12. When the high-pressure nozzle 8 receives the water flow, it will immediately spray out high-pressure water to flush away the dirt and debris on the surface of the drill rod. This step not only reduces the weight and resistance of the drill rod, ensures the smooth up and down movement of the lifting plate 2, but also extends the service life of the drill rod and reduces the replacement frequency due to wear and corrosion.

[0038] It should be noted that, in this document, relational terms such as first and second, etc., are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply the existence of any such actual relationship or order between these entities or operations. Moreover, the terms "comprises," "comprising," or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article, or device comprising a series of elements includes not only those elements, but also other elements not explicitly listed, or elements inherent to such process, method, article, or device. In the absence of further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of other identical elements in the process, method, article, or device comprising the element.

[0039] Although the embodiments of the present application have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present application, and the scope of the present application is defined by the appended claims and their equivalents.

Claims

1. A concrete pipe pile driving device, comprising two movable frames (1), characterized in that: The top ends of the two movable frames (1) are slidably connected to a same lifting plate (2), the interior of the lifting plate (2) is rotatably connected to a drill shaft (3), the outer surface of the drill shaft (3) is fixedly connected to a blade (4), and the bottom end of the drill shaft (3) is fixedly connected to a drill bit (5); The bottom ends of the two movable frames (1) are fixedly connected to a group of support ribs (6), a cleaning ring (7) is fixedly connected between the two groups of support ribs (6), the inner wall of the cleaning ring (7) is fixedly connected to a plurality of high-pressure nozzles (8), and the bottom end of the drill shaft (3) is located inside the cleaning ring (7).

2. A concrete pipe pile driving device according to claim 1, characterized in that: A threaded rod (9) is rotatably connected between the inner top wall and the inner bottom wall of each movable frame (1), and the lifting plate (2) is threadably connected to the two threaded rods (9).

3. A concrete pipe pile driving device according to claim 1, characterized in that: The sides of the bottom ends of the two movable frames (1) that are away from each other are fixedly connected with a fixing plate (10), and a fixing nail (11) is slidably inserted into the interior of each fixing plate (10).

4. A concrete pipe pile driving device according to claim 1, characterized in that: The outer surface of the cleaning ring (7) is fixedly connected to a connecting pipe (12).

5. The concrete pipe pile driving device according to claim 1, characterized in that: A U-shaped frame (13) is fixedly connected to the upper surface of the lifting plate (2), a first motor (14) is fixedly installed inside the U-shaped frame (13), and an output end of the first motor (14) is fixedly connected to the top end of the drill shaft (3).

6. The concrete pipe pile driving device according to claim 1, characterized in that: A second motor (15) is installed on the top of each of the two movable frames (1), and the output ends of the two second motors (15) are fixedly connected to the threaded rods (9) adjacent thereto.

7. The concrete pipe pile driving device according to claim 1, characterized in that: A control host (16) is installed on the front side of the bottom end of the mobile frame (1) on the left side, and the first motor (14) and the second motor (15) are both electrically connected to the control host (16).

8. The concrete pipe pile driving device according to claim 1, characterized in that: The drill shaft (3), blades (4) and drill bit (5) are all made of wear-resistant alloy material.

Citation Information

Patent Citations

  • Construction engineering concrete pipe pile pulling-out device

    CN215759024U