Building engineering construction crack repairing equipment

By designing the crack repair equipment for construction projects and using the combined structure of the support sleeve rod and the guide rod body, automated crack filling and grinding operations are achieved, solving the problems of low efficiency and poor safety in traditional manual repair, and improving construction efficiency and safety.

CN223269671UActive Publication Date: 2025-08-26CHONGQING GUOQIANGZHI JIAN TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422384483.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-29
Publication Date
2025-08-26
Estimated Expiration
2034-09-29

AI Technical Summary

Technical Problem

In traditional construction projects, repairing wall cracks requires manual climbing bracket operation, resulting in low efficiency and safety risks.

Method used

A crack repair equipment for construction engineering construction is designed, using a combined structure of support sleeve rod, guide rod body and feed pipe body, and anti-slip operation is performed by hand-held support sleeve rod, and the feed pipe body is guided to insert the feed pipe body into the gap. Combined with the control valve body and pump body, automatic filling and smoothing is achieved, simplifying the operation process.

Benefits of technology

An efficient and safe crack repair process has been achieved, construction efficiency has been improved, and the risk of manual high-level operation has been reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223269671U_ABST
    Figure CN223269671U_ABST
Patent Text Reader

Abstract

The utility model discloses building engineering construction crack repairing equipment, which relates to the field of building engineering and comprises a main supporting block, a blocking flat plate is horizontally welded on the bottom surface of the main supporting block, a material injection pipe body is obliquely and fixedly welded on the bottom surface of the blocking flat plate, and a guide rod body is obliquely welded on the bottom surface of the main supporting block. A top clamping ball is clamped to the top surface of the main supporting block, a connecting top rod is vertically and upwards welded to the top surface of the top clamping ball, a fixed connecting rod is fixedly connected to the top end of the connecting top rod, a connecting wire is connected to the bottom end of the fixed connecting rod, and a supporting sleeve rod sleeves the top end of the fixed connecting rod; the outer side edge of the supporting sleeve rod is fixedly sleeved with an anti-skid rubber sleeve, a control key is connected to the side edge of the supporting sleeve rod in a clamped mode, and a connecting pipeline is connected to the top end of the supporting sleeve rod in an inserted mode. And meanwhile, under the guide material injection and joint filling treatment structure, the cracks are repaired more quickly and efficiently.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering, in particular to a device for repairing cracks during construction of a construction engineering project. Background Art

[0002] Construction projects refer to the engineering entities formed through the construction of various types of buildings and their ancillary facilities, as well as the installation of supporting wiring, pipelines, and equipment. "Buildings" refer to projects with roofs, beams, columns, walls, foundations, and internal spaces that meet people's needs for production, residence, study, and public activities.

[0003] During the construction of current building projects, it is necessary to repair the cracks on the wall. Traditionally, manual work is required to climb to a specified height through a bracket and fill the cracks with caulking materials, which makes the operation more troublesome and affects the efficiency of the repair. At the same time, the high-level operation of personnel will be dangerous. Utility Model Content

[0004] The purpose of the present utility model is to provide a construction crack repair device to solve the problem raised in the above background technology that during the construction of current construction projects, cracks on the wall need to be repaired. Traditionally, manual labor is required to climb to a specified height through a bracket to fill the cracks with caulking materials, which makes the operation more troublesome and affects the efficiency of the repair. At the same time, the high-position operation of personnel will be dangerous.

[0005] To achieve the above objectives, the present invention provides the following technical solutions:

[0006] A construction engineering crack repair device comprises a main support block, the bottom surface of the main support block is horizontally welded with a blocking plate, the bottom surface of the blocking plate is obliquely fixedly welded with an injection tube body, the bottom surface of the main support block is obliquely welded with a guide rod body, the top surface of the main support block is clamped with a top clamping ball, the top surface of the top clamping ball is vertically welded with a connecting rod, the top end of the connecting rod is fixedly connected to a fixed connecting rod, the bottom end of the fixed connecting rod is connected to a connecting wire, and the top end of the fixed connecting rod is sleeved with a support rod. The sleeve rod has an anti-slip rubber sleeve fixedly sleeved on its outer side, a control key is clamped on the side of the support sleeve rod, a connecting pipe is inserted at the top end of the support sleeve rod, a top clamping groove is provided on the top surface of the main support block, a control valve body is fixedly clamped on the inner side wall of the main support block, a through groove is obliquely provided on the bottom surface of the main support block, a mounting pipe end is fixedly provided on the bottom end of the fixed connecting rod, a spring pipe is clamped on the inner side edge of the support sleeve rod, and a control main board is fixedly clamped on the side wall of the support sleeve rod.

[0007] As a preferred embodiment of the present invention: the bottom surface of the main support block is horizontally fixedly connected to the center line position of the top surface of the blocking plate, and the blocking plate is horizontally arranged at one end position of the bottom surface of the main support block, the injection tube body is fixedly arranged in an inclined shape at a position close to one end position of the bottom surface center line of the blocking plate, and the top opening end of the injection tube body is fixedly connected to the bottom opening of the through groove to maintain connection.

[0008] As a preferred embodiment of the present invention: the inclination direction of the guide rod body is set to be consistent with the inclination direction of the injection tube body, and the top end of the guide rod body is fixedly connected to the end position of the bottom center line of the main support block away from the blocking plate, and the top clamping ball is clamped to the inner side edge of the top clamping groove.

[0009] As a preferred embodiment of the present invention: the top end of the connecting rod is fixedly connected to the center position of the bottom end of the fixed connecting rod, one end of the connecting wire is fixedly connected to the outer edge of the bottom end of the mounting pipe end, and the other end passes through the top surface of the main support block and extends to the inside to maintain connection with the input end of the control valve body, and the support sleeve rod and the fixed connecting rod are arranged in a telescopic rod structure with each other.

[0010] As a preferred embodiment of the present invention: the control key and the control main board are electrically connected to each other, one end of the connecting pipe passes through one end of the support sleeve and extends to the interior, and the extended end is connected to one end of the spring pipe, the top clamping groove is opened on the top surface of the main support block near the center position, the control valve body is fixedly set on the inner side of the main support block near one end position, the through groove is inclined and opened on the bottom surface of the main support block and the inner side edge of the blocking plate, and the top open end of the through groove is connected to the output end of the control valve body.

[0011] As a preferred embodiment of the present invention: the mounting pipe end is fixedly arranged at the bottom end of the fixed connecting rod near the edge, and the bottom end of the spring pipe is kept in communication with the mounting pipe end, and the control main board and the control valve body are kept electrically connected to each other.

[0012] Compared with the prior art, the beneficial effects of the present invention are:

[0013] The utility model can achieve the anti-slip effect by holding the anti-slip rubber sleeve on the outer side of the support sleeve rod with a hand, and at the same time stretching the fixed connecting rod at one end to a specified length to form an extension effect, so that the external material pipe end is fixedly connected to one end of the connecting pipe, and at the same time, the fixed connecting rod supports the main support block at one end, so that the bottom end of the guide rod body at one end of the bottom surface is inserted into the gap of the wall, and the injection pipe is inserted into the gap under the guidance of the guide rod body. Under the push of the fixed connecting rod, the guide rod body can move along the gap, so that the injection pipe body also moves along the gap, and while moving, the external The pump body draws the filling material into the interior of the spring pipe, and finally enters the interior of the control valve body through the connecting wire. After the control key is pressed and controlled, the control main board controls the opening operation of the control valve body, allowing the material to enter the interior of the injection pipe through the through groove, and finally injected into the interior of the gap under the guidance of the injection pipe. A docking arrangement is arranged on one side of the blocking plate at the opening end of the gap. After the material injected into the gap is filled, it can be blocked and smoothed by the blocking plate. The handheld operation structure makes its operation more convenient. At the same time, the guided injection and filling processing structure makes the repair of cracks faster and more efficient. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Other features, objects and advantages of the present invention will become more apparent from the detailed description of the non-limiting embodiments with reference to the following drawings:

[0015] Figure 1 This is a schematic diagram of the three-dimensional structure of a construction crack repair device;

[0016] Figure 2 This is a structural diagram of the front view cross-section connection details of the main support block of a construction engineering crack repair device;

[0017] Figure 3 A schematic structural diagram of a side view of connection details of a barrier plate of a crack repair device for construction engineering;

[0018] Figure 4 This is a structural schematic diagram of the front view cross-sectional connection details of a fixed connecting rod of a construction engineering crack repair device;

[0019] Figure 5 This is a structural schematic diagram of the side view and cross-sectional connection details of a support sleeve rod of a crack repair device for construction engineering.

[0020] In the figure: 1. Main support block; 2. Blocking plate; 3. Injection tube body; 4. Guide rod body; 5. Top clamp ball; 6. Connecting push rod; 7. Fixing connecting rod; 8. Connecting wire; 9. Support sleeve rod; 10. Anti-slip rubber sleeve; 11. Control key; 12. Connecting pipe; 13. Top clamp groove; 14. Control valve body; 15. Through groove; 16. Mounting pipe end; 17. Spring pipe; 18. Control main board. DETAILED DESCRIPTION

[0021] See also Figure 1 The top of the guide rod 4 is fixedly connected to the bottom of the main support block 1, and the top of the guide rod 4 is fixedly connected to the bottom of the main support block 1. The top surface of the top card receiving ball 5 is welded with a connecting rod 6 vertically upward, and the top of the connecting rod 6 is fixedly connected to the fixing link 7, and the bottom end of the fixing link 7 is connected to the connecting wire 8. The top end of the fixing link 7 is sleeved with a supporting sleeve rod 9, and the top of the connecting rod 6 is fixedly connected to the center position of the bottom end of the fixing link 7. One end of the connecting wire 8 is fixedly connected to the outer edge of the bottom end of the mounting pipe end 16, and the other end passes through the top surface of the main support block 1 and extends to the inside to maintain communication with the input end of the control valve body 14. The supporting sleeve rod 9 and the fixing link 7 are arranged in a telescopic rod structure with each other. The outer edge of the supporting sleeve rod 9 is fixedly sleeved with an anti-slip rubber sleeve 10, and the side of the supporting sleeve rod 9 is clamped with a control key 11. The top end of the supporting sleeve rod 9 is plugged with a connecting pipe 12, and the control key 11 and the control main board 18 are electrically connected to each other. One end of the connecting pipe 12 passes through one end of the supporting sleeve rod 9 and extends to the inside, and the extended end is maintained in communication with one end of the spring pipe 17;

[0022] See also Figure 2-5In one embodiment of the present invention, a construction engineering crack repair device is provided, wherein a top clamping groove 13 is provided on the top surface of the main support block 1, a control valve body 14 is fixedly clamped on the inner side wall of the main support block 1, and a through groove 15 is obliquely provided on the bottom surface of the main support block 1. The top clamping groove 13 is provided near the center of the top surface of the main support block 1, the control valve body 14 is fixedly provided on the inner side of the main support block 1 near one end, and the through groove 15 is obliquely provided on the bottom surface of the main support block 1 and the blocking plate 2 The inner side of the through groove 15 is connected to the output end of the control valve body 14, and the bottom end of the fixed connecting rod 7 is fixedly provided with a mounting pipe end 16. The inner side of the support sleeve rod 9 is clamped with a spring pipe 17. The side wall of the support sleeve rod 9 is fixedly clamped with a control main board 18. The mounting pipe end 16 is fixedly provided at the bottom end of the fixed connecting rod 7 near the edge, and the bottom end of the spring pipe 17 is connected to the mounting pipe end 16. The control main board 18 and the control valve body 14 are electrically connected to each other.

[0023] The working principle of this utility model is:

[0024] When you hold the anti-slip rubber sleeve 10 on the outer side of the support sleeve rod 9 with your hand, it can play an anti-slip effect. At the same time, the fixed connecting rod 7 at one end is stretched to the specified length to form an extension effect, so that the external material pipe end is fixedly connected to one end of the connecting pipe 12. At the same time, the fixed connecting rod 7 supports the main support block 1 at one end, so that the bottom end of the guide rod body 4 at one end of the bottom surface is inserted into the gap of the wall. Under the guidance of the guide rod body 4, the injection pipe 3 is inserted into the inside of the gap. Under the push of the fixed connecting rod 7, the guide rod body 4 can move along the gap, so that the injection pipe body 3 can also The operation is performed by moving along the gap, and at the same time, the filling material is drawn into the interior of the spring pipe 17 through the external pump body, and finally enters the interior of the control valve body 14 through the connecting wire 8. After the control key 11 is pressed and controlled, the control main board 18 controls the control valve body 14 to open the operation, allowing the material to enter the interior of the injection pipe 3 through the through groove 15, and finally injected into the interior of the gap under the guidance of the injection pipe 3. It is docked at the open end of the gap on one side of the blocking plate 2. After the material injected into the gap is filled, it can be blocked and smoothed by the blocking plate 2.

[0025] The above is only a preferred specific implementation method of the present invention, but the protection scope of the present invention is not limited to this. Any technician familiar with the technical field within the technical scope disclosed by the present invention can make equivalent replacements or changes based on the technical solution and utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A construction crack repair device, comprising a main support block (1), characterized in that: The bottom surface of the main support block (1) is horizontally welded with a blocking plate (2), the bottom surface of the blocking plate (2) is obliquely fixedly welded with a material injection tube (3), the bottom surface of the main support block (1) is obliquely welded with a guide rod (4), the top surface of the main support block (1) is clamped with a top clamping ball (5), the top surface of the top clamping ball (5) is vertically welded with a connecting rod (6), the top end of the connecting rod (6) is fixedly connected with a fixed connecting rod (7), the bottom end of the fixed connecting rod (7) is connected with a connecting wire (8), the top end of the fixed connecting rod (7) is sleeved with a support sleeve rod (9), the outer side of the support sleeve rod (9) is fixed The main support block (1) is provided with a non-slip rubber sleeve (10), the side of the support sleeve rod (9) is clamped with a control key (11), the top of the support sleeve rod (9) is plugged with a connecting pipe (12), the top surface of the main support block (1) is provided with a top clamping groove (13), the inner side wall of the main support block (1) is fixedly clamped with a control valve body (14), the bottom surface of the main support block (1) is obliquely provided with a through groove (15), the bottom end of the fixed connecting rod (7) is fixedly provided with a mounting pipe end (16), the inner side of the support sleeve rod (9) is clamped with a spring pipe (17), and the side wall of the support sleeve rod (9) is fixedly clamped with a control main board (18).

2. A construction engineering crack repair device according to claim 1, characterized in that: The bottom surface of the main support block (1) is horizontally fixedly connected to the center line of the top surface of the blocking plate (2), and the blocking plate (2) is horizontally arranged at one end of the bottom surface of the main support block (1). The injection tube body (3) is fixedly arranged in an inclined shape at a position close to one end of the bottom surface center line of the blocking plate (2), and the top opening end of the injection tube body (3) is fixedly connected to the bottom opening of the through slot (15) to maintain communication.

3. A construction engineering crack repair device according to claim 1, characterized in that: The inclination direction of the guide rod body (4) is arranged to be consistent with the inclination direction of the injection tube body (3), and the top end of the guide rod body (4) is fixedly connected to the bottom center line of the main support block (1) at one end away from the blocking plate (2), and the top clamping ball (5) is clamped to the inner side of the top clamping groove (13).

4. A construction engineering crack repair device according to claim 1, characterized in that: The top end of the connecting rod (6) is fixedly connected to the center position of the bottom end of the fixed connecting rod (7); one end of the connecting wire (8) is fixedly connected to the outer edge of the bottom end of the mounting pipe end (16), and the other end passes through the top surface of the main support block (1) and extends to the inside to maintain communication with the input end of the control valve body (14); the supporting sleeve rod (9) and the fixed connecting rod (7) are arranged in a telescopic rod structure with respect to each other.

5. A construction engineering crack repair device according to claim 1, characterized in that: The control key (11) and the control main board (18) are electrically connected to each other, one end of the connecting pipe (12) passes through one end of the support sleeve rod (9) and extends to the inside, and the extended end is connected to one end of the spring pipe (17), the top clamping groove (13) is opened on the top surface of the main support block (1) near the center position, the control valve body (14) is fixedly set on the inner side of the main support block (1) near one end position, the through groove (15) is opened in an inclined shape on the bottom surface of the main support block (1) and the inner side edge of the blocking plate (2), and the top open end of the through groove (15) is connected to the output end of the control valve body (14).

6. A construction engineering crack repair device according to claim 1, characterized in that: The mounting pipe end (16) is fixedly arranged at the bottom end of the fixed connecting rod (7) near the edge, and the bottom end of the spring pipe (17) is kept in communication with the mounting pipe end (16), and the control main board (18) and the control valve body (14) are kept in electrical connection with each other.