Fabricated building construction grouting sleeve
By setting up a self-locking structure in the grouting sleeve, including the deformation self-locking of the port slot and the filler ring, the problem of cumbersome operation in the prior art is solved, efficient assembly and consistency of the steel bar length is achieved, and the tensile strength is improved.
Patent Information
- Application Number
- CN202422604798.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-28
- Publication Date
- 2025-08-29
- Estimated Expiration
- 2034-10-28
AI Technical Summary
In the prior art, the grouting sleeve needs to be locked through a envelope when the steel bars are connected to grout to prevent mud from flowing out, resulting in cumbersome operation. If the steel bars are too long, they need to be put into the envelope from the end, making it impossible to achieve efficient assembly.
A self-locking grouting sleeve is designed. By setting port slots and filler rings at both ends of the sleeve main body, the filler ring is deformed under mud pressure to fit the inner wall of the port slot to achieve self-locking operation, and the alignment baffle and stress ring ribs ensure the consistent length of the steel bar and the tensile strength.
It realizes self-locking operation without external sealing, simplifies the assembly process, ensures consistency in the length of the steel bar, and improves the tensile strength of the sleeve and mud to avoid mud sliding.
Smart Images

Figure CN223281566U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of grouting sleeves, in particular to an assembled building construction grouting sleeve. Background Art
[0002] A Chinese patent with announcement number CN214995261U discloses an assembled building construction grouting sleeve. When slurry comes out of the vent holes, the fan-shaped baffle is rotated to block the multiple vent holes, thereby preventing the slurry in the pipe body from leaking out of the vent holes, thereby preventing slurry waste. Grouting is then continuously performed into the pipe body to completely fill the pipe body with slurry and completely wrap the prefabricated end steel bars and the inserted end steel bars, making the hardened slurry more compact.
[0003] In the above patent, the grouting sleeve needs to be locked at both ends by a sleeve when grouting the steel bars to prevent the mud from flowing out. Once the steel bars are too long, the sleeve needs to be inserted from the end. The process is very cumbersome and cannot achieve efficient assembly operation. Utility Model Content
[0004] The purpose of the utility model is to provide an assembled grouting sleeve for building construction. When mud flows into the filling rubber ring, the filling rubber ring will be deformed due to pressure and then tightly fit against the inner wall of the port slot to prevent the outflow of mud, thereby realizing self-locking operation and eliminating the need for external sealing, which can solve the problems in the prior art.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an assembled building construction grouting sleeve, comprising a sleeve body, a grouting port is provided on the upper side of one side of the sleeve body, and a grouting port is provided on the lower side of one side of the sleeve body, wherein the grouting port and the grouting port are provided as an integrated structure with the sleeve body, and port slots are provided at both ends of the sleeve body, and a sealing ring is provided inside the port slot.
[0006] Furthermore, one end of the grouting port and the grouting port is provided with a threaded joint, the interior of the sleeve body is provided with a pre-buried cavity, and the middle section of the pre-buried cavity is provided with an alignment baffle.
[0007] Furthermore, the alignment baffle and the sleeve body are configured as an integrated structure, and stress ring ribs are provided on both sides of the alignment baffle, and the stress ring ribs are welded to the sleeve body.
[0008] Furthermore, the grouting port and the grouting port are connected through a pre-buried cavity.
[0009] Furthermore, a filling rubber ring is provided on the inner side of the port slot, and a mounting support plate is provided on the bottom of the filling rubber ring, wherein the mounting support plate is welded to the sleeve body.
[0010] Furthermore, a flow limiting cone bucket is provided at the bottom of the mounting support plate, and the flow limiting cone bucket is connected to the mounting support plate through a flange, wherein the flow limiting cone bucket extends to one side of the grouting port and the grouting port respectively.
[0011] Compared with the prior art, the beneficial effects of the present invention are:
[0012] 1. In this utility model, when the mud is injected into the embedded cavity through the grouting port, part of the mud will flow to the port slots at both ends. When the mud flows into the filling rubber ring, the filling rubber ring will be deformed by the pressure and then tightly fit with the inner wall of the port slot to prevent the mud from flowing out, realizing self-locking operation without the need for external blocking.
[0013] 2. In the present invention, the positioning baffle is mainly used to limit the steel bars entering at both ends to ensure that the lengths of the steel bars at both ends are consistent. The stress ring reinforcement can improve the tensile strength of the sleeve and the mud after the mud solidifies, thereby preventing the solidified mud from sliding inside the sleeve. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is the overall front view of the utility model;
[0015] Figure 2 It is an overall side view of the utility model;
[0016] Figure 3 It is a schematic diagram of the overall cross-sectional structure of the present utility model.
[0017] In the figure: 1. Sleeve body; 2. Sealing ring; 3. Filling rubber ring; 101. Grouting port; 102. Slurry discharge port; 103. Port slot; 104. Embedded cavity; 1041. Alignment baffle; 1042. Stress ring rib; 301. Mounting support plate; 302. Flow limiting cone. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0019] In order to solve the problem that the grouting sleeve needs to be locked with a sleeve at both ends to prevent the mud from flowing out when the steel bar is butt grouting, and once the steel bar is too long, the sleeve needs to be inserted from the end, which is a very cumbersome process and cannot achieve efficient assembly operation; please refer to Figure 1-3 , the utility model provides the following solutions:
[0020] A prefabricated grouting sleeve for building construction includes a sleeve body 1, a grouting port 101 is provided on the upper side of one side of the sleeve body 1, and a grouting port 102 is provided on the lower side of one side of the sleeve body 1, wherein the grouting port 101 and the grouting port 102 are provided as an integrated structure with the sleeve body 1, and port slots 103 are provided at both ends of the sleeve body 1, and a sealing ring 2 is provided inside the port slot 103, which can lock and limit the steel bars at the port slot 103.
[0021] Specifically, one end of the grouting port 101 and the grouting port 102 are both provided with threaded joints, the interior of the sleeve body 1 is provided with a pre-buried cavity 104 , and the middle section of the pre-buried cavity 104 is provided with an alignment baffle 1041 .
[0022] Specifically, the alignment baffle 1041 and the sleeve body 1 are configured as an integrated structure, and stress ring ribs 1042 are provided on both sides of the alignment baffle 1041. The stress ring ribs 1042 are welded to the sleeve body 1. The alignment baffle 1041 is mainly used to limit the steel bars entering at both ends to ensure that the lengths of the steel bars at both ends are consistent. The stress ring ribs 1042 can increase the tensile strength of the sleeve and the mud after the mud solidifies, thereby preventing the solidified mud from sliding inside the sleeve.
[0023] Specifically, the grouting port 101 and the grouting port 102 are connected through the embedded cavity 104 .
[0024] Specifically, a filling rubber ring 3 is provided on the inner side of the port slot 103. When in use, the steel bars need to be inserted from the inside of the filling rubber ring 3, and the inner side of the filling rubber ring 3 is in contact with the steel bars. A mounting support plate 301 is provided on the bottom of the filling rubber ring 3, wherein the mounting support plate 301 is welded to the sleeve body 1. When the mud is injected into the embedded cavity 104 through the grouting port 101, part of the mud will flow toward the port slots 103 at both ends. When the mud flows into the filling rubber ring 3, the filling rubber ring 3 will be deformed due to the pressure and then tightly fit with the inner wall of the port slot 103 to prevent the outflow of mud, thereby realizing self-locking operation without the need for external sealing.
[0025] Specifically, a flow limiting cone bucket 302 is provided at the bottom of the mounting support plate 301, and the flow limiting cone bucket 302 is connected to the mounting support plate 301 through a flange, wherein the flow limiting cone bucket 302 extends to one side of the grouting port 101 and the grouting port 102 respectively, and the narrow mouth area of the flow limiting cone bucket 302 faces the embedded cavity 104, which can effectively prevent a large amount of mud from flowing into the filling rubber ring 3 during pouring, limit the flow rate, and avoid the situation where the filling rubber ring 3 is dislocated due to large changes in pressure.
[0026] Working principle: when in use, the steel bar needs to be inserted from the port slot 103, and then the steel bar passes through the inside of the filling rubber ring 3 and enters the embedded cavity 104. The positioning baffle 1041 in the embedded cavity 104 is mainly to limit the steel bars entering at both ends to ensure that the length of the steel bars at both ends is consistent. The stress ring 1042 can increase the tensile strength of the sleeve and the mud after the mud solidifies, and avoid the sliding of the solidified mud inside the sleeve. When the mud is then injected into the embedded cavity 104 through the grouting port 101, part of the mud will flow to the port slots 103 at both ends. When the mud flows into the filling rubber ring 3, the filling rubber ring 3 will be deformed due to pressure and then tightly fit against the inner wall of the port slot 103 to prevent the outflow of mud, realizing self-locking operation without the need for external sealing.
[0027] It should be noted that, in this document, relational terms such as first and second, etc., are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that includes a list of elements includes not only those elements but also other elements not explicitly listed, or elements inherent to such process, method, article, or apparatus.
[0028] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An assembled building construction grouting sleeve, characterized in that: The invention comprises a sleeve body (1), wherein a grouting port (101) is provided on the upper side of one side of the sleeve body (1), and a grouting port (102) is provided on the lower side of one side of the sleeve body (1), wherein the grouting port (101) and the grouting port (102) are provided as an integrated structure with the sleeve body (1), and port slots (103) are provided at both ends of the sleeve body (1), and a sealing ring (2) is provided inside the port slot (103).
2. The assembled building construction grouting sleeve according to claim 1, characterized in that: One end of the grouting port (101) and the grouting port (102) are both provided with a threaded joint, the interior of the sleeve body (1) is provided with a pre-buried cavity (104), and the middle section of the pre-buried cavity (104) is provided with a positioning baffle (1041).
3. The assembled building construction grouting sleeve according to claim 2, characterized in that: The alignment baffle (1041) and the sleeve body (1) are configured as an integrated structure. Stress ring ribs (1042) are provided on both sides of the alignment baffle (1041), and the stress ring ribs (1042) are welded to the sleeve body (1).
4. The assembled building construction grouting sleeve according to claim 3, characterized in that: The grouting port (101) and the grouting port (102) are connected through a pre-buried cavity (104).
5. The assembled building construction grouting sleeve according to claim 1, characterized in that: A filling rubber ring (3) is provided on the inner side of the port slot (103), and a mounting support plate (301) is provided on the bottom of the filling rubber ring (3), wherein the mounting support plate (301) is welded to the sleeve body (1).
6. The assembled building construction grouting sleeve according to claim 5, characterized in that: A flow limiting cone hopper (302) is provided at the bottom of the mounting support plate (301), and the flow limiting cone hopper (302) is connected to the mounting support plate (301) via a flange, wherein the flow limiting cone hopper (302) extends to one side of the grouting port (101) and the grouting port (102), respectively.