Coal mine roadway tunneling equipment for mining engineering

By introducing a dust removal mechanism into the coal mine tunneling equipment, using a fan to attract and spray water to settle the dust, and recycling water resources through a filter, the problem of dust accumulation in the tunneling machine cab was solved, achieving clean operations and saving water resources.

CN223344033UActive Publication Date: 2025-09-16SHANXI ZHONGYANG CHINA RESOURCES LIANSHENG NANSHAN COAL IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422860558.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-22
Publication Date
2025-09-16
Estimated Expiration
2034-11-22

AI Technical Summary

Technical Problem

After a long period of cutting operation, a large amount of flying dust accumulates in the cab of the existing coal mine tunnel boring equipment, affecting the operator's vision and equipment use.

Method used

A coal mine tunnel excavation equipment with a dust removal mechanism is designed. A fan is used to attract flying dust and the dust is attached and settled by spraying water through a nozzle. The water is recycled after filtering. The filter is combined with a limit rod and a block structure to facilitate the replacement of the filter.

Benefits of technology

It effectively removes flying dust, improves the operator's field of vision, saves water resources, and has a simple structure and is easy to use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223344033U_ABST
    Figure CN223344033U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of tunneling equipment, and discloses coal mine tunnel tunneling equipment for mining engineering, which comprises a tunneling machine, a tunneling mechanism is arranged at the front part of the tunneling machine, a conveying mechanism is arranged at the bottom of the tunneling machine, a water sprinkling mechanism is arranged at the top of the tunneling machine, and a dust removal mechanism is arranged outside the tunneling machine. The dust removal mechanism comprises a fixing frame, the fixing frame is fixed to the exterior of the heading machine through fixing bolts, a water tank is arranged at the top of the fixing frame, and a pipeline is fixedly connected to the exterior of the water tank. The dust removal mechanism is used for sucking flying dust, the flying dust is attached by means of water flow sprayed by the spray head and driven to settle, the flying dust can be reused after being filtered by the filter, water resources are saved, and the problem that existing coal mine roadway tunneling equipment for mining engineering is inconvenient to use is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunneling equipment, in particular to coal mine tunneling equipment used in mining engineering. Background Art

[0002] The speed and quality of coal mining are both important factors affecting the development of my country's coal mining industry. Coal mine tunneling not only affects the speed of coal mining, but also the quality of coal mining. Therefore, it is necessary to ensure the smooth progress of coal mine tunneling construction, and coal mine tunneling requires the use of roadheaders.

[0003] The tunnel boring machines currently used include a walking mechanism, a cutting mechanism, a transfer mechanism, and a spraying mechanism, which can crush coal rocks and transfer them to the outside of the tunnel. At the same time, the spraying mechanism can be used to reduce the impact of flying dust during the cutting process. However, long-term cutting operations will cause a large amount of flying dust to accumulate inside the tunnel boring machine cab, affecting the use of the tunnel boring machine and the operator's vision. For this reason, we propose a coal mine tunnel boring equipment for mining engineering. Utility Model Content

[0004] In view of the inconvenience of using coal mine tunnel boring equipment for mining projects in the existing technology, the utility model provides a coal mine tunnel boring equipment for mining projects, which has the advantages of auxiliary sprinkler mechanism to complete dust removal operations in the tunnel boring machine cab area and save water.

[0005] To achieve the above-mentioned object, the present invention provides the following technical solution: A coal mine tunnel excavation equipment for mining engineering, comprising a tunneling machine, a tunneling mechanism installed at the front of the tunneling machine, a conveying mechanism provided at the bottom of the tunneling machine, a watering mechanism installed at the top of the tunneling machine, and a dust removal mechanism installed on the outside of the tunneling machine;

[0006] The dust removal mechanism includes a fixing frame, which is fixed to the outside of the tunnel boring machine by fixing bolts. A water tank is provided on the top of the fixing frame. A pipe is fixedly connected to the outside of the water tank. A filter is provided inside the pipe, and a filter is provided inside the filter.

[0007] Preferably, the dust removal mechanism also includes a fixed shell, which is fixed to the outside of the cab of the tunnel boring machine. The interior of the fixed shell is fixedly connected with a shrinkage tube, the tail of the shrinkage tube is fixedly connected with a connecting tube, the outside of the connecting tube is fixedly connected with a dust removal tube, and a fan is installed at the tail of the dust removal tube.

[0008] Preferably, the top of the fixing frame is fixedly connected to a bracket, a waste water tank is provided on the top of the bracket, an air vent is opened on the top of the waste water tank, a pipe is fixedly connected to the outside of the waste water tank, a one-way valve is provided inside the pipe, and the pipe is fixedly connected to the fan.

[0009] Preferably, a water pump is provided inside the water tank, the output end of the water pump is fixedly connected to a water pipe, an installation groove corresponding to the water pipe is opened inside the wastewater tank, the water pipe is fixed inside the installation groove, and a nozzle is installed at the tail of the water pipe.

[0010] Preferably, a water stop ring is fixedly connected to the inside of the water tank, a limiting rod is fixedly connected to the inside of the water tank, a groove body is provided on the outside of the limiting rod, a spring is fixedly connected to the inside of the groove body, and a clamping block is fixedly connected to the tail of the spring, and the spring can be contracted to allow the clamping block to move inside the groove body.

[0011] Preferably, the outside of the filter is fixedly connected with a fixing ring, the outside of the fixing ring is provided with a limiting groove corresponding to the limiting rod, the inner side wall of the limiting groove is provided with a clamping groove corresponding to the clamping block, and the clamping block can be clamped inside the clamping groove.

[0012] Preferably, a closing cover is installed on the top of the water tank, and the pipe is fixedly connected to the waste water tank, so that water can enter the water tank through the pipe.

[0013] Beneficial effects:

[0014] 1. The mining project uses coal mine tunneling equipment, which attracts flying dust through the fan set by the dust removal mechanism, and uses the water flow sprayed by the nozzle to attach the flying dust and drive it to settle. After being filtered by the filter, the water flow contaminated with flying dust can be reused to save water resources.

[0015] 2. The coal mine tunnel excavation equipment used in the mining project limits the position of the fixed ring by a limit rod to fix the position of the filter connected to the fixed ring. When disassembling, the fixed ring can be directly controlled to rotate, and the arc-shaped side wall of the slot corresponding to the block will squeeze the block to drive the spring to deform, so that the block is disengaged from the slot, and then the fixed ring and filter can be directly removed. The structure is simple and easy to use. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the structure of the dust removal mechanism of the utility model;

[0017] Figure 2 This is a schematic diagram of the structure of the utility model;

[0018] Figure 3 This is a schematic diagram of the cross-sectional structure of the utility model;

[0019] Figure 4 This is a schematic diagram of the structure of the water stop ring of the utility model;

[0020] Figure 5 This is a schematic diagram of the limit rod structure of the utility model.

[0021] In the figure: 1. Tunnel boring machine; 2. Tunneling mechanism; 3. Conveying mechanism; 4. Sprinkling mechanism; 5. Dust removal mechanism; 6. Fixed frame; 7. Water tank; 8. Pipeline; 9. Filter; 10. Filter screen; 11. Water stop ring; 12. Limit rod; 13. Spring; 14. Block; 15. Fixed ring; 16. Limit groove; 17. Closing cover; 18. Water pipe; 19. Bracket; 20. Wastewater tank; 21. Air vent; 22. Fixed shell; 23. Shrink tube; 24. Connecting tube; 25. Dust removal tube; 26. Fan. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0023] Example 1

[0024] See also Figure 1-Figure 5 A coal mine tunnel excavation equipment for mining engineering includes a tunneling machine 1, a tunneling mechanism 2 is installed at the front of the tunneling machine 1, a conveying mechanism 3 is provided at the bottom of the tunneling machine 1, a watering mechanism 4 is installed at the top of the tunneling machine 1, and a dust removal mechanism 5 is installed outside the tunneling machine 1;

[0025] The dust removal mechanism 5 includes a fixing frame 6, which is fixed to the outside of the tunnel boring machine 1 by fixing bolts. A water tank 7 is provided on the top of the fixing frame 6. A pipe 8 is fixedly connected to the outside of the water tank 7. A filter 9 is provided inside the pipe 8, and a filter screen 10 is provided inside the filter 9.

[0026] Among them, the dust removal mechanism 5 also includes a fixed shell 22, which is fixed to the outside of the cab of the tunnel boring machine 1. The interior of the fixed shell 22 is fixedly connected to a shrinkage tube 23, the tail of the shrinkage tube 23 is fixedly connected to a connecting tube 24, the outside of the connecting tube 24 is fixedly connected to a dust removal tube 25, and a fan 26 is installed at the tail of the dust removal tube 25.

[0027] Among them, the top of the fixed frame 6 is fixedly connected to the bracket 19, the top of the bracket 19 is provided with a waste water tank 20, the top of the waste water tank 20 is provided with an air vent 21, the outside of the waste water tank 20 is fixedly connected to a pipe, the inside of the pipe is provided with a one-way valve, and the pipe is fixedly connected to the fan 26.

[0028] Among them, a water pump is provided inside the water tank 7, and the output end of the water pump is fixedly connected to a water pipe 18. An installation groove corresponding to the water pipe 18 is opened inside the waste water tank 20, and the water pipe 18 is fixed inside the installation groove. A nozzle is installed at the tail of the water pipe 18.

[0029] A closing cover is installed on the top of the water tank 7 , and the pipe 8 is fixedly connected to the waste water tank 20 , so that water can flow into the water tank 7 through the pipe 8 .

[0030] Working principle: When the coal mine tunnel excavation equipment is used in mining projects, the coal rock can be crushed by the excavation mechanism 2, and the sprinkler mechanism 4 can spray water at the excavation mechanism 2 to reduce dust. The crushed coal rock is transported by the conveying mechanism 3, and then the fan 26 provided by the dust removal mechanism 5 is used to drive the air flow, so that the air at the tail of the contraction tube 23 carries the flying dust into the interior of the contraction tube 23, and attracts the flying dust. After being accelerated by the contraction tube 23 with a gradually decreasing diameter, it enters the connecting pipe 24 and reaches the dust removal pipe 25, and finally enters the interior of the wastewater tank 20. At the same time, the water pump drives the water flow inside the water tank 7 to spray into the interior of the wastewater tank 20 through the nozzle provided at the tail of the water pipe 18, adheres to the outside of the flying dust and drives sedimentation to realize dust removal operation. The water flow inside the wastewater tank 20 can be filtered through the filter 9 inside the pipe 8 and recovered to the interior of the water tank 7, realizing the recycling of water resources to save water resources.

[0031] Example 2

[0032] See also Figure 1-Figure 5 On the basis of embodiment 1, a water stop ring 11 is fixedly connected to the inside of the water tank 7, a limiting rod 12 is fixedly connected to the inside of the water tank 7, a groove is provided on the outside of the limiting rod 12, a spring 13 is fixedly connected to the inside of the groove, a block 14 is fixedly connected to the tail of the spring 13, the spring 13 can be contracted to make the block 14 move inside the groove, a fixing ring 15 is fixedly connected to the outside of the filter 9, a limiting groove 16 corresponding to the limiting rod 12 is provided on the outside of the fixing ring 15, and a card slot corresponding to the card block 14 is provided on the inner side wall of the limiting groove 16, and the card block 14 can be snapped into the inside of the card slot.

[0033] Working principle: When used in coal mine tunnel excavation equipment for mining projects, the position of the fixing ring 15 can be limited by the limit rod 12 to fix the position of the filter 9 connected to the fixing ring 15. When disassembling, the fixing ring 15 can be directly controlled to rotate, and the arc-shaped side wall of the slot corresponding to the block 14 will squeeze the block 14 to drive the spring 13 to deform, so that the block 14 is out of the slot, and then the fixing ring 15 and the filter 9 can be directly removed. The structure is simple and easy to use.

[0034] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A coal mine tunneling equipment for mining engineering, comprising a tunneling machine (1), characterized in that: The front of the tunnel boring machine (1) is equipped with a tunneling mechanism (2), the bottom of the tunnel boring machine (1) is provided with a conveying mechanism (3), the top of the tunnel boring machine (1) is equipped with a water sprinkling mechanism (4), and the outside of the tunnel boring machine (1) is equipped with a dust removal mechanism (5); The dust removal mechanism (5) comprises a fixing frame (6), the fixing frame (6) being fixed to the outside of the roadheader (1) by fixing bolts, a water tank (7) being provided on the top of the fixing frame (6), a pipe (8) being fixedly connected to the outside of the water tank (7), a filter (9) being provided inside the pipe (8), and a filter screen (10) being provided inside the filter (9).

2. The coal mine tunneling equipment for mining engineering according to claim 1, characterized in that: The dust removal mechanism (5) further comprises a fixed housing (22), the fixed housing (22) being fixed to the outside of a cab provided on the roadheader (1), the interior of the fixed housing (22) being fixedly connected to a shrinkage tube (23), the tail of the shrinkage tube (23) being fixedly connected to a connecting tube (24), the exterior of the connecting tube (24) being fixedly connected to a dust removal tube (25), and the tail of the dust removal tube (25) being installed with a fan (26).

3. The coal mine tunneling equipment for mining engineering according to claim 2, characterized in that: The top of the fixing frame (6) is fixedly connected to a bracket (19), a waste water tank (20) is provided on the top of the bracket (19), a vent hole (21) is provided on the top of the waste water tank (20), the outside of the waste water tank (20) is fixedly connected to a pipeline, a one-way valve is provided inside the pipeline, and the pipeline is fixedly connected to the fan (26).

4. The coal mine tunneling equipment for mining engineering according to claim 3, characterized in that: A water pump is provided inside the water tank (7), and a water pipe (18) is fixedly connected to the output end of the water pump. A mounting groove corresponding to the water pipe (18) is provided inside the waste water tank (20), and the water pipe (18) is fixed inside the mounting groove. A nozzle is installed at the tail end of the water pipe (18).

5. The coal mine tunneling equipment for mining engineering according to claim 1, characterized in that: A water stop ring (11) is fixedly connected to the interior of the water tank (7), a limiting rod (12) is fixedly connected to the interior of the water tank (7), a groove body is provided on the exterior of the limiting rod (12), a spring (13) is fixedly connected to the interior of the groove body, and a clamping block (14) is fixedly connected to the tail of the spring (13).

6. The coal mine tunneling equipment for mining engineering according to claim 5, characterized in that: The outside of the filter (9) is fixedly connected to a fixing ring (15), the outside of the fixing ring (15) is provided with a limiting groove (16) corresponding to the limiting rod (12), and the inner side wall of the limiting groove (16) is provided with a clamping groove corresponding to the clamping block (14).

7. The coal mine tunneling equipment for mining engineering according to claim 3, characterized in that: A closing cover is installed on the top of the water tank (7), and the pipe (8) is fixedly connected to the waste water tank (20).