Integrally movable drilling platform suitable for dam slope construction
By designing an integrally movable drilling platform suitable for dam slope construction and adopting connecting rod assemblies and reinforcing rod structures, the problem of time-consuming and labor-intensive installation of drilling equipment under traditional methods is solved, the stability and safety of the platform are achieved, and the construction efficiency and safety are improved.
Patent Information
- Application Number
- CN202422822750.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-19
- Publication Date
- 2025-09-23
- Estimated Expiration
- 2034-11-19
AI Technical Summary
Under special terrain conditions such as dam slopes, traditional foundation construction methods are difficult to implement, resulting in time-consuming and labor-intensive installation of drilling equipment, and the platform needs to be dismantled and rebuilt after each drilling is completed, which is inefficient.
A fully movable drilling platform suitable for dam slope construction is designed. It adopts connecting rod assemblies and reinforcing rod structures, and is directly moved by lifting equipment to ensure the stability and safety of the platform. It includes inclined connecting rods and horizontal connections, and is equipped with bamboo springboards and anti-slip net partitions to improve operating comfort and safety.
The drilling platform can be reused, which saves costs, time and labor, eliminates the need for frequent disassembly and reconstruction, and improves construction efficiency and safety.
Smart Images

Figure CN223374068U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of dam slope construction, in particular to an integrally movable drilling platform suitable for dam slope construction. Background Art
[0002] The installation of drilling equipment is a complex and meticulous process, encompassing not only the installation of the equipment itself but also a series of preliminary and site preparations. Specifically, this work includes, but is not limited to, building the foundation, installing the abutment, erecting the rig, and installing the machinery and ancillary equipment. Each step is crucial and directly impacts the efficiency and safety of subsequent drilling operations.
[0003] However, traditional foundation construction methods are often difficult to implement in unusual terrain conditions, such as dam slopes. In such cases, scaffolding platforms or sandbags are often used to create a stable working surface. While this method can provide a short-term solution, it requires dismantling and rebuilding the platform after drilling and moving to the next location, a time-consuming and labor-intensive process. Utility Model Content
[0004] The purpose of the utility model is to overcome the above technical deficiencies, provide a fully movable drilling platform suitable for dam slope construction, and solve the time-consuming and labor-intensive technical problems in the technical field of dam slope construction.
[0005] In order to achieve the above technical objectives, the technical solution of the utility model provides an integrally movable drilling platform suitable for dam slope construction, comprising:
[0006] A connecting rod assembly, wherein multiple groups of the connecting rod assemblies are arranged in an array; multiple connecting rod assemblies are fixedly connected by a first web rod and a second web rod; the connecting rod assembly includes a first connecting rod, a second connecting rod and a third connecting rod; the first connecting rod is arranged at an angle; the sum of the angle between the first connecting rod and the horizontal plane and the angle between the dam slope and the horizontal plane is 90°; one end of the first connecting rod is welded and fixedly connected to one end of the second connecting rod; the second connecting rod is arranged horizontally; the other end of the second connecting rod is welded and fixedly connected to the upper end of the third connecting rod; the third connecting rod is arranged at 90° to the horizontal plane; the lower end of the third connecting rod is welded and fixedly connected to the end of the first connecting rod away from the second connecting rod.
[0007] Compared with the prior art, the beneficial effects of the present invention include:
[0008] 1. Reusable and cost-saving: The integrally movable drilling platform provided by the utility model, which is suitable for dam slope construction, can be directly hoisted and moved by hoisting equipment such as cranes, and can be used multiple times, saving construction costs.
[0009] 2. Save time and labor: The integrally movable drilling platform suitable for dam slope construction provided by the utility model does not need to be built or disassembled during dam slope construction, which saves time and labor. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 This is a schematic diagram of the three-dimensional structure of an integrally movable drilling platform suitable for dam slope construction provided by the utility model;
[0011] Figure 2 The utility model is a schematic side view of the structure of an integrally movable drilling platform suitable for dam slope construction. DETAILED DESCRIPTION
[0012] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0013] It should be noted that when an element is referred to as being "fixed to" another element, it may be directly attached to the other element or there may be an intermediate element. When an element is referred to as being "connected to" another element, it may be directly connected to the other element or there may be an intermediate element. The terms "vertical," "horizontal," "left," "right," and similar expressions used herein are for illustrative purposes only and do not represent the only implementation methods.
[0014] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by those skilled in the art to which this invention pertains. The terms used herein in the specification of this invention are intended only to describe specific embodiments and are not intended to limit the invention. The term "and / or" as used herein includes any and all combinations of one or more of the associated listed items.
[0015] See also Figure 1 、 Figure 2 This embodiment provides an integrally movable drilling platform suitable for dam slope construction, including: a connecting rod assembly 1, a first web member 2, a second web member 3, a reinforcing rod 14, a bamboo springboard 4, an anti-slip net partition 5 and a safety protection fence 6.
[0016] The integrally movable drilling platform suitable for dam slope construction provided in this embodiment is mainly used for dam slopes in some near-shore shallow water areas such as rivers, reservoirs, ponds, and lakes.
[0017] Furthermore, multiple groups of the connecting rod assemblies 1 are arranged in an array, and the multiple connecting rod assemblies 1 are fixedly connected through the first web 2 and the second web 3. The connecting rod assembly 1 includes a first connecting rod 11, a second connecting rod 12 and a third connecting rod 13.
[0018] Furthermore, the first connecting rod 11 is arranged at an angle, and the sum of the angles between the first connecting rod 11 and the horizontal plane and the angle between the dam slope 7 and the horizontal plane is 90°. In order to keep the drilling platform level, thereby ensuring the stability of the drilling platform and the safety of operation, specifically, the table top of the drilling platform is in a horizontal state, making the operators standing on the drilling platform safer and more comfortable when working, reducing the inconvenience caused by the tilt of the drilling platform.
[0019] Furthermore, one end of the first connecting rod 11 is welded and fixedly connected to one end of the second connecting rod 12, the second connecting rod 12 is arranged horizontally, and the other end of the second connecting rod 12 is welded and fixedly connected to the upper end of the third connecting rod 13; the third connecting rod 13 is arranged at 90° to the horizontal plane, and the lower end of the third connecting rod 13 is welded and fixedly connected to the end of the first connecting rod 11 away from the second connecting rod 12.
[0020] Furthermore, the first connecting rod 11, the second connecting rod 12 and the third connecting rod 13 are welded and fixedly connected end to end in sequence to form a triangular shape, thereby improving the stability of the drilling platform.
[0021] Furthermore, the connecting rod assembly 2 also includes a reinforcing rod 14, and the two reinforcing rods 14 are vertically cross-welded and fixedly connected, wherein one end of the reinforcing rod 14 is welded and fixedly connected to one side of the second connecting rod 12, and the other end of the reinforcing rod 14 is welded and fixedly connected to one side of the first connecting rod 11; wherein one end of the other reinforcing rod 14 is welded and fixedly connected to one side of the first connecting rod 11, and the other end of the reinforcing rod 14 is welded and fixedly connected to one side of the third connecting rod 13.
[0022] In this embodiment, two cross-arranged reinforcing rods 14 are welded in each of the connecting rod assemblies 1. The reinforcing rods 14 increase the rigidity of the structure, so that the drilling platform can better resist the effects of external loads and forces, such as wind loads, equipment weight, operator activities, etc., which helps to prevent the drilling platform from deformation or instability during use; the reinforcing rods 14 can disperse the concentrated load to a larger area, thereby reducing the burden on a single support point, which is very important for ensuring that all parts of the drilling platform are evenly stressed and can avoid damage or failure caused by local overload; the drilling platform will vibrate when working, and the reinforcing rods 14 can enhance the overall seismic resistance of the drilling platform and reduce the impact of vibration on the structure of the drilling platform, which helps to extend the service life of the drilling platform and ensure its normal operation.
[0023] Furthermore, the cross-welding points of the two reinforcing rods 14 in the two adjacent connecting rod assemblies 1 are fixedly connected by welding through the first web member 2, and the welding points of the first connecting rod 11 and the third connecting rod 13 in the two adjacent connecting rod assemblies 1 are fixedly connected by welding through the second web member 3.
[0024] In this embodiment, the first web member 2 and the second web member 3 serve to fix the connection and enhance the stability of the drilling platform, wherein the first web member 2 and the second web member 3 are arranged relatively parallel.
[0025] Furthermore, the first connecting rod 11, the second connecting rod 12, the third connecting rod 13, the first web member 2 and the second web member 3 are all made of channel steel, the cross-sections of the first connecting rod 11, the second connecting rod 12, the third connecting rod 13, the first web member 2 and the second web member 3 are all U-shaped, and the reinforcing rod 14 is made of square steel pipe.
[0026] Furthermore, a bamboo springboard 4 is laid on the upper ends of the plurality of adjacently welded and fixedly connected connecting rod assemblies, and an anti-slip mesh partition 5 is laid on the upper end surface of the bamboo strip board 4 .
[0027] In this embodiment, the anti-slip mesh partition 5 has a rough surface, which increases friction and effectively prevents operators from slipping in a wet or oily environment, especially on rainy days, in a humid environment or when there is oil on the surface; the anti-slip mesh partition 5 can prevent tools, materials and other items from sliding on the table, reducing safety hazards caused by items slipping.
[0028] Furthermore, a safety fence 6 is provided at the upper end of the plurality of adjacent connecting rod assemblies 1 fixedly connected by welding, and the height of the safety fence 6 is not less than 1.4 m.
[0029] Preferably, the safety guard fence 6 is formed by welding and fixing a plurality of steel pipes. In high-altitude working areas such as the drilling platform, the safety guard fence 6 can prevent workers from accidentally falling and ensure their safety.
[0030] In this embodiment, the span of the drilling platform is not less than the minimum length of the drilling platform required for normal operation of the drilling rig, which is usually 4 meters.
[0031] In this embodiment, the width of the drilling platform is not less than the minimum width of the drilling platform required for normal operation of the drilling rig, which is usually 3m.
[0032] Before using the drilling platform, auxiliary equipment 8 is required for assistance, wherein the auxiliary equipment 8 includes a lifting rope 81, a safety rope 82, a safety anchor rod 83, a lifting anchor rod 84, a manual hoist 85 and a lifting chain 86.
[0033] Furthermore, the safety anchors 83 are fixed to both sides of the upper end surface of the dam slope 7, and the lifting anchors 84 are fixed to the middle area of the upper end surface of the dam slope 7. The safety anchors 83 are fixedly connected to the drilling platform via safety ropes 82. One end of the manual hoist 85 is fixedly connected to the lifting anchors 84, and the manual hoist 85 is connected to the drilling platform via a lifting rope 81. Specifically, when raising or lowering the drilling platform, the operator pulls or shakes the lifting chain 86 to raise or lower the drilling platform.
[0034] Furthermore, the safety rope 82 serves as an auxiliary protection device for the manual hoist 85, which can prevent the drilling platform from suddenly falling when the manual hoist 85 fails or breaks, thereby protecting the safety of personnel and equipment below. At the same time, the safety rope 82 can provide a certain buffer when the drilling platform falls, slowing down the falling speed, reducing the impact force, and reducing the severity of the accident.
[0035] Preferably, the safety rope 82 and the lifting rope 81 are steel cables. The selection of the steel cables takes into account a certain safety factor to ensure safety even in extreme situations. Common safety factors range from 5 to 10, complying with international and national standards such as ISO (International Organization for Standardization) and EN (European Standards), China's GB / T standards, and the United States' ASME standards. When the maximum load does not exceed 1000kg, the recommended steel cable diameter is no less than 6mm; when the maximum load is between 1000kg and 3000kg, the recommended steel cable diameter is no less than 8mm; and when the maximum load exceeds 3000kg, the recommended steel cable diameter is no less than 10mm.
[0036] Working principle: The utility model provides an integrally movable drilling platform suitable for dam slope construction, comprising: a connecting rod assembly 1, a first web member 2, a second web member 3, a reinforcing rod 14, a bamboo springboard 4, an anti-slip net partition 5 and a safety protection fence 6. Multiple groups of connecting rod assemblies 1 are arranged in an array, and multiple connecting rod assemblies 1 are fixedly connected by a first web 2 and a second web 3. The connecting rod assembly 1 includes a first connecting rod 11, a second connecting rod 12 and a third connecting rod 13. The first connecting rod 11 is arranged at an angle, and the sum of the angle between the first connecting rod 11 and the horizontal plane and the angle between the dam slope 7 and the horizontal plane is 90°. In order to keep the drilling platform level, thereby ensuring the stability of the drilling platform and the safety of operation, specifically, the table top of the drilling platform is in a horizontal state, making it safer and more comfortable for operators standing on the drilling platform when working, and reducing the inconvenience caused by the tilt of the drilling platform. One end of the first connecting rod 11 is welded and fixedly connected to one end of the second connecting rod 12, and the second connecting rod 12 is arranged horizontally. The other end of the second connecting rod 12 is welded and fixedly connected to the upper end of the third connecting rod 13; the third connecting rod 13 is arranged at 90° to the horizontal plane, and the lower end of the third connecting rod 13 is welded and fixedly connected to the end of the first connecting rod 11 away from the second connecting rod 12. When raising or lowering the drilling platform, the operator pulls or shakes the lifting chain 86 to thereby raise or lower the drilling platform.
[0037] The specific embodiments of the present invention described above do not limit the scope of protection of the present invention. Any other corresponding changes and modifications made based on the technical concept of the present invention should be included in the scope of protection of the claims of the present invention.
Claims
1. A fully movable drilling platform suitable for dam slope construction, characterized in that: include: A connecting rod assembly, wherein multiple groups of the connecting rod assemblies are arranged in an array; multiple connecting rod assemblies are fixedly connected by a first web rod and a second web rod; the connecting rod assembly includes a first connecting rod, a second connecting rod and a third connecting rod; the first connecting rod is arranged at an angle; the sum of the angle between the first connecting rod and the horizontal plane and the angle between the dam slope and the horizontal plane is 90°; one end of the first connecting rod is welded and fixedly connected to one end of the second connecting rod; the second connecting rod is arranged horizontally; the other end of the second connecting rod is welded and fixedly connected to the upper end of the third connecting rod; the third connecting rod is arranged at 90° to the horizontal plane; the lower end of the third connecting rod is welded and fixedly connected to the end of the first connecting rod away from the second connecting rod.
2. The integrally movable drilling platform suitable for dam slope construction according to claim 1 is characterized in that: The connecting rod assembly also includes a reinforcing rod; two of the reinforcing rods are vertically crossed and welded and fixedly connected; one end of one of the reinforcing rods is welded and fixedly connected to one side of the second connecting rod, and the other end of the reinforcing rod is welded and fixedly connected to one side of the first connecting rod; one end of the other reinforcing rod is welded and fixedly connected to one side of the first connecting rod, and the other end of the reinforcing rod is welded and fixedly connected to one side of the third connecting rod.
3. The integrally movable drilling platform suitable for dam slope construction according to claim 2 is characterized in that: The cross welding points of the two reinforcing rods in two adjacent connecting rod assemblies are fixedly connected by welding through the first web; the welding points of the first connecting rod and the third connecting rod in two adjacent connecting rod assemblies are fixedly connected by welding through the second web.
4. The integrally movable drilling platform suitable for dam slope construction according to claim 3 is characterized in that: The first connecting rod, the second connecting rod, the third connecting rod, the first web member and the second web member are all made of channel steel; the cross sections of the first connecting rod, the second connecting rod, the third connecting rod, the first web member and the second web member are all U-shaped; the reinforcing rod is made of square steel pipe.
5. The integrally movable drilling platform suitable for dam slope construction according to claim 4 is characterized in that: A bamboo springboard is laid on the upper ends of a plurality of adjacent connecting rod assemblies that are fixedly connected by welding; and an anti-skid net partition is laid on the upper end surface of the bamboo springboard.
6. The integrally movable drilling platform suitable for dam slope construction according to claim 5, characterized in that: A safety fence is provided at the upper end of the plurality of adjacent connecting rod assemblies fixedly connected by welding; the height of the safety fence is not less than 1.4m.