Drilling machine for underground pipeline construction
Through the coordination of structures such as the base, support frame, rotating ring, clamping plate, drill rod, drill bit and support plate, the problem that existing drilling rigs cannot drill longer holes is solved, and drilling efficiency and flexibility are improved.
Patent Information
- Application Number
- CN202423172505.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-23
- Publication Date
- 2025-10-10
- Estimated Expiration
- 2034-12-23
AI Technical Summary
Existing drilling rigs for underground pipeline construction are unable to drill long pipeline laying holes, resulting in low drilling efficiency.
By using the coordinated use of structures such as the base, support frame, rotating ring, clamping plate, drill rod, drill bit and support plate, and through the coordination of structures such as the electric lifting platform, slide, electric push rod and push plate, the length of the drill rod can be increased and the position can be flexibly adjusted, thereby improving drilling efficiency.
The convenient increase of the drill rod length and the flexible adjustment of the position are realized, the drilling efficiency and the practicality of the device are improved, and the problem of insufficient drilling length is avoided.
Smart Images

Figure CN223423932U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of drilling rigs, in particular to a drilling rig for underground pipeline construction. Background Art
[0002] Underground pipelines typically refer to gas, water, and electrical cables. In municipal construction, the rational use of underground pipeline construction techniques can ensure the stable and safe operation of these pipelines, which are closely related to residents' lives. Traditional underground pipeline laying methods often involve excavating the road surface through open trenches, which can affect traffic during construction and cause road subsidence or cracks.
[0003] For example, the utility model patent with application number: 202321784143.7 discloses a drilling rig for underground pipeline construction, which relates to the technical field of drilling rigs, specifically a drilling rig for underground pipeline construction, including a lifting mechanism, a drilling mechanism and a supporting mechanism. The lifting mechanism includes a base, the left end of the base is movably connected to a shaft rod 1, the right end of the base is provided with a slide groove, the interior of the slide groove is clamped with a shaft rod 2, the tops of the shaft rods 1 and 2 are connected with scissor arms, the top of the scissor arms is slidably mounted with a top seat, and the drilling mechanism includes a frame mounted on the top of the top seat. The drilling rig for underground pipeline construction, by setting up a lifting mechanism, uses a hydraulic cylinder to push the shaft rod 2 back and forth before drilling, and can adjust the height of the lifting mechanism, which is convenient for accurately adjusting the position of the drill hole. It does not require support and is more convenient to use.
[0004] Although the device in the above patent can adjust the height of the lifting mechanism, which facilitates accurate adjustment of the drilling position and does not require support, making it more convenient to use, in actual use, since underground pipelines are generally laid over a long length, when using the device for drilling work, it is impossible to drill a longer pipeline laying hole, thereby reducing the drilling efficiency.
[0005] Therefore, it is necessary to provide a kind of underground pipeline construction drilling rig to solve the above-mentioned technical problems. Utility Model Content
[0006] The purpose of the utility model is to solve the shortcomings of the prior art and to propose a drilling rig for underground pipeline construction.
[0007] In order to achieve the above object, the utility model discloses the following technical scheme: a drilling machine for underground pipeline construction, including the base, the top of base is provided with electric lifting platform, be provided with support frame on electric lifting platform, the support frame is U type, the both sides between the inner wall of support frame are fixedly connected with guide rod, the outer surface of guide rod is swingly connected with two sliding blocks, the top of one of sliding blocks is fixedly connected with two fixed plates, and the opposite side between two fixed plates is rotatably connected with the rotating ring, the outer surface of rotating ring is fixedly installed with hydraulic cylinder, and the telescopic end of hydraulic cylinder is fixedly connected with clamping plate, clamping plate is arc-shaped setting, the inside of rotating ring is provided with drill rod, the one end of drill rod is provided with screw groove, and the other end of drill rod is fixedly connected with drill bit, two support plates are arranged on the support frame, and mobile assembly, rotating assembly and drive assembly are arranged on the base.
[0008] As further description of the above technical scheme:
[0009] One side of the inner wall of the support frame is fixedly connected with a spring, and the other end of the spring is fixedly connected with one side of one of the sliding blocks.
[0010] As further description of the above technical scheme:
[0011] One of the support plates is fixedly connected to the top of the support frame, and the other support plate is fixedly connected to the top of one of the sliding blocks, and a plurality of balls are embedded in the interiors of the two support plates.
[0012] As further description of the above technical scheme:
[0013] The mobile assembly includes a sliding groove, the sliding groove is provided in the top of the electric lifting platform, the inside of the sliding groove is fixedly installed with an electric push rod, the telescopic end of the electric push rod is fixedly connected with a push plate, the push plate is slidably connected with the sliding groove, and the push plate is fixedly connected with the bottom of the support frame.
[0014] As further description of the above technical scheme:
[0015] The rotating assembly includes a motor and a gear ring, the motor is fixedly installed on one side of one of the fixed plates, the output end of the motor is fixedly connected with a gear, the gear ring is fixedly sleeved on the outer surface of the rotating ring, and the gear is engaged with the gear ring.
[0016] As further description of the above technical scheme:
[0017] The drive assembly includes a motor and a threaded rod, the motor is fixedly installed on one side of the support frame, the threaded rod is rotatably connected between the inner walls of the support frame, and the output end of the motor is fixedly connected with one end of the threaded rod.
[0018] As a further description of the above technical solution:
[0019] The threaded rod is threadedly connected to one of the sliders, and the threaded rod movably passes through the other slider.
[0020] The utility model has the following beneficial effects:
[0021] 1. Compared with the existing technology, the drilling rig for underground pipeline construction, through the coordinated use of structures such as the base, support frame, rotating ring, clamping plate, drill rod, drill bit and support plate, can conveniently increase the length of the drill rod, and rotate it after clamping it to perform drilling work, which is convenient and fast, and avoids the problem of shorter drilling length caused by the inability to increase the drilling mechanism, thereby improving the drilling efficiency.
[0022] 2. Compared with the existing technology, the drilling rig for underground pipeline construction can adjust the position of the drill bit when in use up and down and left and right through the coordinated use of structures such as an electric lifting platform, a slide, an electric push rod and a push plate. It is convenient and quick, and there is no need to move the entire device for adjustment, thereby improving the practicality of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 This is a three-dimensional schematic diagram of the overall structure of a drilling rig for underground pipeline construction proposed by the utility model;
[0024] Figure 2 This is a schematic diagram of the structure of motor 1 and motor 2 of a drilling rig for underground pipeline construction proposed by the present invention;
[0025] Figure 3 This is a schematic diagram of the structure of a push plate and a slide chute of a drilling rig for underground pipeline construction proposed by the utility model;
[0026] Figure 4 The utility model is a schematic diagram of the structure of the gears and gear rings of a drilling rig for underground pipeline construction proposed by the present invention.
[0027] Legend:
[0028] 1. Base; 2. Electric lifting platform; 3. Support frame; 4. Guide rod; 5. Slider; 6. Fixed plate; 7. Rotating ring; 8. Hydraulic cylinder; 9. Clamping plate; 10. Drill rod; 11. Threaded groove; 12. Drill bit; 13. Support plate; 14. Spring; 15. Ball bearing; 16. Slide; 17. Electric push rod; 18. Push plate; 19. Motor 1; 20. Gear ring; 21. Gear; 22. Motor 2; 23. Threaded rod. DETAILED DESCRIPTION
[0029] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of the utility model.
[0030] With reference to Figure 1-4 The utility model provides a drilling machine for underground pipeline construction: including base 1, the top of base 1 is provided with electric lifting platform 2, be provided with support frame 3 on electric lifting platform 2, the both sides between the inner wall of support frame 3 are fixedly connected with guide rod 4, two sliding blocks 5 are movably connected to the outer surface of guide rod 4, the top of one of sliding blocks 5 is fixedly connected with two fixed plates 6, the opposite side between two fixed plates 6 is rotatably connected with rotating ring 7, the outer surface of rotating ring 7 is fixedly installed with hydraulic cylinder 8, hydraulic cylinder 8 has certain distance with guide rod 4 and threaded rod 23, so that hydraulic cylinder 8 will not collide with guide rod 4 and threaded rod 23 in the use process, the telescopic end of hydraulic cylinder 8 is fixedly connected with clamping plate 9, the inside of rotating ring 7 is provided with drill rod 10, the one end of drill rod 10 is provided with thread groove 11, the other end of drill rod 10 is fixedly connected with drill bit 12, one side of the inner wall of support frame 3 is fixedly connected with spring 14, the other end of spring 14 is fixedly connected with one side of one of sliding blocks 5, two support plates 13 are set up on support frame 3, moving assembly, rotating assembly and drive assembly are set up on base 1, through the cooperation of base 1, support frame 3, rotating ring 7, clamping plate 9, drill rod 10, drill bit 12 and support plate 13, the length of drill rod 10 can be conveniently increased, and the drill rod 10 can be conveniently rotated after clamping, which is convenient and fast, and avoids the problem that the drilling mechanism cannot be increased, resulting in short drilling length, thereby improving the drilling efficiency.
[0031] One of support plates 13 is fixedly connected to the top of support frame 3, and the other support plate 13 is fixedly connected to the top of one of sliding blocks 5. A plurality of balls 15 are embedded in the interiors of the two support plates 13. Through the arrangement of the support plates 13, the drill rod 10 can be supported to prevent it from sagging under the action of gravity after being released from clamping and affecting the quality of drilling. Through the arrangement of the balls 15, the friction between the drill rod 10 and the support plates 13 can be reduced.
[0032] The moving component includes a slide 16, which is opened at the top of the electric lifting platform 2. An electric push rod 17 is fixedly installed inside the slide 16. The telescopic end of the electric push rod 17 is fixedly connected to a push plate 18. The push plate 18 is slidably connected to the slide 16, and the push plate 18 is fixedly connected to the bottom of the support frame 3. Through the coordinated use of structures such as the electric lifting platform 2, the slide 16, the electric push rod 17 and the push plate 18, the position of the drill bit 12 during use can be adjusted up and down and left and right, which is convenient and quick, and there is no need to move the entire device for adjustment, thereby improving the practicality of the device.
[0033] The rotating assembly includes a motor 19 and a gear ring 20. The motor 19 is fixedly installed on one side of one of the fixed plates 6. The output end of the motor 19 is fixedly connected to a gear 21. The gear ring 20 is fixedly sleeved on the outer surface of the rotating ring 7. The gear 21 is engaged with the gear ring 20. Through the setting of the rotating assembly, the rotating ring 7 and the clamped drill rod 10 can be driven to rotate synchronously, thereby causing the drill bit 12 to rotate, and with the cooperation of structures such as the motor 2 22 and the guide rod 4, it can be drilled into the soil.
[0034] The driving assembly includes a second motor 22 and a threaded rod 23. The second motor 22 is fixedly mounted on one side of the support frame 3. The threaded rod 23 is rotatably connected between the two sides of the inner wall of the support frame 3. The output end of the second motor 22 is fixedly connected to one end of the threaded rod 23. The threaded rod 23 is threadedly connected to one of the sliders 5. The threaded rod 23 movably passes through the other slider 5. Through the setting of the driving assembly, it can drive one of the sliders 5 and the drill bit 12 to move after rotation to perform drilling work.
[0035] Working principle: During operation, the drilling position of the drill bit 12 can be adjusted according to the position of the pipeline to be laid, that is, after the electric lifting platform 2 is started, it drives the support frame 3 to move up and down synchronously, and can synchronously drive the drill bit 12 to move up and down, and adjust its use height. The electric push rod 17 is started to extend or retract its telescopic end, driving the push plate 18 to slide inside the slide groove 16. The push plate 18 drives the support frame 3 and the drill bit 12 and other structures to move synchronously, so that the horizontal position of the drill bit 12 when in use can be adjusted left and right;
[0036] After adjusting the use position of the drill bit 12, start the motor 19 to drive the gear 21 to rotate, the gear 21 drives the gear ring 20 meshing with it to rotate, the gear ring 20 drives the rotating ring 7, the clamped drill rod 10 and the drill bit 12 to rotate synchronously, and then start the motor 22 to drive the threaded rod 23 to rotate. Under the guiding and limiting action of the guide rod 4, the slider 5 threadedly connected to the threaded rod 23 drives the corresponding fixed plate 6, rotating ring 7, clamping plate 9, drill rod 10 and drill bit 12 to move synchronously along the axial direction of the threaded rod 23, and cooperate with the rotating drill bit 12 to perform drilling work. During the drilling process, after one section of the drill rod 10 has been partially drilled into the soil, another new section can be taken out. The drill rod 10 is inserted into the support plate 13 on the other slider 5, and the other end that matches the thread groove 11 is threadedly connected to the thread groove 11. Then the hydraulic cylinder 8 is started to drive the clamping plate 9 to move up. After the clamping of the corresponding drill rod 10 is released, the motor 22 is started to drive the threaded rod 23 to reverse, and the corresponding slider 5 and the rotating ring 7 can be moved to the side close to the spring 14. In the process of moving, after squeezing the other slider 5 and the spring 14, the newly added drill rod 10 can be clamped and fixed near one end by the hydraulic cylinder 8 again, and the drill bit 12 and the drill rod 10 partially drilled into the soil can be used to drill again to increase the length of the drill hole.
[0037] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent replacements for some of the technical features therein. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A drilling rig for underground pipeline construction, comprising a base (1), characterized in that: An electric lifting platform (2) is provided on the top of the base (1), and a support frame (3) is provided on the electric lifting platform (2). A guide rod (4) is fixedly connected between the two sides of the inner wall of the support frame (3), and the outer surface of the guide rod (4) is movably connected to two sliders (5), the top of one of the sliders (5) is fixedly connected to two fixed plates (6), and a rotating ring (7) is rotatably connected between the opposite sides of the two fixed plates (6). A hydraulic cylinder (8) is fixedly installed on the outer surface of the rotating ring (7), and the telescopic end of the hydraulic cylinder (8) is fixedly connected to a clamping plate (9). A drill rod (10) is provided inside the rotating ring (7), and one end of the drill rod (10) is provided with a threaded groove (11), and the other end of the drill rod (10) is fixedly connected to a drill bit (12). Two support plates (13) are provided on the support frame (3), and a moving component, a rotating component and a driving component are provided on the base (1).
2. A drilling rig for underground pipeline construction according to claim 1, characterized in that: A spring (14) is fixedly connected to one side of the inner wall of the support frame (3), and the other end of the spring (14) is fixedly connected to one side of one of the sliders (5).
3. The drilling rig for underground pipeline construction according to claim 1, characterized in that: One of the support plates (13) is fixedly connected to the top of the support frame (3), and the other support plate (13) is fixedly connected to the top of one of the sliders (5). A plurality of balls (15) are embedded in the interior of the two support plates (13).
4. The drilling rig for underground pipeline construction according to claim 1, characterized in that: The moving component includes a slide groove (16), the slide groove (16) is opened on the top of the electric lifting platform (2), an electric push rod (17) is fixedly installed inside the slide groove (16), the telescopic end of the electric push rod (17) is fixedly connected to a push plate (18), the push plate (18) is slidably connected to the slide groove (16), and the push plate (18) is fixedly connected to the bottom of the support frame (3).
5. The drilling rig for underground pipeline construction according to claim 1, characterized in that: The rotating assembly comprises a motor (19) and a gear ring (20), wherein the motor (19) is fixedly mounted on one side of one of the fixed plates (6), an output end of the motor (19) is fixedly connected to a gear (21), the gear ring (20) is fixedly sleeved on the outer surface of the rotating ring (7), and the gear (21) is meshed with the gear ring (20).
6. The drilling rig for underground pipeline construction according to claim 1, characterized in that: The driving assembly comprises a second motor (22) and a threaded rod (23), wherein the second motor (22) is fixedly mounted on one side of the support frame (3), the threaded rod (23) is rotatably connected between two sides of the inner wall of the support frame (3), and the output end of the second motor (22) is fixedly connected to one end of the threaded rod (23).
7. The drilling rig for underground pipeline construction according to claim 6, characterized in that: The threaded rod (23) is threadedly connected to one of the sliders (5), and the threaded rod (23) movably passes through the other slider (5).
Citation Information
Patent Citations
Drilling machine for underground pipeline construction
CN220336829U