Prefabricated part grouting sleeve fixing tool
The design of the sleeve fixing tool body solves the problem of sleeve steel bar deviation in prefabricated components, achieves efficient and accurate steel bar positioning, and reduces production costs.
Patent Information
- Application Number
- CN202422812909.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-19
- Publication Date
- 2025-10-14
- Estimated Expiration
- 2034-11-19
AI Technical Summary
The existing prefabricated component grouting sleeve fixing tooling causes the embedded sleeve of the steel cage to be easily misaligned during the binding process, affecting production efficiency and cost.
The tool body is fixed with a sleeve, which includes an adjustable U-shaped slot and a screw-nut structure, and is used to fix and adjust the spacing between sleeve steel bars to ensure accurate positioning.
The positioning accuracy of the sleeve steel bar is improved, the production cost is reduced, the work efficiency and the convenience of operation are improved, and rework is avoided.
Smart Images

Figure CN223431790U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the technical field of prefabricated component prefabricated reinforcement cage binding, especially relates to a prefabricated component grouting sleeve fixing tool. BACKGROUND
[0002] The assembled building has the characteristics of green, energy saving, low carbon, environmental protection, and is easy to realize building componentization, building industrialization and industrialization, and has been widely applied in China in recent years. The corresponding prefabricated component of the assembled monolithic concrete structure contains a column during design, and the shear wall steel bars are connected through sleeves, wherein sleeve bar positioning requires corresponding positioning reservation accuracy.
[0003] At present, a prefabricated component grouting sleeve fixing tool in the prior art, the prefabricated steel bar cage is a main factor restricting the production efficiency of components, for example, in the prefabricated column production, most manufacturers will redeploy a large number of steel workers for steel binding operation, and the traditional line drawing binding method is easy to cause sleeve steel binding deviation, the prefabricated column steel bar cage does not match the mold after being put into the mold, the sleeve steel bar needs to be repositioned and bound, causing rework, and simultaneously affecting the whole operation process, causing a large number of personnel to be on site, low production efficiency, and increased cost. UTILITY MODEL CONTENTS
[0004] The utility model aims at solving the problems of sleeve steel bar spacing size deviation and repeated positioning in the prior art, and provides a prefabricated component grouting sleeve fixing tool.
[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a prefabricated component grouting sleeve fixing tool, including sleeve fixing tool main part, the base mechanical fixed connection of sleeve fixing tool main part is in first mold bottom die, the first adjustable grouting sleeve spacing U type groove hole and the four around fixed position round hole are set up in first mold bottom die, the bottom end of first mold bottom die is equipped with horizontal channel steel, the fixed connection of horizontal channel steel and first mold bottom die between is inclined support, one side of first mold bottom die is equipped with second mold bottom die, the bottom end of second mold bottom die is fixed with side edge mold in four corners, the second adjustable grouting sleeve spacing U type groove hole is set up in the side edge mold.
[0006] Preferably, the first mold bottom die, the second mold bottom die and the horizontal channel steel are used to connect the sleeve steel bar and the sleeve fixing tool main part.
[0007] Preferably, the first mold bottom die is a square 6mm thick steel plate with a side length of 1500mm, the second mold bottom die is a channel steel with a width of 200mm, and the width of the first adjustable grouting sleeve spacing U type groove hole and the second adjustable grouting sleeve spacing U type groove hole is 22mm.
[0008] Preferably, the side mold is fixed to the base by a matching screw and nut.
[0009] Preferably, the total height of the sleeve fixing tool body is 110mm, and the sleeve fixing tool body is provided with a middle opening and a matching screw and nut.
[0010] Compared with the prior art, the application has the advantages and positive effects that;
[0011] In the application, the problem of the deviation of the embedded sleeve steel bar of the prefabricated component is solved, the time-consuming and deviation phenomenon in the embedding and binding process of the prefabricated steel cage of the prefabricated component is avoided, and the application has good economic benefits, is convenient to operate, improves work efficiency, is safe and reliable. BRIEF DESCRIPTION OF DRAWINGS
[0012] Figure 1 The application provides a mounting plan view of the prefabricated component grouting sleeve fixing tool.
[0013] Figure 2 The application provides a mounting front view of the prefabricated component grouting sleeve fixing tool.
[0014] Figure 3 The application provides a tool front view of the prefabricated component grouting sleeve fixing tool.
[0015] Figure 4 The application provides a tool plan view of the prefabricated component grouting sleeve fixing tool.
[0016] Figure 5 The application provides a tool plan view of the prefabricated component grouting sleeve fixing tool.
[0017] Legend: 1, sleeve fixing tool body; 2, first mold base; 3, first adjustable grouting sleeve spacing U-shaped groove hole; 4, circumferential fixed position circular hole; 5, transverse channel steel; 6, inclined brace; 7, second mold base; 8, second adjustable grouting sleeve spacing U-shaped groove hole; 9, side mold. DETAILED DESCRIPTION
[0018] In order to more clearly understand the above purpose, features and advantages of the application, the application will be further described below in combination with the drawings and embodiments. It should be noted that the embodiments of the application and the features in the embodiments can be combined with each other without conflict.
[0019] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments disclosed in the following specification.
[0020] Example 1, as Figure 1-5 As shown, the utility model provides a prefabricated component grouting sleeve fixing tooling, including a sleeve fixing tooling body 1, the base of the sleeve fixing tooling body 1 is mechanically fixedly connected to the first mold bottom mold 2, the first mold bottom mold 2 is provided with a first adjustable grouting sleeve spacing U-shaped slot hole 3 and four fixed position circular holes 4, the bottom end of the first mold bottom mold 2 is provided with a transverse channel steel 5, and the transverse channel steel 5 and the first mold bottom mold 2 are fixedly connected with a diagonal brace 6, a second mold bottom mold 7 is provided on one side of the first mold bottom mold 2, and the four corners of the bottom end of the second mold bottom mold 7 are fixed with side molds 9, and the side mold 9 is provided with a second adjustable grouting sleeve spacing U-shaped slot hole 8.
[0021] The effect achieved by the entire embodiment 1 is that the spacing of the sleeve steel bars of the prefabricated steel cage is adjusted through the detachable sleeve fixing tool body 1, the side mold 9 controls the overall size of the prefabricated cage, the sleeve fixing tool body 1 fixes the grouting sleeve by squeezing the rubber, and the first adjustable grouting sleeve spacing U-shaped slot 3 and the second adjustable grouting sleeve spacing U-shaped slot 8 are adjusted through the sleeve fixing tool body 1. After the use of the detachable prefabricated component grouting sleeve tooling in this prefabricated component is completed, the concrete on the detachable prefabricated component grouting sleeve tooling is removed, and it can be reused in the next prefabricated component after being smeared with butter.
[0022] Example 2, as Figure 1-5 As shown, the first mold bottom mold 2, the second mold bottom mold 7 and the transverse channel steel 5 are used to connect the sleeve steel bar and the sleeve fixing tooling body 1. The first mold bottom mold 2 is a square 6mm thick steel plate with a side length of 1500mm, and the second mold bottom mold 7 is a channel steel with a width of 200mm. The width of the first adjustable grouting sleeve spacing U-shaped slot hole 3 and the second adjustable grouting sleeve spacing U-shaped slot hole 8 are both 22mm. The side mold 9 is fixed to the base by matching screws and nuts. The total height of the sleeve fixing tooling body 1 is 110mm. The middle hole of the sleeve fixing tooling body 1 is opened and equipped with matching screws and nuts.
[0023] The effect achieved by the entire embodiment 2 is that the sleeve fixing tool body 1 is conveniently installed and disassembled through the screw and nut, and the prefabricated component grouting sleeve fixing tool body 1 can be adjusted and reused when the prefabricated steel cage is produced. The sleeve steel bar is accurately positioned, convenient to install and disassemble, and simple and easy to operate, with accurate positioning and high precision.
[0024] Working principle: the device uses, solves the prefabricated component prefabricated reinforcement cage sleeve offset problem, avoids in prefabricated component prefabricated reinforcement cage sleeve reinforcement binding manufacturing process long time also easy to offset phenomenon, economic benefit is good, convenient operation, improves work efficiency, safe and reliable.Through the convenient adjustment of the prefabricated component grouting sleeve fixing tool main body 1, the prefabricated reinforcement cage can be reused when the prefabricated reinforcement cage is manufactured, the sleeve reinforcement reserved positioning is accurate, convenient to install and simple to disassemble, easy to operate, the positioning is accurate and high in precision.Compared with the conventional line binding reinforcement cage, the sleeve reinforcement positioning accuracy is greatly improved, and the cost is reduced.
[0025] The above is only the preferred embodiment of the present application, and is not intended to limit the present application in other forms. Any skilled person in the art can modify or change the above disclosed technology content to equivalent embodiments applied to other fields, but any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present application without departing from the technical scheme of the present application still falls within the protection scope of the present application.
Claims
1. A prefabricated component grouting sleeve fixing tool, comprising a sleeve fixing tool body (1), characterized in that: The base of the sleeve fixing tool body (1) is mechanically fixedly connected to the first mold bottom mold (2); the first mold bottom mold (2) is provided with a first adjustable grouting sleeve spacing U-shaped slot hole (3) and fixed position circular holes (4) on all sides; a transverse channel steel (5) is provided at the bottom end of the first mold bottom mold (2); a diagonal brace (6) is fixedly connected between the transverse channel steel (5) and the first mold bottom mold (2); a second mold bottom mold (7) is provided on one side of the first mold bottom mold (2); side molds (9) are fixed at the four corners of the bottom end of the second mold bottom mold (7); and a second adjustable grouting sleeve spacing U-shaped slot hole (8) is provided in the side mold (9).
2. A prefabricated component grouting sleeve fixing tool according to claim 1, characterized in that: The first mold bottom mold (2), the second mold bottom mold (7) and the transverse channel steel (5) are used to connect the sleeve steel bar and the sleeve fixing tool body (1).
3. The prefabricated component grouting sleeve fixing device according to claim 1, characterized in that: The first mold bottom mold (2) is a square 6mm thick steel plate with a side length of 1500mm, the second mold bottom mold (7) is a channel steel with a width of 200mm, and the width of the first adjustable grouting sleeve spacing U-shaped slot hole (3) and the second adjustable grouting sleeve spacing U-shaped slot hole (8) are both 22mm.
4. The prefabricated component grouting sleeve fixing device according to claim 1, characterized in that: The side mold (9) is fixed to the base via matching screws and nuts.
5. The prefabricated component grouting sleeve fixing tool according to claim 1, characterized in that: The total height of the sleeve fixing fixture body (1) is 110 mm, and the middle of the sleeve fixing fixture body (1) is opened and equipped with a matching screw and nut.