Clamp and steel structure building
By using clamps in steel structure buildings and securing hangers and pressure plates with locking devices, the problem of drilling holes during the hoisting of fire pipes, cable trays, and air ducts is solved, enabling hole-free installation, improving installation efficiency and structural protection.
Patent Information
- Application Number
- CN202422471466.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-12
- Publication Date
- 2025-10-21
- Estimated Expiration
- 2034-10-12
AI Technical Summary
In the prior art, the installation of fire protection pipes, bridges, and air ducts in steel structure buildings requires drilling holes in the building roof and steel beams, resulting in a complex structure and difficulty in installation.
A clamp is provided, including a hanger, a pressure plate, a support block, and a locking element. The pressure plate and hanger are fixed to an I-beam by the locking element, and the support block plays a stabilizing and balancing role. The object to be lifted is fixed on the hanger, avoiding perforation installation.
It enables quick installation without drilling holes in the I-beams, improving installation efficiency, protecting the original steel structure, and reducing installation costs and hot work operations.
Smart Images

Figure CN223459009U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to steel structure building technical field especially is related to a clamp and steel structure building. BACKGROUND
[0002] Steel structure building is the building of the building steel structure. Usually by section steel and steel plate make beam, column, truss etc. Component constitutes the load bearing structure. Steel structure building usually involves the hoisting of fire pipeline, bridge and air pipe.
[0003] The applicant finds that the prior art at least has the following technical problems: in the prior art, when hoisting the fire pipeline, bridge and air pipe, holes need to be punched on the building roof and steel beam, which is complex in structure and difficult to install. UTILITY MODEL CONTENT
[0004] The utility model discloses a clamp and steel structure building to solve the technical problem that the structure is complex and difficult to install when hoisting the fire pipeline or bridge or air pipe in the prior art. The preferred technical solutions in the many technical solutions provided by the utility model can produce the technical effects described below.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical scheme:
[0006] The clamp provided by the utility model comprises a hanger, a pressing plate, a supporting block and a locking piece, wherein:
[0007] The pressing plate is located on one side of the I-beam horizontal section, the hanger is located on the other opposite side of the I-beam horizontal section, the supporting block is located between the pressing plate and the hanger, and the locking piece passes through and fixedly connects the pressing plate and the hanger, so that the pressing plate and the hanger clamp and fix the I-beam horizontal section. The hoisted object passes through the hanger and is fixed on the hanger.
[0008] Preferably, the hanger is a U-shaped frame, the opening side of the U-shaped frame faces the pressing plate, and the hoisted object is fixed on the horizontal section of the U-shaped frame.
[0009] The thickness of the supporting block is equal to the thickness of the I-beam horizontal section.
[0010] Preferably, a reinforcing rib is fixed at the open upper end of the U-shaped frame, and the reinforcing rib closes the open upper end of the U-shaped frame.
[0011] Preferably, a perforation is arranged on the horizontal section of the U-shaped frame, and a fixing piece passes through the perforation to bind and fix the hoisted object on the U-shaped frame.
[0012] Preferably, the locking member comprises a locking bolt, which is threadedly connected with the pressing plate and the hanger.
[0013] Preferably, the locking member is located between the support block and the end of the I-beam horizontal section.
[0014] The utility model provides a kind of steel structure building, including I-beam and above-mentioned clamp, more than two the clamp is fixed to be hoisted object.
[0015] Preferably, the clamp is arranged along the length direction or width direction of the I-beam.
[0016] Preferably, the hoisted object is fire pipeline or bridge or air pipe.
[0017] Preferably, when the hoisted object is fire pipeline, one clamp contains one or more than two fire pipelines.
[0018] The clamp and the steel structure building provided by the utility model have the following beneficial effects compared with the prior art: the pressing plate and the hanger are fixedly connected by the locking member, so that the pressing plate and the hanger clamp and fix the I-beam horizontal section, the support block is located between the pressing plate and the hanger to play a stabilizing and balancing role, the hoisted object is fixed on the hanger, the locking member does not need to pass through the I-beam and does not need to punch holes on the I-beam, so that the installation is quick and convenient, the installation efficiency is improved, and the original steel structure does not need to be damaged. BRIEF DESCRIPTION OF DRAWINGS
[0019] In order to more clearly illustrate the technical scheme in the embodiments of the utility model or prior art, the drawings needed to be used in the embodiment or prior art description will be briefly introduced below, and obviously, the drawings in the following description are only some embodiments of the utility model, and those skilled in the art can also obtain other drawings according to these drawings without creating labor.
[0020] Figure 1 is the side view of the first embodiment of the steel structure building with the clamp;
[0021] Figure 2 is the front view of the first embodiment of the steel structure building with the clamp;
[0022] Figure 3 is the front view of the second embodiment of the steel structure building with the clamp;
[0023] Figure 4 is the side view of the second embodiment of the steel structure building with the clamp;
[0024] Figure 5 is the detail view of the cooperation of the clamp, the I-beam and the fire pipeline.
[0025] Fig. 1, hanger; 11, reinforcing rib; 101, perforation; 2, pressing plate; 3, supporting block; 4, locking piece; 5, fixing piece; 6, I-beam; 7, fire-fighting pipeline. DETAILED DESCRIPTION
[0026] In order to make the purpose, technical scheme and advantages of the utility model more clear, the technical scheme of the utility model will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor belong to the scope protected by the utility model.
[0027] In the description of the utility model, it is understood that the orientation or positional relationship indicated by the terms 'center', 'length', 'width', 'height', 'upper', 'lower', 'front','rear', 'left', 'right','vertical', 'horizontal', 'top', 'bottom', 'inner', 'outer','side' and the like is the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as a limitation on the utility model. In the description of the utility model, unless otherwise specified, the meaning of 'a plurality of' is two or more.
[0028] In the description of the utility model, it is also necessary to explain that, unless otherwise specified and limited, the terms'set','mount', 'connect', 'connect' should be understood broadly, for example, it can be fixedly connected, or it can be detachably connected, or integrally connected; it can be mechanically connected, or it can be electrically connected; it can be directly connected, or it can be indirectly connected through an intermediate medium, or it can be the communication inside two elements. For those skilled in the art, the specific meaning of the above terms in the utility model can be understood according to the specific circumstances.
[0029] The utility model embodiment provides a kind of clamp and steel structure building, need not to punch on I-beam, fire-fighting pipeline, bridge, air pipe and so on are installed quickly and conveniently, improve installation efficiency, need not to destroy original steel structure.
[0030] The technical scheme provided by the utility model will be described in more detail below. Figures 1-5 The technical scheme provided by the utility model will be described in more detail below.
[0031] Embodiment 1:
[0032] As Figures 1-5As shown in the drawing, the utility model provides a fixture, including gallows 1, pressing plate 2, support block 3 and locking piece 4, wherein: pressing plate 2 is located the upside of I -beam 6 horizontal section, gallows 1 is located the downside of I -beam 6 horizontal section, alternatively, pressing plate 2, gallows 1 are located the opposite two sides of I -beam 6, support block 3 is located between pressing plate 2 and gallows 1, locking piece 4 passes through pressing plate 2 and gallows 1 and is fixedly connected with both, so that pressing plate 2, gallows 1 clamp and fix I -beam 6 horizontal section, and the hoisting object passes through gallows 1 and is fixed on gallows 1.
[0033] The fixture of the embodiment, locking piece 4 is fixedly connected with pressing plate 2 and gallows 1, so that pressing plate 2, gallows 1 clamp and fix I -beam 6 horizontal section, support block 3 is located between pressing plate 2 and gallows 1 and plays the role of stable balance, the hoisting object is fixed on gallows 1, locking piece 4 does not need to pass through I -beam 6, does not need to punch on I -beam 6, and installation is quick and convenient, improves installation efficiency, and does not need to destroy original steel structure.
[0034] As an optional implementation, refer to Figures 1-5 As shown in the drawing, the utility model provides a fixture, including gallows 1, pressing plate 2, support block 3 and locking piece 4, wherein: pressing plate 2 is located the upside of I -beam 6 horizontal section, gallows 1 is located the downside of I -beam 6 horizontal section, alternatively, pressing plate 2, gallows 1 are located the opposite two sides of I -beam 6, support block 3 is located between pressing plate 2 and gallows 1, locking piece 4 passes through pressing plate 2 and gallows 1 and is fixedly connected with both, so that pressing plate 2, gallows 1 clamp and fix I -beam 6 horizontal section, and the hoisting object passes through gallows 1 and is fixed on gallows 1.
[0035] When locking piece 4 passes through between pressing plate 2 and gallows 1 and fixes both, support block 3 is located between pressing plate 2 and gallows 1, plays the role of support balance, so that pressing plate 2 and gallows 1 can clamp I -beam 6 horizontal section.
[0036] As an optional implementation, refer to Figure 5 As shown in the drawing, the upper end open side of U -shaped frame is fixed with reinforcing rib 11, reinforcing rib 11 seals the upper end open side of U -shaped frame, so as to improve structural strength.
[0037] As an optional implementation, refer to Figure 5 As shown in the drawing, the lateral section of U -shaped frame is provided with perforation 101, and fixing piece 5 passes through perforation 101 and binds and fixes the hoisting object on U -shaped frame, and fixing piece 5 can be steel wire, etc., is used to bind and fix fire-fighting pipeline 7 and other hoisting objects on U -shaped frame, prevents fire-fighting pipeline 7 and other hoisting objects from swinging on gallows 1, and improves the stability of structure.
[0038] As an optional implementation, the locking piece 4 of the embodiment includes locking bolt, and the locking bolt is threadedly connected with the pressing plate 2 and the gallows 1, facilitating installation and disassembly.
[0039] As an optional implementation, refer to Figure 1 、 Figure 3 And Figure 5As shown, the locking member 4 is located between the support block 3 and the end of the horizontal section of the I-beam 6, and the locking member 4 does not need to pass through the I-beam 6 and does not need to punch holes on the I-beam 6. The locking member 4 passes through the pressing plate 2 and the hanger 1 to fixedly connect the pressing plate 2 and the hanger 1, so that the pressing plate 2 and the hanger 1 clamp and fix the horizontal section of the I-beam 6.
[0040] The clamp is suitable for hoisting the fire pipe 7 and the bridge and the air pipe of the steel structure building, can reduce the installation cost, avoid the hot work, does not need welding during installation, will not damage the existing steel structure, and has high adjustability.
[0041] Embodiment 2
[0042] As shown in Figure 2 and Figure 4 As shown, the steel structure building of the embodiment comprises the I-beam 6 and the clamp, and two or more clamps are used to fix the hoisted object.
[0043] The steel structure building of the embodiment uses the clamp, and the hoisted object such as the fire pipe 7, the bridge and the air pipe can be fixed.
[0044] As an optional embodiment, as shown in Figure 1 and Figure 3 The clamps are arranged along the length direction or the width direction of the I-beam 6.
[0045] As an optional embodiment, the hoisted object of the embodiment is the fire pipe 7, the bridge or the air pipe.
[0046] As an optional embodiment, when the hoisted object of the embodiment is the fire pipe 7, one clamp contains one or more than two fire pipes 7, and the actual situation is set, and each fire pipe 7 can be fixed on the hanger 1 by the corresponding fixing member 5.
[0047] In the description of the specification, specific features, structures or characteristics can be combined in any one or more embodiments or examples in a suitable manner.
[0048] In the description of the specification, the description of the terms "one embodiment", "some embodiments", "example", "specific example" or "some examples" means that the specific features, structures, materials or characteristics described in combination with the embodiment or example are included in at least one embodiment or example of the utility model. In the specification, the illustrative description of the above terms is not necessarily for the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner. In addition, the person skilled in the art can combine and combine the different embodiments or examples described in the specification and the features of the different embodiments or examples without contradiction.
[0049] The above merely describes a specific implementation of the present application, but the protection scope of the present application is not limited thereto, any skilled person in the art can easily think of changes or replacements within the technical range disclosed by the present application, which should be covered in the protection scope of the present application. Therefore, the protection scope of the present application should be subject to the protection scope of the claims.
Claims
1. A clamp characterized in that, The device comprises a hanger, a pressing plate, a supporting block and a locking member, wherein: The pressing plate is arranged on one side of the horizontal section of the I-beam, the hanger is arranged on the other side of the horizontal section of the I-beam, the supporting block is arranged between the pressing plate and the hanger, and the locking member is arranged to pass through and fixedly connect the pressing plate and the hanger, so that the pressing plate and the hanger clamp and fix the horizontal section of the I-beam; the object to be hoisted passes through the hanger and is fixed on the hanger.
2. The clamp of claim 1, wherein The hanger is a U-shaped bracket, the opening side of the U-shaped bracket faces the pressing plate, and the object to be hoisted is fixed on the horizontal section of the U-shaped bracket. The thickness of the supporting block is equal to the thickness of the horizontal section of the I-beam.
3. The clamp of claim 2, wherein A reinforcing rib is fixed on the open upper end of the U-shaped bracket, and the reinforcing rib seals the open upper end of the U-shaped bracket.
4. The clamp of claim 2, wherein A perforation is arranged on the horizontal section of the U-shaped bracket, and a fixing member passes through the perforation to bind and fix the object to be hoisted on the U-shaped bracket.
5. The clamp of claim 1, wherein The locking member comprises a locking bolt, and the locking bolt is threadedly connected with the pressing plate and the hanger.
6. The clamp of claim 1, wherein The locking member is arranged between the supporting block and the end of the horizontal section of the I-beam.
7. A steel construction building, characterized by The device comprises an I-beam and the clamp of any one of claims 1-6, and two or more clamps are arranged to jointly fix the object to be hoisted.
8. The steel construction building according to claim 7, characterized in that, The clamps are arranged in intervals along the length direction or the width direction of the I-beam.
9. The steel construction building according to claim 7, characterized in that, The object to be hoisted is a fire-fighting pipeline, a bridge or a wind pipe.
10. The steel construction building according to claim 7, characterized in that, When the object to be hoisted is a fire-fighting pipeline, one of the clamps contains one or more fire-fighting pipelines.