Lintel supporting structure of curtain wall

By replacing the concrete structure with steel structure support components, the problem of long construction cycle of traditional curtain walls is solved, enabling rapid installation and efficient construction, and making it suitable for curtain wall installation at various angles.

CN223468944UActive Publication Date: 2025-10-24GUANGZHOU CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422423080.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-08
Publication Date
2025-10-24
Estimated Expiration
2034-10-08

AI Technical Summary

Technical Problem

Traditional building curtain wall construction must wait until the concrete lintel and upper blocking masonry are completed before it can be carried out, resulting in a long construction period and is not suitable for projects with tight schedules.

Method used

The curtain wall is installed quickly by replacing the concrete structure with a steel structure support component. The first steel component is fixed under the beam to form an installation foundation, and combined with the second steel component and fireproof layer.

Benefits of technology

It shortens the construction period, reduces the impact on the main concrete beam structure, and improves construction accuracy and flexibility. It is suitable for large-span supported structures and curtain wall installations at various angles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223468944U_ABST
    Figure CN223468944U_ABST
Patent Text Reader

Abstract

The utility model discloses a lintel supporting structure of a curtain wall, and relates to the technical field of curtain wall construction. The steel structure supporting assembly comprises a first steel member and a second steel member, the first steel member is fixed to the side, facing the ground, of the cross beam, the first steel member extends in the length direction of the cross beam, the second steel member is arranged on one side of the first steel member, a fireproof layer is arranged on the other side of the first steel member, and the fireproof layer is arranged between the first steel member and the second steel member. And the second steel member is used for fixing the curtain wall. Compared with the prior art, the steel structure is adopted, prefabrication can be conducted in advance, machining is convenient, concrete pouring construction does not need to be conducted, holes do not need to be reserved in advance, the steel structure supporting assembly serves as a permanent supporting structure of the curtain wall and also serves as a temporary support in the light partition wall construction process, formworks and supporting frame bodies do not need to be additionally input, cost is low, and the construction period is short.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of curtain wall construction, in particular to a beam supporting structure of curtain wall. BACKGROUND

[0002] In the installation engineering of building curtain wall, the traditional method for the curtain wall of door and window joint needs to wait for the completion of the secondary structure construction of concrete beam and upper plugging masonry and achieve the design strength before the curtain wall construction of door and window joint is carried out. The traditional method has a long construction period and is not suitable for projects with urgent construction period. The traditional building curtain wall system needs to take the concrete beam as a support point. The concrete age, formwork support erection and steel bar binding during the construction of the concrete beam all need to consume time and are not conducive to the construction period. CONTENT OF THE INVENTION

[0003] The present application aims to solve one of the above technical problems in the prior art. To this end, the present application provides a beam supporting structure of curtain wall.

[0004] According to the beam supporting structure of curtain wall provided by the first embodiment of the present application, the beam supporting structure of curtain wall comprises a concrete structure beam comprising a cross beam, a steel structure support assembly comprising a first steel member and a second steel member, the first steel member is fixed to one side of the cross beam facing the ground, the first steel member extends along the length direction of the cross beam, the second steel member is arranged on one side of the first steel member, the other side of the first steel member is provided with a fireproof layer, and the second steel member is used for fixing the curtain wall.

[0005] The beam supporting structure of curtain wall has at least the following beneficial effects: the concrete structure in the prior art is optimized to a steel structure support assembly, the entire support assembly is fixed to the hollow part below the cross beam by the first steel member to form an installation foundation, the second steel member for curtain wall installation is installed at the predetermined position of the first steel member, and then the fireproof layer and the related curtain wall are installed. Compared with the prior art, the present application adopts a steel structure which can be prefabricated in advance and is convenient to process, does not need to be poured with concrete, and does not need to reserve a hole in advance. The steel structure support assembly serves as both a permanent supporting structure of the curtain wall and a temporary support during the construction of a light partition wall, does not need to additionally invest in a formwork and a support frame, has low cost and short construction period; the steel structure is strong and can be used as a transfer supporting structure of the curtain wall due to the characteristics of large-span supporting structure, reduces the connection nodes of the main body structure of the concrete structure beam, and reduces the influence on the main body structure of the concrete structure beam; and the present application can be used for the installation of curtain walls with various angles. For the beam at the corner, the shape of the first steel member can be adjusted according to the requirements to meet the installation requirements, effectively reducing the construction difficulty and improving the construction accuracy.

[0006] The lintel supporting structure of the curtain wall according to the embodiment of the present application, the concrete structure beam further comprises two bearing columns, the two bearing columns support the end of the cross beam respectively, and the end of the first steel member extends to be connected with the bearing column.

[0007] The lintel supporting structure of the curtain wall according to the embodiment of the present application, the first steel member comprises a plurality of first steel pieces and second steel pieces, the first steel pieces are arranged at intervals along the length direction of the cross beam, the first steel pieces are hung on the cross beam along the vertical direction, and the second steel pieces are arranged along the horizontal direction, the second steel pieces are connected between the adjacent two first steel pieces, and the first steel pieces close to the bearing column are connected with the bearing column through the second steel pieces.

[0008] The lintel supporting structure of the curtain wall according to the embodiment of the present application, the plurality of first steel pieces are connected through the same second steel piece at the end away from the cross beam.

[0009] The lintel supporting structure of the curtain wall according to the embodiment of the present application, the first steel piece and the second steel piece are connected through welding.

[0010] The lintel supporting structure of the curtain wall according to the embodiment of the present application, the cross beam and the bearing column are provided with a plurality of anchor pieces for mounting, the first steel member is welded and connected with the anchor pieces, and the anchor pieces are fixed on the cross beam and the bearing column through chemical bolts.

[0011] The lintel supporting structure of the curtain wall according to the embodiment of the present application, the first steel piece or the second steel piece is made of a square tube.

[0012] The lintel supporting structure of the curtain wall according to the embodiment of the present application, the second steel member comprises a plurality of support frames, the support frames are fixedly connected with the first steel pieces through threads or welding, and the plurality of support frames are arranged at intervals along the length direction of the cross beam.

[0013] The lintel supporting structure of the curtain wall according to the embodiment of the present application, the support frame comprises four angle steel pieces, the first ends of the four angle steel pieces are sequentially welded to form the rectangular support frame.

[0014] The lintel supporting structure of the curtain wall according to the embodiment of the present application, the fireproof layer comprises a gypsum board and fireproof rock wool, one side of the first steel member is blocked by the gypsum board, and the fireproof rock wool is laid between the gypsum board and the first steel member.

[0015] Additional aspects and advantages of the present application will be in part apparent and in part pointed out hereinafter. BRIEF DESCRIPTION OF DRAWINGS

[0016] The present application will be further described below in conjunction with the accompanying drawings and embodiments.

[0017] Figure 1 is a structural schematic view of a lintel support structure of a curtain wall of an embodiment of the present application;

[0018] Figure 2 is a connection schematic view of a steel structure support assembly and a concrete structure beam in an embodiment of the present application;

[0019] Figure 3 is a structural schematic view of a second steel member in an embodiment of the present application;

[0020] Figure 4 is a structural schematic view of a support frame in an embodiment of the present application.

[0021] The drawings show: a concrete structure beam 100, a load-bearing column 110, a cross beam 120, a curtain wall 200, a first steel member 310, a second steel member 320, a fireproof layer 330, a support frame 400, an angle steel member 410, and a connecting plate 420. DETAILED DESCRIPTION

[0022] This part will describe the specific embodiments of the present application in detail, the preferred embodiments of the present application are shown in the drawings, the role of the drawings is to supplement the description of the text part with graphics, so that people can intuitively and visually understand each technical feature and the overall technical solution of the present application, but it cannot be understood as a limitation on the protection scope of the present application.

[0023] In the description of the present application, it should be understood that the orientation description, such as the orientation or position relationship indicated by up, down, front, back, left, right, etc. is based on the orientation or position relationship shown in the drawings, and is only for the convenience of describing the present application and simplifying the description, and therefore cannot be understood as a limitation on the present application.

[0024] In the description of the present application, several means one or more, and multiple means more than two, greater than, less than, more than, etc. are not included in the number, and above, below, etc. are included in the number. If it is described as first, second, it is only for the purpose of distinguishing technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of indicated technical features or implicitly indicating the sequence of indicated technical features.

[0025] In the description of the present application, unless otherwise explicitly limited, the words such as setting, installing, connecting, etc. should be understood broadly, and the person skilled in the art can reasonably determine the specific meaning of the above words in the present application in combination with the specific content of the technical solution.

[0026] Reference Figures 1 to 4 The first aspect of the present application provides a lintel supporting structure of a curtain wall 200, which comprises a concrete structure beam 100 and a steel structure supporting assembly.

[0027] The existing concrete structure building slab will be provided with a concrete structure beam 100 to improve the structural strength of each layer, wherein the concrete structure beam 100 comprises a cross beam 120 arranged in the horizontal direction.

[0028] The steel structure supporting assembly comprises a first steel member and a second steel member, the first steel member is fixed to one side of the cross beam 120 facing the ground, the first steel member extends along the length direction of the cross beam 120, the second steel member is arranged on one side of the first steel member, the other side of the first steel member is provided with a fireproof layer 330, and the second steel member is used for fixing the curtain wall 200.

[0029] The present application optimizes the existing concrete structure for curtain wall 200 installation into a steel structure supporting assembly, fixes the entire supporting assembly to the hollowed-out place below the cross beam 120 through the first steel member to form an installation foundation, and installs the second steel member for curtain wall 200 installation at the preset position after the first steel member, so that the installation of the fireproof layer 330 and the related curtain wall 200 can be quickly carried out.

[0030] Compared with the prior art, the present application adopts a steel structure, which can be prefabricated in advance, is convenient to process, does not need to be poured with concrete, and does not need to reserve a hole in advance. The steel structure supporting assembly serves as both a permanent supporting structure of the curtain wall 200 and a temporary support during the construction of a light partition wall, does not need to additionally invest in a formwork and a support frame, has low cost and short construction period; the steel structure is used as a transfer supporting structure of the curtain wall 200 due to its large strength and applicability to large-span supporting structures, reduces the connection nodes with the main structure of the concrete structure beam 100, and reduces the influence on the main structure of the concrete structure beam 100; and the present application can be used for the installation of curtain walls 200 of various angles, and the shape of the first steel member can be adjusted according to the requirements to meet the installation requirements at the corner of the lintel, effectively reducing the construction difficulty and improving the construction accuracy.

[0031] The fireproof layer 330 comprises a gypsum board and fireproof rock wool, the side of the first steel member is sealed with the gypsum board, and the fireproof rock wool is laid between the gypsum board and the first steel member to achieve the purposes of heat insulation and fireproofing.

[0032] In some embodiments, as Figure 1 and Figure 2As shown, the concrete structure beam 100 further comprises two load-bearing columns 110, which respectively support the ends of the cross beam 120, and the ends of the first steel member extend to be connected with the load-bearing columns 110. After the first steel member is hung below the cross beam 120, the ends of the first steel member are fixed with the load-bearing columns 110 to make the first steel member fixed firmly, and the first steel member is not easy to loosen and fall after bearing the weight of the load-bearing curtain wall 200.

[0033] In some specific embodiments, the first steel member comprises a plurality of first steel pieces 310 and second steel pieces 320, the first steel pieces 310 are arranged at intervals along the length direction of the cross beam 120, the first steel pieces 310 are hung in the vertical direction on the cross beam 120, the second steel pieces 320 are arranged in the horizontal direction, the adjacent two first steel pieces 310 are connected through the second steel pieces 320, and the first steel piece 310 close to the load-bearing column 110 is connected with the load-bearing column 110 through the second steel piece 320.

[0034] Specifically, as shown in the figure, Figure 2 As shown, the two sides of each first steel piece 310 are provided with the second steel pieces 320, one end of the vertically arranged first steel piece 310 is fixedly connected with the cross beam 120, and the side edge of the first steel piece 310 is connected with the load-bearing column 110 or another first steel piece through the horizontally arranged second steel piece 320, so as to improve the bending resistance of the first steel piece 310. The combined connection of the first steel piece 310 and the second steel piece 320 makes the structural design of the first steel member simple, light in weight, and also has strong load capacity.

[0035] In some embodiments, the ends of the plurality of first steel pieces 310 away from the cross beam 120 are connected through the same second steel piece 320, and the same end of all the first steel pieces 310 is connected through one second steel piece 320, and after the two ends of the second steel piece 320 are connected with the load-bearing column 110, the structural rigidity of the entire first steel member is effectively strengthened.

[0036] In some embodiments, the first steel piece 310 and the second steel piece 320 are connected through welding. Of course, in other embodiments, the first steel piece 310 and the second steel piece 320 can also be connected through bolts.

[0037] In some embodiments, a plurality of anchor pieces for installation are arranged on the cross beam 120 and the load-bearing column 110, the first steel member is welded with the anchor pieces, and the anchor pieces are fixed on the cross beam 120 and the load-bearing column 110 through chemical bolts. The cross beam 120 and the load-bearing column 110 are both poured by concrete, and too many openings can easily affect the overall structural rigidity and stability. The anchor pieces are fixed on the cross beam 120 or the load-bearing column 110 through chemical bolts, which can minimize the damage to the structure of the cross beam 120 or the load-bearing column 110.

[0038] The chemical bolt comprises a chemical glue pipe, a screw rod, a gasket and a nut. The screw rod, the gasket and the nut are generally made of galvanized steel and stainless steel. The chemical glue pipe contains reaction resin, curing agent and quartz particles. The chemical bolt is used for the connection between new and old structures by the combined action of the gripping force and the mechanical engagement force between the chemical bolt and the concrete and the shear resistance of the bolt itself. The use of the chemical bolt for the fixing of the anchoring piece has the following advantages: the anchoring force of the chemical bolt is strong, the chemical bolt is similar to a pre-buried piece, no expansion stress is generated, the damage to the installed concrete structure is small, the edge distance can be small, the chemical bolt is suitable for narrow spaces, the installation is fast, the setting is rapid, and the construction time is saved.

[0039] The first steel member 310 or the second steel member 320 is made of a square tube. In order to make the weight of the entire first steel member lighter, save material cost, and have certain load capacity, it is ideal to select a square tube as the first steel member 310 or the second steel member 320.

[0040] In some embodiments, as shown in Figure 3 The second steel member comprises a plurality of support frames 400, the support frames 400 are fixedly connected to the first steel members 310 by threading or welding, the support frames 400 are vertically arranged, and the plurality of support frames 400 are arranged at intervals along the length direction of the cross beam 120.

[0041] After the plurality of support frames 400 are fixed to the first steel members 310, an installation frame is formed, which is convenient for the fixing of various curtain walls 200. Of course, in order to adapt to the installation of curtain walls 200 at different angles, the shape of the installation frame formed by the plurality of support frames 400 can be deformed according to the installation requirements, so that the curtain wall 200 is installed in an inclined or vertical manner.

[0042] In some embodiments, the support frames 400 can be fixedly connected to the first steel members 310 by welding, and the arrangement position of each support frame 400 corresponds to one first steel member 310. The vertically arranged first steel members 310 are convenient for the installation and fixation of the support frames 400.

[0043] In some embodiments, in order to facilitate the replacement of the second steel member according to the shape of the curtain wall 200 at any time, the support frames 400 and the first steel members 310 are connected by bolts. Specifically, as shown in Figure 4 The edge of the support frame 400 is provided with a connecting plate 420, and the connecting plate 420 is connected to the side edge of the first steel member 310 by bolts.

[0044] In some embodiments, the middle part of the support frame 400 is hollow, specifically, the support frame 400 comprises four angle steel pieces 410, the cross section of the angle steel piece 410 is L-shaped, and the first ends of the four angle steel pieces 410 are sequentially welded to form a rectangular support frame 400. Among them, the two adjacent angle steel pieces 410 are arranged back to back, the angle steel piece 410 has strong load capacity and is not easy to bend and deform under stress, and has the characteristics of light structure and strong load capacity.

[0045] The application also provides a construction method of the lintel curtain wall 200 based on the lintel supporting structure of the curtain wall 200, specifically, the construction method of the lintel curtain wall 200 comprises the following steps:

[0046] The first steel piece 310 and the second steel piece 320 are prefabricated, for the convenience of the same processing and selection, the first steel piece 310 and the second steel piece 320 are selected as the same type of square tube, and are installed and cut to a predetermined size, then the second steel piece 320 and the second steel piece 320 are matched to form the first steel member matched with the cross beam 120, that is, if the cross beam 120 is straight, the first steel member is also made straight, and if the cross beam 120 has an angle, the first steel member is also provided with an angle, so that the first steel member can be well suspended and fixed below the cross beam 120.

[0047] Further, along the length direction of the cross beam 120, a plurality of anchor pieces are fixed to the side of the cross beam 120 facing the ground by means of chemical bolts. Specifically, holes are drilled at the corresponding predetermined positions of the cross beam 120, the predetermined positions here refer to the fixing positions of the first steel member, then the related accessories of the chemical bolts are fixed in the drilled holes, and the anchor pieces are fixed on the cross beam 120 by the cooperation of the screw rod and the nut, the anchor pieces are used for the fixation of the first steel member.

[0048] Along the vertical direction, a plurality of anchor pieces are fixed to the side of the two support columns facing each other by means of chemical bolts. Specifically, holes are drilled at the corresponding predetermined positions of the bearing column 110, the predetermined positions here refer to the fixing positions of the second steel piece 320, then the related accessories of the chemical bolts are fixed in the drilled holes, and the anchor pieces are fixed on the bearing column 110 by the cooperation of the screw rod and the nut, the anchor pieces of the bearing column 110 are used for the fixation of the second steel piece 320.

[0049] The side of the first steel member is welded and connected with the anchor piece on the cross beam 120, and the end of the first steel member is connected with the support column by welding. In a specific embodiment, the end of the first steel piece 310 of the first steel member is welded and connected with the anchor piece on the cross beam 120, and the end of the second steel piece 320 of the first steel member is welded and connected with the anchor piece on the bearing column 110, so that the first steel member serves as a permanent installation reference and cooperates with the second steel member to be used for the installation of the curtain wall 200.

[0050] After the first steel member is fixed, the second steel member is welded to the first steel member, and then the prefabricated curtain wall 200 is fixed through the anchor and the second steel member.

[0051] The lintel supporting structure of the curtain wall 200 of the present application has no concrete lintel and upper opening blocking masonry, the stress support point adopts a steel structure lintel, the upper opening adopts double-sided gypsum board and fireproof rock wool blocking, and the steel structure lintel is connected to the concrete structure beam 100 through chemical bolts. Steel has high strength, can be customized and processed on site according to needs, and through the use of post-anchoring technology and hoisting technology, the effect of rapid installation can be achieved, effectively saving the construction period.

[0052] In addition, the lintel supporting structure of the curtain wall 200 of the present application adopts a steel structure lintel instead of a concrete lintel, saving the formwork and support frame 400 body, and without the need for aging period, shortening the construction period, the steel structure is factory-produced and assembled on site, having the advantages of simple structure, flexible adjustment, strong applicability, easy disassembly and assembly, fast production, and can be prefabricated in advance, which can effectively improve the installation efficiency of the secondary structure and curtain wall 200 project.

[0053] Overall, the lintel supporting structure of the curtain wall 200 of the present application has the following beneficial effects:

[0054] 1. High construction efficiency: no need to reserve holes in advance, steel member fixed by post-anchoring technology, simple process easy to operate, short construction period.

[0055] 2. Strong adaptability: can be used for installation of curtain walls 200 of various angles, the lintel at the corner can adjust the butt joint angle of the square steel pipe according to needs to meet the requirements.

[0056] 3. Standardization: different parts can be designed in depth according to needs, and construction drawing sets can be provided to provide technical guidance for construction personnel, reducing construction difficulty and improving construction accuracy.

[0057] The above describes the embodiments of the present application in combination with the drawings, but the present application is not limited to the above embodiments, and various changes can be made within the knowledge range of ordinary skilled persons in the art without departing from the purpose of the present application.

Claims

1. A lintel support structure for a curtain wall, characterized by: Comprising A concrete structure beam, comprising a beam; A steel structure support assembly, comprising a first steel member and a second steel member, the first steel member is fixed to one side of the beam towards the ground, the first steel member extends along the length direction of the beam, the second steel member is arranged on one side of the first steel member, the other side of the first steel member is provided with a fireproof layer, and the second steel member is used for fixing the curtain wall.

2. The spandrel support structure for a curtain wall according to claim 1, wherein: The concrete structure beam further comprises two load-bearing columns, and the two load-bearing columns respectively support the end portions of the beam, and the end portions of the first steel member extend to be connected with the load-bearing columns.

3. The spandrel support structure for a curtain wall of claim 2, wherein: The first steel member comprises a plurality of first steel pieces and second steel pieces, the first steel pieces are arranged at intervals along the length direction of the beam, the first steel pieces are hung in the vertical direction on the beam, and the second steel pieces are arranged in the horizontal direction, the second steel pieces are connected between adjacent two first steel pieces, and the first steel pieces close to the load-bearing columns are connected with the load-bearing columns through the second steel pieces.

4. The spandrel support structure for a curtain wall of claim 3, wherein: The ends of the plurality of first steel pieces away from the beam are connected through the same second steel piece.

5. The spandrel support structure for a curtain wall of claim 3, wherein: The first steel pieces and the second steel pieces are connected through welding.

6. The spandrel support structure for a curtain wall of claim 2, wherein: The beam and the load-bearing columns are provided with a plurality of anchor pieces for installation, the first steel member is welded and connected with the anchor pieces, and the anchor pieces are fixed to the beam and the load-bearing columns through chemical bolts.

7. The spandrel support structure for a curtain wall according to any one of claims 3 to 5, wherein: The first steel pieces or the second steel pieces are made of square tubes.

8. The spandrel support structure for a curtain wall of claim 3, wherein: The second steel member comprises a plurality of support frames, the support frames are fixedly connected with the first steel pieces through threads or welding, and the plurality of support frames are arranged at intervals along the length direction of the beam.

9. The spandrel support structure for a curtain wall of claim 8, wherein: The support frame comprises four angle steel pieces, and the first ends of the four angle steel pieces are sequentially welded to form a rectangular support frame.

10. The lintel support structure of the curtain wall according to claim 1, characterized in that: The fireproof layer comprises gypsum boards and fireproof rock wool, one side of the first steel member is blocked through the gypsum board, and the fireproof rock wool is laid between the gypsum board and the first steel member.