Building construction drilling device
The construction drilling device driven by a horizontal operating table and a lifting component achieves precise positioning and height adjustment of the drill bit, solves the problems of insufficient flexibility and lifting adjustment in the existing technology, and improves construction efficiency and safety.
Patent Information
- Application Number
- CN202422803314.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-18
- Publication Date
- 2025-10-24
- Estimated Expiration
- 2034-11-18
AI Technical Summary
Existing construction drilling devices have deficiencies in operational flexibility and lifting and adjustment, making it difficult to accurately position and quickly adjust, affecting construction efficiency and safety.
A construction drilling device consisting of a horizontal operating platform, a mobile component, a lifting component and a water drill head is used. The motor drive and pneumatic cylinder control enable precise positioning and height adjustment of the drill head. A splash-proof pipe and a filtration system are provided to protect the equipment and the environment.
It improves the accuracy and efficiency of drilling, reduces construction time, ensures construction safety and environmental protection, and adapts to different construction height requirements.
Smart Images

Figure CN223469217U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to drilling equipment technical field especially relates to a building construction drilling device. BACKGROUND
[0002] In the field of building construction, drilling operation is a crucial work link. The traditional building construction drilling device often has many shortcomings. On the one hand, the existing drilling device lacks in operation flexibility. Its moving adjustment capacity is limited, and it is difficult to accurately position the drill bit to a specific construction position, which not only increases the construction time, but also may cause deviation of the drilling position, affecting the stability and safety of the building structure.
[0003] The building construction drilling device also has inconvenience in lifting adjustment. It cannot be quickly and accurately adjusted according to different construction height requirements, and the building construction drilling also has inconvenience in installation, and cannot be quickly replaced and disassembled with tools, which brings great trouble to the construction personnel and reduces the construction efficiency. In summary, in order to meet the higher requirements of drilling precision, efficiency and safety in building construction, a new type of building construction drilling device is needed to overcome the shortcomings of the prior art, and therefore a building construction drilling device is proposed to solve the above problems. SUMMARY
[0004] In order to make up for the above shortcomings, the utility model provides a building construction drilling device, aiming at improving the problem of product diversity in the prior art.
[0005] In order to achieve the above purpose, the utility model adopts the following technical scheme: a building construction drilling device, comprising a horizontal operation table, a moving assembly for adjusting parts is fixedly connected to the top of the horizontal operation table, a motor one is fixedly connected to the top of the moving assembly, a water drill base is fixedly connected to the driving end of the motor one, a fixed ring bottom is fixedly connected to the outside of the water drill base, a two-way fixed screw ring is threadedly connected to the inner wall of the fixed ring bottom, a fixed top is threadedly connected to the left end of the two-way fixed screw ring, a rubber buckle is fixedly connected to the inner wall of the fixed top, a water drill bit is fixedly connected to the left end of the fixed top, a lifting assembly for lifting the horizontal operation table is arranged at the bottom of the horizontal operation table;
[0006] As a further description of the above technical scheme: the moving assembly comprises a gear track, the gear track is fixedly connected to the top of the horizontal operation table at the bottom, a supporting base is slidably connected to the top of the horizontal operation table, a motor two is fixedly connected to the front end of the supporting base, a gear is fixedly connected to the driving end of the motor two, the gear track and the gear are meshedly connected;
[0007] As a further description of the above technical solution, the lifting assembly includes two follower plates 2, the two follower plates 2 are rotatably connected to the two sides of the bottom of the horizontal operating table, the outer side walls of the follower plates 2 are rotatably connected to two balance plates, the inner side walls of the balance plates are rotatably connected to the follower plate 3, the bottom of the follower plate 3 is rotatably connected to the bottom plate, the inner side wall of the follower plate 2 is rotatably connected to the follower plate 1, the adjacent sides of the two follower plates 1 are rotatably connected to follower shafts, and the outsides of the follower shafts are fixedly connected to pneumatic cylinders;
[0008] As a further description of the above technical solution: the bottom of the follower plate 1 is rotatably connected to the top of the base plate, and the bottom of the pneumatic cylinder is fixedly connected to the top of the base plate;
[0009] As a further description of the above technical solution: the front end of the bottom plate is fixedly connected to a water tank, the inner wall of the water tank is fixedly connected to two filter screens, the top of the water tank is detachably connected to an inspection cover, the front end of the water tank is fixedly connected to a water pump, and the output end of the water pump is fixedly connected to a second water outlet pipe;
[0010] As a further description of the above technical solution, the top of the inspection cover is fixedly connected to a water outlet pipe 1, the other end of the water outlet pipe 1 is fixedly connected to a splash-proof pipe, and the bottom of the splash-proof pipe is fixedly connected to the top of the horizontal operating table;
[0011] As a further description of the above technical solution: the outside of the rhinestone base is fixedly connected with a clamping bone, and the outside of the clamping bone is fixedly connected to the inner wall of the bottom of the fixing ring;
[0012] As a further description of the above technical solution: the splash-proof tube is a cylindrical tube, which is used to protect the water drill head and can collect wastewater generated by processing.
[0013] The utility model has the following beneficial effects:
[0014] 1. The construction drilling device described in this utility model plays a vital role in modern construction. Its primary function is to create a hole in a material by applying pressure to it through a rotating drill bit, either cutting or squeezing it. The drill bit is typically driven by an electric motor, and its design depends on the material type, diameter, and depth of the hole being drilled.
[0015] 2. In the present invention, in the prior art, the drilling process may generate noise, dust and vibration. Therefore, when designing and operating the drilling device, environmental protection and safety measures need to be considered to reduce the impact on operators and the environment. To this end, a construction drilling device is proposed to solve the above problems. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 A three-dimensional schematic view of a building construction drilling device is provided in the utility model;
[0017] Figure 2 A structure schematic view of the splash-proof pipe of the building construction drilling device is provided in the utility model;
[0018] Figure 3 A structure schematic view of the balance plate of the building construction drilling device is provided in the utility model;
[0019] Figure 4 A structure schematic view of the fixed ring bottom of the building construction drilling device is provided in the utility model;
[0020] Figure 5 A structure schematic view of the filter screen of the building construction drilling device is provided in the utility model.
[0021] Legend:
[0022] 1, horizontal operation platform, 2, motor one, 3, water drill base, 4, bone clamps, 5, fixed ring bottom, 6, two-way fixed screw ring, 7, fixed top, 8, rubber buckle, 9, water drill head, 10, splash-proof pipe, 11, water outlet pipe one, 12, water tank, 13, filter screen, 14, maintenance cover, 15, water pump, 16, bottom plate, 17, pneumatic cylinder, 18, follow-up shaft, 19, follow-up plate one, 20, balance plate, 21, follow-up plate two, 22, follow-up plate three, 23, gear track, 24, support base, 25, motor two, 26, gear, 27, water outlet pipe two. Specific implementation
[0023] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the protection scope of the utility model.
[0024] Reference Figure 1 , Figure 2 and Figure 4The utility model provides a kind of embodiment: a building construction drilling device, horizontal operation platform 1, it is as the basis support platform of entire device, plays the vital role.The top of horizontal operation platform 1 is fixedly connected with the moving assembly for adjusting component.This moving assembly can accurately adjust the position of each component in horizontal direction, so that the whole operation process is more flexible and accurate.At the top of moving assembly, motor one 2 is fixedly connected.Stable motor one 2 as power source provides powerful driving force for subsequent operation.The driving end of motor one 2 is fixedly connected with water drill base 3, and water drill base 3 is the important hinge connecting each key component.The outer fixed connection of water drill base 3 has fixed ring bottom 5, and fixed ring bottom 5 provides the basis for subsequent fixed operation.The inner wall of fixed ring bottom 5 is threadedly connected with bidirectional fixed screw ring 6, and the rotation of bidirectional fixed screw ring 6 can realize the fastening connection of different components.The left end of bidirectional fixed screw ring 6 is threadedly connected with fixed top 7, and fixed top 7 plays the role of further fixing.The inner wall of fixed top 7 is fixedly connected with rubber buckle 8, and rubber buckle 8 can increase friction force, ensure the firmness of connection, and also can play certain buffering effect, protect each component from being damaged.The left end of fixed top 7 is fixedly connected with water drill head 9, and water drill head 9 is the core working component of entire device, is responsible for drilling and other operations.
[0025] And at the bottom of horizontal operation platform 1, lifting assembly for lifting horizontal operation platform 1 is provided.This lifting assembly can adjust the height of horizontal operation platform 1 according to actual needs, so that operation is more convenient and comfortable.It can adapt to different working scenes and the needs of operating personnel, improve the versatility and practicality of entire device, and the building construction drilling device provides efficient, reliable construction solution for building industry with its unique design and advanced technology, and moving assembly is mainly composed of gear track 23, and gear track 23 bottom is fixedly connected on the top of horizontal operation platform 1, to provide stable support for entire moving system.The top of horizontal operation platform 1 is slidably connected with support base 24, and support base 24 can smoothly slide on horizontal operation platform 1, to realize accurate displacement of equipment.The front end of support base 24 is fixedly connected with motor two 25, and motor two 25 provides power for the movement of equipment.The driving end of motor two 25 is fixedly connected with gear 26, and gear track 23 is meshingly connected with gear 26, and through the driving of motor two 25, gear 26 rolls on gear track 23, to drive support base 24 and other components connected therewith to accurately move horizontally.
[0026] The lifting assembly comprises two second follower plates 21, which are respectively installed on the two sides of the bottom of the horizontal operation table 1 in a stable rotary connection mode. The outer side wall of the second follower plate 21 is rotatably connected with two balance plates 20, which play a role in balancing and stabilizing the entire lifting structure. The inner side wall of the balance plate 20 is rotatably connected with a third follower plate 22, and the bottom of the third follower plate 22 is rotatably connected with the bottom plate 16. The inner side wall of the second follower plate 21 is rotatably connected with two first follower plates 19, and the proximal sides of the two first follower plates 19 are rotatably connected with a follower shaft 18, and the outer part of the follower shaft 18 is fixedly connected with a pneumatic cylinder 17. The bottom of the first follower plate 19 is rotatably connected to the top of the bottom plate 16, and the bottom of the pneumatic cylinder 17 is also fixedly connected to the top of the bottom plate 16. Through the extension and retraction of the pneumatic cylinder 17, the angle between the first follower plate 19, the second follower plate 21 and the third follower plate 22 can be changed, thereby realizing the lifting function of the device.
[0027] Referring to Figure 1 , Figure 3 and Figure 5 The front end of the bottom plate 16 is fixedly connected with a water tank 12, which plays a crucial role in the entire device. The inner wall of the water tank 12 is fixedly connected with two filter screens 13, which can effectively filter impurities in the water, ensure the purity of the subsequent use of water, and avoid damage to related equipment caused by impurities. The top of the water tank 12 is provided with a maintenance cover 14 which is detachably connected, which greatly facilitates the inspection and maintenance of the inside of the water tank 12 by the staff. When it is necessary to clean, maintain or check the condition of the filter screen 13 inside the water tank 12, the maintenance cover 14 can be easily removed, greatly improving the work efficiency. The front end of the water tank 12 is fixedly connected with a water pump 15, and the output end of the water pump 15 is fixedly connected with a water outlet pipe 27. The water pump 15 can efficiently pump out the water in the water tank 12 and deliver it to the place where it is needed through the water outlet pipe 27, providing strong power support for the normal operation of the entire system.
[0028] The top of the maintenance cover 14 is fixedly connected with a water outlet pipe 11, and the other end of the water outlet pipe 11 is fixedly connected with a splash-proof pipe 10. The bottom of the splash-proof pipe 10 is fixedly connected to the top of the horizontal operation table 1. The outer part of the water drill base 3 is fixedly connected with a clamping bone 4, and the outer part of the clamping bone 4 is fixedly connected to the inner wall of the fixed ring bottom 5, ensuring the stable installation of the water drill base 3. The splash-proof pipe 10 is in the shape of a cylindrical tube, and its role is very important. On the one hand, it can effectively protect the water drill bit 9 from being damaged by external impact during the machining process; on the other hand, it can collect the waste water generated during the machining process, prevent the waste water from splashing everywhere, keep the working environment clean, and also facilitate the centralized treatment of the waste water, meeting the environmental protection requirements.
[0029] Working principle: when using the machine, place the machine in the position where it is needed to work, place the position of the base plate 16, open the air cylinder 17, with the stretching of the air cylinder 17, drive the movement of the follow-up shaft 18, one end of the follow-up plate 1 19 rises to drive the rise of the follow-up plate 3 22, the rise of the follow-up plate drives the displacement of the balance plate 20 to drive the lifting of the follow-up plate 2 21, finally make the horizontal operation table 1 appear in the plane where it is needed to operate. The start of motor 2 5 makes the support base 24 move horizontally on the gear rail 23 through the gear 26, the start of motor 1 2 makes the water drill base 3 rotate horizontally, the water drill base 3 is fixed with the clamping bone 4, the clamping bone 4 is inlaid on the fixed ring bottom 5, the fixed ring bottom 5 is screwed with the two-way fixed screw ring 6, the left end of the two-way fixed screw ring 6 is screwed with the fixed top 7, the inner wall of the fixed top 7 is fixedly connected with the rubber buckle 8, the rubber buckle 8 can increase the friction force, ensure the firmness of the connection, and also can play a certain buffering effect, protect each component from being damaged. The left end of the fixed top 7 is fixedly connected with the water drill head 9, the water drill head 9 is the core working part of the whole device, is responsible for drilling and other operations, at this time the water drill will pass through the splash-proof pipe 10, the water and dust sprayed out of the wall during drilling are absorbed by the water outlet pipe 1 1 and enter the water tank 12 through the water outlet pipe 1 1, and the water and dust are cooled and cleaned by the filter screen 13 under the suction of the water pump 15 into the water tank 12, the water tank 12 is protected by the maintenance cover 14, and the water is stored in the water tank 12 and connected through the water outlet pipe 2 7 to ensure the self-circulation.
[0030] Finally, it should be pointed out that: the above only for preferred embodiments of the present application, and not for limiting the present application, although the present application has been described in detail with reference to the foregoing embodiments, for those skilled in the art, it still can modify the technical solutions recorded in the foregoing embodiments, or make equivalent replacement for part of the technical features, any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present application, should be included in the protection scope of the present application.
Claims
1. A building construction drilling apparatus comprising a horizontal operating table (1), characterized in that: The top of the horizontal operation platform (1) is fixedly connected with a moving assembly for adjusting parts, the top of the moving assembly is fixedly connected with a motor one (2), the driving end of the motor one (2) is fixedly connected with a water drill base (3), the outside of the water drill base (3) is fixedly connected with a fixed ring bottom (5), the inner wall of the fixed ring bottom (5) is threadedly connected with a bidirectional fixed screw ring (6), the left end of the bidirectional fixed screw ring (6) is threadedly connected with a fixed top (7), the inner wall of the fixed top (7) is fixedly connected with a rubber buckle (8), the left end of the fixed top (7) is fixedly connected with a water drill head (9), and the bottom of the horizontal operation platform (1) is provided with a lifting assembly for lifting the horizontal operation platform (1).
2. A building construction drilling apparatus according to claim 1, wherein: The moving assembly comprises a gear rail (23), the bottom of the gear rail (23) is fixedly connected to the top of the horizontal operation platform (1), the top of the horizontal operation platform (1) is slidably connected with a support base (24), the front end of the support base (24) is fixedly connected with a motor two (25), the driving end of the motor two (25) is fixedly connected with a gear (26), and the gear rail (23) is in meshing connection with the gear (26).
3. A building construction drilling apparatus according to claim 2, wherein: The lifting assembly comprises two follow-up plates two (21), the two follow-up plates two (21) are rotatably connected to the two sides of the bottom of the horizontal operation platform (1), respectively, the outer side wall of the follow-up plate two (21) is rotatably connected with two balance plates (20), the inner side wall of the balance plate (20) is rotatably connected with a follow-up plate three (22), the bottom of the follow-up plate three (22) is rotatably connected with a bottom plate (16), the inner side wall of the follow-up plate two (21) is rotatably connected with a follow-up plate one (19), the proximal sides of the two follow-up plates one (19) are rotatably connected with a follow-up shaft (18), and the outside of the follow-up shaft (18) is fixedly connected with a pneumatic cylinder (17).
4. A building construction drilling apparatus according to claim 3, wherein: The bottom of the follow-up plate one (19) is rotatably connected to the top of the bottom plate (16), and the bottom of the pneumatic cylinder (17) is fixedly connected to the top of the bottom plate (16).
5. A building construction drilling apparatus according to claim 4, wherein: The front end of the bottom plate (16) is fixedly connected with a water tank (12), the inner wall of the water tank (12) is fixedly connected with two filter screens (13), the top of the water tank (12) is detachably connected with an inspection cover (14), the front end of the water tank (12) is fixedly connected with a water pump (15), and the output end of the water pump (15) is fixedly connected with a water outlet pipe two (27).
6. A building construction drilling apparatus according to claim 5, wherein: The top of the inspection cover (14) is fixedly connected with a water outlet pipe one (11), and the other end of the water outlet pipe one (11) is fixedly connected with a splash-proof pipe (10).
7. A building construction drilling apparatus as claimed in claim 1, wherein: The outside of the water drill base (3) is fixedly connected with a clamping bone (4), and the outside of the clamping bone (4) is fixedly connected to the inner wall of the fixed ring bottom (5).
8. A building construction drilling apparatus according to claim 6, wherein: The splash-proof pipe (10) is a cylindrical tube, and the bottom of the splash-proof pipe (10) is fixedly connected to the top of the horizontal operation platform (1).