Paving elevation adjusting device

By using the meshing structure and threaded connection between the positioning pin and the adjusting connector, the problems of insufficient accuracy and poor stability in traditional paving elevation control are solved, achieving efficient and precise paving of the mixture and improving construction quality and efficiency.

CN223522957UActive Publication Date: 2025-11-07SHENZHEN ROAD & BRIDGE CONSTR GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423061641.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-11
Publication Date
2025-11-07
Estimated Expiration
2034-12-11

AI Technical Summary

Technical Problem

In traditional paving elevation control methods, the lack of an effective positioning structure between the wire rope and the smooth steel rod results in insufficient elevation control accuracy. The tension of the wire rope causes the support structure to rotate and become unstable, affecting the accuracy and efficiency of paving.

Method used

The system employs a meshing structure of positioning pin and adjusting connector, combined with adjustable connections of support components and hangers, to form a stable positioning structure that prevents horizontal rotation. Horizontal position adjustment is achieved through threaded connections, ensuring the wire rope's fixation and elevation adjustment accuracy.

Benefits of technology

It improves the construction quality and efficiency of mixed material paving, ensures the adjustment accuracy in the vertical and horizontal directions, prevents slippage and rotation, simplifies the operation process, and extends the service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223522957U_ABST
    Figure CN223522957U_ABST
Patent Text Reader

Abstract

The utility model discloses a paving elevation adjusting device. The paving elevation adjusting device comprises a fixing assembly, an adjusting assembly and a connecting assembly, wherein the meshing section of the positioning drill rod is meshed with the matching hole of the adjusting connecting piece to form a stable positioning structure, so that horizontal rotation is effectively prevented; the adjusting connecting piece and the supporting piece are fixedly connected and can be synchronously adjusted, and smooth elevation adjustment is achieved in cooperation with the smooth section of the positioning drill rod; the through hole in the supporting piece is adjustably connected with the hanging frame, so that the position adjusting capacity in the horizontal direction is provided, and the steel wire rope can be conveniently installed and fixed through the groove in the hanging frame. Therefore, the adjusting precision in the vertical direction and the horizontal direction is guaranteed, stable and reliable supporting is provided, the problems that sliding, rotating and fixing are not firm and the like in the prior art are solved, and the quality and efficiency of mixture paving construction are remarkably improved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to road construction field especially relates to a paving elevation adjusting device. BACKGROUND

[0002] At present, in the domestic road construction field, the bottom base layer and the base layer construction generally adopt the steel wire rope to control the virtual paving thickness of the mixture. The traditional construction method is to erect the steel wire rope on the smooth steel drill provided with the hanger, which has the following problems:

[0003] Firstly, due to the lack of effective positioning structure between the smooth steel drill and the hanger, relative sliding occurs in the paving process, resulting in insufficient elevation control precision. Secondly, the steel wire rope is prone to rotating the supporting structure under the action of tension, affecting the accuracy of paving, frequent re-measurement and adjustment are required, and the construction efficiency is reduced. Thirdly, the traditional fixing mode has simple structure and unstable connection, and is prone to loosening and deformation during use, and has short service life. In addition, the adjusting mode of the traditional structure is relatively complicated, which increases the work burden of the construction personnel. UTILITY MODEL CONTENTS

[0004] In order to overcome the defects of the prior art, the utility model provides a paving elevation adjusting device which has high adjusting precision, simple structure and convenient use.

[0005] The technical scheme adopted by the utility model to solve its technical problems is:

[0006] A paving elevation adjusting device comprises:

[0007] A fixing assembly comprises a positioning drill, the positioning drill has a meshing section and a smooth section arranged in the circumferential direction, and the positioning drill is used for being nailed into the roadbed.

[0008] An adjusting assembly comprises an adjusting connecting piece, the adjusting connecting piece is provided with a matching hole matched with the meshing section of the positioning drill.

[0009] A connecting assembly comprises a supporting piece and a hanger, the supporting piece is provided with a through hole for penetrating the hanger, one end of the hanger is provided with a groove for fixing the steel wire rope, and the other end is adjustably connected with the supporting piece.

[0010] Wherein, the adjusting connecting piece is fixedly connected with the supporting piece.

[0011] Further, the meshing section of the positioning drill is a half gear structure, and the matching hole of the adjusting connecting piece is a half gear hole matched with the half gear structure.

[0012] Further, the adjusting assembly further comprises fixing columns arranged at two ends of the adjusting connecting piece, and a tension bar for providing an outward tension, two ends of the tension bar being connected to the fixing columns at the two ends respectively.

[0013] Further, the fixing columns are in a hook structure, and the hooks extend outwardly from the ends of the adjusting connecting piece.

[0014] Further, the adjusting connecting piece is provided with a tension bar placing groove between the two fixing columns, and the tension bar is accommodated in the placing groove.

[0015] Further, the support is in a C-shaped structure, and the through holes are arranged at two ends of the support; the adjusting connecting piece is in a C-shaped structure, and the matching holes are arranged at two ends of the adjusting connecting piece; and the adjusting connecting piece is fixedly connected to the middle part of the support.

[0016] Further, the hanger is provided with a threaded structure at an end away from the groove, one end of the threaded structure penetrating through the through hole of the support, and the hanger being fixed on the support by a nut cooperating with the threaded structure.

[0017] Further, the hanger is in a cylindrical rod structure, and the through holes at the two ends of the support are circular holes.

[0018] Further, the adjusting connecting piece and the support are fixedly connected by a fastener in a vertical manner.

[0019] Further, the lower end of the positioning drill is provided with a pointed cone part.

[0020] The present application has the following beneficial effects:

[0021] The positioning drill of the present application is engaged with the matching holes of the adjusting connecting piece to form a stable positioning structure, thereby effectively preventing horizontal rotation; the fixed connection between the adjusting connecting piece and the support enables synchronous adjustment of the two, and the smooth section of the positioning drill is used to realize smooth elevation adjustment; the through holes on the support and the adjustable connection of the hanger provide horizontal position adjustment capability, and the groove on the hanger facilitates the installation and fixation of the steel wire rope. BRIEF DESCRIPTION OF DRAWINGS

[0022] The present application will be further described below in combination with the drawings and embodiments.

[0023] Figure 1 is a schematic diagram of the three-dimensional structure of the present application;

[0024] Figure 2 is the front view structural schematic diagram of the utility model;

[0025] Figure 3 is the rear view structural schematic diagram of the utility model;

[0026] Figure 4 is the side view structural schematic diagram of the utility model;

[0027] Figure 5 is the overhead view structural schematic diagram of the utility model;

[0028] Figure 6 is the explosive structural schematic diagram of the utility model.

[0029] Among them,

[0030] 100, fixed assembly, 110, positioning drill, 111, meshing section, 112, smooth section, 113, sharp cone part,

[0031] 200, adjusting assembly, 210, adjusting connecting piece, 211, matching hole, 212, fixed column, 213, tension bar, 214, placing groove,

[0032] 300, connecting assembly, 310, support piece, 311, through hole, 320, hanger, 321, groove, 322, screw structure, 323, nut,

[0033] 400, fastener. DETAILED DESCRIPTION

[0034] The concept, specific structure and generated technical effects of the utility model will be described clearly and completely in the following combined with embodiments and drawings, so as to fully understand the purpose, features and effects of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all embodiments, based on the embodiments of the utility model, other embodiments obtained by the skilled in the art without creative labor are within the protection scope of the utility model. In addition, all the coupling / connection relations involved in the patent are not single component direct interface, but can be composed of better coupling structure by adding or reducing coupling auxiliary parts according to the specific implementation situation. The various technical features in the utility model creation can be interactively combined under the premise of no mutual contradiction and conflict.

[0035] Referring to Figure 1 , the application provides a paving elevation adjusting device, comprising: a fixed assembly 100, an adjusting assembly 200 and a connecting assembly 300.

[0036] Among them, referring to Figures 1 to 4The fixing assembly 100 comprises a positioning spike 110, the positioning spike 110 has a meshing section 111 and a smooth section 112 arranged in a circumferential direction, and the positioning spike 110 is used for being nailed into a roadbed; the adjusting assembly 200 comprises an adjusting connecting piece 210, the adjusting connecting piece 210 is provided with a matching hole 211 matched with the meshing section 111 of the positioning spike 110; the connecting assembly 300 comprises a supporting piece 310 and a hanger 320, the supporting piece 310 is provided with a through hole 311 used for penetrating the hanger 320, one end of the hanger 320 is provided with a groove 321 used for fixing a steel wire rope, and the other end is adjustably connected with the supporting piece 310; and the adjusting connecting piece 210 is fixedly connected with the supporting piece 310.

[0037] It should be noted that the positioning spike 110 provides basic support by being nailed into a roadbed, the meshing section 111 is matched with the matching hole 211 of the adjusting connecting piece 210 to realize height adjustment, in the adjusting process, the smooth section 112 is arranged to enable the adjusting connecting piece 210 to be more smoothly adjusted relative to the positioning spike 110, and accurate control of the height is facilitated; the adjusting connecting piece 210 is fixedly connected with the supporting piece 310 to form a stable overall structure, the through hole 311 on the supporting piece 310 is adjustably connected with the hanger 320, and the groove 321 of the hanger 320 is used for connecting and fixing the steel wire rope.

[0038] It can be understood that, referring to Figure 1 , the adjusting connecting piece 210 is fixedly connected with the supporting piece 310, so that the adjusting connecting piece 210 and the supporting piece 310 can be synchronously adjusted on the positioning spike 110, specifically, referring to Figure 6 , the adjusting connecting piece 210 and the supporting piece 310 are fixedly connected in a vertical direction through a fastener 400, wherein the fastener 400 can be a bolt, a screw, a rivet or other connecting pieces with good fixing effect. Then, the meshing structure of the adjusting connecting piece 210 and the positioning spike 110 can realize height adjustment in a vertical direction, prevent relative rotation, and ensure adjustment accuracy and stability; the through hole 311 on the supporting piece 310 is adjustably connected with the hanger 320, so that the steel wire rope can be positionally adjusted in a horizontal direction, and the steel wire rope can be ensured to maintain a proper connection angle with the paver, thereby improving construction flexibility.

[0039] Wherein, referring to Figure 1 , the lower end of the positioning spike 110 is provided with a pointed cone part 113. The pointed cone part 113 facilitates the positioning spike 110 to be nailed into a roadbed, and reduces the nailing resistance.

[0040] Further, referring to Figure 4 , 5The engagement section 111 of the positioning drill 110 is a half gear structure, and the matching hole 211 of the adjusting connecting piece 210 is a half gear hole matched with the half gear structure. The gear part of the half gear structure is arranged towards the extension direction of the steel wire rope, and the gear part of the half gear hole of the adjusting connecting piece 210 is arranged towards the same direction as the gear part of the half gear structure. The two gear parts are in staggered contact through gear engagement, effectively preventing horizontal rotation caused by excessive tension of the steel wire rope, and improving the stability of the overall structure. In some embodiments, in addition to the half gear structure, square spline, polygonal spline, and plum blossom spline engagement structures can also be used. These structures can also achieve the function of preventing horizontal rotation and ensure the stability of the adjusting device.

[0041] The adjusting connecting piece 210 is a steel sheet, and the half gear through hole 311 can be made by machining the steel sheet on a machine tool. The end of the adjusting connecting piece 210 is also provided with a first handle. The first handle can be easily held and adjusted by the operator, and the movement of the adjusting connecting piece 210 can be more stably controlled during the adjustment of the height, improving the accuracy of the adjustment and the convenience of the operation.

[0042] In some embodiments, referring to Figures 2-6 The adjusting assembly 200 further includes fixing columns 212 arranged at both ends of the adjusting connecting piece 210, and stays 213 for providing outward tension, the two ends of the stay 213 being connected to the fixing columns 212 at both ends respectively. It can be understood that the stay 213 provides an outward tension force for the adjusting connecting piece 210, avoiding the degradation of the elastic ability of the adjusting connecting piece 210, which causes upward and downward displacement during paving, and reducing the actual paving height caused by the upward and downward displacement of the steel wire rope support, which does not conform to the planned paving height. The number of stays 213 can be two, three or more to provide sufficient tension. The material of the stay 213 can be high-strength steel wire, elastic alloy or other materials with good elasticity and durability.

[0043] Further, referring to Figure 6 The fixing column 212 is a hook structure, and the hook extends outwardly from the end of the adjusting connecting piece 210.

[0044] It can be understood that the stay 213 can be installed on the adjusting connecting piece 210 through the hook, which facilitates the installation and replacement of the stay 213 and improves the maintenance convenience of the device.

[0045] Further, referring to Figure 5 , 6The adjusting connecting piece 210 is provided with a stay 213 placing groove 214 between the two end fixed columns 212, and the stay 213 is accommodated in the placing groove 214. It can be understood that the stay 213 placing groove 214 prevents the stay 213 from interfering with other components and the stay 213 from being displaced, thereby ensuring the stability and safety of the device. Specifically, the adjusting connecting piece 210 is a C-shaped structure, and two hooks are uniformly distributed at the two ends thereof. At this time, the number of stays 213 is two, and the corresponding placing grooves 214 are also two. The stays 213 are hung on the opposite hooks through the placing grooves 214, thereby providing sufficient outward tension for the adjusting connecting piece 210.

[0046] In some embodiments, with reference to Figures 1 to 6 The support 310 is a C-shaped structure, and the through hole 311 is arranged at the two ends of the support 310. It should be noted that the support 310 is also a steel sheet structure, and the through hole 311 is directly machined on the support by a machine tool. The two ends of the support 310 are also provided with a second pinch handle to facilitate the operator to hold and adjust.

[0047] Further, with reference to Figures 1 to 3 , 5, one end of the hanger 320 away from the groove 321 is provided with a threaded structure 322. One end of the threaded structure 322 penetrates through the through hole 311 of the support 310, and the threaded structure 322 cooperates with a nut 323 to fix the hanger 320 on the support 310. It can be understood that the cooperation of the threaded structure 322 and the nut 323 not only firmly fixes the hanger 320 on the support 310, but also adjusts the position of the hanger 320 by adjusting the tightening degree of the nut 323, thereby achieving horizontal adjustment. The steel wire rope coincides with the vertical boundary line of the paving, and the nut 323 finally abuts against the support 310, thereby avoiding that the hanger 320 is pulled out due to the tension of the steel wire rope, and improving the paving efficiency. Specifically, the hanger 320 is a cylindrical rod structure, and the through holes 311 at the two ends of the support are circular holes.

[0048] In use, first, the pointed cone part 113 of the positioning drill 110 is downward, and the half-toothed gear meshing section 111 is nailed into the roadbed in the direction of the extension of the steel wire rope. Then, the adjusting connecting piece 210 is held by hand, the half-toothed gear hole cooperates with the meshing section 111 of the positioning drill 110, the height of the hanger 320 is adjusted by sliding the adjusting connecting piece 210 up and down, and the toothed gear of the two is locked after being loosened. The steel wire rope is placed and fixed in the groove 321 of the hanger 320, and the steel wire rope is kept in appropriate tension by adjusting the nut 323, thereby realizing the positioning of the hanger 320 in the vertical and horizontal directions.

[0049] The device effectively limits the displacement of the hanger 320 in the vertical and horizontal directions through the cooperation of the half gear meshing structure and the threaded connection, and significantly improves the flatness and elevation accuracy of paving.

[0050] The above is a specific description of the preferred embodiment of the utility model, but the utility model creation is not limited to the described embodiments, and those skilled in the art can make various equivalent modifications or replacements without departing from the spirit of the utility model, and these equivalent modifications or replacements are all included in the range defined by the claims of the present application.

Claims

1. A paving elevation adjustment device, characterized by, The utility model relates to a paving elevation adjusting device, which comprises the following components: a fixing component, which comprises a positioning spike having a smooth section and an engaging section arranged circumferentially, and is used for being nailed into a roadbed; an adjusting component, which comprises an adjusting connector provided with a matching hole matched with the engaging section of the positioning spike; a connecting component, which comprises a support provided with a through hole for passing through a hanger, and the hanger is provided with a groove for fixing a steel wire rope at one end and is adjustably connected with the support at the other end; wherein the adjusting connector is fixedly connected with the support.

2. The paving elevation adjusting device according to claim 1, wherein the engaging section of the positioning spike is a half gear structure, and the matching hole of the adjusting connector is a half gear hole matched with the half gear structure.

3. The paving elevation adjusting device according to claim 1, wherein the adjusting component further comprises fixing columns arranged at both ends of the adjusting connector, and a tension bar for providing an outward tension, and both ends of the tension bar are connected with the fixing columns at both ends, respectively.

4. The paving elevation adjusting device according to claim 3, wherein the fixing columns are hook structures, and the hooks extend outward from the ends of the adjusting connector.

5. The paving elevation adjusting device according to claim 3, wherein the adjusting connector is provided with a tension bar placing groove between the fixing columns at both ends, and the tension bar is contained in the placing groove.

6. The paving elevation adjusting device according to claim 1, wherein the support is a C-shaped structure, and the through hole is arranged at both ends of the support; the adjusting connector is a C-shaped structure, and the matching hole is arranged at both ends of the adjusting connector; and the adjusting connector is fixedly connected with the middle part of the support.

7. The paving elevation adjusting device according to claim 1, wherein the end of the hanger away from the groove is provided with a threaded structure, one end of the threaded structure passes through the through hole of the support, and the hanger is fixed on the support by cooperating the threaded structure with a nut.

8. The paving elevation adjusting device according to claim 1, wherein the hanger is a cylindrical rod structure, and the through holes at both ends of the support are round holes.

9. The paving elevation adjusting device according to claim 1, wherein the adjusting connector and the support are fixedly connected perpendicularly through a fastener.

10. The paving elevation adjusting device according to claim 1, wherein the lower end of the positioning spike is provided with a pointed cone part. ​ ​ ​ ​ ​ ​ ​ ​ ​