Garbage collection and transportation structure suitable for high-rise building construction
By transforming ventilation shafts into garbage transport channels and adopting a keel frame and door panel structure, the problem of low efficiency in the removal of construction waste from high-rise buildings has been solved, achieving efficient, low-cost, and low-dust garbage disposal.
Patent Information
- Application Number
- CN202422893209.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-26
- Publication Date
- 2025-11-18
- Estimated Expiration
- 2034-11-26
AI Technical Summary
Existing technologies for the removal of construction waste from high-rise buildings are inefficient, and direct dumping pollutes the environment and poses safety hazards.
The building's ventilation shafts are used as garbage transport channels, and a closed transport channel is formed through a combination of keel frame, shielding door panels and movable door panels, so as to realize garbage removal on each floor, reduce dust and reduce mechanical transportation costs.
It improved the efficiency of garbage collection and transportation, reduced dust pollution and costs, and ensured the environmental management of the construction site and the safety of residents' living environment.
Smart Images

Figure CN223562469U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to building structure technical field, concretely relates to a structure is suitable for high -rise building construction garbage clean operation. BACKGROUND
[0002] The construction garbage refers to the construction, construction unit or individual during the construction, laying or demolishing, maintenance process of building, and produces the spoil, the waste and other waste.
[0003] When multilayer building construction, a large amount of construction waste will be produced, and the produced construction waste needs to be transported to the ground for transfer treatment in time, and the general processing mode is transported to the ground through the construction elevator, and the processing efficiency is lower, in order to speed up the construction waste cleaning speed, individual construction unit will adopt the way of throwing to clean up, which can easily cause dust, ash flying in the air and a large amount of noise, seriously pollute the environment around the construction site, and there will be safety hazards.
[0004] Therefore, the prior art needs to be improved. UTILITY MODEL CONTENT
[0005] The utility model solves the technical problem in the prior art that the transportation efficiency is low, and the direct throwing is harmful, and aims at providing a structure suitable for high -rise building construction garbage clean operation, which has the beneficial effects of high cleaning efficiency, little dust raising and low cost by using corresponding technical means.
[0006] The utility model realizes the following technical scheme:
[0007] A structure suitable for high -rise building construction garbage clean operation, including building main part, the building main part has ventilation shaft, the ventilation shaft is configured as the transportation channel of transporting garbage, every floor of the building main part is provided with keel frame around the opening of the transportation channel, the keel frame is provided with the shutter door plate and the movable door plate that shields the opening of the transportation channel.
[0008] Further, in the utility model, the keel frame is connected with the supporting keel, and the supporting keel is connected with the shutter door plate.
[0009] Further, in the utility model, the keel frame and the supporting keel are configured as square tubes.
[0010] Further, in the utility model, the keel frame is provided with the expansion bolt connected with the building main part.
[0011] Further, in the utility model, the shutter door plate is provided with the self -tapping screw one connected with the supporting keel.
[0012] Further, in the utility model, the support keel is provided with self-tapping screw two which is connected with the keel frame.
[0013] Further, in the utility model, the shielding door plate is provided with hinge which is connected with the movable door plate.
[0014] Further, in the utility model, the movable door plate is provided with movable bolt which is connected with the shielding door plate on the side away from the hinge.
[0015] Further, in the utility model, the movable door plate is provided with pull handle.
[0016] Further, in the utility model, the movable door plate is in the middle of the bottom of the keel frame.
[0017] Compared with the prior art, the utility model has the following advantages and beneficial effects:
[0018] 1, utilize the ventilation shaft of building main body as the transport channel of transporting garbage, have the convenience of garbage cleaning and transporting of each floor, need not build the channel of transporting garbage alone, reduce the expense of traditional garbage vertical transportation machinery of elevator simultaneously, have the advantages of low cost, and the transportation efficiency is also higher.
[0019] 2, the opening of the transport channel is blocked by the shielding door plate and the movable door plate, and the closed transport channel controls the dust of the construction site, and has a great effect on the environment management of the construction site and the living environment of the surrounding residents. DETAILED DESCRIPTION
[0020] The drawings described herein are used to provide further understanding of the embodiments of the utility model and form part of the present application, and do not constitute limitation to the embodiments of the utility model.In the drawings:
[0021] Figure 1 It is the front view schematic drawing of the garbage cleaning and transporting structure suitable for high-rise building construction of the utility model;
[0022] Figure 2 It is the sectional view schematic drawing of the garbage cleaning and transporting structure suitable for high-rise building construction of the utility model.
[0023] Markings in the drawings and corresponding part names: 1-building main body, 2-transport channel, 3-keel frame, 301-expansion bolt, 4-shielding door plate, 401-self-tapping screw one, 5-movable door plate, 6-support keel, 601-self-tapping screw two, 7-hinge, 8-movable bolt. DETAILED DESCRIPTION
[0024] In order to make the purpose, technical scheme and advantages of the utility model more clearly, the utility model is further described in detail below in combination with examples and drawings, the schematic implementation mode of the utility model and its description are only used to explain the utility model, and do not serve as the limitation of the utility model. The following detailed description of the examples of the utility model provided in the drawings is not intended to limit the scope of the claimed utility model, but only represents selected examples of the utility model. Based on the examples in the utility model, all other examples obtained by those skilled in the art without creative labor belong to the scope of protection of the utility model.
[0025] It should be noted that: similar reference numerals and letters represent similar items in the following drawings, therefore, once an item is defined in one drawing, it does not need to be further defined and explained in subsequent drawings. In the description of the examples of the utility model, it should also be explained that, unless explicitly defined and limited, if the terms "arrange", "mount", "connect" appear, they should be understood broadly, for example, can be fixedly connected, can be detachably connected, or integrally connected, can be mechanically connected, can be electrically connected, can be directly connected, or indirectly connected through an intermediate medium, can be the communication inside two elements. For those skilled in the art, the specific meaning of the above terms in the utility model can be understood according to the specific circumstances.
[0026] Example 1
[0027] Example 1 provides a garbage cleaning and transporting structure suitable for high-rise building construction, which is suitable for multi-storey building construction, such as Figures 1-2 As shown in the specific structure description below.
[0028] Please refer to Figure 1 As shown, the garbage cleaning and transporting structure suitable for high-rise building construction of the utility model mainly comprises a keel frame 3, a shielding door plate 4 and a movable door plate 5, and further comprises a transporting channel 2.
[0029] Further, in combination with Figure 1 As shown, the building body 1 is a high-rise building (more than 5-storey building) constructed for construction, and has a vertical ventilation shaft on the building body 1. In this example, the original ventilation shaft is used as the transporting channel 2 for transporting garbage, without the need to modify a special channel for transporting garbage, thereby reducing the construction cost.
[0030] Further, in combination with Figure 1As shown, in order to reduce dust, the need to transport the channel 2 to do closed processing. Keel frame 3 using 30㎜x30㎜x1.0㎜ multiple rectangular tube welded in turn, the keel frame 3 is rectangular structure, fixedly installed on the side of the two sides of the shaft wall. Building main body 1 each floor is installed a keel frame 3, floor transport channel 2 opening is located in the middle of the keel frame 3.
[0031] It should be noted that the keel frame 3 is installed on the top of the plurality of expansion bolts 301, expansion bolts 301 into the side of the shear wall, and then realize the fixed connection of the keel frame 3.
[0032] In some embodiments of the present embodiment, the shielding door plate 4 and the movable door plate 5 are both wooden door plates, which have the advantages of easy access and low cost. The shielding door plate 4 covers the keel frame 3, and the self-tapping screw 401 is inserted to connect the shielding door plate 4 and the keel frame 3.
[0033] Further, in combination with Figure 1 As shown, the movable door plate 5 is installed at the bottom of the keel frame 3, and two hinges 7 are installed on the left side of the movable door plate 5. The hinges 7 are connected with the shielding door plate 4, so that the movable door plate 5 can be rotated to open or close.
[0034] It should be noted that the shielding door plate 4 can be sprayed with advertisements, slogans, and company LOGO according to the requirements of the enterprise visual identification system.
[0035] Embodiment 2
[0036] This embodiment is a further optimization of the structure suitable for high-rise building construction waste removal in embodiment 1, and the specific structure is as follows.
[0037] In combination with Figure 1 And Figure 2 As shown, five support keels 6 are installed on the keel frame 3 to increase the structural strength. The support keel 6 also uses a rectangular tube with a cross-sectional size of 30㎜x30㎜, and the thickness of the rectangular tube is 1.0㎜.
[0038] Further, the support keel 6 is installed horizontally, the left end of the support keel 6 is fixedly connected with the keel frame 3 through the self-tapping screw 601, and the right end of the support keel 6 is fixedly connected with the keel frame 3 through the self-tapping screw 601. The keel frame 3 and the support keel 6 form a stable rectangular frame unit, and the stable rectangular frame system bears the lateral impact force of the shielding door plate 4 under the upper garbage. The shielding door plate 4 is fixedly connected with the support keel 6 through the screw.
[0039] It should be noted that after the keel frame 3 and the support keel 6 are installed, check whether all the welding points are firmly welded, and if there are loose parts, carry out repair welding and rust prevention paint. It should be noted that after the keel frame 3 and the support keel 6 are installed, check whether all the welding points are firmly welded, and if there are loose parts, carry out repair welding and rust prevention paint.
[0040] Embodiment 3
[0041] This embodiment is further optimized for the garbage removal structure for high-rise building construction in embodiment 1, and the specific structure is as follows.
[0042] In combination Figure 1 As shown, the movable bolt 8 is installed on the right side of the movable door plate 5, and the lock hole is arranged above the shielding door plate 4. The movable bolt 8 is inserted into the lock hole of the shielding door plate 4 to realize the closing of the movable door plate 5.
[0043] In order to facilitate the pushing or pulling of the movable door plate 5, a handle is installed on the movable door plate 5.
[0044] The working principle of the garbage removal structure for high-rise building construction of the utility model is as follows:
[0045] The movable bolt 8 is pulled out of the lock hole, and then the movable door plate 5 is pulled open. The construction garbage is pushed into the transportation channel 2 and automatically falls into the bottom of the transportation channel 2. Then the movable door plate 5 is closed, and the movable bolt 8 is inserted into the lock hole to realize the closing.
[0046] In summary, the garbage removal structure for high-rise building construction provided by the utility model comprises a building main body 1, the building main body 1 has a ventilation shaft, the ventilation shaft is configured as a transportation channel 2 for transporting garbage, a keel frame 3 is arranged around the opening of the transportation channel 2 on each floor of the building main body 1, the keel frame 3 is provided with a shielding door plate 4 and a movable door plate 5 for shielding the opening of the transportation channel 2. The above-mentioned keel frame 3 is connected with a supporting keel 6, and the supporting keel 6 is connected with the shielding door plate 4. The above-mentioned keel frame 3 and the supporting keel 6 are both configured as square tubes. The above-mentioned keel frame 3 is provided with an expansion bolt 301 connected with the building main body 1. The above-mentioned shielding door plate 4 is provided with a self-tapping screw 1 401 connected with the supporting keel 6. The above-mentioned supporting keel 6 is provided with a self-tapping screw 2 601 connected with the keel frame 3. The above-mentioned shielding door plate 4 is provided with a hinge 7 connected with the movable door plate 5. The side of the above-mentioned movable door plate 5 away from the hinge 7 is provided with a movable bolt 8 connected with the shielding door plate 4. The above-mentioned movable door plate 5 is provided with a handle for pulling. The above-mentioned movable door plate 5 is located in the middle of the bottom of the keel frame 3. Therefore, the garbage removal structure for high-rise building construction has the beneficial effects of high removal efficiency, small dust raising and low cost.
[0047] The above-mentioned specific embodiments further specifically describe the purpose, technical scheme and beneficial effects of the utility model, and it should be understood that the above-mentioned specific embodiments are only specific embodiments of the utility model and are not used to limit the protection scope of the utility model. Any modification, equivalent replacement, improvement, etc. within the spirit and principle of the utility model should be included in the protection scope of the utility model.
Claims
1. A structure suitable for garbage removal in high-rise building construction, comprising a building main body (1) having a ventilation shaft, characterized in that, The ventilation shaft is configured as a transportation channel (2) for transporting garbage, and a keel frame (3) is arranged around the opening of the transportation channel (2) of each floor of the building body (1), and the keel frame (3) is provided with a shielding door plate (4) and a movable door plate (5) shielding the opening of the transportation channel (2).
2. The garbage removal structure suitable for high-rise building construction according to claim 1, characterized in that, The keel frame (3) is connected with a support keel (6), and the support keel (6) is connected with the shielding door plate (4).
3. The garbage removal structure suitable for high-rise building construction according to claim 2, characterized in that, The keel frame (3) and the support keel (6) are both configured as square tubes.
4. The garbage removal structure suitable for high-rise building construction according to claim 2, wherein, The keel frame (3) is provided with expansion bolts (301) connected with the building body (1).
5. The garbage removal structure suitable for high-rise building construction according to claim 2, wherein, The shielding door plate (4) is provided with self-tapping screws (401) connected with the support keel (6).
6. The garbage removal structure suitable for high-rise building construction according to claim 5, wherein, The support keel (6) is provided with self-tapping screws (601) connected with the keel frame (3).
7. The garbage removal structure suitable for high-rise building construction according to claim 1, wherein, The shielding door plate (4) is provided with hinges (7) connected with the movable door plate (5).
8. The garbage removal structure suitable for high-rise building construction according to claim 7, characterized in that, The side of the movable door plate (5) away from the hinges (7) is provided with a movable bolt (8) connected with the shielding door plate (4).
9. The garbage removal structure suitable for high-rise building construction according to claim 7, wherein, The movable door plate (5) is provided with a pull handle.
10. The garbage removal structure suitable for high-rise building construction according to claim 1, wherein, The movable door plate (5) is in the middle of the bottom of the keel frame (3).