Formwork reinforcing structure of formwork support construction tunnel lining
The formwork reinforcement structure using L-shaped hooks and steel plate clamps solves the problem of unstable formwork reinforcement in subway construction, achieves formwork stability and convenient adjustment, reduces construction costs, and provides material turnover.
Patent Information
- Application Number
- CN202520107055.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-17
- Publication Date
- 2025-11-18
- Estimated Expiration
- 2035-01-17
AI Technical Summary
In subway construction, the insecure reinforcement of small-section formwork leads to inaccurate formwork positioning, deformation, displacement, misalignment, uneven joints, dimensional encroachment, and poor overall alignment of the secondary lining. Moreover, the construction cost of dealing with such problems is high.
The template reinforcement structure adopts L-shaped hooks and steel plate clamps. The L-shaped hooks are hooked into the connecting bolt holes of the spliced steel templates, and the steel plate clamps are connected to the keel to form multiple connections, which enhances the stability of the templates. The position can be adjusted by nuts, which is suitable for different models of spliced steel templates.
It achieves stable fixation of the template, avoids displacement and deformation, simplifies position adjustment, reduces construction costs, and provides convenient on-site applicability and recyclable materials.
Smart Images

Figure CN223562819U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model belongs to tunnel lining formwork technology field, concretely relates to a formwork reinforcing structure of template support construction tunnel lining. BACKGROUND
[0002] In the subway construction process, because the subway entrance, air duct and safety mouth passage structure section changes variously, it is impossible to adopt the secondary lining trolley or the pouring of the shaped steel mold, and the construction mainly uses the frame body support and the small steel mold splicing. However, in the small section construction process, the formwork positioning is not accurate, the reinforcement is not firm, the formwork deforms and displaces in the concrete pouring process, thereby leading to the situations such as the formwork error, the jointing seam misalignment, the size limit invasion, the two lining overall linear difference and the like, which do not meet the requirements of the concrete 'inside solid and outside beautiful'. CONTENT OF THE UTILITY MODEL
[0003] The utility model solves the problems such as the formwork error, the jointing seam misalignment, the size limit invasion, the two lining overall linear difference and the like of the conventional small section formwork reinforcement and the high construction cost of processing such apparent quality problems.
[0004] The utility model provides the following technical scheme: a formwork reinforcing structure of template support construction tunnel lining, including L type draw hook and steel plate fixture, the hook body of L type draw hook is hooked into the connecting bolt hole of spliced steel formwork, two L type draw hooks are aligned on the both sides of spliced steel formwork, the steel plate fixture is placed on the keel, the rod body of L type draw hook is passed through the mounting hole of steel plate fixture and is connected with anti-drop part, and the anti-drop part is tightened to make L type draw hook fixed spliced steel formwork by the steel plate fixture holding the keel.
[0005] Further, the back of the spliced steel formwork is crossly arranged with a main keel and a secondary keel, the secondary keel is pressed on the main keel, the secondary keel is parallel to the spliced steel formwork, and the steel plate fixture is vertically placed on the secondary keel.
[0006] Further, the hook body of L type draw hook is hooked into the connecting bolt hole of two adjacent spliced steel formworks.
[0007] Further, at least two formwork reinforcing structures are arranged on the same spliced steel formwork.
[0008] Further, the rod body of L type draw hook is marked with external threads, the anti-drop part is a nut, and the nut is screw-coupled with the rod body.
[0009] Further, the mounting hole of the steel plate fixture is a long hole parallel to the long side of the steel plate fixture.
[0010] Compared with the prior art, the utility model has the advantages that:
[0011] The utility model provides a kind of formwork support construction tunnel lining's formwork reinforcing structure, simple structure, reasonable in design, by installing reinforcement in different height, different position, unified axis, it realizes the multiple connection of L type draw hook and steel plate fixture, the strength of formwork reinforcement is improved, the phenomenon of formwork displacement, deformation, uneven stress is prevented from happening;When the size of formwork, position is not suitable, when formwork position is adjusted, only need to be adjusted after the nut that cooperates with steel plate fixture is removed, it is convenient and fast;By the installation hole drilled in advance, and the cooperation of L type draw hook and installation hole, it can be applicable to different models of spliced steel formwork, provide convenient conditions for on-site use;L type draw hook, steel plate fixture and other components are made of on-site material, not only convenient to disassemble, simple to make, and from long-term interests, can be recycled as turnover material, save a lot of cost. BRIEF DESCRIPTION OF DRAWINGS
[0012] Figure 1 It is the perspective view of the formwork support construction tunnel lining's formwork reinforcing structure;
[0013] Figure 2 It is the front view of the formwork support construction tunnel lining's formwork reinforcing structure;
[0014] Figure 3 It is the side view of the formwork support construction tunnel lining's formwork reinforcing structure.
[0015] In the drawing: 1-L type draw hook;2-steel plate fixture;2.1-installation hole;3-spliced steel formwork;3.1-connection bolt hole;4-nut;5-main keel;6-secondary keel. DETAILED DESCRIPTION
[0016] In order to more clearly illustrate the technical scheme in the embodiments of the utility model or prior art, the following will briefly introduce the drawing needed to be used in embodiment or prior art description, obviously, the drawing in the following description only some embodiments of the utility model, for ordinary skilled person in the art, under the premise of not paying creative labor, other drawings can also be obtained according to these drawings.
[0017] As Figure 1 , Figure 2 , Figure 3 Indicated: a kind of formwork support construction tunnel lining's formwork reinforcing structure, including L type draw hook 1 and steel plate fixture 2, the hook body of L type draw hook 1 is hooked into spliced steel formwork 3's connection bolt hole 3.1, two L type draw hooks 1 are a group in the alignment of the two sides of spliced steel formwork 3, steel plate fixture 2 rests on keel, the rod body of L type draw hook 1 passes through the installation hole 2.1 of steel plate fixture 2 after connection anti-drop component, anti-drop component tightens and makes L type draw hook 1 hold keel by steel plate fixture 2 and fix spliced steel formwork 3, make spliced steel formwork 3 and main secondary keel connection property enhance.
[0018] The back of the spliced steel formwork 3 is cross-arranged with a main keel 5 and a secondary keel 6, the main keel 5 is an I-beam, the secondary keel 6 is a square steel, the secondary keel 6 is pressed on the main keel 5, the secondary keel 6 is parallel to the spliced steel formwork 3, and the steel plate clamp 2 is vertically placed on the secondary keel 6.
[0019] The hook body of the L-shaped draw hook 1 is hooked into the connecting bolt holes 3.1 of the adjacent two spliced steel formworks 3.
[0020] At least two formwork reinforcing structures are arranged on the same spliced steel formwork 3. After the formwork support is reinforced, it is necessary to put the point line on the frame body to determine the specific installation position of the formwork reinforcing structure, so that the multiple formwork reinforcing structures are finally fixed on the spliced steel formwork 3 and the main and secondary keels with equal spacing and equal height.
[0021] The L-shaped draw hook 1 is made of A10 steel bar cutting, the rod body of the L-shaped draw hook 1 is engraved with external threads, the anti-falling component is a nut 4, and the nut 4 is screwed with the rod body.
[0022] The steel plate clamp 2 is made of a 1cm thick steel strip, the mounting hole 2.1 of the steel plate clamp 2 is a long hole parallel to the long side of the steel plate clamp 2; the position of the L-shaped draw hook 1 can be adjusted appropriately during installation and positioning.
[0023] The above description of the disclosed embodiments enables a person skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application should not be limited to the embodiments shown herein, but should be consistent with the widest scope of principles and novel features disclosed herein.
Claims
1. A formwork reinforcement structure for tunnel lining construction using a formwork support system, characterized in that: Includes an L-shaped hook (1) and a steel plate clamp (2). The hook body of the L-shaped hook (1) is hooked into the connecting bolt hole (3.1) of the splicing steel template (3). Two L-shaped hooks (1) are aligned on both sides of the splicing steel template (3). The steel plate clamp (2) is placed on the keel. The rod body of the L-shaped hook (1) passes through the mounting hole (2.1) of the steel plate clamp (2) and is connected to the anti-detachment component. The anti-detachment component tightens so that the L-shaped hook (1) holds the keel and fixes the splicing steel template (3) through the steel plate clamp (2).
2. The formwork reinforcement structure for tunnel lining construction using a formwork support as described in claim 1, characterized in that: The back of the splicing steel template (3) is arranged with a main keel (5) and a secondary keel (6) in a cross shape. The secondary keel (6) is pressed on the main keel (5) and parallel to the splicing steel template (3). The steel plate clamp (2) is placed vertically on the secondary keel (6).
3. The formwork reinforcement structure for tunnel lining construction using a formwork support as described in claim 2, characterized in that: The hook body of the L-shaped hook (1) simultaneously hooks into the connecting bolt holes (3.1) of two adjacent spliced steel templates (3).
4. The formwork reinforcement structure for tunnel lining construction using a formwork support as described in claim 1, characterized in that: At least two template reinforcement structures are arranged on the same spliced steel template (3).
5. A formwork reinforcement structure for tunnel lining construction using a formwork support system according to any one of claims 1 to 4, characterized in that: The L-shaped hook (1) has an external thread engraved on its rod body, and the anti-disengagement component is a nut (4), which is screwed into the thread of the rod body.
6. A formwork reinforcement structure for tunnel lining construction using a formwork support, as described in any one of claims 1 to 4, characterized in that: The mounting hole (2.1) of the steel plate clamp (2) is an elongated hole parallel to the long side of the steel plate clamp (2).