Continuous pouring auxiliary device
By designing a continuous pouring auxiliary device, the problem of waiting for the bottom to harden during the construction of funnel-shaped structures was solved, enabling continuous pouring of funnel-shaped structures and improving construction efficiency and structural strength.
Patent Information
- Application Number
- CN202423008702.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-06
- Publication Date
- 2025-11-25
- Estimated Expiration
- 2034-12-06
AI Technical Summary
Existing technology requires waiting for the bottom to harden before building the supporting frame when pouring the "tongue-shaped" funnel structure of underground corridors, which leads to slow construction progress and reduced structural strength.
Design a continuous pouring auxiliary device, including a base plate, a frame and anchor columns. The base plate is provided with a filling groove and a flow hole. The frame is provided with a crossbeam and a secondary beam. The anchor columns are inserted into the insertion holes to support the frame and are directly integrated with the concrete pouring to ensure the continuity of pouring at the bottom and sides of the funnel.
This method enables continuous concrete pouring for funnel-shaped structures, improves construction efficiency and structural strength, shortens construction time, and enhances the overall quality of the concrete.
Smart Images

Figure CN223593369U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to a kind of continuous pouring auxiliary devices, belong to building support technical field. BACKGROUND
[0002] When concrete pouring construction, it often faces a variety of complex irregular structures, such as in pouring underground corridor, it needs to pour the concrete structure of "tongue type" funnel, the traditional construction method is: first, pour the bottom of "funnel", after hardening, support frame is established on the bottom, and the formwork of "funnel" side is erected, so that the whole "funnel" structure is poured into shape.
[0003] The shortcomings of this construction method are obvious: first, it needs a long time to wait for the hardening of the bottom of "funnel", and the waiting process slows down the construction progress, reducing the construction efficiency of concrete pouring; second, the hardening concrete structure and the new poured concrete have weak bonding ability, reducing the overall structural strength. INVENTION CONTENTS
[0004] The technical problem to be solved by the utility model is to overcome the shortcomings of the prior art, provide a continuous pouring auxiliary device, ensure the continuity of the concrete pouring construction of "tongue type" funnel structure, and improve the efficiency and quality of concrete pouring construction.
[0005] The utility model relates to a kind of continuous pouring auxiliary devices, comprising: the vertical frame for supporting pouring frame is arranged on the bottom plate, the anchor column for enhancing the fixing effect is further provided on the top of bottom plate;Bottom plate and anchor column are poured into concrete;
[0006] The bottom surface of bottom plate is provided with first filling groove and second filling groove.
[0007] Optionally, the first filling groove and the second filling groove are crossed and communicated.
[0008] Optionally, flow hole is further provided on the bottom plate, and the flow hole passes through the first filling groove or the second filling groove.
[0009] The bottom plate is provided with a bushing, and the anchor column is inserted into the bushing.
[0010] Optionally, the vertical frame comprises: main support rib, first cross beam and second cross beam are arranged on the main support rib; the second cross beam is arranged above the first cross beam.
[0011] The first cross beam is connected to the top of bottom plate.
[0012] Optionally, the first cross beam comprises: first vice beam arranged on both sides of main support rib.
[0013] Optionally, the second cross beam comprises: second vice beam arranged on both sides of main support rib.
[0014] Optionally, the surfaces of the anchor post, main support bar, first secondary beam, and second secondary beam are provided with anti-slip textures to enhance the anchoring effect.
[0015] The advantages of this utility model compared with the prior art are:
[0016] The device provided by this utility model is directly integrated with the concrete pouring process, and the support frame provides a stable support point for the supporting frame. Even if the concrete at the bottom of the "funnel" has not hardened, the supporting frame can still be built on it, ensuring that the pouring construction of the bottom and sides of the funnel can be carried out continuously. Through this device, the efficiency and quality of concrete pouring construction of the funnel structure are effectively improved. Attached Figure Description
[0017] Figure 1 This is a first-view structural schematic diagram of a continuous casting auxiliary device according to this utility model;
[0018] Figure 2 This is a second-view structural schematic diagram of a continuous casting auxiliary device according to this utility model;
[0019] Figure 3 This is a schematic diagram of the frame structure of a continuous casting auxiliary device according to this utility model;
[0020] Figure 4 This is a schematic diagram of the installation structure of a continuous pouring auxiliary device according to this utility model.
[0021] In the picture:
[0022] 1. Base plate; 101. Insertion hole; 102. First filling groove; 103. Second filling groove; 104. Flow hole;
[0023] 2. Anchor bolt;
[0024] 3. Frame erection; 301. First crossbeam; 3011. First secondary beam; 302. Main support reinforcement; 303. Second crossbeam; 3031. Second secondary beam;
[0025] 4. Supporting framework. Detailed Implementation
[0026] like Figures 1-4 As shown, this embodiment is achieved through the following technical solution: a support frame 3 for supporting the casting frame is provided on the base plate 1, and an anchor column 2 for enhancing the fixing effect is also provided on the top of the base plate 1; the base plate 1 and the anchor column 2 are cast in concrete.
[0027] The bottom surface of the base plate 1 is provided with a first filling groove 102 and a second filling groove 103.
[0028] Specifically, the first filling groove 102 and the second filling groove 103 intersect and communicate.
[0029] Specifically, the bottom plate 1 is further provided with a flow hole 104 penetrating through the first filling groove 102 or the second filling groove 103.
[0030] During pouring, the concrete fills the first filling groove 102, the second filling groove 103 and the flow hole 104, and the concrete is fully combined with the bottom plate 1 through multiple pouring positions to ensure the overall structural strength.
[0031] The bottom plate 1 is provided with a insertion hole 101, and the anchor column 2 is inserted into the insertion hole 101.
[0032] In the embodiment, the anchor column 2 protrudes on the upper surface of the bottom plate 1, and preferably, the insertion hole 101 is a through hole, and the anchor column 2 can also protrude on the lower surface of the bottom plate 1 by penetrating through the insertion hole 101, and at this time, the insertion hole 101 provides support for the bottom plate 1.
[0033] Specifically, the stand 3 comprises: a main support rib 302, a first cross beam 301 and a second cross beam 303 are arranged on the main support rib 302; the second cross beam 303 is arranged above the first cross beam 301; and the first cross beam 301 is connected to the upper surface of the bottom plate 1.
[0034] The upper end of the main support rib 302 protrudes on the second cross beam 303, as shown in the figure. Figure 3 The support frame 4 is composed of a steel pipe of a hand and foot support, as shown in the figure. Figure 4 The steel pipe is inserted into the upper end of the main support rib 302, and the second cross beam 303 supports the bottom of the steel pipe to provide axial support for the steel pipe.
[0035] Specifically, the first cross beam 301 comprises: a first auxiliary beam 3011 arranged on both sides of the main support rib 302.
[0036] Specifically, the second cross beam 303 comprises: a second auxiliary beam 3031 arranged on both sides of the main support rib 302.
[0037] Specifically, the surfaces of the anchor column 2, the main support rib 302, the first auxiliary beam 3011 and the second auxiliary beam 3031 are provided with anti-skid lines for enhancing the anchoring effect. In the embodiment, the type of the anti-skid lines is a spiral line, as shown in the figure. Figure 1
[0038] The specific use principle of the utility model is as follows:
[0039] When pouring the "tongue-shaped" funnel structure, first, multiple groups of the device of the utility model are arranged and placed on the bottom formwork of the funnel, further, the steel pipe of the support frame 4 is clamped on the stand 3, the inner wall formwork of the funnel is established relying on the stand 3, after all the formworks are assembled, the concrete can be poured, the upper surface of the bottom of the funnel is not provided with a formwork, the surface is an open surface, then, the concrete is poured to the bottom to immerse the bottom plate 1, the anchor column and part of the stand 3, after the concrete at the bottom of the funnel is initially set in a short time and has a certain strength, the sidewall of the funnel can be poured, during the period of waiting for the initial setting of the concrete at the bottom of the funnel, the wall on the opposite side of the funnel can also be poured by artificial, multiple positions are continuously constructed, the structural quality of the whole concrete is ensured, and the specific pouring structure is as shown in Figure 4
[0040] Of course, the above content is only the preferred embodiment of the utility model, and cannot be considered as limiting the scope of the embodiment of the utility model. The utility model is also not limited to the above examples, and the equal changes and improvements made by the ordinary skilled in the art within the essential scope of the utility model should all belong to the patent coverage range of the utility model.
Claims
1. A continuous pouring aid device, characterized in that, The application relates to a continuous pouring auxiliary device, which comprises a bottom plate (1), a stand (3) for supporting a pouring frame arranged on the bottom plate (1), and a plurality of anchor columns (2) arranged on the upper surface of the bottom plate (1); the bottom plate (1) and the anchor columns (2) are poured into concrete. First and second filling grooves (102 and 103) are arranged on the bottom surface of the bottom plate (1).
2. The continuous pouring auxiliary device according to claim 1, wherein, The first and second filling grooves (102 and 103) are crossed and communicated.
3. The continuous pouring auxiliary device according to claim 2, wherein, Flow holes (104) are further arranged on the bottom plate (1) and pass through the first filling groove (102) or the second filling groove (103). Holes (101) are arranged on the bottom plate (1), and the anchor columns (2) are inserted into the holes (101).
4. The continuous pouring auxiliary device according to claim 1, wherein, The stand (3) comprises a main supporting rib (302), first and second cross beams (301 and 303) arranged on the main supporting rib (302), and the second cross beam (303) is arranged above the first cross beam (301). The first cross beam (301) is connected to the upper surface of the bottom plate (1).
5. The continuous pouring auxiliary device according to claim 4, wherein, The first cross beam (301) comprises first auxiliary beams (3011) arranged on both sides of the main supporting rib (302).
6. The continuous pouring auxiliary device according to claim 4, wherein, The second cross beam (303) comprises second auxiliary beams (3031) arranged on both sides of the main supporting rib (302).
7. The continuous pouring auxiliary device according to claim 4, wherein, The surfaces of the anchor columns (2), the main supporting rib (302), the first auxiliary beams (3011) and the second auxiliary beams (3031) are provided with anti-skid lines for enhancing the anchoring effect.