Construction fence structure

By introducing components such as posts, panels, ball bearings, and turntables into the construction fence, the climbing protection problem is solved, achieving safety protection and material protection at the construction site, and facilitating the rapid installation and dismantling of the fence.

CN223608311UActive Publication Date: 2025-11-28QINGDAO AOCHENG TOOLS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423008046.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-06
Publication Date
2025-11-28
Estimated Expiration
2034-12-06

AI Technical Summary

Technical Problem

The existing construction fences lack anti-climbing design, which allows outsiders to enter the construction site, causing safety hazards and loss of construction materials.

Method used

A construction fence structure was designed, which adopts a combination of posts, panels, first ball bearings, first pole, turntable and second ball bearings. The design of rotation and ball bearings makes it difficult for climbers to grip, the rotation of the turntable prevents climbing, and the combination of inserts and springs enables the quick assembly and disassembly of the panels.

Benefits of technology

It effectively prevents outsiders from climbing into the construction site, protects safety, prevents the loss of construction materials, and enables the rapid installation and dismantling of the railings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223608311U_ABST
    Figure CN223608311U_ABST
Patent Text Reader

Abstract

The utility model discloses a construction fence structure which comprises stand columns, a fence plate is connected between the two stand columns in an attached mode, a plurality of sets of first balls are installed in grooves in the fence plate, the two stand columns are rotationally connected with the same first rod body, and the first rod body is fixedly connected with two sets of rotating discs. The vertical columns at the two ends are rotationally connected with the same first rod body, the rotating discs are fixedly connected to the two sides of the first rod body, the second rod bodies are installed between the rotating discs, and the second balls are installed on the second rod bodies. A first ball on a breast board and a second ball on a second rod body can enable climbing personnel not to grasp firmly, and the first rod body drives a turntable to rotate, so that the turntable can rotate once being touched, external personnel can be prevented from climbing up, and the danger caused by the external personnel entering a construction site is prevented; and meanwhile, the situation that construction materials in the construction site are lost can be prevented.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to construction fence technical field especially relates to a construction fence structure. BACKGROUND

[0002] In various construction processes, such as building construction, road construction, municipal engineering construction etc., there are many potential dangers in the construction site. For example, there are high-altitude falling risks in the building construction site, including building materials, tools, etc.; excavating operations may cause ground subsidence; and the operation of various construction machinery also threatens the surrounding personnel. As a physical isolation means, the construction fence can effectively block the spread of these dangers to the outside of the construction site, protecting the safety of pedestrians, vehicles and nearby residents. It can also divide the construction area and the non-construction area, facilitating the effective management of the construction site by the construction personnel. However, the current construction fences do not have good anti-climbing design or anti-climbing measures, which may lead to the entry of external personnel into the construction site, causing personnel danger or loss of construction materials. SUMMARY

[0003] The utility model aims at solving the shortcomings in the prior art and provides a construction fence structure.

[0004] To achieve the above-mentioned purpose, the utility model adopts the following technical scheme:

[0005] A construction fence structure, comprising a stand, two groups of stand are connected with a fence plate, a plurality of first balls are installed in the groove on the fence plate, a same first rod body is rotatably connected to the two groups of stand, two groups of turntables are fixedly connected to the first rod body, and a plurality of second rod bodies are installed between the two groups of turntables.

[0006] Preferably, two groups of rotating rods are rotatably connected to the two groups of stand, two groups of insertion rods are slidably connected to the two groups of rotating rods, springs are installed between the two groups of insertion rods and the corresponding rotating rods, two groups of sliding grooves are formed in the two groups of stand, the two groups of insertion rods are partially inserted into the corresponding sliding grooves, two groups of plate bodies are installed on the two groups of stand, third rod bodies are fixedly connected to the plurality of plate bodies, insertion grooves are formed in the plurality of third rod bodies, and the plurality of third rod bodies are movably penetrated through the fence plate.

[0007] Preferably, a plurality of second balls are installed in the grooves of the plurality of second rod bodies.

[0008] Preferably, a slope is formed on the fence plate.

[0009] Preferably, support plates are installed on the two groups of stand.

[0010] Preferably, a base is installed on the two groups of stand.

[0011] Preferably, the first balls are evenly distributed on the fence plate.

[0012] The utility model discloses the beneficial effect that:

[0013] 1. Through setting up the stand, fence plate, first ball, first rod body, carousel, second rod body and second ball, two ends stand rotation is connected with a first rod body, and the first rod body is fixedly connected with carousel on both sides, and a plurality of second rod bodies are installed between the carousel, and second ball is installed on the second rod body, when the personnel want to climb, the first ball on the fence plate and the second ball on the second rod body can make the climbing personnel not firm, and because the first rod body drives the carousel to be able to rotate, once touch will rotate, can avoid external personnel to climb up, prevent the danger caused by the external personnel into the construction site, can also prevent the construction material loss condition in construction site;

[0014] 2. Through setting up the carousel, plug rod, spring, sliding slot, plate body, third rod body and slot, when the fence plate is installed through the third rod body, can be pulled plug rod, and make plug rod slide out from sliding slot, utilize plug rod and insert into the slot on the third rod body, and through the pressure of spring, make plug rod stably insert, can quickly disassemble and assemble the fence plate. BRIEF DESCRIPTION OF DRAWINGS

[0015] Figure 1 The utility model provides a construction fence structure's structure schematic diagram;

[0016] Figure 2 The utility model discloses a construction fence structure's structure schematic diagram; Figure 1 The utility model discloses a construction fence structure's structure schematic diagram;

[0017] Figure 3 The utility model discloses a construction fence structure's structure schematic diagram; Figure 1 The utility model discloses a construction fence structure's structure schematic diagram;

[0018] Figure 4 The utility model discloses a construction fence structure's structure schematic diagram; Figure 1 The utility model discloses a construction fence structure's structure schematic diagram;

[0019] Figure 5 The utility model discloses a construction fence structure's structure schematic diagram; Figure 1 The utility model discloses a construction fence structure's structure schematic diagram.

[0020] In the drawing: 1, stand;2, fence plate;3, first ball;4, first rod body;5, carousel;6, second rod body;7, second ball;8, carousel;9, plug rod;10, spring;11, sliding slot;12, plate body;13, third rod body;14, slot;15, slope;16, support plate;17, base. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments.

[0022] Embodiment 1, refer to Figures 1 to 5 A construction fence structure, including stand 1, two groups of stand 1 are connected with fence board 2 between sticking, the recess on fence board 2 is all installed with multiple groups of first ball 3, first ball 3 can make the personnel who wants to climb from fence board 2 slide, the same first rod body 4 of rotating connection is installed on two groups of stand 1, two groups of rotating disc 5 are fixedly connected on first rod body 4, multiple groups of second rod body 6 are installed between two groups of rotating disc 5, rotating disc 5 can rotate along with the rotation of first rod body 4, once touching will rotate, the overall process is through the same first rod body 4 of rotating connection on both end stand 1, and two groups of rotating disc 5 are installed on first rod body 4, multiple second rod body 6 are installed between rotating disc 5, and second ball 7 is installed on second rod body 6, when personnel wants to climb, first ball 3 on fence board 2 and second ball 7 on second rod body 6 can make the climbing personnel not firm, and rotating disc 5 rotates along with the rotation of first rod body 4, once touching will rotate, can avoid external personnel to climb, prevent external personnel from entering construction site and cause danger, can also prevent the loss of construction materials in construction site.

[0023] In the embodiment, two groups of rotating rods 8 are rotatably connected to the two groups of stands 1, two groups of insertion rods 9 are slidably connected to the two groups of rotating rods 8, springs 10 are installed between the two groups of insertion rods 9 and the corresponding rotating rods 8, the springs 10 can provide tension to the insertion rods 9, allowing them to be tightly inserted into the insertion slots 14, two groups of sliding grooves 11 are formed in the two groups of stands 1, and the two groups of insertion rods 9 are partially inserted into the corresponding sliding grooves 11, the sliding grooves 11 are mainly used to accommodate the protruding parts of the insertion rods 9, two groups of plate bodies 12 are installed on the two groups of stands 1, third rods 13 are fixedly connected to the multiple groups of plate bodies 12, insertion slots 14 are formed in the multiple groups of third rods 13, the multiple groups of third rods 13 are movably penetrated by the fence board 2, multiple groups of second balls 7 are installed in the grooves of the multiple groups of second rods 6, the second balls 7 can make the climbing personnel not firm the second rods 6, a slope 15 is formed on the fence board 2, the design of the slope 15 can also allow the climbing personnel to use less force, support plates 16 are installed on the two groups of stands 1, the support plates 16 serve as auxiliary supports for the fence board 2, bases 17 are installed on the two groups of stands 1, the bases 17 can be installed on the ground through the through holes on them, and the first balls 3 are evenly distributed on the fence board 2.

[0024] The working principle of the embodiment is as follows: when in use, after installation through the third rod body 13, the insertion rod 9 is pulled out of the sliding groove 11, and the insertion rod 9 is inserted into the insertion slot 14 on the third rod body 13, and the insertion rod 9 is stably inserted into the insertion slot 14 through the pressure of the spring 10, the fence 2 can be quickly disassembled and assembled, the two groups of stand columns 1 are rotatably connected with the same first rod body 4, the two groups of turntables 5 are installed between the two groups of turntables 5, and the second rod body 6 is installed on the second rod body 6. The second ball 7 is installed on the second rod body 6, when a person wants to climb, the first ball 3 on the fence 2 and the second ball 7 on the second rod body 6 can make the climbing person not firm, and the turntable 5 can rotate with the rotation of the first rod body 4, and once touched, it can rotate to avoid external personnel to climb up, prevent external personnel from entering the construction site to cause danger, and also prevent the loss of property in the construction site.

[0025] The above is only a preferred embodiment of the present application, but the protection scope of the present application is not limited to this. Any skilled person in the art can make equivalent replacement or change according to the technical scheme and the inventive concept of the present application within the technical range disclosed by the present application, which should be covered in the protection scope of the present application.

Claims

1. A construction fence structure, comprising posts (1), characterized in that, A railing (2) is attached between the two sets of columns (1). Multiple sets of first ball bearings (3) are installed in the grooves of the railing (2). The same first rod (4) is rotatably connected to the two sets of columns (1). Two sets of turntables (5) are fixed on the first rod (4). Multiple sets of second rods (6) are installed between the two sets of turntables (5).

2. The construction fence structure according to claim 1, characterized in that, Two sets of rotating rods (8) are rotatably connected to each of the two sets of columns (1), and two sets of insert rods (9) are slidably connected to each of the two sets of rotating rods (8). Springs (10) are installed between each set of insert rods (9) and the corresponding rotating rods (8). Two sets of sliding grooves (11) are opened on each of the two sets of columns (1). Parts of the two sets of insert rods (9) are inserted into the corresponding sliding grooves (11). Two sets of plates (12) are installed on each of the two sets of columns (1). A third rod (13) is fixedly connected to each of the multiple sets of plates (12). A slot (14) is opened on each of the multiple sets of third rods (13). The multiple sets of third rods (13) are movably connected to the railing (2).

3. The construction fence structure according to claim 1, characterized in that, Multiple sets of second ball bearings (7) are installed in the grooves of multiple sets of the second rod body (6).

4. A construction fence structure according to claim 1, characterized in that, The parapet (2) has a slope (15).

5. A construction fence structure according to claim 1, characterized in that, Support plates (16) are installed on both sets of columns (1).

6. A construction fence structure according to claim 1, characterized in that, Both sets of columns (1) are equipped with bases (17).

7. A construction fence structure according to claim 1, characterized in that, The first ball (3) is evenly distributed on the guardrail (2).