Horseshoe flame feeding extension blocking brick hanging device

By introducing an arched support plate and roller design into the horseshoe flame feeding retaining brick suspension device, the problem of deformation of the load-bearing structure under high temperature environment is solved, ensuring the stability of the retaining brick position and improving the safety and maintenance convenience of the kiln.

CN223636636UActive Publication Date: 2025-12-05SHAANXI TOPRAY SOLAR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422933185.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-29
Publication Date
2025-12-05
Estimated Expiration
2034-11-29

Smart Images

  • Figure CN223636636U_ABST
    Figure CN223636636U_ABST
Patent Text Reader

Abstract

The utility model discloses a horse shoe flame feeding extension brick suspension device, and relates to the technical field of suspension devices, the horse shoe flame feeding extension brick suspension device comprises a mounting plate, a suspension mechanism is arranged outside the mounting plate, and the suspension mechanism comprises a groove, a roller, support steel, a support plate and a lifting hook. The supporting steel is in sliding connection with the rolling wheels, the blocking and extending bricks can slide towards the outside of the feeding port conveniently for replacement and maintenance, the design of the arched supporting plates is the key for preventing the supporting steel from being heated and deformed, the arched supporting plates can convert vertically-downward force into axial pressure along the arched structures, and under the long-term heating environment, even if materials have certain thermal expansion, the supporting steel can not be damaged. The arch-shaped structure can still effectively disperse force, reduces bending deformation of the supporting steel caused by thermal stress and gravity action, prevents the blocking effect of the blocking bricks on flames and dust from being affected by position deviation of the blocking bricks, and guarantees the safety of the kiln.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to a suspension device technical field, especially in a horseshoe flame feeding delay brick suspension device. BACKGROUND

[0002] The horseshoe flame feeding delay brick suspension device is a device for the feeding opening of a horseshoe flame kiln, which is used for suspending a delay brick, and the delay brick effectively prevents the scattering of raw material dust and the outflow of kiln flame, reduces heat loss, and the suspension device has the following technologies:

[0003] 1. Load-bearing structure technology, a load-bearing beam is installed at the feeding opening.

[0004] 2. Delay brick suspension technology, the delay brick clamp is designed in a ring embracing or clamp jaw type, and is customized according to the shape and size of the delay brick, for a rectangular delay brick, the ring embracing clamp can embrace the delay brick from both sides, and a groove matched with the surface of the delay brick is arranged in the interior of the clamp to increase friction and stability. The clamp jaw type clamp clamps the delay brick through an adjustable jaw, and the jaw is covered with a high-temperature-resistant rubber or ceramic gasket, which can prevent the delay brick from being clamped and damaged, and can also enhance the clamping effect. The other end of the clamp and the lifting chain are connected through high-strength bolts or pins, and the lifting chain is installed on the load-bearing beam.

[0005] In a long-term high-temperature environment, the load-bearing structure is prone to thermal deformation, which causes the position of the delay brick to deviate, affects the blocking effect of the delay brick on the flame and dust, and reduces the safety of the kiln. To solve this problem, a supporting mechanism is added to reduce the bending deformation caused by thermal stress and gravity, thereby ensuring the blocking effect of the delay brick on the flame and dust and ensuring the safety of the kiln. SUMMARY

[0006] In view of the deficiencies of the prior art, the utility model provides a horseshoe flame feeding delay brick suspension device, which solves the technical problem that in a long-term high-temperature environment, the load-bearing structure is prone to thermal deformation, which causes the position of the delay brick to deviate, affects the blocking effect of the delay brick on the flame and dust, and reduces the safety of the kiln.

[0007] To achieve the above purpose, the utility model is implemented by the following technical solutions:

[0008] A horseshoe flame feeding delay brick suspension device, comprising a mounting plate, a suspension mechanism is arranged outside the mounting plate, the suspension mechanism comprises a groove, two rollers, a support steel, a support plate and twenty-two hooks, the groove is arranged outside the mounting plate, the two rollers are both rotationally connected inside the groove, the support steel is slidingly connected outside the rollers, the support plate is fixedly installed outside the support steel, and the twenty-two hooks are arranged outside the support plate.

[0009] The outer part of each roller is provided with a through hole, the inner part of each through hole is slidably connected with a connecting shaft, the two ends of the mounting plate close to each roller are provided with an opening, the two ends of the connecting shaft are slidably connected in the two openings respectively, the outer part of each connecting shaft is fixedly provided with a threaded rod, the outer part of each threaded rod is threadedly connected with a nut, the threaded rod is located outside the groove, the two ends of the supporting plate close to each hook are provided with a mounting groove, the hook is slidably connected in the mounting groove, the inner part of the supporting plate close to each mounting groove is provided with a threaded groove, the threaded groove is communicated with the inner part of the mounting groove, the inner part of each threaded groove is threadedly connected with a limiting screw rod, the limiting screw rod is attached to the outer part of the hook, the outer part of the supporting steel is fixedly provided with a limiting plate, the outer part of the mounting plate is fixedly provided with a sliding plate, and the limiting plate is slidably connected to the outer part of the sliding plate.

[0010] Preferably, the outer part of the sliding plate is threadedly connected with a fixing bolt, the outer part of the sliding plate is provided with a threaded hole, and the fixing bolt is threadedly connected in the threaded hole.

[0011] Preferably, one side of the mounting plate close to the sliding plate is provided with a baffle, the outer part of the sliding plate is fixedly provided with a fixing screw rod, the outer part of the fixing screw rod is threadedly connected with a threaded block, and the baffle is slidably connected to the outer part of the fixing screw rod.

[0012] Compared with the prior art, the utility model has the advantages of:

[0013] 1. By setting up the roller, cooperation hook, the sliding connection of the supporting steel and the roller, it is convenient to change and maintain the delay brick which slides to the feeding port, the design of the arched supporting plate is the key to prevent the supporting steel from being deformed by heat, the arched supporting plate can convert the vertical downward force into the axial pressure along the arched structure, even if the material has certain thermal expansion in the long-term heat environment, the arched structure can still effectively disperse the force, reduce the bending deformation of the supporting steel caused by thermal stress and gravity, prevent the position deviation of the delay brick from affecting the blocking effect of the delay brick on the flame and dust, and guarantee the safety of the kiln.

[0014] 2. By setting up the roller, cooperation nut, the connection between the mounting plate and the supporting steel is released, the connection between the nut and the threaded rod is released by rotating the nut, at this time, the connecting shaft is pulled to release the connection between the connecting shaft and the roller, at this time, the roller can be disassembled, the disassembly of the roller is convenient for the user to replace the damaged roller, so as to guarantee the sliding effect of the supporting steel. BRIEF DESCRIPTION OF DRAWINGS

[0015] The above description is only a summary of the technical scheme of the utility model, in order to more clearly understand the technical means of the utility model, and the content of the specification can be implemented, the following is the preferred embodiment of the utility model and the detailed description of the drawings.

[0016] Figure 1The utility model discloses a structure diagram

[0017] Figure 2 The utility model discloses a structure diagram Figure 1 The utility model discloses a structure diagram of mounting plate

[0018] Figure 3 The utility model discloses a structure diagram Figure 1 The utility model discloses an explosion structure diagram of support steel

[0019] Figure 4 The utility model discloses an explosion structure diagram of mounting plate Figure 1 The utility model discloses an explosion structure diagram of mounting plate

[0020] Figure 5 The utility model discloses an explosion structure diagram of mounting plate Figure 1 The utility model discloses an explosion structure diagram of mounting plate

[0021] Figure 6 The utility model discloses an explosion structure diagram of mounting plate Figure 3 The utility model discloses an explosion structure diagram of mounting plate

[0022] Figure 7 The utility model discloses an explosion structure diagram of mounting plate Figure 3 The utility model discloses an explosion structure diagram of mounting plate

[0023] Legend: 1, mounting plate, 2, recess, 3, gyro wheel, 4, support steel, 5, support plate, 6, lifting hook, 7, through -hole, 8, connecting shaft, 9, opening, 10, threaded rod, 11, nut, 12, installation slot, 13, thread groove, 14, limit screw, 15, limit plate, 16, sliding plate, 17, fixed bolt, 18, thread hole, 19, baffle, 20, fixed screw, 21, threaded block. Specific implementation

[0024] The embodiment of the application provides a horse-shoe flame feeding and blocking brick suspension device, which effectively solves the technical problem that the load-bearing structure is easily deformed by heat in a long-term high-temperature environment, the position of the blocking brick is deviated, the blocking effect on the flame and dust is affected, and the safety of the kiln is reduced.

[0025] Embodiment

[0026] The technical scheme in the embodiment of the application effectively solves the technical problem that the load-bearing structure is easily deformed by heat in a long-term high-temperature environment, the position of the blocking brick is deviated, the blocking effect on the flame and dust is affected, and the safety of the kiln is reduced, and the general idea is as follows:

[0027] In view of the problems in the prior art, the utility model provides a horse hoof flame feeding blocking brick suspension device, including the mounting plate 1, the outside of mounting plate 1 is provided with the suspension mechanism, the suspension mechanism includes the recess 2, the gyro wheel 3, the support steel 4, the support plate 5 and the hook 6, the recess 2 is set up in the outside of mounting plate 1, the gyro wheel 3 has two, two gyro wheels 3 are all rotationally connected in the inside of recess 2, the support steel 4 is slidably connected in the outside of gyro wheel 3, the support plate 5 is fixedly installed in the outside of support steel 4, the hook 6 has twenty two, twenty two hooks 6 all are set up in the outside of support plate 5, through setting up gyro wheel 3, cooperate hook 6, the sliding connection of support steel 4 and gyro wheel 3, it is convenient to change maintenance to the sliding blocking brick of feeding port, the design of arcuate support plate 5 is the key to prevent support steel 4 from heat deformation, arcuate support plate 5 can convert the force vertically downward into the axial pressure along the arch structure, under the environment of long -term heat, even if material has certain thermal expansion, the arch structure still can effectively disperse force, reduce the bending deformation of support steel 4 due to thermal stress and gravity, prevent blocking brick position deviation influence the blocking effect of flame and dust of blocking brick, guarantee the security of kiln.

[0028] The outside of each gyro wheel 3 is provided with a through hole 7, the inside of each through hole 7 is slidably connected with a connecting shaft 8, the two ends of each gyro wheel 3 are provided with a through hole 9, the two ends of each connecting shaft 8 are slidably connected in the inside of two through holes 9, the outside of each connecting shaft 8 is fixedly installed with a threaded rod 10, the outside of each threaded rod 10 is threadedly connected with a nut 11, and the threaded rod 10 is located outside the recess 2. By setting the gyro wheel 3, cooperating with the nut 11, the connection between the mounting plate 1 and the support steel 4 is released, the nut 11 is rotated to disconnect the nut 11 and the threaded rod 10, at this time, the connecting shaft 8 is pulled to disconnect the connecting shaft 8 and the gyro wheel 3, at this time, the gyro wheel 3 can be disassembled, and the disassembly of the gyro wheel 3 is convenient for the user to replace the damaged gyro wheel 3, so as to ensure the sliding effect of the support steel 4.

[0029] The two ends of the support plate 5 near each hook 6 are provided with a mounting groove 12, and the hook 6 is slidably connected in the inside of the mounting groove 12. The inside of each mounting groove 12 of the support plate 5 is provided with a threaded groove 13, and the threaded groove 13 is communicated with the inside of the mounting groove 12. The inside of each threaded groove 13 is threadedly connected with a limiting screw 14, and the limiting screw 14 is attached to the outside of the hook 6, so as to replace the hook 6.

[0030] The outside of the support steel 4 is fixedly installed with a limiting plate 15, and the outside of the mounting plate 1 is fixedly installed with a sliding plate 16. The limiting plate 15 is slidably connected to the outside of the sliding plate 16, and it is a connecting mechanism between the support steel 4 and the mounting plate 1, to avoid the mounting plate 1 and the support steel 4 from being separated.

[0031] The outer part of the sliding plate 16 is threadedly connected with a fixing bolt 17, the outer part of the sliding plate 16 is provided with a threaded hole 18, the fixing bolt 17 is threadedly connected in the inner part of the threaded hole 18, the movement of the supporting steel 4 during use can be limited, the side of the mounting plate 1 close to the sliding plate 16 is provided with a baffle 19, the outer part of the sliding plate 16 is fixedly provided with a fixing screw rod 20, the outer part of the fixing screw rod 20 is threadedly connected with a threaded block 21, the baffle 19 is slidingly connected in the outer part of the fixing screw rod 20, after the connection between the baffle 19 and the sliding plate 16 is released, the supporting steel 4 can be disassembled from the mounting plate 1.

[0032] Working principle:

[0033] Firstly, the roller 3 is placed in the groove 2, at this time the connecting shaft 8 is connected with the connecting shaft 8 by entering the inner part of the groove 2 through one side hole 9, at this time the connecting shaft 8 is pushed to make the connecting shaft 8 pass through the other hole 9, at this time the nut 11 is threadedly connected in the outer part of the threaded rod 10, at this time the hooks 6 are inserted into the inner part of the mounting groove 12, at this time the limiting screw rod 14 is rotated to make the limiting screw rod 14 closely adhere to the surface of the hook 6 to fix the hook 6, the hook 6 cooperates with the lifting chain and the refractory brick clamp, that is, the hook 6 provides a hanging point for the lifting chain, the refractory brick clamp is connected with the other end of the lifting chain in a firm way, forming a stable hanging system, ensuring that the refractory brick can effectively block the flame and heat from spreading outward from the feeding port, at this time the limiting plate 15 outside the supporting steel 4 is slidingly connected in the outer part of the limiting plate 15, at this time the end of the supporting steel 4 close to the limiting plate 15 is slidingly connected in the outer part of the roller 3.

[0034] Secondly, at this time the baffle 19 is slidingly connected in the outer part of the fixing screw rod 20, at this time the threaded block 21 is threadedly connected in the outer part of the fixing screw rod 20 until the threaded block 21 closely adheres to the outer part of the baffle 19 to fix the baffle 19, at this time the fixing bolt 17 is threadedly connected in the inner part of the threaded hole 18, at this time the limiting plate 15 is limited and cannot slide, when the refractory brick needs to be moved, the connection between the fixing bolt 17 and the threaded hole 18 is released, at this time the supporting steel 4 is pulled, at this time the supporting steel 4 is moved through the roller 3, at this time the supporting steel 4 drives the refractory brick away from the feeding port.

[0035] Finally, it should be noted that: obviously, the above embodiments are only examples for clearly illustrating the utility model and are not limited to the implementation. For ordinary skilled persons in the art, other different forms of changes or variations can be made on the basis of the above description. Here, it is not necessary and impossible to enumerate all the implementation. The obvious changes or variations derived therefrom are still within the protection scope of the utility model.

Claims

1. A device for suspending a horse-shoe flame damper brick, comprising a mounting plate (1), characterised in that, The outside of the mounting plate (1) is provided with a hanging mechanism, the hanging mechanism comprises a groove (2), a roller (3), a support steel (4), a support plate (5) and a hook (6); The groove (2) is opened in the outside of the mounting plate (1), the roller (3) has two, two rollers (3) are all rotatably connected in the inside of the groove (2), the support steel (4) is slidably connected in the outside of the roller (3), the support plate (5) is fixedly installed in the outside of the support steel (4), and the hook (6) has twenty two, twenty two hooks (6) are all arranged in the outside of the support plate (5).

2. A horse-shoe flame delivery damper brick hanger as defined in claim 1, wherein: The outside of each roller (3) is provided with a through hole (7), and the inside of each through hole (7) is slidably connected with a connecting shaft (8); Wherein, the mounting plate (1) is close to two ends of each roller (3) and is provided with an opening (9), and the connecting shaft (8) is slidably connected in the inside of the two openings (9).

3. A horse-shoe flame delivery damper brick hanger as defined in claim 2, wherein: The outside of each connecting shaft (8) is fixedly installed with a threaded rod (10), and the outside of each threaded rod (10) is threadedly connected with a nut (11); Wherein, the threaded rod (10) is located in the outside of the groove (2).

4. A horse-shoe flame delivery damper brick hanger as defined in claim 1, wherein: The support plate (5) is close to two ends of each hook (6) and is provided with a mounting groove (12); Wherein, the hook (6) is slidably connected in the inside of the mounting groove (12).

5. A horse-shoe flame delivery damper brick hanger as defined in claim 4, wherein: The inside of the support plate (5) close to each mounting groove (12) is provided with a threaded groove (13), the threaded groove (13) is communicated with the inside of the mounting groove (12), and the inside of each threaded groove (13) is threadedly connected with a limiting screw rod (14); Wherein, the limiting screw rod (14) is attached to the outside of the hook (6).

6. A horse-shoe flame delivery damper brick hanger as defined in claim 1, wherein: The outside of the support steel (4) is fixedly installed with a limiting plate (15), and the outside of the mounting plate (1) is fixedly installed with a sliding plate (16); Wherein, the limiting plate (15) is slidably connected in the outside of the sliding plate (16).

7. A horse-shoe flame delivery damper brick hanger as defined in claim 6, wherein: The outside of the sliding plate (16) is threadedly connected with a fixing bolt (17); Wherein, the outside of the sliding plate (16) is provided with a threaded hole (18), and the fixing bolt (17) is threadedly connected in the inside of the threaded hole (18).

8. A horse-shoe flame delivery damper brick hanger as defined in claim 6, wherein: One side of the mounting plate (1) close to the sliding plate (16) is provided with a baffle (19); Wherein, the outside of the sliding plate (16) is fixedly installed with a fixed screw rod (20), the outside of the fixed screw rod (20) is threadedly connected with a threaded block (21), and the baffle (19) is slidably connected in the outside of the fixed screw rod (20).