Nitrogen balance cylinder system
By employing a redundant design with two sets of nitrogen cylinders and a real-time monitoring system, the system solves the shutdown problem of existing nitrogen balance cylinder systems when a single device fails, achieving more stable gas pressure output and rapid response, extending equipment life, and ensuring safety.
Patent Information
- Application Number
- CN202520161855.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-24
- Publication Date
- 2025-12-12
- Estimated Expiration
- 2035-01-24
AI Technical Summary
The existing nitrogen balance cylinder system requires shutdown for maintenance when a single device fails, which affects its performance and has insufficient response speed and stability.
The system employs a dual-cylinder design with redundancy. When the pressure in one cylinder drops, the pressure in the other cylinder is quickly replenished to ensure system stability. Real-time monitoring and early warning are provided via pressure sensors and alarms to prevent leaks.
It improves the system's air pressure stability and response speed, enhances the stability and redundancy of the equipment, extends its service life, and ensures operational safety.
Smart Images

Figure CN223663141U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to nitrogen balance cylinder technical field more specifically, it is a kind of nitrogen balance cylinder system. BACKGROUND
[0002] The working principle of nitrogen balance cylinder system is based on the compression and expansion characteristics of nitrogen. When the pressure in the system is lower than the set value, nitrogen flows from the nitrogen cylinder into the nitrogen balance cylinder, increasing the pressure in the system by compressing nitrogen. When the pressure in the system is higher than the set value, nitrogen flows out of the nitrogen balance cylinder, reducing the pressure in the system by expanding nitrogen. Through this dynamic compression and expansion process, the system can maintain a relatively stable pressure environment.
[0003] At present, the structure of the existing nitrogen balance cylinder system is shown in the nitrogen balance cylinder system disclosed in publication No. CN206382868U. Although this nitrogen balance cylinder system improves the stability of the movement process and the machining precision and surface quality of the product, it is suitable for high-speed cutting, does not require a power source and piping, is compact and occupies a small space, has small pressure changes, and has stable balancing force. However, the practicality of this technical solution is low. When a single device is damaged, the device needs to be shut down for maintenance, which affects the use performance of the technical solution. UTILITY MODEL CONTENTS
[0004] To overcome the above-mentioned defects of the prior art, the utility model provides a nitrogen balance cylinder system, which provides more stable and uniform gas pressure output through two groups of nitrogen cylinders. One group of nitrogen cylinders can quickly supplement when the pressure of the other group of nitrogen cylinders decreases, thereby ensuring the gas pressure stability of the overall system. In the case of needing to quickly adjust the balance pressure, the two groups of nitrogen cylinders can work simultaneously to provide faster response speed. The configuration of the two groups of nitrogen cylinders increases the redundancy of the system. Even if one group fails, the other group can still work, thereby increasing the pressure stability, improving the response speed, enhancing the system stability, optimizing the pressure distribution, and prolonging the service life of the equipment, to solve the problems in the above background technology.
[0005] To achieve the above-mentioned purposes, the utility model provides the following technical scheme: a nitrogen balance cylinder system, comprising a support plate, two nitrogen cylinders, two balance oil cylinders and an oil distribution block are installed outside the support plate, the two nitrogen cylinders are distributed at the top of the support plate, the two balance oil cylinders are distributed at the front side of the bottom end of the support plate, and the oil distribution block is arranged at the front side of the support plate.
[0006] High-pressure rubber hoses are arranged between the nitrogen cylinders and the oil distribution block and between the balance oil cylinders and the oil distribution block, and the nitrogen cylinders and the oil distribution block and the balance oil cylinders and the oil distribution block are connected in communication through the high-pressure rubber hoses.
[0007] In a preferred embodiment, an external safety valve group is arranged at the top of the oil distribution block and connected to one end of the nitrogen cylinder;
[0008] The safety valve group comprises a shockproof pressure gauge, a high-pressure ball valve and a pipe joint body, the shockproof pressure gauge is arranged at the front side of the high-pressure ball valve, the pipe joint body is arranged at the top of the high-pressure ball valve, and the high-pressure ball valve is arranged at the top of the nitrogen cylinder.
[0009] In a preferred embodiment, an air filter is arranged at the bottom end of the balance oil cylinder.
[0010] In a preferred embodiment, a pressure relay is arranged at the rear side of the high-pressure ball valve, and the pressure relay is arranged at the top of the nitrogen cylinder.
[0011] In a preferred embodiment, a fixing plate is arranged at the front side of the bottom end of the support plate and at the top of the support plate, and a gas pressure sensor for monitoring gas leakage is arranged at the top of the fixing plate.
[0012] In a preferred embodiment, an installation plate is arranged at the bottom of the oil distribution block, two alarm devices are arranged at the top of the installation plate, a controller is arranged between the two alarm devices, and the controller is arranged at the top of the installation plate.
[0013] The technical effects and advantages of the present application are as follows:
[0014] 1. The design of two groups of nitrogen cylinders can provide more stable and uniform gas pressure output. When the pressure of one group of nitrogen cylinders decreases, the other group of nitrogen cylinders can quickly supplement the pressure, thereby ensuring the stability of the overall system pressure. In the case of needing to quickly adjust the balance pressure, the two groups of nitrogen cylinders can work simultaneously to provide faster response speed. The configuration of the two groups of nitrogen cylinders increases the redundancy of the system. Even if one group fails, the other group can still work, thereby increasing the pressure stability, improving the response speed, enhancing the system stability, optimizing the pressure distribution and prolonging the service life of the equipment.
[0015] 2. The gas pressure sensor can monitor the gas pressure changes at the nitrogen cylinders and the balance oil cylinder in real time. Once gas leakage occurs, the gas pressure sensor can quickly capture the abnormal decrease in gas pressure, thereby issuing an alarm in time through the alarm device. In this way, accidents can be avoided, the safety of workers can be ensured, and equipment damage caused by leakage can be avoided. BRIEF DESCRIPTION OF DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of the present application;
[0017] Figure 2 It is a schematic diagram of the overall structure of the present application; Figure 1 It is an enlarged view of part A in the middle;
[0018] Figure 3 The utility model discloses a Figure 1 The enlarged view of part B;
[0019] Figure 4 The utility model discloses a support plate plan view;
[0020] Figure 5 The utility model discloses a Figure 4 The enlarged view of part C.
[0021] The figure mark is: 1, support plate, 2, nitrogen cylinder, 3, balance oil cylinder, 4, oil distribution block, 5, high pressure rubber tube, 6, shockproof pressure gauge, 7, high pressure ball valve, 8, pipe joint body, 9, air cleaner, 10, pressure relay, 11, fixed plate, 12, air pressure sensor, 13, mounting plate, 14, alarm, 15, controller. DETAILED DESCRIPTION
[0022] The technical scheme in the embodiments of the utility model will be apparently and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by the ordinary skill in the art without creative labor belong to the range of protection of the utility model.
[0023] With reference to the drawings in the description, Figures 1-5 The utility model provides a nitrogen balance cylinder system, including support plate 1, two nitrogen cylinders 2, two balance oil cylinders 3 and oil distribution block 4 are installed outside the support plate 1, two nitrogen cylinders 2 interval distribution is in support plate 1 top, two balance oil cylinders 3 interval distribution is in support plate 1 bottom end front side, and oil distribution block 4 sets up in support plate 1 front side, be equipped with high pressure rubber tube 5 between nitrogen cylinder 2 and oil distribution block 4 and between balance oil cylinder 3 and oil distribution block 4, and nitrogen cylinder 2 and oil distribution block 4 and balance oil cylinder 3 and oil distribution block 4 are communicated through high pressure rubber tube 5 between.
[0024] When using, the design of two groups of nitrogen cylinders 2 can provide more stable and uniform air pressure output, one group of nitrogen cylinders 2 can be quickly replenished when the pressure of another group of nitrogen cylinders 2 drops, thereby guaranteeing the air pressure stability of the overall system, which effectively reduces the system instability factors caused by the pressure fluctuation of a single group of nitrogen cylinders 2. In the case of needing to quickly adjust the balance pressure, two groups of nitrogen cylinders 2 can work simultaneously to provide faster response speed, and the configuration of two groups of nitrogen cylinders 2 increases the redundancy of the system. Even if one of them fails, the other can still work, ensuring the continuous operation of the system. Thus, the pressure stability, response speed, system stability, pressure distribution and equipment service life can be increased, optimized and prolonged.
[0025] In order to improve the convenience of operation gas delivery, as shown in Figure 1 , 2 and 5, the end of the nitrogen cylinder 2 is externally provided with a safety valve group; the safety valve group comprises a shockproof pressure gauge 6, a high-pressure ball valve 7 and a pipe joint body 8, the shockproof pressure gauge 6 is arranged on the front side of the high-pressure ball valve 7, the pipe joint body 8 is arranged on the top of the high-pressure ball valve 7, and the high-pressure ball valve 7 is arranged on the top of the nitrogen cylinder 2; the opening and closing of the high-pressure ball valve 7 is simple and convenient, and the gas flow can be quickly cut off to ensure the safety of the system, and the influence of mechanical vibration on the measurement results is reduced by the shockproof pressure gauge 6.
[0026] In order to improve the performance of the equipment, as shown in Figure 1 , the bottom end of the balance oil cylinder 3 is provided with an air filter 9; the air filter 9 filters out the dust, sand and other small particulate matters in the air to prevent these impurities from entering the inside of the balance oil cylinder 3 and causing pollution, thereby ensuring the use performance of the balance oil cylinder 3.
[0027] In order to improve the running safety, as shown in Figure 5 , the rear side of the high-pressure ball valve 7 is provided with a pressure relay 10, and the pressure relay 10 is arranged on the top of the nitrogen cylinder 2; when the pressure exceeds the set value, the pressure relay 10 can quickly send an electric signal, thereby preventing the system from overloading and avoiding equipment damage and safety accidents.
[0028] In order to monitor whether the gas leaks, as shown in Figure 1 and 3 , the bottom end of the support plate 1 and the top of the support plate 1 are both provided with a fixed plate 11, and the top of the fixed plate 11 is provided with a gas pressure sensor 12 for monitoring gas leakage; the arrangement of the two gas pressure sensors 12 can detect the gas at the balance oil cylinder 3 and the nitrogen cylinder 2; the bottom of the oil distribution block 4 is provided with a mounting plate 13, and the top of the mounting plate 13 is provided with two alarm devices 14 which are spaced apart; a controller 15 is arranged between the two alarm devices 14, and the controller 15 is arranged on the top of the mounting plate 13; the controller 15 can judge according to the detection information, and when the gas pressure changes, the alarm device 14 gives an early warning to inform the staff to repair and maintain in time, thereby avoiding accidents and ensuring the safety of the staff, and also avoiding equipment damage caused by leakage.
[0029] Finally: the above only for preferred embodiments of the present application, and not for limiting the present application, any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.
Claims
1. A nitrogen balance cylinder system, comprising a support plate (1), characterized in that: Two nitrogen cylinders (2), two balance cylinders (3) and an oil distribution block (4) are installed on the outside of the support plate (1). The two nitrogen cylinders (2) are spaced apart on the top of the support plate (1), the two balance cylinders (3) are spaced apart on the front side of the bottom end of the support plate (1), and the oil distribution block (4) is located on the front side of the support plate (1). High-pressure hoses (5) are provided between the nitrogen cylinder (2) and the oil distribution block (4) and between the balance cylinder (3) and the oil distribution block (4), and the nitrogen cylinder (2) and the oil distribution block (4) and the balance cylinder (3) and the oil distribution block (4) are connected by high-pressure hoses (5).
2. The nitrogen balance cylinder system according to claim 1, characterized in that: A safety valve assembly is provided on the outside of the end located at the top of the oil distribution block (4) and connected to the nitrogen cylinder (2); The safety valve assembly includes a shock-resistant pressure gauge (6), a high-pressure ball valve (7), and a pipe connector (8). The shock-resistant pressure gauge (6) is located in front of the high-pressure ball valve (7), the pipe connector (8) is located on top of the high-pressure ball valve (7), and the high-pressure ball valve (7) is located on top of the nitrogen cylinder (2).
3. A nitrogen balance cylinder system according to claim 1, characterized in that: An air filter (9) is installed at the bottom of the balance cylinder (3).
4. A nitrogen balance cylinder system according to claim 2, characterized in that: A pressure relay (10) is installed on the rear side of the high-pressure ball valve (7), and the pressure relay (10) is located on the top of the nitrogen cylinder (2).
5. A nitrogen balance cylinder system according to claim 1, characterized in that: A fixing plate (11) is installed on the front side of the bottom end of the support plate (1) and the top of the support plate (1), and a pressure sensor (12) for monitoring gas leakage is installed on the top of the fixing plate (11).
6. A nitrogen balance cylinder system according to claim 1, characterized in that: The oil separator (4) is provided with a mounting plate (13) at the bottom, and two alarms (14) are installed at the top of the mounting plate (13) at intervals. A controller (15) is provided between the two alarms (14), and the controller (15) is installed on the top of the mounting plate (13).