Tower tray installation winch support tool
By designing a hoist support fixture for tower tray installation and utilizing adjustable limiting columns and beams, the problem of difficult hoist installation in tower equipment was solved, achieving efficient and low-cost installation of tower internals.
Patent Information
- Application Number
- CN202520154890.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-23
- Publication Date
- 2025-12-19
- Estimated Expiration
- 2035-01-23
AI Technical Summary
The installation of winches in tower equipment is difficult, especially because the height and width of the crossbeams are not uniform in different types of tower equipment, which makes it difficult to position the winch and affects the efficiency and cost of tower tray installation.
A hoist support fixture for tower plate installation was designed, including a first fixed plate, a second fixed plate, a limiting column, and a limiting beam. The adjustable limiting column and limiting beam structure can adapt to the installation requirements of different crossbeams and ensure the stable fixation of the hoist.
It simplifies the installation process of tower internals, shortens the installation cycle, reduces construction costs, and is applicable to a variety of tower equipment, improving the convenience and efficiency of installation.
Smart Images

Figure CN223688009U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to tray installation technical field, specifically, the utility model relates to a kind of tray installation winch support tool. BACKGROUND
[0002] With the rapid development of chemical industry in China, various tower type equipment is applied more and more, so that tower inner part installation becomes the focus of domestic inner part industry research. Nowadays, in the field of chemical industry construction, efficient and high-quality installation of equipment inner part is particularly important.
[0003] In the operation of chemical equipment, there are many tower type equipment. In conventional tower type equipment, there are many types of trays with large diameter, and the tray installation is in a closed space inside the tower, which is difficult to construct and hoist. Especially for the installation and positioning operation of winch, due to the different heights and widths of cross beams in different tower type equipment, the installation of winch needs to be carried out according to the type of tower type equipment, which increases the difficulty of winch installation in tray installation operation. Therefore, a tray installation winch support tool is provided. SUMMARY
[0004] Therefore, the utility model provides a kind of tray installation winch support tool, to solve or at least alleviate the above-mentioned problems existing in the prior art.
[0005] In order to achieve the foregoing purpose, the utility model provides a kind of tray installation winch support tool, comprising:
[0006] The first fixed plate is provided with two, and the same side end of the two first fixed plates is connected by the second fixed plate, and the second fixed plate is arranged on the upper surface of the first fixed plate;
[0007] The limiting column is provided with two corresponding to each first fixed plate, the top end of the limiting column is detachably connected to the first fixed plate, and the limiting column is arranged to be adjustable in the length direction of the first fixed plate;
[0008] The limiting beam is arranged below the first fixed plate in parallel to the first fixed plate, and the two ends of the limiting beam are detachably connected to the two limiting columns at the bottom of the first fixed plate, and the limiting beam is arranged to be adjustable in the height direction of the limiting column.
[0009] In the tray installation winch support tool as described above, optionally, the two ends of the first fixed plate and the second fixed plate are provided with bolt holes for fixing the winch.
[0010] In the tower tray installation hoist support tool as claimed in the preceding description, optionally, a first slot is arranged on the first fixed plate along the length direction of the first fixed plate, a first bolt is arranged at the top end of the limiting column, and the first bolt penetrates the first slot.
[0011] In the tower tray installation hoist support tool as claimed in the preceding description, optionally, the limiting column is arranged in the shape of a channel steel, a first connecting plate is fixedly arranged at the top of the limiting column, and the first bolt is arranged on the first connecting plate.
[0012] In the tower tray installation hoist support tool as claimed in the preceding description, optionally, a second slot is arranged on the limiting column, a second bolt is arranged at the end of the limiting beam, and the second bolt penetrates the second slot.
[0013] In the tower tray installation hoist support tool as claimed in the preceding description, optionally, the limiting beam is arranged in the shape of a channel steel, a second connecting plate is fixedly arranged at the end of the limiting beam, and the second bolt is arranged on the second connecting plate.
[0014] In the tower tray installation hoist support tool as claimed in the preceding description, optionally, the limiting beam comprises a first part, a second part and a third part, the opposite ends of the first part and the third part are both provided with a second bolt, the opposite ends of the first part and the third part are both slidably sleeved on the two ends of the second part, and the depths of the two ends of the second part inserted into the first part and the third part are adjustable.
[0015] In the tower tray installation hoist support tool as claimed in the preceding description, optionally, the two sides of the first part and the third part are both provided with a third slot, the two sides of the second part are both provided with a third bolt, and the two third bolts penetrate the third slots on the first part and the third part respectively.
[0016] Compared with the prior art, the tower tray installation hoist support tool has at least the following beneficial effects:
[0017] 1. The tower tray installation hoist support tool can solve the problems of long installation period and difficult hoisting of the inner parts of the existing tower equipment, shorten the installation period of the inner parts of the tower, make the manual installation of the inner parts of the tower more convenient, make the construction more convenient, and greatly reduce the construction cost.
[0018] 2. The tower tray installation hoist support tool has simple structure, common materials and fast on-site splicing speed, and has the property of analogy, that is, the tower tray installation hoist support tool can be applied to the installation method of the inner parts of most tower equipment, and the size of the structure of the tower tray installation hoist support tool can be reasonably adjusted according to the size of the on-site construction equipment, so that the construction can be satisfied. BRIEF DESCRIPTION OF DRAWINGS
[0019] The disclosure of the present application will be more apparent with reference to the drawings. It should be understood that these drawings are only for illustrative purposes, and are not intended to limit the scope of protection of the present application. In the drawings:
[0020] Figure 1 is a schematic view of the overall structure of the hoist support tool for tower tray installation of the present application.
[0021] Figure 2 is a schematic view of the present application Figure 1 .
[0022] Reference signs: 1 - first fixed plate; 2 - second fixed plate; 3 - limiting column; 4 - limiting beam; 4.1 - first part; 4.2 - second part; 4.3 - third part; 5 - bolt hole; 6 - first slot; 7 - first bolt; 8 - first connecting plate; 9 - second slot; 10 - second bolt; 11 - second connecting plate; 12 - third slot; 13 - third bolt. DETAILED DESCRIPTION
[0023] The technical solutions in the embodiments of the present application will be described clearly and completely below. Obviously, the described embodiments are only a part of the embodiments of the present application, not all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the present application.
[0024] As shown in Figure 1 and Figure 2 , a typical embodiment of the present application provides a tower tray installation hoist support tool, comprising: a first fixed plate 1 and a second fixed plate 2, two first fixed plates 1 are provided, the same side ends of the two first fixed plates 1 are connected by the second fixed plate 2, and the second fixed plate 2 is arranged on the upper surface of the first fixed plate 1; the second fixed plate 2 connects the two first fixed plates 1, so that the two first fixed plates 1 and the two second fixed plates 2 form a whole, ensuring the stable support performance of the hoist.
[0025] A limiting column 3 is provided corresponding to each first fixed plate 1, and the top end of the limiting column 3 is detachably connected to the first fixed plate 1, and the limiting column 3 is arranged to be adjustable in the length direction of the first fixed plate 1; by adjusting the position of the limiting column 3 in the length direction of the first fixed plate 1, the installation operation of the support can be adapted to the installation operation of the support on the cross beam of different widths when supporting the hoist.
[0026] A limiting beam 4 is arranged below the first fixing plate 1 in a state parallel to the first fixing plate 1, both ends of the limiting beam 4 are detachably connected with the two limiting posts 3 at the bottom of the first fixing plate 1, and the limiting beam 4 is arranged to be adjustable in the height direction of the limiting posts 3. The limiting beam 4 forms a whole with the two limiting posts 3 below the same first fixing plate 1, and the whole support tool is formed into a stable whole through the second fixing plate 2. By adjusting the position of the limiting beam 4 in the height direction of the limiting posts 3, the installation operation of the support on the cross beam at different heights can be adapted.
[0027] In the embodiment, bolt holes 5 are formed at both ends of the first fixing plate 1 and the second fixing plate 2 for fixing the winch. Specifically, the first fixing plate 1 and the second fixing plate 2 are connected and fixed by passing the connecting bolts through the bolt holes 5. Specifically, in the process of placing the winch, the connecting bolts can be directly passed through the bolt holes 5 on the first connecting plate 8 and the second connecting plate 11, and then passed through the through hole on the base of the winch, so as to stably fix the winch on the support tool.
[0028] A first slot 6 is arranged on the first fixing plate 1 along the length direction thereof, the top end of the limiting post 3 is provided with a first bolt 7, and the first bolt 7 penetrates the first slot 6. The first bolt 7 can be displaced in the first slot 6, so as to realize the displacement of the limiting post 3 in the length direction of the first fixing plate 1. When the limiting post 3 is moved to the appropriate position, the nut is installed on the first bolt 7, so as to fix the limiting post 3 on the first fixing plate 1.
[0029] In a relatively specific embodiment, the limiting post 3 is arranged in the shape of a channel steel, the first connecting plate 8 is fixedly installed at the top of the limiting post 3, and the first bolt 7 is installed on the first connecting plate 8. In this way, the end of the limiting beam 4 is located in the cavity of the limiting post 3, and further, the limiting post 3 can improve the limiting effect on the limiting beam 4, so as to stably fix the limiting beam 4 at different positions in the height direction of the limiting post 3.
[0030] A second slot 9 is formed on the limiting post 3, the end of the limiting beam 4 is provided with a second bolt 10, and the second bolt 10 penetrates the second slot 9. When the position of the limiting beam 4 is adjusted in the height direction of the limiting post 3, the second bolt 10 is displaced in the second slot 9. When the limiting beam 4 is adjusted to the appropriate height, the nut is installed on the second bolt 10, so as to fix the limiting beam 4 on the limiting post 3.
[0031] The limiting beam 4 is arranged in the shape of a channel steel, the second connecting plate 11 is fixedly installed at the end of the limiting beam 4, and the second bolt 10 is installed on the second connecting plate 11. Specifically, in the embodiment, the limiting beam 4 is in an open downward state.
[0032] More specifically, the limiting beam 4 comprises a first part 4.1, a second part 4.2 and a third part 4.3, the first part 4.1 and the third part 4.3 are provided with the second bolt 10 at the opposite ends, the opposite ends of the first part 4.1 and the third part 4.3 are respectively sleeved on the two ends of the second part 4.2, and the depths of the two ends of the second part 4.2 inserted into the first part 4.1 and the third part 4.3 are adjustable.
[0033] The limiting beam 4 is provided in a separated structure, which not only facilitates the disassembly and transportation of the support tooling, but also automatically adjusts the length of the limiting beam 4 by the sliding of the second part 4.2 in the first part 4.1 and the third part 4.3 when the limiting column 3 is adjusted in the length direction of the first fixed plate 1 to adapt to the installation of the support on the beam of different widths. After the position of the limiting column 3 is fixed, the first part 4.1, the second part 4.2 and the third part 4.3 are fixed and formed as a whole to ensure the stability.
[0034] The two sides of the first part 4.1 and the third part 4.3 are provided with a third slot 12, and the two sides of the second part 4.2 are provided with a third bolt 13, and the two third bolts 13 pass through the third slots 12 on the first part 4.1 and the third part 4.3 respectively. In the process of adjusting the length of the limiting beam 4, the two third bolts 13 are respectively displaced in the third slots 12 on the first part 4.1 and the third part 4.3, and after the limiting column 3 is fixed, the first part 4.1, the second part 4.2 and the third part 4.3 are formed as a whole by installing the nut on the third bolt 13.
[0035] In a relatively specific embodiment, the limiting column 3, the first part 4.1 and the second part 4.2 are all galvanized channel steels, and the first connecting plate 8 and the second connecting plate 11 are stainless steel plates. The first bolt 7 and the second bolt 10 are respectively welded with the first connecting plate 8 and the second connecting plate 11. The second part 4.2 is welded by a stainless steel plate.
[0036] The third bolt 13 can be provided on the second part 4.2, of course, in other embodiments, the third bolt 13 can be welded on the two sides of the second part 4.2. The welding portions and the right angles in the embodiment are polished flat and sprayed with anticorrosive paint.
[0037] The technical scope of the utility model is not limited to the content in the above description, and those skilled in the art can make various deformations and modifications to the above embodiments without departing from the technical thought of the utility model, and these deformations and modifications should all belong to the scope of the utility model.
Claims
1. A tray installation hoist support tool characterized by, The utility model relates to a kind of fixed plate and fixed plate, the first fixed plate (1) is provided with two, the same side end of two first fixed plate (1) is connected by second fixed plate (2), and second fixed plate (2) is arranged on the upper surface of first fixed plate (1); Limiting column (3) is provided with two corresponding to each first fixed plate (1), the top end of limiting column (3) is detachably connected on the first fixed plate (1), and limiting column (3) is arranged into the position adjustable in the length direction of first fixed plate (1); Limiting beam (4) is arranged below the first fixed plate (1) in the state parallel to first fixed plate (1), both ends of limiting beam (4) are detachably connected with the two limiting columns (3) of the bottom of first fixed plate (1), and limiting beam (4) is arranged into the position adjustable in the height direction of limiting column (3). Both ends of the first fixed plate (1) and the second fixed plate (2) are provided with bolt holes (5) for fixing the winch.
2. A tower tray installation hoist support tooling according to claim 1, wherein, First strip slot (6) is arranged on the first fixed plate (1) along its length direction, the top of limiting column (3) is provided with first bolt (7), and the first bolt (7) penetrates the first strip slot (6).
3. A tower tray installation hoist support tooling according to claim 1 or 2, characterised in that, Limiting column (3) is arranged into channel steel, and first connecting plate (8) is fixedly installed on the top of limiting column (3), and first bolt (7) is installed on first connecting plate (8).
4. A tower tray installation hoist support tooling according to claim 3, wherein, Second strip slot (9) is arranged on the limiting column (3), and the end of limiting beam (4) is provided with second bolt (10), and second bolt (10) penetrates second strip slot (9).
5. A tower tray installation hoist support tooling according to claim 1 or 4, characterised in that, Limiting beam (4) is arranged into channel steel, and second connecting plate (11) is fixedly installed on the end of limiting beam (4), and second bolt (10) is installed on second connecting plate (11).
6. A tray installation hoist support tooling according to claim 5, wherein, Limiting beam (4) includes first part (4.1), second part (4.2) and third part (4.3), the opposite end of the first part (4.1) and the third part (4.3) is provided with second bolt (10), and the opposite end of the first part (4.1) and the third part (4.3) is respectively slidably sleeved on the two ends of second part (4.2), and the depth of the two ends of second part (4.2) inserted into first part (4.1) and third part (4.3) can be adjusted.
7. A tray installation hoist support tooling according to claim 5, wherein, Third strip slot (12) is arranged on the two sides of the first part (4.1) and the third part (4.3), and third bolt (13) is arranged on the two sides of second part (4.2), and two third bolts (13) pass through third strip slot (12) on the first part (4.1) and the third part (4.3) respectively.
8. A tray installation hoist support tooling according to claim 7, characterised in that,