Emergency repair fixing device for 10kV distribution line pole
By designing an emergency repair fixing device, which uses triangular supports and flood diversion baffles to fix tilted poles, the problem of pole tilting or falling under the impact of floods was solved, and power supply was quickly restored. This device is suitable for emergency repairs of 10kV distribution lines.
Patent Information
- Application Number
- CN202423218251.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-26
- Publication Date
- 2025-12-26
- Estimated Expiration
- 2034-12-26
AI Technical Summary
10kV overhead power line poles are susceptible to tilting or falling due to flood impacts, leading to power outages. Furthermore, large machinery is difficult to use for emergency repairs when floods destroy roads.
Design an emergency repair and fixing device for 10kV power distribution line poles. The pole is connected by a first clamp, a second clamp, and a third clamp. The pole is fixed by a triangular support composed of a first diagonal brace, a second diagonal brace, and a third diagonal brace. An additional bendable diversion plate is added as a flood diversion baffle to prevent secondary erosion by floods.
It achieves temporary fixation of tilted power poles, preventing them from collapsing due to secondary flooding, ensuring uninterrupted power supply, and is simple in structure and easy to transport, making it suitable for rapid power restoration after floods.
Smart Images

Figure CN223724272U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The application relates to the technical field of ring main units, in particular to an emergency repair fixing device for a 10kV power distribution line pole. BACKGROUND
[0002] The 10kV overhead power line is one of main devices for supplying power to industrial and agricultural production and residential life, and most of the 10kV overhead power lines are in fields or hilly areas. When floods occur, the 10kV power distribution line poles are easily impacted by floods, and the poles are easily tilted or even fallen, thus causing power failure. Meanwhile, due to the flood damage to roads, large machinery is also difficult to be used in emergency repair of the 10kV power distribution line poles. CONTENT OF THE UTILITY MODEL
[0003] The application aims to solve at least one of the technical problems in the prior art. To this end, the application provides an emergency repair fixing device for a 10kV power distribution line pole, which can temporarily fix the tilted pole and prevent the tilted pole from being washed by secondary flood and falling, and has a simple structure and is easy to transport.
[0004] The application provides an emergency repair fixing device for a 10kV power distribution line pole, which comprises a first hoop, a second hoop, a third hoop, a bendable shunt plate, a ground anchor assembly, a first layer of horizontal support assemblies, a second layer of horizontal support assemblies, a horizontal support assembly, a first inclined strut, a second inclined strut, a third inclined strut, a fourth inclined strut and a fifth inclined strut.
[0005] The first layer of horizontal support assemblies and the second layer of horizontal support assemblies are in a rhombic shape, the outer wall of the first hoop, the bottom side of the first inclined strut, the bottom side of the second inclined strut and the bottom side of the third inclined strut are respectively connected with four corners of the rhombic first layer of horizontal support assemblies, the bottom of the first inclined strut, the second inclined strut and the third inclined strut is respectively connected with the ground anchor assembly, the outer wall of the second hoop, the middle part of the first inclined strut, the middle part of the second inclined strut and the middle part of the third inclined strut are respectively connected with four corners of the rhombic second layer of horizontal support assemblies, and the top end of the first inclined strut, the second inclined strut and the third inclined strut is respectively connected with the outer wall of the third hoop.
[0006] The bottom sides of the fourth and fifth diagonal support rods are connected to the outer wall of the first hoop, respectively, two ends of the horizontal support assembly are connected to the top ends of the fourth and fifth diagonal support rods, respectively, the top end of the foldable flow distribution plate is connected to the horizontal support assembly, the bottom of the foldable flow distribution plate is connected to the top of the ground anchor assembly, and the horizontal support assembly and the first layer horizontal support assembly are arranged on opposite sides of the first hoop, and the foldable flow distribution plate has a triangular shape.
[0007] The second hoop is located above the first hoop, and the third hoop is located above the second hoop. The first hoop, the second hoop, and the third hoop are used to be connected to the 10kV power distribution line pole.
[0008] According to some embodiments of the present application, the first layer horizontal support assembly comprises a first horizontal support frame, a second horizontal support frame, a third horizontal support frame, and a fourth horizontal support frame. The first horizontal support frame, the second horizontal support frame, the third horizontal support frame, and the fourth horizontal support frame are sequentially connected and combined in a diamond shape. The bottom sides of the first, second, and third diagonal support rods are connected to one end of the first, second, and third horizontal support frames, respectively. The bottom sides of the second and third diagonal support rods are connected to the other end of the second horizontal support frame and one end of the third horizontal support frame, respectively. The bottom sides of the third and fourth diagonal support rods are connected to the other end of the third horizontal support frame and one end of the fourth horizontal support frame, respectively. The other ends of the first and fourth horizontal support frames are connected to the outer wall of the first hoop, respectively.
[0009] According to some embodiments of the present application, the 10kV power distribution line pole emergency repair fixing device further comprises a fifth horizontal support frame. One end of the fifth horizontal support frame is connected to the other end of the second horizontal support frame and one end of the third horizontal support frame, respectively. The other end of the fifth horizontal support frame is connected to the outer wall of the first hoop.
[0010] According to some embodiments of the present application, the second layer horizontal support assembly comprises a sixth horizontal support frame, a seventh horizontal support frame, an eighth horizontal support frame, and a ninth horizontal support frame. The sixth horizontal support frame, the seventh horizontal support frame, the eighth horizontal support frame, and the ninth horizontal support frame are sequentially connected and combined in a diamond shape. The middle parts of the first, second, and third diagonal support rods are connected to one end of the sixth, seventh, and eighth horizontal support frames, respectively. The middle parts of the second and third diagonal support rods are connected to the other end of the seventh horizontal support frame and one end of the eighth horizontal support frame, respectively. The middle parts of the third and fourth diagonal support rods are connected to the other end of the eighth horizontal support frame and one end of the ninth horizontal support frame, respectively. The other ends of the sixth and ninth horizontal support frames are connected to the outer wall of the second hoop, respectively.
[0011] According to some embodiments of the present application, the emergency repair fixing device of the 10kV distribution line pole further comprises a tenth horizontal support frame, one end of the tenth horizontal support frame is connected with the other end of the seventh horizontal support frame and one end of the eighth horizontal support frame respectively, and the other end of the tenth horizontal support frame is connected with the outer wall of the second hoop.
[0012] According to some embodiments of the present application, the ground anchor assembly comprises four ground anchors, the top ends of three ground anchors are connected with the first inclined support rod, the second inclined support rod, the third inclined support rod and the bottom of the foldable diversion plate respectively.
[0013] According to some embodiments of the present application, the horizontal support assembly comprises a first transverse horizontal support, a second transverse horizontal support and a third transverse horizontal support, the ends of the fourth inclined support rod and the fifth inclined support rod away from the first hoop are connected with the first transverse horizontal support respectively and form a triangular shape, the two ends of the second transverse horizontal support are connected with one end of the first transverse horizontal support and one end of the third transverse horizontal support respectively, and one end of the third transverse horizontal support away from the second transverse horizontal support is connected with one end of the first transverse horizontal support away from the second transverse horizontal support.
[0014] According to some embodiments of the present application, the included angles between the first inclined support rod, the second inclined support rod, the third inclined support rod, the fourth inclined support rod and the fifth inclined support rod and the central axis of the first hoop are all 30°.
[0015] In the present application, the principle of pole holding during the extension of the emergency repair fixing device of the 10kV distribution line pole is adopted, the first hoop, the second hoop and the third hoop are connected with the pole respectively, the first inclined support rod, the second inclined support rod and the third inclined support rod form a triangular support to fix the pole vertically, the foldable diversion plate is additionally provided as a flood diversion baffle to prevent the pole from being washed by the secondary flood, ensure that the pole does not fall and the power supply is not interrupted; by setting the first inclined support rod, the second inclined support rod and the third inclined support rod, the direction of the impact of the flood is reversed, forming a reverse impact fixation; by additionally providing the first hoop, the second hoop and the third hoop, the connection with the pole is realized, and the integral fixation of the first inclined support rod, the second inclined support rod and the third inclined support rod with the pole is completed; before the positive direction of the flood washing, the triangular foldable diversion plate is additionally provided as a flood diversion baffle, the flood diversion baffle is connected with the ground anchor assembly to prevent the washing of the pole root by the secondary flood and avoid the pole falling. Through the above setting, the temporary fixation of the inclined pole can be realized, the pole that has been inclined due to the flood washing can be prevented from falling and power supply being interrupted due to the secondary flood washing, and the structure is simple and easy to transport.
[0016] Additional aspects and advantages of the application will be set forth in part in the description which follows, and in part will become apparent to those having ordinary skill in the art upon examination of the following or can be learned from practice of the application. BRIEF DESCRIPTION OF DRAWINGS
[0017] Additional aspects and advantages of the application will become apparent upon consideration of the following detailed description of embodiments of the application, taken in conjunction with the accompanying drawings.
[0018] Figure 1 Front view schematic diagram of the emergency repair fixing device of the 10kV distribution line pole without installation of the 10kV ring network cabinet provided by the embodiment of the application;
[0019] Figure 2 Structural schematic diagram of the 10kV ring network cabinet provided by the embodiment of the application arranged on the assembled frame;
[0020] Figure 3 Top view schematic diagram of the emergency repair fixing device of the 10kV distribution line pole without installation of the 10kV ring network cabinet provided by the embodiment of the application.
[0021] REFERENCE NUMERALS:
[0022] First hoop 110, second hoop 111, third hoop 112, first inclined strut 113, second inclined strut 114, third inclined strut 115, fourth inclined strut 116, fifth inclined strut 117, bendable shunt plate 118, ground anchor 119;
[0023] First horizontal support frame 120, second horizontal support frame 121, third horizontal support frame 122, fourth horizontal support frame 123, sixth horizontal support frame 124, seventh horizontal support frame 125, eighth horizontal support frame 126, ninth horizontal support frame 127;
[0024] First transverse horizontal support 130, second transverse horizontal support 131, third transverse horizontal support 132;
[0025] Pole 200. DETAILED DESCRIPTION
[0026] Embodiments of the application are described in detail below with reference to the attached drawing figures, wherein the same or like reference numerals are used throughout the drawing figures to refer to the same or like elements or elements having the same or similar functionality. The embodiments described below are exemplary and are intended to be illustrative of the application, and are not to be construed as limiting the application.
[0027] In the description of the present application, it should be understood that the orientation description, such as the orientation or position relationship indicated by the upper, lower, front, rear, left, right and the like, is based on the orientation or position relationship shown in the drawings, and is only for the purpose of facilitating the description of the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as a limitation of the present application.
[0028] In the description of the present application, if the first, second is described for the purpose of distinguishing technical features, it cannot be understood as indicating or implying the relative importance of the indicated technical features or implying the number of the indicated technical features or implying the order of the indicated technical features.
[0029] In the description of the present application, unless otherwise explicitly limited, the words such as setting, installing, connecting and the like should be broadly understood, and the person skilled in the art can reasonably determine the specific meaning of the above words in the present application in combination with the specific content of the technical scheme.
[0030] 10kV overhead power line is one of the main equipment for supplying power to users, agricultural production and residential life. Since most of the 10kV overhead power lines are in fields or hilly areas, when flooding occurs, the 10kV distribution line pole is easy to be impacted by flood, and the pole is easy to tilt or even fall, which further leads to power failure. At the same time, due to the destruction of roads by flood, it is also difficult for large machinery to be used in emergency repair of 10kV distribution line poles.
[0031] In order to solve the above problems, the present application provides an emergency repair fixing device for 10kV distribution line pole. The embodiments of the present application are further described below with reference to the drawings.
[0032] Referring to Figures 1 to 3The embodiment of the application provides an emergency repair fixing device for a 10kV power distribution line electric pole, which comprises a first hoop 110, a second hoop 111, a third hoop 112, a bendable shunt plate 118, a ground anchor assembly, a first layer horizontal support assembly, a second layer horizontal support assembly, a horizontal support assembly, a first inclined strut 113, a second inclined strut 114, a third inclined strut 115, a fourth inclined strut 116 and a fifth inclined strut 117; the first layer horizontal support assembly and the second layer horizontal support assembly are both in the shape of a rhombus, the outer wall of the first hoop 110, the bottom side of the first inclined strut 113, the bottom side of the second inclined strut 114 and the bottom side of the third inclined strut 115 are respectively connected with four corners of the rhombus-shaped first layer horizontal support assembly, the bottom of the first inclined strut 113, the second inclined strut 114 and the third inclined strut 115 is respectively connected with the ground anchor assembly, the outer wall of the second hoop 111, the middle part of the first inclined strut 113, the middle part of the second inclined strut 114 and the middle part of the third inclined strut 115 are respectively connected with four corners of the rhombus-shaped second layer horizontal support assembly, and the top end of the first inclined strut 113, the second inclined strut 114 and the third inclined strut 115 is respectively connected with the outer wall of the third hoop 112; the bottom side of the fourth inclined strut 116 and the fifth inclined strut 117 is respectively connected with the outer wall of the first hoop 110, the two ends of the horizontal support assembly are respectively connected with the top end of the fourth inclined strut 116 and the fifth inclined strut 117, the top end of the bendable shunt plate 118 is connected with the horizontal support assembly, the bottom of the bendable shunt plate 118 is connected with the top of the ground anchor assembly, the horizontal support assembly and the first layer horizontal support assembly are arranged on the opposite sides of the first hoop 110, and the bendable shunt plate 118 is in the shape of a triangle; the second hoop 111 is located above the first hoop 110, the third hoop 112 is located above the second hoop 111, and the first hoop 110, the second hoop 111 and the third hoop 112 are all used for being connected with the 10kV power distribution line electric pole 200.
[0033] It should be noted that the distance between the first hoop 110 and the second hoop 111 is equal to the distance between the second hoop 111 and the third hoop 112, the three equidistant hoops are arranged to realize the connection with the 10kV power distribution line electric pole 200, and the integral fixing of the first inclined strut 113, the second inclined strut 114, the third inclined strut 115, the fourth inclined strut 116 and the fifth inclined strut 117 and the electric pole 200 is completed.
[0034] Specifically, the triangle-shaped bendable shunt plate 118 is arranged as a flood diversion baffle in the positive direction of flood scouring, the bendable shunt plate 118 is connected with the ground anchor 119, the secondary flood scouring to the root of the electric pole 200 is prevented, and the electric pole is prevented from falling.
[0035] It should be noted that the 10kV distribution line pole emergency repair fixing device of the application meets the requirements of fast, effective, safe and reduced power outage service for power failure emergency repair; also effectively solves the problem that after a flood disaster, due to the destruction of the road, it is difficult to put large-scale repair machinery into operation, is not limited by the topography, and the emergency repair task can be completed by putting manpower; at the same time, the device can be stored in batches, which can serve the rapid large-area power restoration in the event of a large flood disaster; it can also be used for temporary fixing of the inclined pole 200 caused by long-term water erosion in farmland; and meets the requirements of 10kV distribution network cable line operation regulation.
[0036] In the application, the pole holding principle of the 10kV distribution line pole emergency repair fixing device extends the pole operation, adopts the first hoop 110, the second hoop 111 and the third hoop 112 to connect the pole 200 respectively, uses the first inclined strut 113, the second inclined strut 114 and the third inclined strut 115 to form a triangular support reaction force to fix the pole 200 vertically, and additionally adds a bendable diversion plate 118 as a flood diversion baffle to prevent the pole 200 from being washed by the secondary flood, ensure that the pole 200 does not fall, and the power supply is not interrupted; by setting the first inclined strut 113, the second inclined strut 114 and the third inclined strut 115, the flood washing forms a counter-impact direction, forming a counter-impact fixing; by adding the first hoop 110, the second hoop 111 and the third hoop 112, the connection with the pole 200 is realized, and the integral fixing of the first inclined strut 113, the second inclined strut 114 and the third inclined strut 115 with the pole 200 is completed; before the flood washing in the positive direction, the triangular bendable diversion plate 118 is added as a flood diversion baffle, the flood diversion baffle is connected with the ground anchor assembly, preventing the pole 200 from being washed by the secondary flood, and avoiding the pole falling. Through such setting, the application can realize the temporary fixing of the inclined pole 200, prevent the inclined pole 200 washed by the flood from being washed by the secondary flood and falling, and the structure is simple and easy to transport.
[0037] Reference Figure 1 and Figure 3It can be understood that the first layer horizontal support assembly includes the first horizontal support frame 120, the second horizontal support frame 121, the third horizontal support frame 122 and the fourth horizontal support frame 123, the first horizontal support frame 120, the second horizontal support frame 121, the third horizontal support frame 122 and the fourth horizontal support frame 123 are sequentially connected and combined in a diamond shape, the bottom side of the first inclined support rod 113 is connected with one end of the first horizontal support frame 120 and the second horizontal support frame 121 respectively, the bottom side of the second inclined support rod 114 is connected with the other end of the second horizontal support frame 121 and one end of the third horizontal support frame 122 respectively, the bottom side of the third inclined support rod 115 is connected with the other end of the third horizontal support frame 122 and one end of the fourth horizontal support frame 123 respectively, and the other end of the first horizontal support frame 120 and the other end of the fourth horizontal support frame 123 are connected with the outer wall of the first hoop 110 respectively.
[0038] It can be understood that the emergency repair fixing device of the 10kV power distribution line pole further includes a fifth horizontal support frame, one end of the fifth horizontal support frame is connected with the other end of the second horizontal support frame 121 and one end of the third horizontal support frame 122 respectively, and the other end of the fifth horizontal support frame is connected with the outer wall of the first hoop 110.
[0039] In the embodiment, the length of the fifth horizontal support frame is 2.5m.
[0040] It should be noted that by arranging the fifth horizontal support frame, one diagonal line of the first horizontal support assembly in a diamond shape is connected, the stability of the first layer horizontal support assembly is improved, and the resistance of the first inclined support rod 113, the second inclined support rod 114 and the third inclined support rod 115 to the pole 200 is further strengthened.
[0041] Referring to Figure 1 and Figure 2 It can be understood that the second layer horizontal support assembly includes the sixth horizontal support frame 124, the seventh horizontal support frame 125, the eighth horizontal support frame 126 and the ninth horizontal support frame 127, the sixth horizontal support frame 124, the seventh horizontal support frame 125, the eighth horizontal support frame 126 and the ninth horizontal support frame 127 are sequentially connected and combined in a diamond shape, the middle part of the first inclined support rod 113 is connected with one end of the sixth horizontal support frame 124 and the seventh horizontal support frame 125 respectively, the middle part of the second inclined support rod 114 is connected with the other end of the seventh horizontal support frame 125 and one end of the eighth horizontal support frame 126 respectively, the middle part of the third inclined support rod 115 is connected with the other end of the eighth horizontal support frame 126 and one end of the ninth horizontal support frame 127 respectively, and the other end of the sixth horizontal support frame 124 and the other end of the ninth horizontal support frame 127 are connected with the outer wall of the second hoop 111 respectively.
[0042] It can be understood that the emergency repair fixing device of the 10kV power distribution line pole further comprises a tenth horizontal support frame, one end of the tenth horizontal support frame is connected with the other end of the seventh horizontal support frame 125 and one end of the eighth horizontal support frame 126 respectively, and the other end of the tenth horizontal support frame is connected with the outer wall of the second hoop 111.
[0043] It should be noted that by arranging the tenth horizontal support frame, one diagonal line of the second layer of the horizontal support assembly in the shape of a rhombus is connected, the stability of the second layer of the horizontal support assembly is improved, and the resistance of the first inclined strut 113, the second inclined strut 114 and the third inclined strut 115 to the pole 200 is further strengthened.
[0044] Referring to Figure 1 It can be understood that the ground anchor assembly comprises four ground anchors 119, the top ends of the three ground anchors 119 are connected with the bottom of the first inclined strut 113, the second inclined strut 114, the third inclined strut 115 and the foldable flow distribution plate 118 respectively.
[0045] It should be noted that by arranging three ground anchors 119, the first inclined strut 113, the second inclined strut 114 and the third inclined strut 115 are connected by the three ground anchors 119 to form a triangular shape, which strengthens the non-displacement of the emergency repair fixing device of the 10kV power distribution line pole during flood scouring.
[0046] Referring to Figure 2 and Figure 3 It can be understood that the horizontal support assembly comprises a first transverse horizontal support 130, a second transverse horizontal support 131 and a third transverse horizontal support 132, the ends of the fourth inclined strut 116 and the fifth inclined strut 117 away from the first hoop 110 are connected with the first transverse horizontal support 130 in a triangular shape, the two ends of the second transverse horizontal support 131 are connected with one end of the first transverse horizontal support 130 and one end of the third transverse horizontal support 132 respectively, and the end of the third transverse horizontal support 132 away from the second transverse horizontal support 131 is connected with the end of the first transverse horizontal support 130 away from the second transverse horizontal support 131.
[0047] It should be noted that the first transverse horizontal support 130, the second transverse horizontal support 131 and the third transverse horizontal support 132 are combined in a triangular shape, which improves the stability of the connection between the foldable flow distribution plate 118 and the fifth inclined strut 117 and the sixth inclined strut.
[0048] It can be understood that the included angles between the first inclined strut 113, the second inclined strut 114, the third inclined strut 115, the fourth inclined strut 116 and the fifth inclined strut 117 and the central axis of the first hoop 110 are all 30°.
[0049] It should be noted that the first hoop 110 is connected with the inclined electric pole 200, the included angle between the first inclined bracing rod 113, the second inclined bracing rod 114, the third inclined bracing rod 115, the fourth inclined bracing rod 116 and the fifth inclined bracing rod 117 and the central axis of the first hoop 110 is 30°, that is, the included angle between the first inclined bracing rod 113, the second inclined bracing rod 114, the third inclined bracing rod 115, the fourth inclined bracing rod 116 and the fifth inclined bracing rod 117 and the central axis of the inclined electric pole 200 is also 30°, and the first inclined bracing rod 113, the second inclined bracing rod 114 and the third inclined bracing rod 115 are in the direction opposite to the impact direction of the flood, so as to form the impact fixing.
[0050] In the embodiment, the ∠75×7 angle steel is used for each horizontal support frame and each inclined bracing rod, and the horizontal support frame is divided into two layers, that is, a first layer horizontal support assembly and a second layer horizontal support assembly, each layer horizontal support assembly is composed of one vertical support and three horizontal cross arms, and is assembled by bolts.
[0051] In the description of the present specification, the description of the terms "one embodiment", "some embodiments", "exemplary embodiment", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in connection with the embodiment or example are included in at least one embodiment or example of the present application. In the present specification, the exemplary description of the above terms does not necessarily mean the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0052] The above is the preferred embodiment of the present application, and it should be noted that for those skilled in the art, without departing from the principles of the present application, a number of improvements and refinements can be made, which are also considered to be within the scope of protection of the present application.
[0053] Although the embodiments of the present application have been shown and described, those skilled in the art can understand that various changes, modifications, replacements and variations can be made to the embodiments without departing from the principles and purposes of the present application, and the scope of the present application is defined by the claims and their equivalents.
Claims
1. An emergency repair fixing device for a 10kV power distribution line pole, characterized in that, Comprise: The first hoop, the second hoop, the third hoop, the foldable shunt plate, the ground anchor assembly, the first layer horizontal support assembly, the second layer horizontal support assembly, the horizontal support assembly, the first inclined strut, the second inclined strut, the third inclined strut, the fourth inclined strut and the fifth inclined strut; The first layer horizontal support assembly and the second layer horizontal support assembly are both in the shape of a diamond, the outer wall of the first hoop, the bottom side of the first inclined strut, the bottom side of the second inclined strut and the bottom side of the third inclined strut are respectively connected with the four corners of the diamond-shaped first layer horizontal support assembly, and the bottom of the first inclined strut, the second inclined strut and the third inclined strut are respectively connected with the ground anchor assembly, the outer wall of the second hoop, the middle part of the first inclined strut, the middle part of the second inclined strut and the middle part of the third inclined strut are respectively connected with the four corners of the diamond-shaped second layer horizontal support assembly, and the top end of the first inclined strut, the second inclined strut and the third inclined strut are respectively connected with the outer wall of the third hoop; The bottom side of the fourth inclined strut and the fifth inclined strut is respectively connected with the outer wall of the first hoop, the two ends of the horizontal support assembly are respectively connected with the top end of the fourth inclined strut and the fifth inclined strut, the top end of the foldable shunt plate is connected with the horizontal support assembly, the bottom of the foldable shunt plate is connected with the ground anchor assembly, and the horizontal support assembly and the first layer horizontal support assembly are arranged on the opposite sides of the first hoop, and the foldable shunt plate is in the shape of a triangle; The second hoop is located above the first hoop, the third hoop is located above the second hoop, and the first hoop, the second hoop and the third hoop are all used for connecting with the 10kV power distribution line pole.
2. The emergency repair fixture for 10 kV distribution line poles according to claim 1, characterized in that, The first layer horizontal support assembly comprises a first horizontal support frame, a second horizontal support frame, a third horizontal support frame and a fourth horizontal support frame, the first horizontal support frame, the second horizontal support frame, the third horizontal support frame and the fourth horizontal support frame are sequentially connected and combined in the shape of a diamond, the bottom side of the first inclined strut is respectively connected with one end of the first horizontal support frame and the second horizontal support frame, the bottom side of the second inclined strut is respectively connected with the other end of the second horizontal support frame and one end of the third horizontal support frame, the bottom side of the third inclined strut is respectively connected with the other end of the third horizontal support frame and one end of the fourth horizontal support frame, and the other end of the first horizontal support frame and the other end of the fourth horizontal support frame are respectively connected with the outer wall of the first hoop.
3. The emergency repair fixture for 10 kV distribution line poles according to claim 2, characterized in that, The 10kV power distribution line pole emergency repair fixing device further comprises a fifth horizontal support frame, one end of the fifth horizontal support frame is respectively connected with the other end of the second horizontal support frame and one end of the third horizontal support frame, and the other end of the fifth horizontal support frame is connected with the outer wall of the first hoop.
4. The emergency repair fixture for 10 kV distribution line poles of claim 1, wherein, The second layer horizontal support assembly comprises a sixth horizontal support frame, a seventh horizontal support frame, an eighth horizontal support frame and a ninth horizontal support frame, the sixth horizontal support frame, the seventh horizontal support frame, the eighth horizontal support frame and the ninth horizontal support frame are sequentially connected and combined in a diamond shape, the middle part of the first inclined support rod is connected with one end of the sixth horizontal support frame and the seventh horizontal support frame respectively, the middle part of the second inclined support rod is connected with the other end of the seventh horizontal support frame and one end of the eighth horizontal support frame respectively, the middle part of the third inclined support rod is connected with the other end of the eighth horizontal support frame and one end of the ninth horizontal support frame respectively, and the other end of the sixth horizontal support frame and the other end of the ninth horizontal support frame are connected with the outer wall of the second hoop respectively.
5. The emergency repair fixture for 10 kV distribution line poles according to claim 4, characterized in that, The emergency repair fixing device of the 10kV power distribution line pole further comprises a tenth horizontal support frame, one end of the tenth horizontal support frame is connected with the other end of the seventh horizontal support frame and one end of the eighth horizontal support frame respectively, and the other end of the tenth horizontal support frame is connected with the outer wall of the second hoop.
6. The emergency repair fixture for 10 kV distribution line poles of claim 1, wherein, The ground anchor assembly comprises four ground anchors, the top ends of three ground anchors are connected with the first inclined support rod, the second inclined support rod, the third inclined support rod and the bottom of the bendable shunt plate respectively.
7. The emergency repair fixture for 10 kV distribution line poles of claim 1, wherein, The horizontal support assembly comprises a first transverse horizontal support, a second transverse horizontal support and a third transverse horizontal support, one end of the fourth inclined support rod and the fifth inclined support rod away from the first hoop is connected with the first transverse horizontal support and forms a triangular shape, the two ends of the second transverse horizontal support are connected with one end of the first transverse horizontal support and one end of the third transverse horizontal support respectively, and one end of the third transverse horizontal support away from the second transverse horizontal support is connected with one end of the first transverse horizontal support away from the second transverse horizontal support.
8. The emergency repair fixture for 10 kV distribution line poles of claim 1, wherein, The included angle between the first inclined support rod, the second inclined support rod, the third inclined support rod, the fourth inclined support rod and the fifth inclined support rod and the central axis of the first hoop is 30°.