Pouring type anchor and structure for fixing wallboard

By using cast-in-place anchors and structures, the secondary structural wall panels and the main building are cast simultaneously, solving the problems of easy corrosion of anchors and complex construction, and achieving the effects of firm connection and shortened construction period.

CN223738750UActive Publication Date: 2025-12-30汪涛
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520044049.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-08
Publication Date
2025-12-30
Estimated Expiration
2035-01-08

AI Technical Summary

Technical Problem

In existing technologies, when secondary structural wall panels are connected to the main building, the anchors are prone to corrosion and breakage, resulting in weak connections, complicated construction procedures, long construction periods, and high hidden costs.

Method used

The use of cast-in-place anchors and structures allows the secondary structure wall panels to be cast simultaneously with the main building. The anchors are completely enclosed in concrete. An anchor group composed of branches and main rods is connected by connecting rods to form an internal anchoring structure. The vent holes are connected to the anchoring holes, enabling synchronous installation and casting.

Benefits of technology

This achieves a firm anchorage between the secondary structural wall panels and the main building structure, preventing oxidation of the anchors, shortening the construction period, reducing costs, and improving construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223738750U_ABST
    Figure CN223738750U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of building wallboard installation and construction, and discloses a pouring type anchor and structure for fixing wallboards, the anchor comprises a main rod and branch rods, a plurality of branch rods are circumferentially fixed on the main rod in a barb shape, and a plurality of anchors can be connected together through connecting rods according to construction requirements to form an anchor group. An anchoring hole is pre-drilled in the wallboard, an outward small exhaust hole is pre-drilled in the hole, the anchor nail is inserted into the anchoring hole, and the anchor nail, the anchoring hole and the small exhaust hole form a pourable cylindrical anchoring structure with the built-in anchor nail. The wallboard with the structure serves as all or a part of a non-dismantling formwork on the side face of a column or a shear wall and the bottom face of a beam, wallboard anchoring and building main body pouring are integrally achieved, and a secondary structure and a main body go deep into each other. By means of the technical scheme, anchoring of the secondary structure wallboard and pouring of the building body are synchronously implemented, the construction period is shortened, cost is reduced, corrosion of anchoring parts is avoided, and anchoring is firmer.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to building wallboard installation construction technical field, concretely relates to a kind of for fixing wallboard's pouring type anchor nail and structure. BACKGROUND

[0002] At present, secondary structure wallboard is generally installed separately after primary structure is completed, and wallboard and main building part are mainly anchored and connected by pipe clamp or U-shaped clamp, and connecting part is exposed in air for long time, and there is hidden danger of corrosion, fracture and falling of anchoring element in later period, and the construction method is difficult to guarantee long-term firmness of secondary structure, and construction procedure is more complicated, and separate construction period is long, and hidden cost is high. SUMMARY

[0003] Therefore, the utility model aims at providing a kind of for fixing wallboard's pouring type anchor nail and structure, to realize the synchronous implementation of secondary structure wallboard anchoring and building main pouring, complete integrally, shorten construction period, and anchoring element is completely enclosed in concrete, and air oxidation is isolated.

[0004] To achieve the above-mentioned purpose, the utility model provides the following technical scheme:

[0005] Firstly, a kind of for fixing wallboard's pouring type anchor nail, including main rod, further including branch rod, multiple branch rods are fixed on the main rod periphery.

[0006] The branch rod further includes bend section one and bend section two, and the bend section one is fixed on the main rod.

[0007] The bend section two forms an included angle with the main rod axis.

[0008] Preferably, the included angle is acute angle.

[0009] Preferably, the vertical distance of the end of multiple bend section two and the main rod axis is equal.

[0010] Preferably, multiple anchor nails are connected together by connecting rod, form anchor nail group, facilitate pre-control distance between anchor nails and improve construction efficiency.

[0011] The anchor nail on the anchor nail group and the connecting rod cross perpendicularly, and space direction is same.

[0012] Secondly, a kind of for fixing wallboard's pouring type structure, characterized by: wallboard is pre-drilled with anchoring hole, the anchoring hole is pre-drilled with outward exhaust small hole, and the exhaust small hole is communicated with the anchoring hole, the anchor nail is inserted into the anchoring hole, and the anchoring hole and the exhaust small hole form built-in anchor nail's pourable cylindrical anchoring structure.

[0013] The exhaust small hole communicates with the bottom of the anchoring hole at an angle of 0°≤included angle with the horizontal line<90°.

[0014] The anchor nail is arranged with one end of the branch rod penetrating into the bottom end of the anchoring hole and the other end exposed outside the anchoring hole by a certain length.

[0015] The wallboard with the structure is used as a part of the formwork of the column or the shear wall side and the bottom surface of the beam, and is used together with the common formwork to enclose and pour, and the secondary structure wallboard installation anchoring and the building main body pouring are implemented synchronously and integrally.

[0016] The beneficial effects of the utility model are: through the above technical scheme, the secondary structure wallboard and the building main body are mutually penetrated and firmly anchored together, the anchoring piece is isolated from air oxidation, the primary structure construction and the secondary structure installation are synchronously completed, the construction period is shortened, the cost is reduced, and the anchoring is more firm. BRIEF DESCRIPTION OF DRAWINGS

[0017] In order to more clearly illustrate the technical scheme of the embodiment of the utility model, the following will briefly introduce the drawings needed to be used in the embodiment description. Obviously, the drawings in the following description are only one embodiment of the utility model, and for those skilled in the art, other drawings can also be obtained from these drawings without creative labor.

[0018] The utility model will be further illustrated below in combination with the drawings and the embodiment.

[0019] Figure 1 It is the structure schematic view of anchor nail;

[0020] Figure 2 It is the structure schematic view of anchor nail group;

[0021] Figure 3 It is the schematic view of anchoring structure;

[0022] Figure 4 It is the schematic view of anchor nail group fixed on beam reinforcement net cage;

[0023] Figure 5 It is the schematic view of foundation after pouring;

[0024] Figure 6 It is the schematic view of column bottom before one layer formwork;

[0025] Figure 7 It is the plan view of anchor nail implanted in anchoring hole in the top of wallboard after one layer formwork;

[0026] Figure 8 It is the side view of beam reinforcement net cage after binding after one layer formwork;

[0027] Figure 9It is a schematic view of binding and anchoring of a layer of formwork after the floor steel mesh cage is bound and the group of anchorings is welded and fixed again.

[0028] The reference signs involved in the above drawings are explained as follows:

[0029] 1. main rod;

[0030] 2. branch rod, 201, bending section one, 202, bending section two;

[0031] 3. included angle formed by the bending section two and the main rod axis;

[0032] 4. connecting rod;

[0033] 5. anchoring hole;

[0034] 6. exhaust small hole. DETAILED DESCRIPTION

[0035] The technical scheme of the present application will be described clearly and completely in combination with the drawings of the embodiment of the present application. The described embodiment is only a possible technical implementation of the present application, and not all possible implementations. Those skilled in the art can obtain other embodiments by combining the embodiment of the present application without creative labor, and these embodiments are also within the protection scope of the present application.

[0036] In the description of the present application, it should be understood that the terms "upper", "lower", "inner", "outer", "intermediate", "vertical", "circumferential" and the like indicate the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as a limitation on the present application.

[0037] In the present application, unless otherwise explicitly specified and limited, the terms "mounting", "adjacent", "connection", "fixing" and the like should be understood broadly, for example, it can be fixed connection, or detachable connection or integrally connected; it can be directly connected, or indirectly connected through an intermediate medium. For those skilled in the art, the specific meaning of the above terms in the present application can be understood according to the specific circumstances.

[0038] Embodiment: Taking a rural villa building with a frame structure as an example, the secondary structure wallboard is selected as B05 autoclaved aerated concrete wallboard, and the installation of the secondary structure wallboard and the pouring of the main building are completed integrally.

[0039] As Figure 1As shown, a pouring type anchor for fixing wallboard, comprising a plurality of said branches (2) and said main rod (1), said main rod (1) is selected from threaded steel section, said branch (2) is selected from cold-drawn wire, said branch (2) is bent by bending section one (201) and bending section two (202). A plurality of said branches (2) are evenly spaced in groups and fixed circumferentially on said main rod (1), wherein the bending section one (201) of one group is welded at one end of the main rod (1), flush with the end of said main rod (1), the other group is welded on said main rod (1) at a certain distance, said bending section two (202) forms an acute angle (3) with the axis of said main rod (1), and the fixed part is in the shape of a barb. The vertical distance between the end of said bending section two (202) and the main rod axis is equal, which is convenient for standard production and avoids the jamming phenomenon when implanting said anchor hole (5).

[0040] As shown, Figure 2 A plurality of said anchors and said connecting rod (4) are crosswise perpendicular welded, forming an anchor group with the same space direction, said connecting rod (4) is selected from threaded steel section, the welding distance between two adjacent anchors is equal to the distance between two adjacent said anchor holes (5). As shown, Figure 4 The connecting rod (4) is welded at the upper middle position of the beam reinforcement cage, and the said anchor is vertically upward, the distance between the first anchor and the column edge control line is half the width of the wallboard, after pouring the column and beam, the exposed part of each anchor of the anchor group on the beam is not greater than the depth of the anchor hole (5) drilled on the wallboard.

[0041] Pre-treatment before wallboard formwork: Before formwork, consider that the side with a tenon of the first wallboard is close to the edge control line of the column during installation, and plan the inner and outer surfaces of the wallboard accordingly. One said anchor hole (5) is drilled at the top and bottom end of the wallboard, and the spatial position of the anchor hole (5) at the lower end of the wallboard corresponds to the anchor in the beam, and the depth is not less than the exposed part of the anchor in the beam after pouring. From the inner or outer surface, drill said exhaust hole (6) at an angle of 0°≤ included angle with horizontal line <90°, said exhaust hole (6) opens at the bottom end of said anchor hole (5), as shown in the structure. Figure 3 The exhaust hole (6) at the top end of the wallboard is used for exhaust, and the exhaust hole (6) at the bottom end of the wallboard is used for separate grouting.

[0042] Foundation pouring: as shown, Figure 5 After foundation pouring, the lower part of said anchor is fixed in the foundation beam concrete, and the upper part inserted into said anchor hole (5) is exposed vertically to the ground.

[0043] Formwork: as shown, Figure 6 , Figure 7 and Figure 8As shown, after the foundation is poured, the calibration template control line is installed, the column pouring template is installed, the temporary support or fixation is prepared, and the opening of the side of the intersection of the column and the wall plate is reserved. The subsequent opening is enclosed by the wall plate as the template, and the cleaning port of the column template is used before the enclosure. After the column template is cleaned, the first wall plate is installed at the opening of the side of the intersection of the column and the wall plate, the anchor hole (5) at the bottom end is inserted into the anchor nail solidified in the beam, the side with the tenon is parallel to the column template and is flush, thereby becoming a part of the column template, the other side is installed with the wall plate, the top surface becomes the bottom mold of the beam, the other part that cannot be enclosed is supplemented by the traditional template, and the anchor nail is inserted into each anchor hole (5) at the top. Figure 9 As shown, after the reinforcement cage of the first floor beam is installed, the main rod (1) of all the anchor nails at the top end of the wall plate is welded on the reinforcement cage, the anchor nail group is welded on the upper middle part of the reinforcement cage of the first floor beam, and the reinforcement cage binding of the floor is completed. After the completion, the wall plate with the structure is used as a part of the non-removable template of the column side and the bottom surface of the beam, the secondary structure wall plate installation anchoring and the pouring of the building main body can be implemented synchronously, and are realized integrally.

[0044] The pouring is implemented in the order of the column, the beam and the roof, and whether the exhaust small hole (6) starts to leak mortar should be observed during the pouring. After the exhaust small hole (6) starts to leak mortar, the exhaust small hole (6) is blocked by a small wedge.

[0045] Each anchor hole (5) at the bottom end of the wall plate is separately backfilled by the exhaust small hole (6), and the backfilling is performed by using fine mortar, so that the backfilling failure caused by blockage is avoided.

[0046] After the poured concrete is solidified, the template is removed according to the construction requirements, and the above process is repeated until the house construction is completed.

[0047] The above disclosed embodiments of the utility model are only used for helping to describe the utility model. The embodiments do not describe all the details, and the utility model embodiments are not limited to only one specific implementation. Apparently, according to the content of the specification, many modifications and changes can be made. The embodiments are selected and described in the specification, so as to better explain the principle and practical application of the utility model, thereby enabling the person skilled in the art to well understand and utilize the utility model. The utility model is limited by the claims and the whole scope and equivalents.

Claims

1. A cast-in anchor for fixing a wall panel, comprising a main stem (1), characterised in that: Also included are branch rods (2), a plurality of which are fixed circumferentially on the main rod (1), the branch rod (2) further comprising a bent section one (201) and a bent section two (202), the bent section one (201) being fixed on the main rod (1), and the bent section two (202) forming an included angle (3) with the axis of the main rod (1).

2. The cast-in anchor for securing a wall panel of claim 1, wherein: The included angle (3) is an acute angle.

3. The poured-in-place anchor for securing a wall panel of claim 1, wherein: The terminal ends of a plurality of the bent section two (202) have equal vertical distance from the axis of the main rod (1).

4. The poured-in-place anchor for securing a wall panel of claim 1, wherein: A plurality of the anchor nails can be connected together by connecting rods (4) to form an anchor nail group.

5. The cast-in anchor for securing a wall panel according to claim 4, wherein: The anchor nails on the anchor nail group cross the connecting rod (4) perpendicularly and point in the same direction.

6. A cast-in-place structure for securing a wall panel comprising a cast-in-place anchor for securing a wall panel as claimed in any one of claims 1 to 5, characterised in that: The wallboard is pre-drilled with anchor holes (5), the anchor holes (5) being pre-drilled with outward exhaust small holes (6) communicating with the anchor holes (5), the anchor nails being inserted into the anchor holes (5), and the anchor holes (5) and the exhaust small holes (6) forming a cylindrical anchor structure with the anchor nails embedded therein.

7. The cast structure for securing wall panels of claim 6, wherein: The exhaust small holes (6) communicate with the bottom of the anchor holes (5) at an angle of 0°≤ included angle with the horizontal line < 90°.

8. The cast structure for securing wall panels of claim 6, wherein: The anchor nails have one end of the branch rod (2) penetrating into the bottom of the anchor hole (5) and the other end protruding out of the anchor hole (5) by a certain length.

9. A cast structure for securing wall panels according to claim 6, claim 7 or claim 8, characterised in that: The wallboard with the structure is used as part of the formwork of the column or shear wall side and the bottom surface of the beam, and is used together with the common formwork to enclose and pour, the secondary structure wallboard installation and anchoring and the pouring of the main building are implemented synchronously and integrally.