Hanging basket for constructional engineering
By installing compensation and cushioning components on the suspended platform, the risk of construction tools falling and discomfort caused by the gap between the suspended platform and the building were solved, thus improving safety and comfort.
Patent Information
- Application Number
- CN202520280193.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-21
- Publication Date
- 2025-12-30
- Estimated Expiration
- 2035-02-21
AI Technical Summary
During the construction of the building facade, the gap between the suspended platform and the building poses a risk of construction tools falling, and the hard contact when the suspended platform falls affects comfort.
A suspended platform for construction engineering has been designed, equipped with a compensation component and a buffer component. The compensation component fills the gap between the suspended platform and the building through a protective net, and the buffer component provides a cushioning effect through a buffer spring.
It effectively prevents construction tools from falling, improves construction safety, and enhances comfort when the suspended platform descends.
Smart Images

Figure CN223738956U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the technical field of building engineering more particularly relates to a building engineering is with the basket. BACKGROUND
[0002] At present, when the construction of building facade is carried out, the hoist will be usually used to hoist the basket to the air, and the staff stands in the basket to carry out the construction operation, and in the construction process, there is a certain gap between the basket and the building facade.
[0003] Sometimes, due to the staff's negligence and operation failure, the construction tools and other articles will fall down from the gap, thereby certain danger exists, in addition, when the basket falls to the ground, the basket and the ground directly contact hard, which brings discomfort to the staff in the basket. UTILITY MODEL CONTENT
[0004] In order to overcome the above-mentioned defects of the prior art, the utility model provides a building engineering basket to solve the problems in the above background art.
[0005] The utility model provides the following technical scheme: a building engineering basket, including the basket main part, the basket main part bottom is installed with the compensation assembly, the compensation assembly is installed with the protective net, the basket main part bottom is still installed with the buffer assembly, the protective net is used for preventing the tool from falling down from the gap between the basket main part and the building, the compensation assembly is used for traction protective net moves to compensate the gap between the basket main part and the building, the buffer assembly is used for buffering landing when the basket main part falls to the ground.
[0006] Preferably, the compensation assembly includes a fixed shell, an installation frame, a rotating rod and a transmission rod, the fixed shell is symmetrically provided with two, the fixed shell top is fixedly connected with the basket main part bottom, the fixed shell is internally provided with a guide groove, the guide groove is provided with a guide block and a threaded rod, one end of the threaded rod is rotatably connected with the guide groove wall, the other end penetrates the guide groove wall and extends outward, the other end of the threaded rod is fixedly connected with a fourth bevel gear, the guide block surface is slidably connected with the guide groove wall, and the guide block is screwed on the surface of the threaded rod.
[0007] Preferably, the installation frame is fixedly connected with the guide block on the left and right sides, and the protective net is fixedly installed on the inner side of the installation frame.
[0008] Preferably, the basket body inner cavity bottom is fixedly connected with a mounting frame, the rotating rod is rotatably installed on the mounting frame, the rotating rod surface is fixedly connected with a rotating handle, the rotating rod two ends are each fixedly connected with a first bevel gear, the transmission rod is symmetrically provided with two, the transmission rod is rotatably installed on the basket body, the transmission rod top end is fixedly connected with a second bevel gear, the transmission rod bottom end is fixedly connected with a third bevel gear, the first bevel gear is meshingly connected with the second bevel gear, and the third bevel gear is meshingly connected with a fourth bevel gear.
[0009] Preferably, the buffer assembly comprises a receiving frame and a supporting leg, the receiving frame is fixedly installed on the basket body bottom, the receiving frame bottom is fixedly connected with sliding rods, the sliding rods are uniformly provided with a plurality of, the sliding rod bottom end is fixedly connected with a limiting block, the supporting leg is symmetrically provided with two, the supporting leg is sleeved on the sliding rod surface, the sliding rod surface is sleeved with a buffer spring, one end of the buffer spring is fixedly connected with the receiving frame bottom, and the other end is fixedly connected with the supporting leg top.
[0010] The technical effects and advantages of the utility model are as follows:
[0011] 1, the staff can use hand screwing rotating handle and make rotating rod rotate around its axis, rotating rod rotates and drives transmission rod synchronous rotation around its axis, transmission rod rotates and drives screw rod synchronous rotation around its axis, screw rod rotates and drives mounting frame and protective net synchronous movement towards the direction of approaching building facade, and the protective net fills the gap between the basket body and building facade, thereby effectively preventing construction tools and other articles from falling down from the gap.
[0012] 2, when the basket body falls to the ground, the supporting leg first contacts the ground, then the basket body and the receiving frame move downward under the action of its own gravity, and the sliding rod also synchronously slides downward along its axis direction, in this process, the buffer spring is extruded and shrinks and the elastic force increases, the elastic force of the buffer spring has the effect of buffering, and the comfort of the staff in the basket body is enhanced. ACCURATE DRAWINGS
[0013] Figure 1 It is the overall structure schematic diagram of the utility model.
[0014] Figure 2 It is the partial structure schematic diagram of the utility model.
[0015] Figure 3 It is the compensation assembly structure schematic diagram of the utility model.
[0016] Figure 4 It is the fixed shell sectional view of the utility model.
[0017] Figure 5 It is the utility modelFigure 3 Enlarged view of the structure at A in FIG.
[0018] Figure 6 Structure diagram of the buffer assembly of the utility model.
[0019] The figure signs are as follows: 1, hanging basket main body; 2, compensation assembly; 21, fixed shell; 211, guide groove; 22, guide block; 23, threaded rod; 231, fourth bevel gear; 24, installation frame; 25, rotating rod; 251, first bevel gear; 26, transmission rod; 261, second bevel gear; 262, third bevel gear; 27, mounting frame; 28, rotating handle; 3, protective net; 4, buffer assembly; 41, receiving frame; 42, supporting leg; 43, sliding rod; 431, limiting block; 44, buffer spring. DETAILED DESCRIPTION
[0020] The technical scheme in the utility model will be described clearly and completely below in combination with the drawings in the utility model, and additionally, the forms of each structure recorded in the following implementation manners are only examples, and the hanging basket for constructional engineering involved in the utility model is not limited to each structure recorded in the following implementation manners, and all other implementation manners obtained by the ordinary skilled in the art without making creative efforts belong to the protection scope of the utility model.
[0021] The utility model provides a kind of hanging basket for constructional engineering, including hanging basket main body 1, compensation assembly 2 is installed in hanging basket main body 1 bottom, protective net 3 is installed on compensation assembly 2, and buffer assembly 4 is also installed in hanging basket main body 1 bottom, protective net 3 is used to prevent tool from falling down from the gap between hanging basket main body 1 and building, compensation assembly 2 is used to compensate the gap between hanging basket main body 1 and building by pulling protective net 3 to move, and buffer assembly 4 is used to buffer landing when hanging basket main body 1 falls to ground.
[0022] Further, compensation assembly 2 includes fixed shell 21, installation frame 24, rotating rod 25 and transmission rod 26, two fixed shells 21 are symmetrically provided, the top of fixed shell 21 is fixedly connected with the bottom of hanging basket main body 1, guide groove 211 is arranged in the inside of fixed shell 21, guide block 22 and threaded rod 23 are arranged in guide groove 211, one end of threaded rod 23 is rotatably connected with the groove wall of guide groove 211, the other end passes through the groove wall of guide groove 211 and extends outward, fourth bevel gear 231 is fixedly connected to the other end of threaded rod 23, the surface of guide block 22 is slidably connected with the groove wall of guide groove 211, and the sliding guide cooperation along the axis direction of threaded rod 23 is formed between the two, guide block 22 is screwed on the surface of threaded rod 23, threaded rod 23 can rotate around its axis to generate rotary force, so as to pull guide block 22 to slide synchronously along guide groove 211.
[0023] Further, the installation frame 24 is fixedly connected with the guide block 22 on the left and right sides, and the protective net 3 is fixedly installed on the inner side of the installation frame 24, so that the gap between the hanging basket body 1 and the building facade can be filled by the protective net 3, thereby effectively preventing the falling of construction tools and other articles from the gap.
[0024] Further, the installation frame 24 is fixedly connected with the guide block 22 on the left and right sides, and the protective net 3 is fixedly installed on the inner side of the installation frame 24, so that the gap between the hanging basket body 1 and the building facade can be filled by the protective net 3, thereby effectively preventing the falling of construction tools and other articles from the gap.
[0025] Further, the buffer assembly 4 comprises a receiving frame 41 and a supporting leg 42, the receiving frame 41 is fixedly installed at the bottom of the hanging basket body 1, the receiving frame 41 is fixedly connected with a sliding rod 43 at the bottom, the sliding rod 43 is uniformly provided with a plurality of sliding rods 43, the sliding rod 43 is fixedly connected with a limiting block 431 at the bottom, the supporting leg 42 is symmetrically provided with two supporting legs 42, the supporting leg 42 is sleeved on the surface of the sliding rod 43, the supporting leg 42 and the sliding rod 43 form a sliding guide cooperation along the axis direction of the sliding rod 43, the surface of the sliding rod 43 is sleeved with a buffer spring 44, one end of the buffer spring 44 is fixedly connected with the bottom of the receiving frame 41, and the other end is fixedly connected with the top of the supporting leg 42.
[0026] The working principle of the utility model is as follows: the staff stands in the hanging basket body 1, the hoisting machine hoists the hanging basket body 1 to the air through the rope, the staff constructs the outer facade of the building, at this time, there is a certain gap between the hanging basket body 1 and the building facade, the staff twists the rotating handle 28 to make the rotating rod 25 rotate around its axis, the rotating rod 25 rotates and drives the transmission rod 26 to synchronously rotate around its axis through the first bevel gear 251 and the second bevel gear 261, the transmission rod 26 rotates and drives the threaded rod 23 to synchronously rotate around its axis through the third bevel gear 262 and the fourth bevel gear 231, the threaded rod 23 rotates and drives the guide block 22 to synchronously slide along the guide groove 211, the guide block 22 moves and drives the installation frame 24 and the protective net 3 to synchronously move towards the direction of approaching the building facade, and the protective net 3 fills the gap between the hanging basket body 1 and the building facade.
[0027] When the basket body 1 falls to the ground, the supporting feet 42 first contact the ground, then the basket body 1 and the supporting frame 41 move downward under the action of gravity, and the sliding rod 43 also slides downward along the axis direction, in the process, the buffer spring 44 is extruded to shrink and the elastic force increases, and the elastic force of the buffer spring 44 has a buffering effect.
[0028] Finally, it should be pointed out that: first, in the description of the present application, it should be pointed out that unless otherwise specified and limited, the terms "mounting", "connecting", "connecting" should be understood broadly, which can be mechanical connection or electrical connection, or the communication between two elements, or direct connection, "up", "down", "left", "right" and the like are only used to indicate the relative positional relationship, when the absolute position of the described object changes, the relative positional relationship may change;
[0029] Secondly: the utility model discloses the embodiment of the drawings only relates to the structure involved in the embodiment of the present disclosure, other structures can refer to the usual design, under the condition of no conflict, the same embodiment and different embodiments of the utility model can be combined with each other;
[0030] Finally: the above only for the preferred embodiment of the utility model, and does not limit the utility model, any modification, equivalent replacement, improvement etc. within the spirit and principle of the utility model should be included in the protection scope of the utility model.
Claims
1. A hanging basket for construction work, comprising a hanging basket body (1), characterized in that, The bottom of the basket body (1) is provided with a compensation assembly (2), and the compensation assembly (2) is provided with a protective net (3); the bottom of the basket body (1) is also provided with a buffer assembly (4); the protective net (3) is used for preventing tools from falling down from the gap between the basket body (1) and the building; the compensation assembly (2) is used for moving the protective net (3) to compensate the gap between the basket body (1) and the building; and the buffer assembly (4) is used for buffering the landing of the basket body (1) when falling to the ground.
2. A hanging basket for construction work according to claim 1, characterized in that The compensation assembly (2) comprises fixed shells (21), mounting frames (24), rotating rods (25) and transmission rods (26); the fixed shells (21) are symmetrically provided with two; the top of the fixed shell (21) is fixedly connected with the bottom of the basket body (1); the inside of the fixed shell (21) is provided with a guide groove (211); the guide groove (211) is provided with a guide block (22) and a threaded rod (23); one end of the threaded rod (23) is rotatably connected with the groove wall of the guide groove (211), and the other end of the threaded rod (23) penetrates through the groove wall of the guide groove (211) and extends outward; the other end of the threaded rod (23) is fixedly connected with a fourth bevel gear (231); the surface of the guide block (22) is slidably connected with the groove wall of the guide groove (211); and the guide block (22) is threadedly installed on the surface of the threaded rod (23).
3. A suspended scaffold according to claim 2, wherein, The mounting frames (24) are fixedly connected with the guide blocks (22) on the left and right sides; and the protective net (3) is fixedly installed on the inner side of the mounting frame (24).
4. A suspended scaffold according to claim 3, wherein The bottom of the inner cavity of the basket body (1) is fixedly connected with a mounting frame (27); the rotating rod (25) is rotatably installed on the mounting frame (27); the surface of the rotating rod (25) is fixedly connected with a rotating handle (28); the two ends of the rotating rod (25) are each fixedly connected with a first bevel gear (251); the transmission rods (26) are symmetrically provided with two; the transmission rods (26) are rotatably installed on the basket body (1); the top end of the transmission rod (26) is fixedly connected with a second bevel gear (261); the bottom end of the transmission rod (26) is fixedly connected with a third bevel gear (262); the first bevel gear (251) is meshingly connected with the second bevel gear (261); and the third bevel gear (262) is meshingly connected with the fourth bevel gear (231).
5. The hanging basket for construction work according to claim 1, wherein The buffer assembly (4) comprises receiving frames (41) and supporting feet (42); the receiving frames (41) are fixedly installed on the bottom of the basket body (1); the bottom of the receiving frame (41) is fixedly connected with sliding rods (43); the sliding rods (43) are uniformly provided with a plurality of; the bottom end of the sliding rod (43) is fixedly connected with a limiting block (431); the supporting feet (42) are symmetrically provided with two; the supporting feet (42) are sleeved on the surface of the sliding rod (43); the surface of the sliding rod (43) is sleeved with a buffer spring (44); one end of the buffer spring (44) is fixedly connected with the bottom of the receiving frame (41), and the other end of the buffer spring (44) is fixedly connected with the top of the supporting foot (42).