Pile-column integrated three-pile casing

The integrated pile-column three-casing structure solves the problem of high construction difficulty of cast-in-place piles, achieves both aesthetic appeal and stability of the exposed parts, and reduces construction costs.

CN223753319UActive Publication Date: 2026-01-02XINJIANG CONSTR ENG GRP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423073590.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-13
Publication Date
2026-01-02
Estimated Expiration
2034-12-13

AI Technical Summary

Technical Problem

Traditional cast-in-place pile construction methods cannot meet the design requirements for the appearance of the exposed steel frame bridge across the river in the construction of the paddy field train, and the construction is difficult and costly.

Method used

The pile-column integrated three-casing structure is adopted, including the foundation, the placement trough, the cast-in-place pile body, the ring groove and the permanent casing. By selecting a reasonable mechanical drilling method and inserting the steel cage and concrete, combined with the design of the detachable casing and the insertion of the steel reinforcement group, one-time grouting and stable installation can be achieved.

Benefits of technology

It reduces construction difficulty and cost while ensuring the aesthetics and stability of exposed parts. The appearance quality is improved through rust removal and waterproof and rust-proof coating treatment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223753319U_ABST
    Figure CN223753319U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, in particular to a pile-column integrated three-protection cylinder which comprises a foundation, a containing groove formed in the foundation, a cast-in-place pile body arranged in the containing groove, an annular groove formed in the foundation, a protection structure embedded and installed in the annular groove and a temporary protection cylinder. A permanent pile casing is fixedly mounted on the circumferential surface of the cast-in-place pile body, an economical and reasonable pile foundation construction machine is selected according to different geological conditions, pile foundation hole forming is carried out according to design requirements, a reinforcement cage is placed in a hole, concrete is injected into the hole, the cast-in-place pile body and a reinforcement group are formed, then the hole is sleeved with the permanent pile casing, and the cast-in-place pile is formed. By means of the structure, follow-up workers can complete pouring at a time, the construction difficulty and cost are reduced, meanwhile, the workers can conduct rust removal treatment on the permanent pile casing exposed to the upper portion of the foundation, waterproof and anti-rust paint brushing is conducted immediately after rust removal, and therefore the ornamental value of the appearance of the exposed part of the pile foundation is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of building construction, especially relates to pile column integrated three protecting tubes. BACKGROUND

[0002] In the construction of the rice field small train, the steel frame bridge of 6m is used in the river section, the design service life of the structure is 20 years, and the form of the cast-in-place pile + the bent cap is used in the lower structure design.

[0003] The average exposed part of the cast-in-place pile in the river section is about 5m, the traditional island building method cannot meet the appearance of the exposed part, the cast-in-place pile is constructed in sections, the underground part is poured first, and then the exposed part is constructed, and the construction difficulty and cost will be very high, and it is more troublesome. UTILITY MODEL CONTENTS

[0004] In view of the defects of the prior art, the utility model provides a pile column integrated three protecting tubes, and the technical problem of the existing cast-in-place pile construction is solved.

[0005] In order to realize the above object, the utility model is realized by the following technical scheme:

[0006] The pile column integrated three protecting tubes, including the foundation, the inside of the foundation is provided with a storage groove, the inside of the storage groove is provided with a cast-in-place pile body, the cast-in-place pile body is partially exposed on the upper and lower ends of the storage groove, the inside of the foundation is provided with a ring groove, and the ring groove is located on the outer side of the storage groove.

[0007] The inside of the ring groove is embedded with a protection structure;

[0008] The protection structure includes a temporary protecting tube, the temporary protecting tube is partially exposed on the outside of the cast-in-place pile body, the circumferential surface of the cast-in-place pile body is fixedly installed with a permanent protecting tube, the permanent protecting tube is fixedly installed with the inner wall of the storage groove, and the permanent protecting tube is partially exposed on the upper and lower ends of the storage groove.

[0009] Preferably, the inside of the permanent protecting tube is provided with a mounting groove, and the inside of the mounting groove is slidably installed with a clamping block.

[0010] Preferably, the upper end of the clamping block is fixedly installed with a detachable protecting tube, the upper end of the cast-in-place pile body is provided with a plurality of steel bar groups, the inner side of the detachable protecting tube is fixedly installed with a first square plate, and the inner side of the detachable protecting tube is fixedly installed with a first through groove.

[0011] Preferably, the first square plate and the first through groove are vertically and cross arranged, the inside of the first square plate is symmetrically and through provided with a second square plate, the inside of the first through groove is symmetrically and through provided with a second through groove, and the second square plate and the second through groove are matched with the steel bar groups.

[0012] Compared with the prior art, the utility model has the following beneficial effects:

[0013] In the utility model, according to different geological conditions, economic and reasonable pile foundation construction machinery is selected, and pile foundation is formed according to design requirements, and the steel reinforcement cage is put into the hole and the concrete is injected, so that the cast-in-place pile body and the reinforcement group are set, then the permanent casing is sleeved in the hole, so that the subsequent workers can complete the pouring at one time, the construction difficulty and the cost are reduced, and simultaneously, the workers can carry out rust removal treatment on the permanent casing exposed above the foundation, and after rust removal, waterproof and rustproof paint is brushed, so that the ornamental property of the exposed part of the pile foundation appearance is ensured.

[0014] In the utility model, by inserting the clamping block on the detachable casing into the mounting groove, then the first through groove and the second through groove on the first square plate and the second square plate inside the detachable casing are inserted into the reinforcement group on the cast-in-place pile body, so that the installation is completed, and simultaneously, after the concrete above the cast-in-place pile body reaches the initial setting state, the detachable casing at the upper portion is demoulded, so that the floating slurry of the pile head is conveniently broken, and because the first through groove and the second through groove on the first square plate and the second square plate are inserted into the reinforcement group on the cast-in-place pile body, the stability of the detachable casing installed on the permanent casing is also ensured. BRIEF DESCRIPTION OF DRAWINGS

[0015] The above description is only a summary of the technical scheme of the utility model, in order to more clearly understand the technical means of the utility model, and the content of the specification can be implemented, the following preferred embodiments of the utility model are described in detail in cooperation with the drawings.

[0016] Figure 1 It is a perspective view of the utility model;

[0017] Figure 2 It is a perspective connection explosion structure view of the utility model;

[0018] Figure 3 It is a cast-in-place pile body connection explosion structure view of the utility model;

[0019] Figure 4 It is a permanent casing sectional view of the utility model.

[0020] Legend: 11, foundation; 12, storage groove; 13, cast-in-place pile body; 14, ring groove; 15, temporary casing; 16, permanent casing; 17, mounting groove; 18, clamping block; 19, detachable casing; 21, reinforcement group; 22, first square plate; 23, second square plate; 24, first through groove; 25, second through groove. DETAILED DESCRIPTION

[0021] The embodiment of the application effectively solves the technical problem of the existing cast-in-place pile construction trouble by providing a pile column integrated three-protecting cylinder, selecting an economic and reasonable pile foundation construction machine according to different geological conditions, performing pile foundation hole forming according to design requirements, and placing a steel reinforcement cage in the hole and injecting concrete, so that the cast-in-place pile body and the steel reinforcement group are set, and then the permanent protecting cylinder is sleeved in the hole, so that subsequent workers can complete the pouring at one time, reduce the construction difficulty and cost, and at the same time, the workers can perform rust removal treatment on the permanent protecting cylinder exposed above the foundation, and immediately perform waterproof and rust-proof paint brushing after rust removal, thereby ensuring the ornamental appearance of the exposed part of the pile foundation, and by inserting the clamping block on the detachable protecting cylinder into the installation groove, then inserting the first through groove and the second through groove on the first square plate and the second square plate on the inside of the detachable protecting cylinder into the steel reinforcement group on the cast-in-place pile body, the installation can be completed, and at the same time, after the concrete above the cast-in-place pile body reaches the initial setting state, the upper detachable protecting cylinder is demoulded, thereby facilitating the breaking of the pile head float mud, and since the first through groove and the second through groove on the first square plate and the second square plate are inserted into the steel reinforcement group on the cast-in-place pile body, the stability of the detachable protecting cylinder installed on the permanent protecting cylinder can also be ensured.

[0022] Embodiment

[0023] As shown in Figure 1 - Figure 4 The technical scheme in the embodiment of the application effectively solves the technical problem of the existing cast-in-place pile construction trouble, and the overall idea is as follows:

[0024] In view of the problems in the prior art, the utility model provides a pile column integrated three-protecting cylinder, which comprises a foundation 11, a storage groove 12 is formed in the inside of the foundation 11, a cast-in-place pile body 13 is arranged in the inside of the storage groove 12, the cast-in-place pile body 13 is partially exposed on the upper and lower ends of the storage groove 12, a ring groove 14 is formed in the inside of the foundation 11, and the ring groove 14 is located outside the storage groove 12.

[0025] The protection structure is embedded and installed in the ring groove 14.

[0026] The protection structure comprises a temporary casing 15 partially exposed outside the cast-in-place pile body 13, a permanent casing 16 fixedly installed on the circumferential surface of the cast-in-place pile body 13 and fixedly installed on the inner wall of the storage groove 12, and the permanent casing 16 is partially exposed on the upper and lower ends of the storage groove 12. By selecting an economical and reasonable pile foundation construction machine according to different geological conditions, the pile foundation hole is formed according to the design requirements, and the reinforcement cage and the concrete are placed in the hole, so that the cast-in-place pile body 13 and the reinforcement group 21 are placed in the hole, and then the permanent casing 16 is placed in the hole, so that the subsequent workers can complete the pouring at one time, reduce the construction difficulty and cost, and at the same time, the workers can perform rust removal treatment on the permanent casing 16 exposed above the foundation 11. After rust removal, waterproof and rust-proof paint should be brushed immediately, so as to ensure the ornamental appearance of the exposed part of the pile foundation.

[0027] The permanent casing 16 is internally provided with an installation groove 17, the installation groove 17 is internally slidably provided with a clamping block 18, the clamping block 18 is fixedly provided with a detachable casing 19 at the upper end, the cast-in-place pile body 13 is provided with a plurality of reinforcement groups 21 at the upper end, the detachable casing 19 is fixedly provided with a first square plate 22 at the inner side, the detachable casing 19 is fixedly provided with a first through groove 24 at the inner side, the first square plate 22 and the first through groove 24 are vertically and transversely arranged, the first square plate 22 is symmetrically and internally provided with a second square plate 23, the first through groove 24 is symmetrically and internally provided with a second through groove 25, the second square plate 23 and the second through groove 25 are adapted to the reinforcement groups 21, the clamping block 18 on the detachable casing 19 is inserted into the installation groove 17, then the first through groove 24 and the second through groove 25 on the first square plate 22 and the second square plate 23 at the inner side of the detachable casing 19 are inserted into the reinforcement groups 21 on the cast-in-place pile body 13, and the installation is completed, at the same time, after the concrete above the cast-in-place pile body 13 reaches the initial setting state, the detachable casing 19 at the upper part is removed, thereby facilitating the removal of the pile head, and since the first through groove 24 and the second through groove 25 on the first square plate 22 and the second square plate 23 are inserted into the reinforcement groups 21 on the cast-in-place pile body 13, the stability of the detachable casing 19 installed on the permanent casing 16 can be ensured.

[0028] Working principle:

[0029] First step, construction preparation

[0030] In use, the worker can first preset the reinforced concrete pipe on the foundation 11 according to the normal flow of the river and the flood discharge capacity in flood season, and backfill the river island according to the position of the cast-in-place pile body 13, then the worker can re-measure the construction surface of the foundation 11 and perform measurement and lofting, then two control piles can be introduced on each side in the longitudinal and transverse directions, the distance between the two control piles is 2 meters, which is used to control the axis deviation during drilling, after the control piles are introduced, the cross line is pulled, and the drill bit is adjusted to the center of the cross line by the line hammer, then the worker can install the temporary casing 15 at the ring groove 14 according to the four ends of the cross line.

[0031] Second step, pile foundation hole forming;

[0032] According to different geological conditions, select economic and reasonable pile foundation construction machinery, according to the design requirements to form the hole of the pile foundation, after the hole is formed, the drill bit is raised 10-20 cm from the bottom of the hole, and the slow rotation is maintained, the circulating hole cleaning time is maintained for not less than 30 minutes, the mud with good performance is used, the specific gravity and viscosity of the mud are controlled, and the water is not used for replacement, when the reinforcement cage is hoisted, the center of the reinforcement cage is kept consistent with the center of the pile to avoid collision with the hole wall, the cold pressure joint process of the reinforcement cage can be used to speed up the butt joint of the reinforcement cage, reduce the empty hole time, and thus reduce the sediment, after the reinforcement cage is lowered, the sediment amount is checked, if the sediment amount exceeds the specification requirement, the second hole cleaning is performed by using the guide pipe until the hole opening returns to the mud specific gravity and the sediment thickness meet the specification requirements, thereby completing the hole forming of the pile foundation, and further forming the cast-in-place pile body 13 and the reinforcement group 21.

[0033] Third step, finishing work;

[0034] After the pile foundation construction is completed, the soil cofferdam should be removed to the river bottom elevation, then the worker can sleeve the permanent casing 16 outside the cast-in-place pile body 13, at the same time, the worker can perform rust removal treatment on the permanent casing 16 exposed above the foundation 11, immediately perform waterproof and rust-proof paint brushing after the rust removal, ensure the ornamental nature of the appearance of the exposed part of the pile foundation, then the worker can take the detachable casing 19, and insert the clamping block 18 on the detachable casing 19 into the installation slot 17, then insert the first through slot 24 and the second through slot 25 on the first square plate 22 and the second square plate 23 inside the detachable casing 19 into the reinforcement group 21 on the cast-in-place pile body 13, and the installation is completed, at the same time, after the concrete above the cast-in-place pile body 13 reaches the initial setting state, the upper detachable casing 19 is removed, and the floating slurry of the pile head is broken.

[0035] Finally, it should be noted that: apparently, the above embodiments are merely examples for clearly illustrating the utility model, and are not limited to the implementation. For ordinary skilled in the art, on the basis of the above description, other different forms of changes or variations can be made. Here, it is not necessary and impossible to exhaust all the implementation. The obvious changes or variations derived from it are still within the protection scope of the utility model.

Claims

1. A pile-integrated three-protecting cylinder, comprising a foundation (11), a storage groove (12) is formed in the inside of the foundation (11), a cast-in-place pile body (13) is arranged in the inside of the storage groove (12), and the cast-in-place pile body (13) is partially exposed on the upper and lower ends of the storage groove (12), characterized in that, The foundation (11) is internally provided with an annular groove (14) located outside the storage groove (12); The annular groove (14) is internally embedded with a protection structure; The protection structure comprises a temporary casing (15) partially exposed outside the cast-in-place pile body (13), the cast-in-place pile body (13) is fixedly provided with a permanent casing (16) on the circumferential surface, the permanent casing (16) is fixedly provided on the inner wall of the storage groove (12), and the permanent casing (16) is partially exposed on the upper and lower ends of the storage groove (12).

2. The monolithic pile and three- casing according to claim 1, wherein, The permanent casing (16) is internally provided with a mounting groove (17); The mounting groove (17) is internally slidably provided with a clamping block (18).

3. The monolithic pile and three- casing according to claim 2, wherein, The clamping block (18) is fixedly provided with a detachable casing (19) on the upper end; The cast-in-place pile body (13) is provided with a plurality of steel bar groups (21) on the upper end.

4. The monolithic pile and three- casing according to claim 3, wherein The detachable casing (19) is fixedly provided with a first square plate (22) on the inner side; The detachable casing (19) is fixedly provided with a first through groove (24) on the inner side.

5. The monolithic pile and three- casing according to claim 4, wherein The first square plate (22) and the first through groove (24) are vertically and crossly arranged; The first square plate (22) is internally and symmetrically provided with a second square plate (23).

6. The monolithic pile and three- casing according to claim 5, wherein The first through groove (24) is internally and symmetrically provided with a second through groove (25); The second square plate (23) and the second through groove (25) are adapted to the steel bar groups (21).