Hoisting operation rack for color steel tiles of large color steel shed

By designing a hoisting platform for large color steel sheds, the problem of traditional equipment being unable to meet the needs of multiple people working at heights has been solved, achieving efficient color steel tile installation and ensuring the safety of construction personnel. The structure is simple and highly stable.

CN223792747UActive Publication Date: 2026-01-13SINOHYDRO BUREAU 14 CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520329844.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-02-27
Publication Date
2026-01-13
Estimated Expiration
2035-02-27

AI Technical Summary

Technical Problem

Traditional lifting platforms and mobile scaffolding cannot meet the needs of multiple people working at heights on large color steel sheds and color steel tiles, resulting in low installation efficiency and safety hazards such as falls from heights.

Method used

Design a hoisting operation platform including a first column, a second column, a third column, a first horizontal bar, a second horizontal bar, a fixed pulley, a top locking component, and a middle locking component. Through triangular arrangement and the fixing of the locking components, a stable vertical triangular prism cage structure is formed, enabling multiple people to work at height and safely hoist.

Benefits of technology

It improves the installation efficiency of large-scale color steel sheds and color steel tiles, ensures the safety of construction workers, avoids falls from heights, and has a simple structure, is easy to assemble, and has high stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223792747U_ABST
    Figure CN223792747U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of color steel tile hoisting, and discloses a hoisting operation rack for color steel tiles of a large color steel shed, which comprises a first upright post, a second upright post, a third upright post, a first cross rod, a second cross rod, a fixed pulley, a top locking piece and a middle locking piece, the first stand column, the second stand column and the third stand column are vertically arranged in a triangular mode, the plane where the second stand column and the third stand column are located is parallel to the plane of the color steel shed side wall, and the second stand column, the third stand column and the color steel shed side wall are arranged at intervals. The operating rack can meet the requirement of multi-person high-altitude operation when side wall plate color steel tiles of a high large color steel shed are installed, the efficiency of installing the side wall plate color steel tiles of the color steel shed can be effectively improved, the operating rack is simple in structure, convenient to manufacture and assemble, convenient to take materials, capable of effectively ensuring the stability of the operating rack in the process of hoisting and installing the color steel tiles, and high in practicability. The operation rack can be effectively prevented from overturning, and constructors can be effectively prevented from falling from high positions.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model belongs to the color steel tile hoisting technical field, specifically relates to a kind of hoisting operation rack for large color steel shed color steel tile. BACKGROUND

[0002] Color steel shed is the common site of various processing and manufacturing industries, with the continuous development of construction industry and the continuous progress of technology, people's demand for color steel shed site is also more and more big, therefore, it is inevitable development trend to organize and build the color steel shed integrating standardization, facility specialization, process standardization, management standardization and behavior standardization. Most of the traditional processing plant adopts lifting platform car, mobile scaffold during color steel tile installation process, however, the land area and installation height of large color steel shed is 3-7 times of traditional processing plant, therefore, due to the limitation of site station, as well as operation height, wind grade, color steel tile installation height and other factors, traditional lifting platform car and mobile scaffold cannot meet the demand of multi-person high-altitude operation, greatly reduce the efficiency of installing color steel shed, and it is also difficult to guarantee operation safety, there is the security risk of high fall accident. CONTENT OF UTILITY MODEL

[0003] To solve or partially solve the problems in the related art, the utility model provides a kind of hoisting operation rack for large color steel shed color steel tile, to solve the problem that traditional lifting platform car and mobile scaffold cannot meet the demand of multi-person high-altitude operation when installing color steel tile of large color steel shed, and the problem of security risk of high fall accident.

[0004] The application provides a kind of hoisting operation rack for large color steel shed color steel tile, including first column, second column, third column, first cross bar, second cross bar, fixed pulley, top locking piece, middle locking piece;

[0005] First column, second column, third column are vertically arranged in triangle, the plane where second column and third column are parallel to the plane of color steel shed side wall, and second column, third column are spaced apart from color steel shed side wall;

[0006] First column and second column, third column are respectively horizontally arrayed and fixedly installed with a plurality of first cross bars, second column and third column are horizontally arrayed and fixedly installed with second cross bar, and fixedly provided with fixed pulley on one second cross bar higher than color steel shed side wall;

[0007] The connection part of the first column, the second column and the third column with at least one group of first horizontal rods higher than the side wall of the color steel shed is sleeved with a top locking piece, and the other end of the top locking piece is connected with the top cross beam of the color steel shed.

[0008] In an optional solution, the top locking piece comprises a safety rope fixer, a safety rope and an anti-dropping ring, each safety rope fixer is sleeved at the connection part of the first column, the second column and the third column with one group of first horizontal rods higher than the side wall of the color steel shed, the safety rope fixer is provided with the safety rope, the safety rope is tied on the top cross beam of the color steel shed, and the end of the safety rope is connected with the anti-dropping ring.

[0009] In an optional solution, the safety rope of the top locking piece sleeved on the second column and the third column is collinear with the projection of the corresponding first horizontal rod on the horizontal plane.

[0010] In an optional solution, the middle locking piece comprises a U-shaped buckle and a connecting rope, the U-shaped buckle is fixedly clamped on the side wall cross beam of the color steel shed, one end of the connecting rope is fixedly connected to the U-shaped buckle, and the other end of the connecting rope is tied on the first horizontal rod.

[0011] In an optional solution, the horizontal distance between the U-shaped buckles of the two middle locking pieces adjacent to the second column and the third column is at least greater than the width of a single color steel tile.

[0012] In an optional solution, the projection of the center of the first column, the second column and the third column on the water surface is an isosceles triangle, and the center line of the second column and the third column is parallel to the plane of the side wall of the color steel shed.

[0013] In an optional solution, the height of each group of first horizontal rods between the first column and the second column and the third column is equal, and each group of first horizontal rods and the corresponding second horizontal rod are arranged alternately.

[0014] The utility model discloses beneficial effects:

[0015] The utility model discloses a first cross bar, second cross bar are connected to first stand, second stand, third stand, support to form vertical three prism cage -like operation platform frame to the operation platform frame upper portion fixed pulley of installing can promote the lifting of color steel tile to the demand of many high altitude operations of satisfying the installation of higher large -scale color steel shed side wall board color steel tile can effectively improve the efficiency of installing color steel shed side wall board color steel tile, and the operation platform frame simple structure, easy production and assembly, convenient material taking, the upper portion of the operation platform frame, the middle part and the lower part position are fixed by setting top locking part and middle part locking part to can effectively ensure the stability of operation platform frame in the process of lifting and installing color steel tile, can effectively avoid the operation platform frame to overturn, can effectively guarantee the personal safety of construction personnel, can effectively avoid the high -altitude falling accident of construction personnel.

[0016] It should be understood that the above general description and the following detailed description are only exemplary and explanatory, and cannot limit the application. BRIEF DESCRIPTION OF DRAWINGS

[0017] In order to more clearly illustrate the technical scheme of the embodiment of the utility model, the following will be briefly introduced the drawing needed to be used in the embodiment description, obviously, the drawing in the following description is only some embodiments of the utility model, for the person skilled in the art, under the premise of not paying the creative labor, can also obtain other drawings according to these drawings.

[0018] Figure 1 It is the overall structure and installation schematic drawing of operation platform frame in an embodiment of the application;

[0019] Figure 2 It is the installation schematic drawing of first stand, second stand in an embodiment of the application;

[0020] Figure 3 It is the installation schematic drawing of second stand, third stand in an embodiment of the application;

[0021] Figure 4 It is the projection schematic drawing of first stand, second stand, third stand, first cross bar, safety rope on horizontal plane in an embodiment of the application.

[0022] The reference signs in the drawing are: 100-top cross beam, 200-side wall cross beam;

[0023] 1-first stand, 2-second stand, 3-third stand, 4-first cross bar, 5-second cross bar, 6-fixed pulley, 7-top locking part, 71-safety rope fixer, 72-safety rope, 73-anti-drop ring, 8-middle part locking part, 81-U buckle, 82-connecting rope. DETAILED DESCRIPTION

[0024] The specific embodiments of this application will be further described in detail below with reference to the accompanying drawings and examples. The following examples are used to illustrate this application, but are not intended to limit the scope of this application. Similarly, the following examples are only some embodiments of this application, not all embodiments. All other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0025] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this application, "multiple" means at least two, such as two, three, etc., unless otherwise explicitly specified.

[0026] In this application, unless otherwise expressly specified and limited, the terms "installation," "connection," "linking," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection, an electrical connection, or a connection that allows communication between components; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components, unless otherwise expressly limited. Those skilled in the art can understand the specific meaning of the above terms in this application based on the specific circumstances.

[0027] In this application, the terms "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., refer to a specific feature, structure, material, or characteristic described in connection with that embodiment or example, which is included in at least one embodiment or example of this application. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.

[0028] Traditional lifting platforms and mobile scaffolding cannot meet the needs of multiple people working at height when installing corrugated steel tiles for large corrugated steel sheds, resulting in low installation efficiency and safety hazards such as falls from heights.

[0029] To address the aforementioned problems, this application proposes improvements and innovations, including the following embodiments.

[0030] In some implementations, please refer to Figure 1 , Figure 2 , Figure 3 ,Figure 4 A hoisting operation platform for large-scale color steel sheds and color steel tiles is provided, including a first column 1, a second column 2, a third column 3, a first horizontal bar 4, a second horizontal bar 5, a fixed pulley 6, a top locking component 7, and a middle locking component 8. The first column 1, second column 2, and third column 3 are arranged vertically in a triangle. The plane containing the second column 2 and third column 3 is parallel to the plane of the side wall of the color steel shed, and the second column 2 and third column 3 are spaced apart from the side wall of the color steel shed. Several first horizontal bars 4 are horizontally arrayed and fixedly installed between the first column 1, second column 2, and third column 3. Second horizontal bars 5 are horizontally arrayed and fixedly installed between the second column 2 and third column 3, and a fixed pulley 6 is fixedly installed on one of the second horizontal bars 5 that is higher than the side wall of the color steel shed.

[0031] The first horizontal bar 4 and the second horizontal bar 5 connect and support the first column 1, the second column 2, and the third column 3 to form a vertical triangular prism cage-like operating platform. The corrugated steel sheets can be lifted and hoisted using the fixed pulley 6 installed on the upper part of the operating platform. Thus, multiple construction workers can stand at various heights on the operating platform via the first horizontal bar 4 to hoist and install the corrugated steel sheets for the side walls of the corrugated steel shed. This meets the needs of multi-person high-altitude operations when installing the side walls of large corrugated steel sheds, solving the problems associated with traditional lifting platforms and mobile [equipment / mechanical systems]. The problem of scaffolding being unable to meet the needs of multiple people working at height due to the height of large color steel sheds can be effectively solved by improving the efficiency of installing color steel tiles on the side walls of the color steel shed. By making the planes of the second column 2 and the third column 3 parallel to the plane of the side wall of the color steel shed, and by setting the second column 2 and the third column 3 at intervals with the side wall of the color steel shed, it is convenient for construction workers to hoist and install color steel tiles in the gap between the operating platform and the side wall of the color steel shed. In addition, the operating platform has a simple structure, is easy to manufacture and assemble, and can be welded from steel bars or steel pipes, saving time and effort in processing and making materials readily available.

[0032] In this embodiment, a top locking member 7 is respectively fitted at the connection points of the first column 1, the second column 2, and the third column 3 with at least one set of first horizontal bars 4 that are higher than the side wall of the color steel shed. The other end of the top locking member 7 is connected to the top horizontal beam 100 of the color steel shed. Specifically, the top locking member 7 includes a safety rope fixing device 71, a safety rope 72, and an anti-detachment ring 73. Each safety rope fixing device 71 is respectively fitted at the connection points of the first column 1, the second column 2, and the third column 3 with one or more sets of first horizontal bars 4 that are higher than the side wall of the color steel shed. A safety rope 72 is provided on the safety rope fixing device 71. Thus, by using three sets of safety ropes 72 and safety rope fasteners 71 to pull the first column 1, the second column 2, and the third column 3 respectively, the upper part of the operating platform can be fixed to the top beam 100 of the color steel shed through the top locking device 7; wherein, the safety rope 72 is tied to the top beam 100 of the color steel shed, and the end of the safety rope 72 is connected to an anti-detachment ring 73, which can prevent the safety rope 72 from loosening and detaching from the top beam 100.

[0033] In this embodiment, several sets of first horizontal bars 4 located within the height range of the side wall of the color steel shed are symmetrically equipped with central locking members 8. One end of the central locking member 8 is located on the side of the first horizontal bar 4 adjacent to the second column 2 and the third column 3, respectively, and the other end of the central locking member 8 is connected to the side wall beam 200 of the color steel shed. Specifically, the central locking member 8 includes a U-shaped buckle 81 and a connecting rope 82. The U-shaped buckle 81 is fixedly fastened to the side wall beam 200 of the color steel shed, and one end of the connecting rope 82 is fixedly connected to the U-shaped buckle 81. The other end of the connecting rope 82 is tied to the first horizontal bar 4. In this way, by pulling multiple positions in the middle of the second column 2 and the third column 3 through several central locking members 8, multiple middle and lower positions of this operating platform can be pulled and fixed to the side wall beam 200 of the color steel shed through the central locking members 8.

[0034] When hoisting and installing the corrugated steel roof panels on the side walls of the corrugated steel shed, each worker stands with both feet on the first horizontal bar 4 or the second horizontal bar 5 at different heights, with their safety belts attached to the appropriate height of the first horizontal bar 4 or the second horizontal bar 5. They can also lean against the first upright 1 to ensure their safety without affecting the construction. In this embodiment, the upper, middle, and lower parts of the operating platform are secured by a top locking component 7 and a middle locking component 8, effectively ensuring the stability of the operating platform during hoisting and installing the corrugated steel roof panels. This effectively prevents the operating platform from overturning and protects the personal safety of the workers. Furthermore, the multiple sets of first horizontal bars 4 and second horizontal bars 5 connecting the first upright 1, the second upright 2, and the third upright 3 ensure a stable operating platform structure with good load-bearing capacity, and facilitates the attachment of safety belts by workers, effectively preventing falls from heights.

[0035] In some embodiments, the line connecting the centers of the first column 1, the second column 2, and the third column 3 projected onto the water surface forms an isosceles triangle, and the line connecting the centers of the second column 2 and the third column 3 is parallel to the plane of the side wall of the corrugated steel shed. This arrangement of the first column 1, the second column 2, and the third column 3 as an isosceles triangle, specifically, with the second column 2 and the third column 3, which are the two endpoints of the base of this isosceles triangle, positioned close to the side wall of the corrugated steel shed, and the plane containing the second column 2 and the third column 3 being parallel to the plane of the side wall of the corrugated steel shed, further enhances the structural strength of the operating platform, thereby improving its stability during the hoisting and installation of the corrugated steel tiles.

[0036] In some embodiments, the safety rope 72 of the top locking member 7, which is fitted onto the second column 2 and the third column 3, is collinear with the projection of the corresponding first crossbar 4 on the horizontal plane, such as... Figure 4 As shown, the projections of the two sets of first crossbars 4 and safety ropes 72 on the second column 2 and the third column 3 and the tied top crossbeam 100 on the horizontal plane form an isosceles triangle. This can further improve the stability of the operating platform during the hoisting and installation of color steel tiles and effectively prevent the operating platform from tilting backward or to the left or right.

[0037] In some embodiments, the horizontal distance between the U-shaped buckles 81 of the two central locking members 8 adjacent to the second column 2 and the third column 3 is at least greater than the width of a single corrugated steel sheet. This ensures that the distance between the U-shaped buckles 81 of the central locking members 8 on both sides and the connecting rope 82 will not obstruct the upward hoisting of the corrugated steel sheet. In specific applications, the corrugated steel sheet is sometimes tilted when hoisting. Therefore, the horizontal distance between the U-shaped buckles 81 of the two central locking members 8 adjacent to the second column 2 and the third column 3 should also be greater than the width of a single corrugated steel sheet when it is tilted during hoisting, in order to facilitate the upward hoisting operation of the corrugated steel sheet.

[0038] In some implementations, the height of each set of first horizontal bars 4 between the first column 1 and the second column 2 and the third column 3 is equal, and each set of first horizontal bars 4 is staggered with the corresponding second horizontal bar 5. In this way, while ensuring that the spacing between adjacent sets of first horizontal bars 4 and adjacent second horizontal bars 5 in the height direction of the operating platform does not affect the construction operation, the staggered arrangement of the first horizontal bars 4 and second horizontal bars 5 compensates for the problem of excessive height spacing of horizontal bars on the same side, thereby facilitating the up and down movement of construction personnel on the operating platform.

[0039] Finally, it should be noted that although embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention. Those skilled in the art can make changes, modifications, substitutions and variations to the above embodiments within the scope of the present invention, all of which should be included within the protection scope of this application.

Claims

1. A hoisting operation bench for large color steel shed color steel tiles, characterized by: The utility model relates to a kind of steel shed support structure, including first column (1), second column (2), third column (3), first crossbar (4), second crossbar (5), fixed pulley (6), top locking part (7), middle locking part (8); The first column (1), the second column (2), the third column (3) are vertically arranged in a triangular shape, the plane where the second column (2) and the third column (3) are located is parallel to the plane of the side wall of the color steel shed, and the second column (2) and the third column (3) are arranged at intervals with the side wall of the color steel shed. A plurality of first crossbars (4) are fixedly installed in horizontal array between the first column (1) and the second column (2) and the third column (3), respectively, a second crossbar (5) is fixedly installed in horizontal array between the second column (2) and the third column (3), and a fixed pulley (6) is fixedly arranged on one second crossbar (5) located higher than the side wall of the color steel shed. The connection between the first column (1), the second column (2), the third column (3) and at least one group of first crossbars (4) higher than the side wall of the color steel shed is respectively sleeved with one top locking part (7), the other end of the top locking part (7) is connected with the top crossbeam (100) of the color steel shed, a plurality of groups of first crossbars (4) located within the height range of the side wall of the color steel shed are symmetrically provided with middle locking parts (8), one end of the middle locking part (8) is arranged on one side of the first crossbar (4) adjacent to the second column (2) and the third column (3), respectively, and the other end of the middle locking part (8) is connected with the side wall crossbeam (200) of the color steel shed.

2. The hoisting operation bench for large color steel shed color steel tile according to claim 1, characterized in that: The top locking part (7) includes a safety rope fixer (71), a safety rope (72) and an anti-dropping ring (73), each safety rope fixer (71) is sleeved at the connection between the first column (1), the second column (2), the third column (3) and one group of first crossbars (4) higher than the side wall of the color steel shed, the safety rope fixer (71) is provided with the safety rope (72), the safety rope (72) is tied on the top crossbeam (100) of the color steel shed, and the end of the safety rope (72) is connected with the anti-dropping ring (73).

3. The hoisting operation bench for large color steel shed color steel tile according to claim 2, characterized in that: The safety rope (72) of the top locking part (7) sleeved on the second column (2) and the third column (3) is collinear with the projection of the corresponding first crossbar (4) on the horizontal plane.

4. The hoisting operation bench for large color steel shed color steel tile according to claim 1, characterized in that: The middle locking part (8) includes a U-shaped buckle (81) and a connecting rope (82), the U-shaped buckle (81) is fixedly clamped on the side wall crossbeam (200) of the color steel shed, one end of the connecting rope (82) is fixedly connected to the U-shaped buckle (81), and the other end of the connecting rope (82) is tied on the first crossbar (4).

5. The hoisting operation bench for large color steel shed color steel tile according to claim 4, characterized in that: The horizontal distance between the U-shaped buckles (81) of the two middle locking parts (8) adjacent to the second column (2) and the third column (3) is at least greater than the width of a single color steel tile.

6. The hoisting operation bench for large color steel shed color steel tile according to claim 1, characterized in that: The projection of the centers of the first column (1), the second column (2) and the third column (3) on the water surface is an isosceles triangle, and the center line of the second column (2) and the third column (3) is parallel to the plane of the side wall of the color steel shed.

7. The hoisting operation bench for large color steel shed color steel tile according to claim 1, characterized in that: Each group of first crossbars (4) between the first upright (1) and the second upright (2), third upright (3) is respectively equal in height, each group of first crossbars (4) and the corresponding second crossbar (5) are staggered arrangement.