Preparation tank for producing green copper preparation
By designing a combination of a multi-chamber preparation tank and a mixing shaft, the problems of time-consuming and inaccurate operation caused by the step-by-step dissolution of copper sulfate and lime in the Bordeaux mixture preparation process were solved, and an efficient and accurate preparation process was achieved.
Patent Information
- Application Number
- CN202520409644.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-11
- Publication Date
- 2026-01-20
- Estimated Expiration
- 2035-03-11
AI Technical Summary
In the existing technology, the preparation process of Bordeaux mixture requires dissolving copper sulfate crystals and lime in steps, which makes the operation time-consuming and labor-intensive and prone to inaccurate proportions.
A mixing tank containing multiple chambers and a mixing shaft has been designed to simultaneously dissolve copper sulfate and lime. The dissolution process is made efficient and accurate through a temperature controller and a water level monitoring device, including a heating element and a water level monitoring device to control the dissolution conditions.
This method enables the simultaneous dissolution of copper sulfate and lime, improving the convenience and accuracy of preparation and ensuring the quality and efficiency of Bordeaux mixture.
Smart Images

Figure CN223810990U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to green copper preparation production technical field especially relates to a kind of preparation tank for green copper preparation production. BACKGROUND
[0002] Green copper preparation is a kind of environmental protection type chemical preparation with copper as main active ingredient, in the field of agriculture and horticulture, copper preparation is widely used as an important fungicide to prevent and cure plant diseases.
[0003] Bordeaux solution as a kind of classic copper preparation, because of its simple preparation, low cost and remarkable effect, is favored. It is mainly mixed by lime milk and copper sulfate solution according to specific proportion, presents sky blue, has good adhesion and rainwater washability, can effectively prevent and cure downy mildew, anthracnose and other various fungal plant diseases. When preparing Bordeaux solution, copper sulfate crystal needs to be dissolved in water to form copper sulfate solution using a container first, then lime and water are reacted to generate lime milk in another container separately, after completing the two dissolution steps, pour them into water in specific proportion to mix, and Bordeaux solution can be obtained, however, since two dissolution steps need to be carried out separately, it leads to time-consuming and laborious operation, and it is easy to lead to inaccurate proportioning due to improper operation and other factors, and then reduce the accuracy and efficiency of preparation.
[0004] Therefore, a kind of high-efficiency preparation preparation tank for green copper preparation production is needed. UTILITY MODEL CONTENT
[0005] In order to overcome the shortcomings that the existing technology in the preparation of Bordeaux solution, since two dissolution steps of copper sulfate crystal and lime need to be carried out separately, it leads to time-consuming and laborious operation, and it is easy to lead to inaccurate proportioning due to improper operation and other factors, and then reduce the accuracy and efficiency of preparation, the utility model provides a kind of high-efficiency preparation preparation tank for green copper preparation production.
[0006] The utility model discloses a technical scheme is: a kind of preparation tank for green copper preparation production, including preparation tank body, sealing cover, water inlet pipe, solenoid valve, plug rod, discharge pipe, first valve and connecting pipe, preparation tank body top is covered with sealing cover, sealing cover left upper portion is provided with first feed inlet, sealing cover right upper portion is provided with second feed inlet, sealing cover front portion is connected and is communicated with water inlet pipe, water inlet pipe is tee pipe, solenoid valve is provided in water inlet pipe middle part, two plug rods are slidably arranged in sealing cover rear portion, the discharge pipe is connected and is communicated with the central position of preparation tank body bottom, and first valve is arranged in discharge pipe lower end, and connecting pipe is connected and is communicated with the lower position of preparation tank body right side middle part, further including motor, belt pulley group, mixing shaft, first chamber, second chamber and third chamber, motor is installed in the right position of sealing cover middle part, two mixing shafts are rotatably arranged in the horizontal central position of sealing cover, and two mixing shafts are longitudinally through preparation tank body, the output shaft of motor is connected with the mixing shaft of the right position of sealing cover middle part by coupling, and belt pulley group is jointly arranged on the upper end of two mixing shafts, the left upper portion of preparation tank body is first chamber, and the right upper portion of preparation tank body is second chamber, and water inlet pipe left end extends into first chamber, and water inlet pipe right end extends into second chamber, and the lower portion of preparation tank body is third chamber.
[0007] Further, it further includes control box, heating pipe and temperature controller, the right side of second chamber is fixedly connected with control box, and a plurality of heating pipes are connected on control box, and temperature controller is arranged on the right side of preparation tank body, and temperature controller is electrically connected with control box.
[0008] Further, it further includes water level detection pipe, second valve and scale, and water level detection pipe is connected and communicated with the front side of the lower portion of preparation tank body, water level detection pipe is made of transparent material, second valve is arranged on the end of water level detection pipe close to preparation tank body, and scale is clamped on the right side of water level detection pipe.
[0009] Further, it further includes observation window, and observation window is embeddedly arranged on the front side of the lower portion of preparation tank body.
[0010] Further, it further includes connecting plate, and connecting plate is slidably arranged on the upper end of two plug rods.
[0011] Further, it further includes protective sleeve, and protective sleeve is sleeved on the outside of heating pipe.
[0012] Compared with prior art, the utility model provides a kind of preparation tank for green copper preparation production, with the following beneficial effects: 1, by the setting of first chamber, second chamber, third chamber and mixing shaft etc., can simultaneously dissolve two kinds of substances of lime and copper sulfate in preparation tank body, need not to dissolve separately, improve the convenience and accuracy of preparation, to realize efficient preparation.
[0013] 2, through the temperature controller open heating pipe, and control the temperature of heating pipe heating, copper sulfate crystal and water are heated, so as to ensure that the copper sulfate crystal can be fully and quickly dissolved in water, improve the quality of bordeaux mixture.
[0014] 3, with the third chamber water level rises, the water level detection pipe in the water level will change accordingly, by observing the scale, the third chamber can accurately solve the water quantity, so as to facilitate the control of water quantity, improve the accuracy of preparation. BRIEF DESCRIPTION OF DRAWINGS
[0015] Figure 1 It is the three-dimensional structure schematic diagram of the utility model.
[0016] Figure 2 It is the three-dimensional structure schematic diagram of the utility model preparation tank body, sealing cover and motor.
[0017] Figure 3 It is the three-dimensional structure schematic diagram of the utility model first chamber, second chamber and third chamber.
[0018] Figure 4 It is the three-dimensional structure schematic diagram of the utility model control box, heating pipe and temperature controller.
[0019] Figure 5 It is the three-dimensional structure schematic diagram of the utility model heating pipe and protective sleeve.
[0020] Figure 6 It is the three-dimensional structure schematic diagram of the utility model water level detection pipe, valve and scale.
[0021] In the drawing mark: 1 preparation tank body, 2 sealing cover, 3 first inlet, 301 inlet pipe, 302 electromagnetic valve, 4 second inlet, 5 motor, 6 belt pulley group, 7 plug rod, 8 mixing shaft, 9 discharge pipe, 901 first valve, 902 connecting pipe, 10 first chamber, 11 second chamber, 12 third chamber, 13 control box, 14 heating pipe, 15 temperature controller, 16 water level detection pipe, 17 second valve, 18 scale, 19 observation window, 20 connecting plate, 21 protective sleeve. DETAILED DESCRIPTION
[0022] The utility model will be specifically introduced in combination with the drawings and specific embodiment.
[0023] Embodiment 1: a kind of preparation tank for green copper preparation production, please refer to Figures 1-4, including a preparation tank body 1, a sealing cover 2, a water inlet pipe 301, a solenoid valve 302, a plug rod 7, a discharge pipe 9, a first valve 901 and a connecting pipe 902, the top of the preparation tank body 1 is covered with the sealing cover 2, the upper left part of the sealing cover 2 is provided with a first feeding port 3, the upper right part of the sealing cover 2 is provided with a second feeding port 4, the front part of the sealing cover 2 is connected and communicated with the water inlet pipe 301, the water inlet pipe 301 is a three-way pipe, the middle part of the water inlet pipe 301 is provided with the solenoid valve 302, the rear part of the sealing cover 2 is slidably provided with two plug rods 7, the bottom center of the preparation tank body 1 is connected and communicated with the discharge pipe 9, the lower end of the discharge pipe 9 is provided with the first valve 901, the right middle part of the preparation tank body 1 is connected and communicated with the connecting pipe 902, the middle right part of the sealing cover 2 is installed with a motor 5, the transverse central part of the sealing cover 2 is rotatably provided with two mixing shafts 8, both of the mixing shafts 8 longitudinally penetrate the preparation tank body 1, the output shaft of the motor 5 is connected with the mixing shaft 8 in the middle right part of the sealing cover 2 through a shaft coupling, and both plug rods are pulled at the same time, so that the operation convenience is improved, the upper ends of the two mixing shafts 8 are commonly sleeved with a belt pulley set 6, the upper left part of the preparation tank body 1 is a first chamber 10, the upper right part of the preparation tank body 1 is a second chamber 11, the left end of the water inlet pipe 301 extends into the first chamber 10, the right end of the water inlet pipe 301 extends into the second chamber 11, the lower part of the preparation tank body 1 is a third chamber 12, the lower part of the preparation tank body 1 is embeddedly provided with an observation window 19 at the front side, the preparation situation of the green copper preparation can be observed through the observation window 19, the upper ends of the two plug rods 7 are commonly slidably provided with a connecting plate 20, so that both plug rods 7 can be pulled at the same time, and the operation convenience is improved.
[0024] When it is necessary to prepare green copper preparation, first, lime is poured into the first chamber 10 from the first feeding port 3, and an equal proportion of copper sulfate crystals is poured into the second chamber 11 from the second feeding port 4, and the addition amounts of the two materials are ensured to meet the predetermined proportioning requirements, after pouring, the external water pipe is connected with the water inlet pipe 301, after ensuring the tight connection, the electromagnetic valve 302 is started, and an appropriate amount of water is injected into the first chamber 10 and the second chamber 11 respectively, and the water injection amount needs to be accurately controlled according to the dissolution requirements of lime and copper sulfate, so as to avoid excess or deficiency, after the injection is completed, the motor 5 is started, the output shaft of the motor 5 rotates to drive the right mixing shaft 8 to rotate, the left mixing shaft 8 is driven to rotate through the belt pulley, and the two mixing shafts 8 rotate at the same time to fully stir the materials in the first chamber 10 and the second chamber 11, in this process, it is ensured that the lime is completely digested into lime milk and the copper sulfate crystals are completely dissolved into copper sulfate solution, after the dissolution is completed, the motor 5 is closed to stop stirring, the external water pipe is connected with the connecting pipe 902, and water is injected into the third chamber 12, when the water reaches a certain proportion with the lime and the copper sulfate, the injection is stopped, then the two plug rods 7 are pulled upward to open the outlets at the bottoms of the first chamber 10 and the second chamber 11, so that the dissolved lime milk and copper sulfate solution flow into the third chamber 12, then the motor 5 is started again, the two mixing shafts 8 rotate to stir the liquid in the third chamber 12 until the lime milk and the copper sulfate solution are completely mixed and uniform to form the sky blue bordeaux liquid, through the above operation, the two substances can be dissolved at the same time without separate dissolution, the convenience and accuracy of preparation are improved, so as to realize efficient preparation, after the preparation is completed, the first valve 901 is rotated to enable the bordeaux liquid to be discharged from the discharge pipe 9, after the discharge is completed, the first valve 901 is closed, and the inside of the equipment is washed with clean water to ensure that there is no residual material.
[0025] Example 2: Based on example 1, please refer to Figure 1 、 Figure 4 and Figure 5 , the control box 13 is fixedly connected to the right side of the second chamber 11, three heating pipes 14 are connected to the control box 13, the temperature controller 15 is arranged on the right side of the preparation tank body 1, the model of the temperature controller 15 is Honeywell T87 series, the temperature controller 15 is electrically connected with the control box 13, and the temperature controller 15 is used for monitoring and adjusting the temperature in the second chamber 11 in real time. The protection sleeve 21 is arranged on the outside of the heating pipe 14, and the protection sleeve 21 protects the heating pipe 14 to avoid direct contact between the heating pipe 14 and the copper sulfate solution, so that the heating pipe 14 is not damaged due to corrosion.
[0026] When the copper sulfate crystals are dissolved, the heating pipe 14 is started through the temperature controller 15, and the temperature of the heating pipe 14 is controlled to heat the copper sulfate crystals and water, so that the copper sulfate crystals can be fully and quickly dissolved in water, and the quality of the bordeaux liquid is improved.
[0027] Please refer to Figure 1 and Figure 6 The water level detection pipe 16 is connected and communicated with the lower front side of the preparation tank body 1, the water level detection pipe 16 is made of transparent material, the water level detection pipe 16 is provided with a second valve 17 near one end of the preparation tank body 1, the dissolved lime milk and copper sulfate solution flow into the third chamber 12, the second valve 17 is turned to close the water level detection pipe 16, the two liquids are prevented from entering the water level detection pipe 16, and the scale 18 is clamped on the right side of the water level detection pipe 16.
[0028] In the process of adding water into the third chamber 12, under the action of water pressure, the water in the third chamber 12 enters the water level detection pipe 16, along with the rising of the water level in the third chamber 12, the water level in the water level detection pipe 16 also changes correspondingly, the water quantity in the third chamber 12 can be accurately solved through the observation of the scale on the scale 18, so that the water quantity is conveniently controlled, and the preparation accuracy is improved.
[0029] The above only describes the preferred embodiment of the utility model, and does not limit the utility model, and any modification, equivalent replacement, improvement, etc. within the spirit and principle of the utility model should be included in the protection scope of the utility model.
Claims
1. A preparation tank for green copper preparation production, comprising a preparation tank body (1), a sealing cover (2), a water inlet pipe (301), a solenoid valve (302), a plug rod (7), a discharge pipe (9), a first valve (901) and a connecting pipe (902), the top of the preparation tank body (1) is covered with the sealing cover (2), the upper left part of the sealing cover (2) is provided with a first feeding port (3), the upper right part of the sealing cover (2) is provided with a second feeding port (4), the front part of the sealing cover (2) is connected and communicated with the water inlet pipe (301), the water inlet pipe (301) is a three-way pipe, the middle part of the water inlet pipe (301) is provided with the solenoid valve (302), the rear part of the sealing cover (2) is slidably provided with two plug rods (7), the bottom center of the preparation tank body (1) is connected and communicated with the discharge pipe (9), the lower end of the discharge pipe (9) is provided with the first valve (901), the right middle lower part of the preparation tank body (1) is connected and communicated with the connecting pipe (902), characterized in that: It also includes motor (5), pulley set (6), mixing shaft (8), first chamber (10), second chamber (11) and third chamber (12), the motor (5) is installed in the right part of the middle of the sealing cover (2), the sealing cover (2) is rotatably provided with two mixing shafts (8) in the transverse central position, the two mixing shafts (8) are longitudinally through the preparation tank body (1), the output shaft of the motor (5) is connected with the mixing shaft (8) in the right part of the middle of the sealing cover (2) through the shaft coupling, the upper ends of the two mixing shafts (8) are commonly sleeved with the pulley set (6), the upper left part of the preparation tank body (1) is the first chamber (10), the upper right part of the preparation tank body (1) is the second chamber (11), the left end of the water inlet pipe (301) extends into the first chamber (10), the right end of the water inlet pipe (301) extends into the second chamber (11), the lower part of the preparation tank body (1) is the third chamber (12).
2. A compounding tank for green copper preparation production according to claim 1, characterized in that: It also includes control box (13), heating pipe (14) and temperature controller (15), the control box (13) is fixedly connected to the right side of the second chamber (11), a plurality of heating pipes (14) are connected to the control box (13), the temperature controller (15) is arranged on the right side of the preparation tank body (1), and the temperature controller (15) is electrically connected with the control box (13).
3. The formulation tank for green copper preparation production according to claim 1, characterized in that: It also includes water level detection pipe (16), second valve (17) and scale (18), the water level detection pipe (16) is connected and communicated to the front side of the lower part of the preparation tank body (1), the water level detection pipe (16) is made of transparent material, the second valve (17) is arranged on the end of the water level detection pipe (16) close to the preparation tank body (1), and the scale (18) is clamped on the right side of the water level detection pipe (16).
4. The compounding tank for green copper preparation production according to claim 1, characterized in that: It also includes observation window (19), and the observation window (19) is embeddedly arranged on the front side of the lower part of the preparation tank body (1).
5. The compounding tank for green copper preparation production according to claim 1, characterized in that: It also includes connecting plate (20), and the connecting plate (20) is slidably arranged on the upper ends of the two plug rods (7).
6. The compounding tank for green copper preparation production according to claim 1, characterized in that: It also includes protective sleeve (21), and the protective sleeve (21) is sleeved on the outside of the heating pipe (14).