Building construction protective shed
By designing a combined structure of high-strength steel plates and metal inserts, the problem of inconvenient disassembly of existing protective sheds has been solved, achieving waterproof protection of construction materials and convenient operation.
Patent Information
- Application Number
- CN202520191968.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-07
- Publication Date
- 2026-01-27
- Estimated Expiration
- 2035-02-07
AI Technical Summary
Existing construction safety sheds are of a single length and are inconvenient to dismantle, resulting in inconvenience in use and low practicality.
Two high-strength steel plates are used, which are fixed to the ground by rectangular grooves and metal inserts. Combined with steel plate components and support columns, protective canopy panels are installed to protect construction materials and are easy to disassemble.
It achieves effective waterproof protection for construction materials, facilitating flexible use and operation on the construction site.
Smart Images

Figure CN223838638U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the technical field of protective sheds for building construction, and in particular to a protective shed for building construction. Background Technology
[0002] Building construction refers to the production activities during the implementation phase of an engineering project. It is the process of building various types of structures, or the process of turning the lines on design drawings into a physical object at a designated location. It includes foundation construction, main structure construction, roofing construction, and decoration construction.
[0003] Currently, various construction materials are piled up on construction sites. Some of these materials need to be covered and protected to prevent quality problems caused by long-term exposure to the air. However, most of the storage warehouses on construction sites are temporary buildings. After a large amount of materials are piled up, the existing protective sheds are of limited length and are inconvenient to install and dismantle, resulting in inconvenience and low practicality. Therefore, those skilled in the art have provided a construction protective shed to solve the problems mentioned in the background art. Utility Model Content
[0004] To address the problems mentioned in the background art, this application provides a construction protective shed.
[0005] The technical solution for a construction protective shed provided in this application is as follows:
[0006] A construction protective shed includes two high-strength steel plates arranged horizontally. A rectangular groove is formed on one side of each high-strength steel plate, and a connecting plate is fixedly installed on the other side of each high-strength steel plate. Several metal inserts are fixedly installed at the lower end of the connecting plate and are arranged horizontally at equal intervals. Several steel plate components are arranged between the two high-strength steel plates, and a support column is fixedly installed near the middle position at the lower end of each steel plate component.
[0007] Preferably, the lower end of the steel plate is fixedly installed with limit blocks near both sides, and the limit blocks are cuboid in shape.
[0008] Preferably, the rectangular groove has a reserved square hole inside, and the limiting block is inserted and matched with the reserved square hole.
[0009] Preferably, a protective canopy is provided above the two high-strength steel plates, and horizontal connecting feet are fixedly installed on both sides of the protective canopy.
[0010] Preferably, a fixing bolt passes through the upper end of the horizontal connecting foot, and a reserved threaded hole is opened at the upper end of the high-strength steel plate.
[0011] Preferably, the fixing bolt is threadedly connected to the reserved threaded hole.
[0012] In summary, this application includes the following beneficial technical effects: by setting two high-strength steel plates, after inserting the metal plug at the lower end of the connecting plate into the ground, the two high-strength steel plates are positioned, and then multiple steel plate components are installed. After the multiple steel plate components are installed, construction materials can be placed on the top of the steel plate components to provide waterproof protection for the construction materials. Finally, the protective canopy is installed. This protective canopy is easy to disassemble, suitable for different construction sites, and easy to operate. Attached Figure Description
[0013] Figure 1 This is a schematic diagram of the overall structure of a construction protective shed according to an embodiment of this application;
[0014] Figure 2 This is a schematic diagram of a high-strength steel plate structure for a construction protective shed, as described in an embodiment of this application.
[0015] Figure 3 This is a schematic diagram of the steel plate structure of a construction protective shed according to an embodiment of this application;
[0016] Figure 4 This is a schematic diagram of the protective canopy structure of a construction protective canopy according to an embodiment of this application.
[0017] Explanation of reference numerals in the attached drawings: 1. High-strength steel plate; 2. Rectangular groove; 3. Connecting plate; 4. Metal insert; 5. Protective canopy panel; 6. Reserved threaded hole; 7. Steel plate component; 8. Support column; 9. Limiting block; 10. Reserved square hole; 11. Horizontal connecting foot; 12. Fixing bolt. Detailed Implementation
[0018] To make the technical means, creative features, objectives and effects of this utility model easier to understand, the present utility model will be further described below in conjunction with specific embodiments.
[0019] like Figures 1-4 As shown, a construction protective shed includes two high-strength steel plates 1, which are arranged horizontally. A rectangular groove 2 is opened on one side of the high-strength steel plate 1, and a connecting plate 3 is fixedly installed on the other side of the high-strength steel plate 1. Several metal plugs 4 are fixedly installed at the lower end of the connecting plate 3, and the several metal plugs 4 are arranged horizontally and equidistantly. Several steel plate components 7 are arranged between the two high-strength steel plates 1, and a support column 8 is fixedly installed at the lower end of the steel plate component 7 near the middle position.
[0020] After inserting the metal insert 4 at the lower end of the connecting plate 3 into the ground by setting two high-strength steel plates 1, the two high-strength steel plates 1 are positioned, and then multiple steel plate parts 7 are installed. After installing multiple steel plate parts 7, construction materials can be placed on the top of the steel plate parts 7 to provide waterproof protection for the construction materials. Finally, the protective canopy 5 is installed. This protective canopy is easy to disassemble, suitable for different construction sites, and easy to operate.
[0021] In this embodiment, limit blocks 9 are fixedly installed on both sides of the lower end of the steel plate 7, and the shape of the limit blocks 9 is cuboid.
[0022] In this embodiment, a reserved square hole 10 is provided inside the rectangular groove 2, and the limiting block 9 is inserted and matched with the reserved square hole 10.
[0023] In this embodiment, a protective canopy 5 is provided above the two high-strength steel plates 1, and horizontal connecting feet 11 are fixedly installed on both sides of the protective canopy 5.
[0024] In this embodiment, a fixing bolt 12 passes through the upper end of the horizontal connecting foot 11, and a reserved threaded hole 6 is opened at the upper end of the high-strength steel plate 1.
[0025] In this embodiment, the fixing bolt 12 is threadedly connected to the reserved threaded hole 6.
[0026] The implementation principle of a construction protective shed according to an embodiment of this application is as follows: After inserting the metal plug 4 at the lower end of the connecting plate 3 into the ground through two high-strength steel plates 1, the two high-strength steel plates 1 are positioned, and then multiple steel plate components 7 are installed. After the multiple steel plate components 7 are installed, construction materials can be placed on the upper part of the steel plate components 7 to provide waterproof protection for the construction materials. Finally, the protective shed board 5 is installed. This protective shed is easy to disassemble, suitable for different construction sites, and easy to operate.
[0027] Finally, the following points should be noted: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installation", "connection", and "linkage" should be interpreted broadly, and can be mechanical or electrical connections, or internal connections between two components, or direct connections. "Up", "down", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may change.
[0028] Secondly: The accompanying drawings of the embodiments disclosed in this utility model only involve the structures involved in the embodiments disclosed in this utility model. Other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of this utility model can be combined with each other.
[0029] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.
Claims
1. A construction safety shed, characterized in that: It includes two high-strength steel plates (1), which are arranged horizontally. A rectangular groove (2) is provided on one side of each high-strength steel plate (1), and a connecting plate (3) is fixedly installed on the other side of each high-strength steel plate (1). Several metal plugs (4) are fixedly installed at the lower end of the connecting plate (3), and the several metal plugs (4) are arranged horizontally at equal intervals. Several steel plate parts (7) are arranged between the two high-strength steel plates (1), and a support column (8) is fixedly installed at the lower end of each steel plate part (7) near the middle position.
2. The construction protective shed according to claim 1, characterized in that: The lower end of the steel plate (7) is fixedly installed with limit blocks (9) near both sides, and the limit blocks (9) are cuboid in shape.
3. A construction protective shed according to claim 2, characterized in that: The rectangular groove (2) has a reserved square hole (10) inside, and the limiting block (9) is inserted and matched with the reserved square hole (10).
4. A construction protective shed according to claim 1, characterized in that: A protective canopy (5) is provided above the two high-strength steel plates (1), and horizontal connecting feet (11) are fixedly installed on both sides of the protective canopy (5).
5. A construction protective shed according to claim 4, characterized in that: The upper end of the horizontal connecting foot (11) is provided with a fixing bolt (12), and the upper end of the high-strength steel plate (1) is provided with a reserved threaded hole (6).
6. A construction protective shed according to claim 5, characterized in that: The fixing bolt (12) is threadedly connected to the reserved threaded hole (6).