Road construction crack treatment device

By incorporating components such as a storage box, delivery pump, cover plate, electromagnet, traction rope, and return spring, the problem of easy deformation of the delivery pipeline nozzles was solved, achieving protection and safeguarding during transportation and improving the durability and safety of the device.

CN223853130UActive Publication Date: 2026-01-30郑州修远建设工程有限公司
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202520366544.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-03-04
Publication Date
2026-01-30
Estimated Expiration
2035-03-04

AI Technical Summary

Technical Problem

Existing highway construction crack treatment devices are prone to deformation and damage during transportation due to collisions after the cracks are filled, and the delivery pipe nozzles are difficult to protect.

Method used

A highway construction crack treatment device was designed, comprising a storage box, a delivery pump, a delivery pipeline, a cover plate, an electromagnet, a traction rope, a return spring, and a protective frame. The protective frame is moved upward by a fixed rod to separate the nozzle. After treatment, the return spring moves the fixed rod downward to cover the nozzle with the protective frame to prevent collision and deformation. The cover plate is flipped over by the traction rope to close the feed channel and prevent debris from entering.

Benefits of technology

It effectively protects the nozzles of the delivery pipeline from collision and deformation during transportation, while preventing debris from entering the storage box during transportation, thus improving the durability and transportation safety of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223853130U_ABST
    Figure CN223853130U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of highway construction, and discloses a highway construction crack treatment device which comprises a storage box, the middle of the upper end of the storage box is communicated with a feeding channel, a conveying pump is fixedly installed in the middle of one side of the storage box, the discharging end of the conveying pump is communicated with a conveying pipeline, and a cover plate is arranged at the upper end of the feeding channel. According to the technical scheme, the fixing rod can be driven to move downwards and reset by means of the rebound resilience of the spring and the reset spring, and the protection frame on the fixing rod moves along with the fixing rod, so that the protection frame covers the spray head below the conveying pipeline, and the spray head of the conveying pipeline is protected; the situation that the conveying pipeline spray head is collided and deformed in the pushing and transporting process is avoided, the fixing rod can drive the cover plate to turn over rightwards through the traction rope in the downward moving process, then the feeding channel is covered, and the situation that outside sundries enter the storage box in the transporting process is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of highway construction, concretely to a highway construction crack processing device. BACKGROUND

[0002] Highway construction refers to the process of constructing, building, improving or expanding highways and road networks, and some cracks are inevitably generated in the use process of highways, and the highway cracks refer to the cracks or fractures in the road surface or structure, which can be gradually formed in the use process of the road.

[0003] Through the retrieval announcement No. (CN221398615U), a kind of highway construction crack processing device, including base, the top of the base is fixedly connected with storage barrel, the top of the base is fixedly connected with support, the tail end of the support is fixedly connected with hydraulic telescopic rod, the telescopic end of the hydraulic telescopic rod is provided with filling mechanism;The filling mechanism includes cylinder, the bottom of the cylinder is fixedly connected with several groups of conveying pipeline, the bottom of the conveying pipeline is fixedly connected with spray head, the inner wall of the conveying pipeline is fixedly connected with baffle, the inner wall of the baffle is penetrated and slidably connected with sliding rod, the outer wall of the sliding rod is fixedly connected with moving plate.

[0004] In the implementation of the technical scheme, at least the following defects still exist: although the utility model can fill the cracks, the spray head of the conveying pipeline is not protected after filling, which can easily cause the spray head of the conveying pipeline to be deformed by collision during transportation, and improvement is needed.Therefore, we propose a kind of highway construction crack processing device. UTILITY MODEL CONTENTS

[0005] The utility model aims at providing a kind of highway construction crack processing device, solve the problem raised in background art.

[0006] To achieve the above object, the utility model provides the following technical scheme: a kind of highway construction crack processing device, including storage box, the upper end of the storage box is communicated with feed channel, the middle part of the side of the storage box is fixedly installed with conveying pump, the discharge end of the conveying pump is communicated with conveying pipeline, the upper end of the feed channel is provided with cover plate, the lower end of the side of the cover plate is rotatably installed with hinged seat;

[0007] The lower end of the hinged seat is fixedly connected with the upper end of storage box, the lower end of the conveying pump is movably installed with fixed rod, the lower end of the fixed rod is welded with fixed plate, the side of the fixed plate is welded with protection frame, the upper end of the fixed rod is fixedly connected with traction rope, the other end of the traction rope is fixedly connected with the front side of cover plate around guide wheel.

[0008] By adopting the technical scheme, the fixed rod can drive the protective frame to move upward, and then the protective frame is separated from the nozzle of the conveying pipeline, so that the crack filling treatment is facilitated, and after the treatment is completed, the reset spring drives the fixed rod to move downward and reset by virtue of the spring resilience, the protective frame on the fixed rod moves along, so that the protective frame is covered at the nozzle below the conveying pipeline, thereby protecting the nozzle of the conveying pipeline, avoiding the situation that the nozzle of the conveying pipeline is collided and deformed in the pushing and transporting process, and the cover plate can be turned right by the fixed rod through the traction rope during the downward movement of the fixed rod, thereby covering the feeding channel, avoiding the situation that foreign matters enter the storage box during the transportation process.

[0009] Optionally, the upper end of the fixed rod is sleeved with a reset spring, and the other end of the reset spring is fixedly connected with the storage box.

[0010] By adopting the technical scheme, the fixed rod can drive the protective frame to move upward, and then the protective frame is separated from the nozzle of the conveying pipeline, so that the crack filling treatment is facilitated, and after the treatment is completed, the reset spring drives the fixed rod to move downward and reset by virtue of the spring resilience, the protective frame on the fixed rod moves along, so that the protective frame is covered at the nozzle below the conveying pipeline, thereby protecting the nozzle of the conveying pipeline, avoiding the situation that the nozzle of the conveying pipeline is collided and deformed in the pushing and transporting process, and the cover plate can be turned right by the fixed rod through the traction rope during the downward movement of the fixed rod, thereby covering the feeding channel, avoiding the situation that foreign matters enter the storage box during the transportation process.

[0011] Optionally, the inside of the protective frame is provided with a plurality of channels, and the conveying pipeline corresponds to the channels one by one.

[0012] By adopting the technical scheme, the fixed rod can drive the protective frame to move upward, and then the protective frame is separated from the nozzle of the conveying pipeline, so that the crack filling treatment is facilitated, and after the treatment is completed, the reset spring drives the fixed rod to move downward and reset by virtue of the spring resilience, the protective frame on the fixed rod moves along, so that the protective frame is covered at the nozzle below the conveying pipeline, thereby protecting the nozzle of the conveying pipeline, avoiding the situation that the nozzle of the conveying pipeline is collided and deformed in the pushing and transporting process, and the cover plate can be turned right by the fixed rod through the traction rope during the downward movement of the fixed rod, thereby covering the feeding channel, avoiding the situation that foreign matters enter the storage box during the transportation process.

[0013] Optionally, the upper end of the fixed rod is sleeved with a reset spring, and the other end of the reset spring is fixedly connected with the storage box.

[0014] By adopting the technical scheme, the fixed rod can drive the protective frame to move upward, and then the protective frame is separated from the nozzle of the conveying pipeline, so that the crack filling treatment is facilitated, and after the treatment is completed, the reset spring drives the fixed rod to move downward and reset by virtue of the spring resilience, the protective frame on the fixed rod moves along, so that the protective frame is covered at the nozzle below the conveying pipeline, thereby protecting the nozzle of the conveying pipeline, avoiding the situation that the nozzle of the conveying pipeline is collided and deformed in the pushing and transporting process, and the cover plate can be turned right by the fixed rod through the traction rope during the downward movement of the fixed rod, thereby covering the feeding channel, avoiding the situation that foreign matters enter the storage box during the transportation process.

[0015] Optionally, the feeding end of the conveying pump is in communication with the discharging end of the storage box.

[0016] By adopting the technical scheme, the fixed rod can drive the protective frame to move upward, and then the protective frame is separated from the nozzle of the conveying pipeline, so that the crack filling treatment is facilitated, and after the treatment is completed, the reset spring drives the fixed rod to move downward and reset by virtue of the spring resilience, the protective frame on the fixed rod moves along, so that the protective frame is covered at the nozzle below the conveying pipeline, thereby protecting the nozzle of the conveying pipeline, avoiding the situation that the nozzle of the conveying pipeline is collided and deformed in the pushing and transporting process, and the cover plate can be turned right by the fixed rod through the traction rope during the downward movement of the fixed rod, thereby covering the feeding channel, avoiding the situation that foreign matters enter the storage box during the transportation process.

[0017] Optionally, the size of the cover plate is greater than the size of the upper end opening of the feeding channel, and the lower end of the cover plate is in abutment with the upper end of the feeding channel.

[0018] By adopting the technical scheme, the fixed rod can drive the protective frame to move upward, and then the protective frame is separated from the nozzle of the conveying pipeline, so that the crack filling treatment is facilitated, and after the treatment is completed, the reset spring drives the fixed rod to move downward and reset by virtue of the spring resilience, the protective frame on the fixed rod moves along, so that the protective frame is covered at the nozzle below the conveying pipeline, thereby protecting the nozzle of the conveying pipeline, avoiding the situation that the nozzle of the conveying pipeline is collided and deformed in the pushing and transporting process, and the cover plate can be turned right by the fixed rod through the traction rope during the downward movement of the fixed rod, thereby covering the feeding channel, avoiding the situation that foreign matters enter the storage box during the transportation process.

[0019] Compared with the prior art, the beneficial effects of the technical scheme of the present application are as follows:

[0020] The storage box, the conveying pipeline, the cover plate, the electromagnet, the traction rope, the reset spring and the protection frame are arranged, so that the fixed rod drives the protection frame to move upwards, and then the protection frame is separated from the nozzle of the conveying pipeline, thereby facilitating the filling treatment of the cracks; after the treatment is completed, the reset spring drives the fixed rod to move downwards and reset due to the spring resilience, the protection frame on the fixed rod moves, the protection frame is covered below the nozzle of the conveying pipeline, thereby protecting the nozzle of the conveying pipeline, and the collision and deformation of the nozzle of the conveying pipeline caused by the transportation process are avoided; and the cover plate is turned right due to the downward movement of the fixed rod, thereby covering the feeding channel, and the situation that foreign matters enter the storage box in the transportation process is avoided. BRIEF DESCRIPTION OF DRAWINGS

[0021] Other features, objects and advantages of the present application will become more apparent from the following detailed description of non-limiting embodiments, read in conjunction with the accompanying drawings:

[0022] Fig. 1 It is a whole structure schematic view of the highway construction crack treatment device of the present application;

[0023] Fig. 2 It is a local enlarged structure schematic view of A of the highway construction crack treatment device of the present application;

[0024] Fig. 3 It is a top view structure schematic view of the protection frame of the highway construction crack treatment device of the present application.

[0025] In the figure: 1, storage box; 11, feeding channel; 12, conveying pump; 13, conveying pipeline; 2, cover plate; 21, hinged seat; 22, electromagnet; 23, traction rope; 3, fixed rod; 4, reset spring; 5, fixed plate; 6, protection frame. DETAILED DESCRIPTION

[0026] Please refer to Figs. 1-3 The present application provides a technical solution: a highway construction crack treatment device, which comprises a storage box 1, a feeding channel 11 is communicated with the upper middle part of the storage box 1, a conveying pump 12 is fixedly installed on the middle part of one side of the storage box 1, a conveying pipeline 13 is communicated with the discharge end of the conveying pump 12, a cover plate 2 is arranged on the upper end of the feeding channel 11, a hinged seat 21 is rotatably installed on the lower end of one side of the cover plate 2;

[0027] The lower end of the hinged seat 21 is fixedly connected with the upper end of the storage box 1, the lower end of the delivery pump 12 is movably installed with a fixed rod 3, the lower end of the fixed rod 3 is welded with a fixed plate 5, one side of the fixed plate 5 is welded with a protective frame 6, the upper end of the fixed rod 3 is fixedly connected with a traction rope 23, the other end of the traction rope 23 is fixedly connected with the front side of the cover plate 2 through a guide wheel, the upper end of the storage box 1 is fixedly installed with an electromagnet 22, and the electromagnet 22 is arranged on one side of the cover plate 2, so that the cover plate 2 can be adsorbed and limited through the arrangement of the electromagnet 22, the feeding end of the delivery pump 12 is communicated with the discharging end of the storage box 1, and the concrete slurry can be conveyed through the arrangement of the delivery pump 12, the size of the cover plate 2 is greater than the upper end opening size of the feeding channel 11, and the lower end of the cover plate 2 is fitted with the upper end of the feeding channel 11, and the feeding channel 11 can be covered through the arrangement of the cover plate 2.

[0028] The upper end of the fixed rod 3 is sleeved with a reset spring 4, the other end of the reset spring 4 is fixedly connected with the storage box 1, and the fixed rod 3 can be reset through the arrangement of the reset spring 4, so as to protect the nozzle below the delivery pipeline 13.

[0029] The inside of the protective frame 6 is provided with a plurality of channels, and the delivery pipeline 13 corresponds to the channels one by one, so that the nozzle below the delivery pipeline 13 can be covered through the arrangement of the protective frame 6.

[0030] When filling, the cover plate 2 is turned to the left, the cover plate 2 is adsorbed by the electromagnet 22, at this time, the fixed rod 3 is driven upward by the traction rope 23, the reset spring 4 is stretched, the fixed rod 3 drives the protective frame 6 to move upward, and then the protective frame 6 is separated from the nozzle of the delivery pipeline 13, and the delivery pump 12 is opened to fill the crack, when the treatment is completed, the electromagnet 22 is closed, the reset spring 4 drives the fixed rod 3 to move downward and reset by the spring resilience, the protective frame 6 on the fixed rod 3 moves, so that the protective frame 6 is covered below the nozzle of the delivery pipeline 13, so as to protect the nozzle of the delivery pipeline 13, avoid the collision and deformation of the nozzle of the delivery pipeline 13 in the process of pushing and transporting, and at the same time, the cover plate 2 is turned to the right through the traction rope 23 during the downward movement of the fixed rod 3, so as to cover the feeding channel 11, and avoid the entry of foreign matters into the storage box 1 in the process of transportation.

Claims

1. A device for treating cracks in road construction, comprising a storage box (1), characterized in that: The upper end of the storage box (1) is communicated with a feeding channel (11), one side of the middle of the storage box (1) is fixedly installed with a conveying pump (12), the outlet end of the conveying pump (12) is communicated with a conveying pipeline (13), the upper end of the feeding channel (11) is provided with a cover plate (2), and the lower end of one side of the cover plate (2) is rotatably installed with a hinged seat (21). The lower end of the hinged seat (21) is fixedly connected with the upper end of the storage box (1), the lower end of the conveying pump (12) is movably installed with a fixed rod (3), the lower end of the fixed rod (3) is welded with a fixed plate (5), one side of the fixed plate (5) is welded with a protective frame (6), the upper end of the fixed rod (3) is fixedly connected with a traction rope (23), and the other end of the traction rope (23) is fixedly connected with the front side of the cover plate (2) through a guide wheel.

2. A highway construction crack treatment device as claimed in claim 1, characterized in that: The upper end of the fixed rod (3) is sleeved with a reset spring (4), and the other end of the reset spring (4) is fixedly connected with the storage box (1).

3. A highway construction crack treatment device as defined in claim 1, wherein: Multiple channels are formed in the protective frame (6), and the conveying pipeline (13) corresponds to the channels one by one.

4. The highway construction crack treatment device of claim 1, wherein: An electromagnet (22) is fixedly installed on one side of the upper end of the storage box (1), and the electromagnet (22) is arranged on one side of the cover plate (2).

5. The highway construction crack treatment device of claim 1, wherein: The feeding end of the conveying pump (12) is communicated with the outlet end of the storage box (1).

6. A highway construction crack treatment device as defined in claim 1, wherein: The size of the cover plate (2) is greater than the opening size of the upper end of the feeding channel (11), and the lower end of the cover plate (2) is in close contact with the upper end of the feeding channel (11).

Citation Information

Patent Citations

  • Road construction crack treatment device

    CN221398615U