Waste recycling device for green building construction

By combining the crushing frame and the electromagnetic collecting roller, the problem of existing devices being unable to efficiently collect metal waste is solved, achieving efficient separation and collection of metal waste and concrete waste, and improving the recycling quality of waste.

CN223901940UActive Publication Date: 2026-02-13DEZHOU WANYING NEW BUILDING MATERIALS CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202520004893.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-02
Publication Date
2026-02-13
Estimated Expiration
2035-01-02

AI Technical Summary

Technical Problem

Existing construction waste recycling equipment is unable to efficiently collect metal waste, resulting in poor secondary utilization.

Method used

The system employs a combination structure of a crushing frame and an electromagnetic collecting roller. The waste material is crushed in multiple directions by the horizontal and vertical crushing rollers, and the metal waste is adsorbed by the electromagnetic collecting roller.

Benefits of technology

It achieves efficient separation and collection of metal waste and concrete waste, improves the recycling quality of waste, and facilitates subsequent secondary utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223901940U_ABST
    Figure CN223901940U_ABST
Patent Text Reader

Abstract

The utility model discloses a waste recycling and reusing device for green building construction, relates to the field of building waste recycling, and solves the problem that an existing device is difficult to efficiently collect metal waste according to requirements so as to facilitate subsequent secondary utilization of the metal waste. According to the technical scheme, the crusher comprises a crushing frame, a material collecting frame and a waste material frame, the material collecting frame and the waste material frame are arranged on the bottom side of the crushing frame, rear drive motors are fixedly installed on the front wall and the rear wall of the crushing frame, and output shafts of the front rear drive motor and the rear rear drive motor are fixedly sleeved with two adjacent transverse crushing rollers; side drive motors are fixedly mounted on the left side wall and the right side wall of the crushing frame. According to the waste recycling and reusing device for green building construction, through arrangement of all assemblies on the crushing frame, waste blocks can be gradually conveyed downwards, efficient crushing is conducted on the waste blocks in the transverse and longitudinal directions through a transverse crushing roller and a material guiding plate, metal waste and concrete waste are separated, finally, the metal waste doped in the waste is adsorbed and collected through a material collecting frame, and the waste blocks are recycled. And therefore, the effect of efficiently collecting the metal waste in the waste is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to building waste recovery technical field, concretely is a kind of waste recovery and recycling device for green building construction. BACKGROUND

[0002] In the process of building construction, there are many waste materials, these waste materials contain powder materials, also include some block, therefore limit building waste recovery and recycling, some even directly fill up, as construction waste is thrown away;

[0003] Through the search, the application book with patent application No.202420297460.4 discloses a kind of waste recovery and recycling device for green building construction, which belongs to the field of building waste recovery.It includes: processing box, layered board, electromagnetic roller;Layered board is L-shaped structure, the inside of processing box is separated, the upper surface of layered board has screen cloth;Waste recovery and recycling device for green building construction further includes: the upper surface of processing box is provided with feed inlet, feed inlet corresponds with screen cloth, the upper surface of processing box is fixedly installed with dust baffle, electromagnetic roller is installed horizontally below screen cloth, electromagnetic roller is externally equipped with push plate, electromagnetic roller is fixedly installed with partition plate below, partition plate is distributed with layered board, and iron recovery bin is arranged between them.The beneficial effects of the present application are to provide a kind of waste recovery and recycling device for green building construction, so that iron waste can be reduced in the process of adsorption by timely pushing and cleaning, the magnetic force adsorption effect of electromagnetic roller can be guaranteed, and the recovery quality of waste is higher;

[0004] The above application file realizes efficient recovery of building waste by the setting of various components, but the broken roller is used to extrude the waste, which can only be extruded and broken unilaterally, and the effect is limited, and the waste recovery effect may still be poor.

[0005] Therefore, we propose a kind of waste recovery and recycling device for green building construction. Utility model content

[0006] In view of the deficiencies of prior art, the utility model provides a kind of waste recovery and recycling device for green building construction, solves the problems that existing device is difficult to efficiently collect metal waste according to demand so as to facilitate subsequent secondary utilization.

[0007] To achieve the above object, the utility model is realized by the following technical scheme: a kind of waste recovery and recycling device for green building construction, including broken frame and the material collecting frame and waste frame of its bottom side, rear drive motor is fixedly installed on the front and rear walls of broken frame, and the output shaft of the front and rear two groups of rear drive motor is fixedly equipped with two groups of horizontal broken rollers next to each other;

[0008] The left and right side walls of the crushing frame are fixedly installed with side drive motors, and two groups of longitudinal crushing rollers are fixedly sleeved on the output shafts of the two groups of side drive motors;

[0009] The top and bottom sides of the crushing frame are open ends, a discharging plate is fixedly installed on the top side of the inner side of the crushing frame and located above the horizontal crushing rollers, guide plates are further arranged on the inner side of the crushing frame, the bottom side of the guide plate is provided with a guide frame for switching the direction of the material, and the bottom end of the guide frame is arranged on the top side of the longitudinal crushing rollers.

[0010] As a preferred scheme of the present application, the inner side of the guide frame is hollow, the top of the guide frame is provided with a feeding port located below the gap between the two groups of guide plates, and the bottom of the guide frame is provided with a discharging port located above the two groups of longitudinal crushing rollers.

[0011] The setting of the guide frame structure can convert the horizontally transported material into vertically downward transported material, and the setting of the upper and lower horizontal crushing rollers and the longitudinal crushing rollers can crush the waste material from the top and bottom sides in the horizontal and vertical directions, thereby ensuring the crushing effect.

[0012] As a preferred scheme of the present application, the discharging plate and the guide plate are inclined steel plates, and the outer end edges of the discharging plate and the guide plate are fixedly welded on the inner side walls of the crushing frame.

[0013] The setting of the discharging plate and the guide plate can transport the waste material downward, thereby achieving the effect of automatic crushing.

[0014] As a preferred scheme of the present application, the inner side of the material collecting frame is fixedly installed with electromagnetic collecting rollers distributed in a stacking manner, and the input end of the electromagnetic collecting roller is fixedly connected to a power supply.

[0015] The setting of the electromagnetic collecting roller can generate a magnetic field on the circumferential side after being energized, thereby attracting the crushed metal waste material, so as to facilitate the recycling and secondary utilization of the metal waste material.

[0016] As a preferred scheme of the present application, the inner side of the material collecting frame is used to attract the metal waste material in the waste material by the electromagnetic collecting roller, and the inner side of the waste material frame is used to contain the falling waste material.

[0017] The setting of the electromagnetic collecting roller can collect the falling metal waste material by the material collecting frame.

[0018] As a preferred scheme of the present application, the outer wall of the material collecting frame is assembled with a side blocking door through a hinge shaft, and the outer wall of the waste material frame is further provided with a discharging port.

[0019] The setting of the side blocking door facilitates the taking out of the metal waste material, and the setting of the discharging port facilitates the output of the concrete slurry waste material.

[0020] The utility model provides a kind of waste recycling device of green building construction.It possesses following

[0021] Beneficial effect:

[0022] The waste recycling device of green building construction, by the setting of each component on crushing frame, waste block can be gradually conveyed downward, and by transverse crushing roller and material guide plate, it is carried out efficient crushing in horizontal and vertical directions, metal waste and concrete waste are separated, finally by aggregate frame adsorption collection metal waste doped therein, to reach the effect of efficient collection of metal waste in waste, solve the problem that existing device is difficult to efficiently collect metal waste according to demand to facilitate subsequent secondary utilization. BRIEF DESCRIPTION OF DRAWINGS

[0023] Figure 1 It is the structure schematic diagram of the utility model;

[0024] Figure 2 It is the structure schematic diagram of inside of the utility model;

[0025] Figure 3 It is the structure schematic diagram of material guide frame of the utility model;

[0026] Figure 4 It is the structure schematic diagram of aggregate frame of the utility model.

[0027] In the drawing: 1, crushing frame;11, rear drive motor;12, side drive motor;13, transverse crushing roller;14, longitudinal crushing roller;15, blanking plate;16, material guide plate;17, material guide frame;171, feeding port;172, discharge port;2, aggregate frame;21, side door;22, electromagnetic collection roller;3, waste frame;31, discharge port. DETAILED DESCRIPTION

[0028] The technical scheme in the embodiments of the utility model will be described clearly and completely in combination with the drawings in the embodiments of the utility model, obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments.Based on the embodiments in the utility model, all other embodiments obtained by the person skilled in the art without creative labor are within the protection scope of the utility model.

[0029] Please refer to Figures 1-4The utility model embodiment provides a kind of technical scheme: a kind of waste recycling device of green building construction, including broken frame 1 and the aggregate frame 2 and waste frame 3 of its bottom side, and the rear drive motor 11 is fixedly installed on the front and back wall of broken frame 1, and the output shaft of the two groups of rear drive motor 11 is fixedly sleeved with the two groups of transverse crushing roller 13 that are immediately adjacent;Side drive motor 12 is fixedly installed on the left and right side walls of broken frame 1, and the output shaft of the two groups of side drive motor 12 is fixedly sleeved with the two groups of longitudinal crushing roller 14 that are immediately adjacent;The top and bottom sides of broken frame 1 are open end, and the top of the inside of broken frame 1 is fixedly installed with the discharging plate 15 located above transverse crushing roller 13, and the inside of broken frame 1 is also provided with guide plate 16, the bottom side of guide plate 16 is provided with guide frame 17 for switching material direction, and the bottom end of guide frame 17 is arranged at the top side of longitudinal crushing roller 14;

[0030] Wherein, the waste recycling device of green building construction, by the setting of each component on broken frame 1, can gradually transport waste block downwards, and is crushed in horizontal and vertical directions by transverse crushing roller 13 and guide plate 16, so that metal waste and concrete waste are separated, and finally the metal waste mixed therein is collected by aggregate frame 2, so that the metal waste in waste is efficiently collected, and the problem that the existing device cannot efficiently collect metal waste according to demand for subsequent secondary utilization is solved.

[0031] Embodiment 2:

[0032] The inside of guide frame 17 is hollow, the top of guide frame 17 is provided with feeding port 171 located below the gap between the two groups of guide plates 16, and the bottom of guide frame 17 is provided with discharging port 172 located above the two groups of longitudinal crushing roller 14;Wherein, the structure of guide frame 17 can convert the horizontally transported material into vertically downward transportation, and the setting of upper and lower transverse crushing roller 13 and longitudinal crushing roller 14 can crush the waste from top and bottom sides in horizontal and vertical directions, to ensure the crushing effect.

[0033] The discharging plate 15 and the guide plate 16 are inclined steel plates, and the outer end edges of the discharging plate 15 and the guide plate 16 are fixedly welded on the inner side wall of the broken frame 1;Wherein, the setting of the discharging plate 15 and the guide plate 16 can transport the waste downward, to achieve the effect of automatic crushing.

[0034] The inside of the aggregate frame 2 is fixedly installed with the electromagnetic collection roller 22 distributed in a stacked manner, and the input end of the electromagnetic collection roller 22 is fixedly connected to the power supply;Wherein, the setting of the electromagnetic collection roller 22 can generate a magnetic field on its circumferential side after energization, and then attract the crushed metal waste, to facilitate subsequent recycling and secondary utilization.

[0035] The inner side of the collecting frame 2 is used for adsorbing the metal waste in the waste by the electromagnetic collecting roller 22, and the inner side of the waste frame 3 is used for containing the falling waste; wherein, the electromagnetic collecting roller 22 is arranged to collect the metal waste falling by the collecting frame 2.

[0036] The outer wall of the collecting frame 2 is provided with the side blocking door 21 by the hinge shaft, and the outer wall of the waste frame 3 is also provided with the discharging port 31; wherein, the side blocking door 21 is arranged to facilitate taking out the metal waste, and the discharging port 31 is arranged to facilitate outputting the concrete sludge waste.

[0037] The working principle and use process of the utility model are as follows: when the device works, the waste is placed on the discharging plate 15 from the top side, and the waste automatically slides between the two groups of horizontal crushing rollers 13, and is crushed in the horizontal direction, and under the influence of the guide plate 16 and the guide frame 17, the crushed waste is changed to be conveyed to the vertical crushing roller 14 on the lower side, so that the waste is crushed in the vertical direction, the crushing effect is guaranteed, and the electromagnetic collecting roller 22 in the collecting frame 2 can adsorb the metal waste in the waste, so as to facilitate subsequent collection and corresponding secondary utilization.

[0038] The basic principle and main features of the utility model and the advantages of the utility model are shown and described above, and it is obvious for those skilled in the art that the utility model is not limited to the details of the above-mentioned exemplary embodiments, and the utility model can be realized in other specific forms without departing from the spirit or basic characteristics of the utility model. Therefore, from any point of view, the embodiments should be regarded as exemplary and non-limiting, the scope of the utility model is defined by the appended claims rather than the above description, and therefore all changes falling within the meaning and scope of the equivalent elements of the claims are intended to be included in the utility model. Any figure mark in the claims should not be regarded as limiting the involved claims.

[0039] In addition, it should be understood that, although the present specification is described in terms of embodiments, not every embodiment contains only one independent technical solution, and the description manner of the specification is only for the sake of clarity, and those skilled in the art should regard the specification as a whole, and the technical solutions in each embodiment can be properly combined to form other embodiments that those skilled in the art can understand.

Claims

1. A waste recycling and reuse device for green building construction, characterized in that: Including broken frame (1) and its bottom side aggregate frame (2) and waste frame (3), the rear wall of the broken frame (1) is fixedly installed with rear drive motor (11), and the output shaft of the two groups of rear drive motor (11) is fixedly sleeved with two groups of horizontal crushing roller (13) next to each other; The left and right side walls of the broken frame (1) are fixedly installed with side drive motor (12), and the output shaft of the two groups of side drive motor (12) is fixedly sleeved with two groups of vertical crushing roller (14) next to each other; The top and bottom sides of the broken frame (1) are open ends, the top of the inner side of the broken frame (1) is fixedly installed with the discharging plate (15) above the horizontal crushing roller (13), the inner side of the broken frame (1) is further provided with the guide plate (16), the bottom side of the guide plate (16) is provided with the guide frame (17) for switching the direction of material body, and the bottom end of the guide frame (17) is arranged at the top side of the vertical crushing roller (14).

2. A green building construction waste recycling device according to claim 1, characterized in that: The inner side of the guide frame (17) is hollow, the top of the guide frame (17) is provided with the feeding port (171) below the gap between the two groups of guide plates (16), and the bottom of the guide frame (17) is provided with the discharging port (172) above the two groups of vertical crushing roller (14).

3. A green building construction waste recycling device according to claim 1, characterized in that: The discharging plate (15) and the guide plate (16) are inclined steel plates, and the outer end edges of the discharging plate (15) and the guide plate (16) are fixedly welded on the inner side wall of the broken frame (1).

4. A green building construction waste recycling device according to claim 1, characterized in that: The inner side of the aggregate frame (2) is fixedly installed with the electromagnetic collection roller (22) distributed in a stacking manner, and the input end of the electromagnetic collection roller (22) is fixedly connected to the power supply.

5. A green building construction waste recycling device according to claim 4, characterized in that: The inner side of the aggregate frame (2) is adsorbed by the electromagnetic collection roller (22) to the metal waste in the waste material, and the inner side of the waste frame (3) contains the falling waste material.

6. A green building construction waste recycling device according to claim 5, characterized in that: The outer wall of the aggregate frame (2) is assembled with the side door (21) through the hinge shaft, and the outer wall of the waste frame (3) is further provided with the discharge port (31).