Quick adjustable road surface supporting device

The stable triangular bracket, composed of struts, threaded rods, and positioning components, solves the problems of complex structure and inconvenient adjustment of existing road support devices, achieving rapid adjustment and stable support, and ensuring the construction quality of concrete pavement.

CN223907301UActive Publication Date: 2026-02-13HEBEI BOHAI INVESTMENT GROUP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202520478748.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-03-18
Publication Date
2026-02-13
Estimated Expiration
2035-03-18

AI Technical Summary

Technical Problem

The existing road support device has a complex structure, making construction and installation inconvenient. The support structure is located on the upper part of the concrete road surface, making adjustment difficult and affecting the construction process.

Method used

A stable triangular support consisting of struts, threaded rods, and positioning components is used. The installation angle of the construction template can be quickly adjusted by rotating the adjusting nut on the threaded rod. The stable triangular support composed of struts, threaded rods, and positioning components provides stable support for the construction template, preventing it from turning inward or outward.

Benefits of technology

It enables rapid adjustment of the installation angle of the construction formwork, avoiding inward or outward tilting of the formwork and ensuring the construction quality of the concrete pavement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223907301U_ABST
    Figure CN223907301U_ABST
Patent Text Reader

Abstract

The utility model discloses a fast adjustable pavement supporting device, and belongs to the technical field of concrete pavement construction. Comprising construction formworks, the construction formworks are used for abutting against the edge face of a concrete pavement, every two adjacent construction formworks are spliced and connected in an assembled mode, a lower cross rod and an upper cross rod are rotationally installed on each construction formwork, supporting rods are rotationally installed at the two ends of each lower cross rod, threaded rods are rotationally installed at the two ends of each upper cross rod, and the threaded rods are connected with the lower cross rods. The supporting rods and the threaded rods are arranged in a crossed mode and are jointly and detachably connected with the positioning piece, the positioning piece comprises a vertical pipe, a stable triangular support composed of the supporting rods, the threaded rods and the positioning piece is utilized, and the installation angle of the construction formwork can be rapidly adjusted by rotating adjusting nuts on the threaded rods. And the construction formwork can be stably supported for treatment through the triangular support, the inward turning or outward turning phenomenon of the construction formwork is effectively avoided, and the construction quality of the concrete pavement is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The application relates to the technical field of concrete pavement construction, in particular to a rapid adjustable pavement support device. BACKGROUND

[0002] In the process of concrete pavement construction, a support formwork needs to be stably installed along the edge line surface of the concrete pavement for stable setting treatment of the poured concrete pavement, so that the concrete can be solidified under the setting structure. Generally, construction personnel use steel bars to resist the formwork and insert the ground for installation, so as to position the support formwork. However, after pouring concrete, the formwork support structure is unstable, which may cause the formwork to expand and run, resulting in unqualified concrete quality and waste of concrete.

[0003] The existing public technology number CN221523240U proposes an adjustable device for concrete pavement formwork support. The device can be used in various complex geological and topographical conditions for formwork support during concrete pavement construction, ensuring the construction quality of the concrete pavement and improving the construction efficiency. It can prevent the formwork from tilting outward and inward, and a plurality of buckles B are configured to be used in different complex conditions. The two sleeves in the buckle B are adjusted to different angles to cope with various complex geological and topographical conditions, effectively fix the formwork support device, prevent the formwork from running and expanding, ensure the construction quality, and solve the technical problems of the related technology in the background. However, the structure of the pavement support device in the comparative document is relatively complex, the construction installation is not convenient, the support structure is located on the upper part of the concrete pavement, and the adjustment is not convenient, which affects the construction process. Therefore, we propose a rapid adjustable pavement support device. CONTENT OF THE UTILITY MODEL

[0004] 1. Technical problem to be solved

[0005] The purpose of the present application is to provide a rapid adjustable pavement support device, which solves the technical problems of the pavement support device in the comparative document in the background technology, such as complex structure, inconvenient construction installation, support structure located on the upper part of the concrete pavement, inconvenient adjustment, and influence on the construction process. The stable triangular support composed of the support rod, threaded rod and positioning piece can quickly adjust the installation angle of the construction formwork by rotating the adjusting mother on the threaded rod. The triangular support can stably support the construction formwork, effectively prevent the construction formwork from turning inward or outward, and ensure the construction quality of the concrete pavement.

[0006] 2. Technical solution

[0007] The technical scheme of the application provides a quick adjustable road surface supporting device, which comprises a construction formwork, the construction formwork is used for abutting against the side surface of a concrete road surface, two adjacent construction formworks are assembled and connected in a mode of assembly, a lower cross bar and an upper cross bar are rotatably installed on the construction formwork, a support rod is rotatably installed at the two ends of the lower cross bar, a threaded rod is rotatably installed at the two ends of the upper cross bar, the support rod and the threaded rod are arranged in a cross mode and are jointly connected with a detachable positioning member, the positioning member comprises a vertical pipe, two L-shaped ground insertion plates, a fixed block and a positioning sleeve are fixedly arranged on the vertical pipe, a lock bolt is threadedly fixed between the positioning sleeve and the support rod, the threaded rod is movably inserted through the fixed block, and an adjusting female thread is threadedly connected to the threaded rod, and a plug rod is inserted and installed in the vertical pipe.

[0008] By adopting the above technical scheme, the construction formwork needs to be placed and installed at the side line during the construction process of the concrete road surface to support and process, in order to stably support the concrete road surface by the construction formwork, the lower cross bar and the upper cross bar are rotatably installed on the construction formwork, the support rod and the threaded rod are rotatably installed by the lower cross bar and the upper cross bar respectively, the ground outside the two ends of the construction formwork is stably inserted and connected by the L-shaped ground insertion plate and the plug rod, the support rod is threadedly connected to the vertical pipe by the lock bolt through the positioning sleeve, the threaded rod movably penetrates the fixed block on the vertical pipe and is threadedly connected to the adjusting female thread, the threaded rod drives the construction formwork to rotate and adjust to the vertical state along the lower cross bar by rotating the adjusting female thread, the stable triangular support composed of the support rod, the threaded rod and the positioning member can stably support the construction formwork, the phenomenon of the construction formwork turning inwards or outwards is effectively avoided, and the construction quality of the concrete road surface is ensured.

[0009] Optionally, a plurality of through holes are formed in the construction formwork, and the lower cross bar and the upper cross bar are rotatably installed along the plurality of through holes.

[0010] By adopting the above technical scheme, the lower cross bar and the upper cross bar are rotatably installed on the construction formwork, and the support rod and the threaded rod are rotatably installed by the lower cross bar and the upper cross bar respectively.

[0011] Optionally, two connecting bolts are threadedly connected between the two adjacent construction formworks.

[0012] By adopting the above technical scheme, when the construction formwork is used for supporting the side line of the concrete road surface, the two adjacent construction formworks can be assembled and connected by using the connecting bolts.

[0013] Optionally, a lower rotating sleeve is fixedly arranged at one end of the support rod close to the construction formwork, the lower rotating sleeve is rotatably sleeved with the lower cross bar, an upper rotating sleeve is fixedly arranged at one end of the threaded rod close to the construction formwork, and the upper rotating sleeve is rotatably sleeved with the upper cross bar.

[0014] By adopting the technical scheme, one end of the supporting rod is rotatably connected with the lower horizontal rod through the lower rotating sleeve, the other end of the supporting rod is rotatably connected with the positioning sleeve through the lock bolt, one end of the threaded rod is rotatably connected with the upper horizontal rod through the upper rotating sleeve, and the other end of the threaded rod is movably penetrated through the fixing block and is rotatably connected with the adjusting nut.

[0015] Optionally, a strip-shaped groove is formed in the fixing block, and the other end of the threaded rod away from the construction template is movably penetrated through the strip-shaped groove.

[0016] By adopting the technical scheme, the threaded rod is movably penetrated through the strip-shaped groove formed in the fixing block, the adjusting nut is larger than the strip-shaped groove, and the construction template can be adjusted to the vertical state along the lower horizontal rod by rotating the adjusting nut.

[0017] Optionally, the bottom end of the inserting rod is in a conical structure, and a hand-held handle is fixedly arranged at the upper end of the inserting rod.

[0018] By adopting the technical scheme, the inserting rod is inserted into the ground along the standpipe, the standpipe can be stably positioned by pressing the standpipe through the hand-held handle, and the inserting rod inserted into the ground can be conveniently pulled out through the hand-held handle.

[0019] 3. Beneficial effects

[0020] One or more technical schemes provided in the technical scheme have at least the following technical effects or advantages: the stable triangular support composed of the supporting rod, the threaded rod and the positioning member can quickly adjust the installation angle of the construction template by rotating the adjusting nut on the threaded rod, the triangular support can stably support the construction template, the phenomenon of the construction template being turned inwards or outwards is effectively avoided, and the construction quality of the concrete pavement is ensured. BRIEF DESCRIPTION OF DRAWINGS

[0021] Figure 1 The overall structure schematic view of the quick and adjustable pavement support device is disclosed for a preferred embodiment of the present application.

[0022] Figure 2 The construction template structure schematic view of the quick and adjustable pavement support device is disclosed for a preferred embodiment of the present application.

[0023] Figure 3 The supporting rod, the threaded rod and the positioning member structure schematic view of the quick and adjustable pavement support device is disclosed for a preferred embodiment of the present application.

[0024] Figure 4 The adjusting nut structure schematic view of the quick and adjustable pavement support device is disclosed for a preferred embodiment of the present application. Figure 3 The enlarged structure schematic view of the adjusting nut is disclosed for a preferred embodiment of the present application.

[0025] Explanation of reference numerals in the drawings: 1, construction template; 11, perforation; 12, connecting bolt; 2, lower crossbar; 3, upper crossbar; 4, brace; 41, lower rotating sleeve; 5, threaded rod; 51, upper rotating sleeve; 52, adjusting female; 6, positioning member; 61, vertical pipe; 62, L-shaped floor insert; 63, positioning sleeve; 64, lock bolt; 65, fixed block; 651, strip-shaped slot; 7, insert rod; 71, hand-held handle. DETAILED DESCRIPTION

[0026] The present application is further described in detail below with reference to the accompanying drawings.

[0027] Reference Figures 1 to 4 The embodiment of the present application provides a kind of fast adjustable road surface support device, comprising: construction template 1, construction template 1 is used to resist the side surface of concrete road, adjacent two construction templates 1 assembly type splicing connection, construction template 1 is rotatably installed with lower crossbar 2 and upper crossbar 3, the both ends of lower crossbar 2 are rotatably installed with brace 4, the both ends of upper crossbar 3 are rotatably installed with threaded rod 5, brace 4 and threaded rod 5 are cross arrangement, and it is jointly detachable to connect positioning member 6, positioning member 6 includes vertical pipe 61, two L-shaped floor inserts 62, a fixed block 65 and a positioning sleeve 63 are fixedly provided on vertical pipe 61, lock bolt 64 is threadedly fixed between positioning sleeve 63 and brace 4, threaded rod 5 is movably penetrated through fixed block 65, and adjusting female 52 is threadedly sleeved, insert rod 7 is inserted and installed in vertical pipe 61, and construction template 1 is placed and installed in the sideline during concrete road construction process and needs to be placed and installed construction template 1 for supporting treatment, in order to make construction template 1 can stably support concrete road, construction template 1 is rotatably installed with lower crossbar 2 and upper crossbar 3, brace 4 and threaded rod 5 are rotatably installed using lower crossbar 2 and upper crossbar 3, the ground at the outer side of the both ends of construction template 1, vertical pipe 61 is stably inserted and connected to the ground using L-shaped floor insert 62 and insert rod 7, brace 4 is threadedly connected to vertical pipe 61 using lock bolt 64 through positioning sleeve 63 on vertical pipe 61, and threaded rod 5 is movably penetrated through fixed block 65 on vertical pipe 61 and is threadedly connected to adjusting female 52, by rotating adjusting female 52, threaded rod 5 drives construction template 1 along lower crossbar 2 to rotate and adjust to vertical state through upper crossbar 3, the stable triangular support formed by brace 4, threaded rod 5 and positioning member 6 can stably support construction template 1 treatment, effectively avoid the inside or outside turning phenomenon of construction template 1, guarantee the construction quality of concrete road.

[0028] Reference Figure 1 And Figure 2 Two rows of multiple perforations 11 are formed on construction template 1, lower crossbar 2 and upper crossbar 3 are rotatably installed along a row of multiple perforations 11, lower crossbar 2 and upper crossbar 3 are rotatably installed on construction template 1, and brace 4 and threaded rod 5 are rotatably installed using lower crossbar 2 and upper crossbar 3.

[0029] Reference Figure 1And Figure 2 Two connecting pins 12 are threadedly connected between two adjacent construction templates 1, and the adjacent two construction templates 1 can be assembled and connected by using the connecting pins 12 when the construction templates 1 are used to support the edge line of the concrete pavement.

[0030] Referring to Figure 3 And Figure 4 The end of the supporting rod 4 close to the construction template 1 is fixedly provided with a lower rotating sleeve 41, the lower rotating sleeve 41 is rotatably sleeved with the lower cross rod 2, the end of the threaded rod 5 close to the construction template 1 is fixedly provided with an upper rotating sleeve 51, the upper rotating sleeve 51 is rotatably sleeved with the upper cross rod 3, one end of the supporting rod 4 is rotatably sleeved with the lower cross rod 2 through the lower rotating sleeve 41, the other end of the supporting rod 4 is threadedly connected with the positioning sleeve 63 by using the lock pin 64, one end of the threaded rod 5 is rotatably sleeved with the upper cross rod 3 through the upper rotating sleeve 51, and the other end of the threaded rod 5 is movably penetrated through the fixed block 65 and is threadedly sleeved with the adjusting nut 52.

[0031] Referring to Figure 3 And Figure 4 A strip-shaped groove 651 is formed in the fixed block 65, the end of the threaded rod 5 away from the construction template 1 is movably penetrated through the strip-shaped groove 651, the threaded rod 5 is movably penetrated through the strip-shaped groove 651 formed in the fixed block 65, and the adjusting nut 52 is larger than the strip-shaped groove 651, by rotating the adjusting nut 52, the threaded rod 5 can drive the construction template 1 to rotate along the lower cross rod 2 to the vertical state through the upper cross rod 3.

[0032] Referring to Figure 3 And Figure 4 The bottom end of the insertion rod 7 is in a conical structure, a hand-held handle 71 is fixedly arranged on the upper end of the insertion rod 7, the insertion rod 7 is inserted into the ground along the stand pipe 61, the stand pipe 61 can be stably positioned by pressing the stand pipe 61 through the hand-held handle 71, and the insertion rod 7 inserted into the ground can be conveniently pulled out through the hand-held handle 71.

[0033] Working principle: during the construction process of the concrete pavement, the construction template 1 needs to be placed and installed at the edge line for supporting, in order to stably support the concrete pavement by the construction template 1, the lower cross rod 2 and the upper cross rod 3 are rotatably installed on the construction template 1, the supporting rod 4 and the threaded rod 5 are rotatably installed by using the lower cross rod 2 and the upper cross rod 3 respectively, the ground outside the two ends of the construction template 1 is stably inserted and positioned by using the stand pipe 61 through the L-shaped ground insertion plate 62 and the insertion rod 7, the supporting rod 4 is threadedly connected with the stand pipe 61 through the positioning sleeve 63 by using the lock pin 64, the threaded rod 5 is movably penetrated through the fixed block 65 on the stand pipe 61 and is threadedly connected with the adjusting nut 52, by rotating the adjusting nut 52, the threaded rod 5 can drive the construction template 1 to rotate along the lower cross rod 2 to the vertical state through the upper cross rod 3, the stable triangular support composed of the supporting rod 4, the threaded rod 5 and the positioning member 6 can stably support the construction template 1, the phenomenon of the construction template 1 being turned inwards or outwards is effectively avoided, and the construction quality of the concrete pavement is ensured.

Claims

1. A rapid adjustable road support device, characterized by: The utility model provides a construction template (1) is used for the confrontation concrete pavement side surface, and two adjacent construction templates (1) are assembled and spliced, and the construction template (1) is rotatably installed with lower cross bar (2) and upper cross bar (3), and the both ends of lower cross bar (2) are rotatably installed with support rod (4), and the both ends of upper cross bar (3) are rotatably installed with threaded rod (5), and support rod (4) and threaded rod (5) are crossed and are detachably connected with positioning piece (6), and the positioning piece (6) includes vertical pipe (61), and two L-shaped ground insertion plates (62), a fixed block (65) and a positioning sleeve (63) are fixed on the vertical pipe (61), and the positioning sleeve (63) and support rod (4) are threadedly fixed with lock bolt (64), threaded rod (5) passes through fixed block (65) and is threadedly connected with adjusting female (52), and plug rod (7) is inserted in vertical pipe (61).

2. A rapidly adjustable road support device according to claim 1, characterized in that: The construction template (1) is provided with two rows of multiple perforations (11), and the lower cross bar (2) and the upper cross bar (3) are rotatably installed along one row of multiple perforations (11).

3. A rapidly adjustable road support device according to claim 2, wherein: Two connecting bolts (12) are threadedly connected between two adjacent construction templates (1).

4. A rapidly adjustable road support device according to claim 1, wherein: The end of the support rod (4) close to the construction template (1) is fixed with a lower rotating sleeve (41), and the lower rotating sleeve (41) is rotatably sleeved with the lower cross bar (2); the end of the threaded rod (5) close to the construction template (1) is fixed with an upper rotating sleeve (51), and the upper rotating sleeve (51) is rotatably sleeved with the upper cross bar (3).

5. A rapidly adjustable road support device according to claim 1, wherein: The fixed block (65) is provided with a strip-shaped groove (651), and the end of the threaded rod (5) away from the construction template (1) is movably penetrated through the strip-shaped groove (651).

6. A rapidly adjustable roadway support device as defined in claim 1, wherein: The bottom end of the plug rod (7) is conical, and a hand-held handle (71) is fixed on the upper end of the plug rod (7).

Citation Information

Patent Citations

  • Adjustable device for supporting concrete pavement template

    CN221523240U