Slurry isolating and circulating collecting device for pore-forming pouring
By designing a mud isolation and recycling collection device, the problem of difficulty in judging mud replacement after drilling was solved, and the effective isolation and recycling of mud was achieved, reducing waste and environmental pollution.
Patent Information
- Application Number
- CN202423303677.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-30
- Publication Date
- 2026-02-13
- Estimated Expiration
- 2034-12-30
AI Technical Summary
In existing technologies, it is difficult to determine the replacement of drilling mud after drilling, and the mixing of new and old mud makes it difficult to recycle and reuse, resulting in waste and environmental pollution.
Design a mud isolation and circulation collection device, including a casing, an extension cylinder, a hole cleaning mud collection box and a raw mud collection box. The hole cleaning mud and the raw mud are discharged in layers through the isolation device, and are collected and replaced with hole cleaning mud that meets the casting standards.
It achieves effective isolation and recycling of mud, reduces mud waste, prevents environmental pollution, and meets the needs of concrete pouring.
Smart Images

Figure CN223907519U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of mud recycling, and in particular to a mud isolation and recycling device for hole pouring. BACKGROUND
[0002] Currently, the requirements for mud indexes during hole (slot) forming and after hole cleaning are different in the specification when constructing underground continuous walls and pile foundations. Therefore, the hole (slot) needs to be cleaned and the mud needs to be replaced before pouring concrete. The existing replacement method mainly uses new mud injected from the bottom of the slot hole and old mud overflowing from the top of the slot hole to finally complete the mud replacement. In this method, the new and old mud mix with each other in the slot hole, it is difficult to determine the completion point of mud replacement, it is difficult to recycle and reuse, it is relatively wasteful of mud, and after pouring concrete, the mud is mixed with the previous recycled mud for use, which increases the amount of mud discharge and causes environmental pollution. SUMMARY
[0003] The present application provides a mud isolation and recycling device for hole pouring to overcome at least one of the above problems, which can replace the mud in the hole to meet the pouring standard, and can isolate and collect the hole cleaning mud and the original mud separately.
[0004] The technical solution adopted by the present application to solve its technical problems is: a mud isolation and recycling device for hole pouring for mud cleaning and replacement of hole forming of a continuous wall / pile foundation, comprising:
[0005] A casing is arranged in the hole, and the upper part protrudes above the upper plane of the hole.
[0006] An expansion cylinder is arranged on the upper plane of the hole, and a mud transition chamber is formed in the middle part of the expansion cylinder and communicates with the casing.
[0007] A hole cleaning mud collecting box is communicated with the expansion cylinder through a pipeline, and a mud collecting valve switch is arranged on the pipeline.
[0008] An original mud collecting box is communicated with the expansion cylinder through a pipeline, and a mud discharging valve switch is arranged on the pipeline.
[0009] A hole cleaning mud injection device comprises an injection pipe and an isolation device. The isolation device is located at the bottom of the injection pipe, and the isolation device is sunk into the bottom of the casing. The isolation device is attached to the casing, and the isolation device makes the mud in the upper and lower layers be discharged in layers. When the amount of injected hole cleaning mud in the lower layer of the isolation device increases, the isolation device rises, the mud in the upper layer is discharged into the original mud collecting box, the original mud in the casing is replaced by the hole cleaning mud, and different muds are collected separately.
[0010] When the hole cleaning mud is injected, the hole cleaning mud is injected into the bottom of the casing through the injection pipe, as the hole cleaning mud in the bottom of the casing increases, the isolation device rises, the upper mud is squeezed into the mud transition cavity of the expansion cylinder, and the valve switch of the mud outlet is opened, so that the original mud is discharged into the original mud collecting box.
[0011] When the concrete is poured, the concrete sinks into the casing, as the concrete in the casing increases, the hole cleaning mud is squeezed into the mud transition cavity of the expansion cylinder, and the valve switch of the mud outlet is opened, so that the hole cleaning mud is discharged into the hole cleaning mud collecting box.
[0012] As preferred, a sealing air bag is arranged between the casing and the expansion cylinder, and the sealing air bag is closely attached to the casing and the expansion cylinder.
[0013] As preferred, an open flange is arranged at the upper part of the casing, and the open flange is attached to and clamped with the sealing air bag.
[0014] As preferred, the isolation device is a placing box or a film belt.
[0015] As preferred, the isolation device is a piston structure arranged at the bottom of the injection pipe.
[0016] As preferred, the casing is deeply arranged at the bottom of the hole.
[0017] The mud isolation and recycling collecting device for hole pouring has the advantages that the original mud in the hole of the continuous wall / pile foundation can be replaced by the hole cleaning mud meeting the pouring concrete requirements, the original mud and the hole cleaning mud can be separated and collected respectively, subsequent treatment or recycling use is facilitated, waste mud is avoided, and environmental pollution is prevented. BRIEF DESCRIPTION OF DRAWINGS
[0018] The application will be further described below in combination with the drawings and examples.
[0019] Figure 1 FIG. 1 is a schematic structural diagram of the mud isolation and recycling collecting device for hole pouring;
[0020] Figure 2 FIG. 2 is a schematic structural diagram of a hole cleaning mud injection process of the mud isolation and recycling collecting device for hole pouring;
[0021] Figure 3 FIG. 3 is a schematic structural diagram of a hole cleaning mud injection process of the mud isolation and recycling collecting device for hole pouring;
[0022] Figure 4 FIG. 4 is a schematic structural diagram of a concrete pouring process of the mud isolation and recycling collecting device for hole pouring;
[0023] Figure 5This is a schematic diagram of the concrete pouring process of the mud isolation and circulation collection device for hole casting described in this invention.
[0024] Figure label:
[0025] 1. Casing, 2. Expansion tube, 21. Sealing airbag, 3. Hole cleaning mud collection box, 31. Mud collection port valve switch, 4. Original mud collection box, 41. Mud discharge port valve switch, Hole cleaning mud injection device, 5. Injection pipe, 6. Isolation device, 11. Hole cleaning mud, 12. Original mud, 13. Concrete. Detailed Implementation
[0026] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, illustrating only the basic structure of the invention, and therefore only show the components relevant to the invention.
[0027] like Figure 1 The mud isolation and circulation collection device shown is used for cleaning and replacing mud in the drilling of continuous wall / pile foundation. It consists of a casing 1, an expansion cylinder 2, a cleaning mud collection box 3, an original mud collection box 4, and a cleaning mud injection device.
[0028] It can replace the original drilling mud 12 in the borehole of continuous wall / pile foundation with cleaning mud 11 that meets the requirements of concrete pouring 13, and the original drilling mud 12 and the cleaning mud 11 can be separated and collected separately for subsequent treatment or recycling. This eliminates the waste of drilling mud and prevents environmental pollution.
[0029] Specifically, the casing 1 is installed inside the hole, and has a portion of its upper surface protruding from the hole.
[0030] The expansion cylinder 2 is set on the upper plane of the hole, and the protective sleeve 1 is fitted in the middle. The middle of the expansion cylinder 2 forms a mud transition cavity that communicates with the protective sleeve 1.
[0031] The hole cleaning mud collection box 3 is connected to the expansion cylinder 2 through a pipe, and the pipe is equipped with a mud collection port valve switch 31;
[0032] The original mud collection box 4 is connected to the expansion cylinder 2 through a pipe, and the pipe is equipped with a discharge port valve switch 41;
[0033] The hole cleaning mud injection device comprises an injection pipe 5 and a separation device 6, the separation device 6 is located at the bottom of the injection pipe 5, the separation device 6 is sunk into the bottom of the casing 1, the separation device 6 is attached to the casing 1, the separation device 6 makes the mud in the upper and lower layers be discharged separately, when the injection of the hole cleaning mud 11 in the lower layer of the separation device 6 is increased, the separation device 6 is raised, the mud in the upper layer is discharged to the original mud collecting tank 4, the original mud 12 in the casing 1 is replaced by the hole cleaning mud 11, and the different muds are collected respectively.
[0034] Referring to Figure 2 , 3 When the hole cleaning mud 11 is injected, the hole cleaning mud 11 is injected into the bottom of the casing 1 through the injection pipe 5, as the hole cleaning mud in the bottom of the casing 1 is increased, the separation device 6 is raised, the mud in the upper part is squeezed into the mud transition cavity of the expansion cylinder 2, and the mud discharging valve switch 41 is opened, so that the original mud 12 is discharged into the original mud collecting tank 4.
[0035] Referring to Figure 4 , 5 When the concrete 13 is poured, the concrete 13 is sunk into the casing 1, as the concrete 13 in the casing 1 is increased, the hole cleaning mud is squeezed into the mud transition cavity of the expansion cylinder 2, and the mud collecting valve switch 31 is opened, so that the hole cleaning mud is discharged into the hole cleaning mud collecting tank 3.
[0036] The sealing air bag 21 is arranged between the casing 1 and the expansion cylinder 2, and the sealing air bag 21 is tightly attached to the casing 1 and the expansion cylinder 2. The sealing air bag 21 is inflated and tightly attached, and has good sealing effect.
[0037] The open flange is arranged at the upper part of the casing 1, the open flange is attached to and engaged with the sealing air bag 21, and the connection is more stable.
[0038] The expansion cylinder 2 is flexibly matched with the casing 1, so that the muds can flow into mud pools with different properties, the mud separation device 6 is arranged, so that the new and old muds can be separated, the hole cleaning mud 11 can be reused, the mud needs not to be repeatedly treated, the mud discharge amount is reduced, and the environmental pollution is avoided.
[0039] The injection pipe 5 and the separation device 6 of the hole cleaning mud injection device can be sunk into the casing 1, after being sunk, the separation device 6 is attached to the casing 1, and a separation layer is formed.
[0040] In an embodiment, the separation device 6 is a placing box or a film belt.
[0041] In an embodiment, the separation device 6 is a piston structure arranged at the bottom of the injection pipe 5.
[0042] Referring to Figures 2-5 , the construction process is as follows:
[0043] 1. After the hole forming is completed, before the hole cleaning is performed:
[0044] ① Close the suction valve: Ensure the suction valve is completely closed to prevent mud leakage.
[0045] ② Place the hole cleaning mud injection device: Place the isolation device in the casing to isolate the original mud in the casing.
[0046] 2. Hole cleaning mud injection:
[0047] ① Inject hole cleaning mud from the injection pipe: Inject hole cleaning mud below the isolation device.
[0048] ② Push the original mud out of the casing: As the hole cleaning mud is injected, the original mud in the hole is gradually pushed out, and the discharge valve is opened to allow the original mud to be discharged into the original mud collection tank.
[0049] 3. Pouring concrete:
[0050] ① Close the discharge valve: Before pouring concrete, ensure that the discharge valve is completely closed.
[0051] ② During the concrete pouring process, the hole cleaning mud will be gradually pushed out, and the suction valve will be opened to allow the hole cleaning mud to be discharged into the hole cleaning mud collection tank.
[0052] Based on the above ideal embodiments according to the present application, through the above description, relevant personnel can make various changes and modifications without deviating from the technical concept of the present application. The technical scope of the present application is not limited to the contents of the specification, and must be determined by the scope of the claims.
Claims
1. A slurry isolation and recycling collection device for use in diaphragm walling for slurry clean-up and replacement of the hole for continuous walling / pile foundation, characterized in that, The utility model relates to a mud displacement device for a cast-in-place pile, comprising: a casing arranged in a hole and protruding above the upper plane of the hole; an extension cylinder arranged on the upper plane of the hole and having a mud transition chamber in communication with the casing; a hole-cleaning mud collecting tank in communication with the extension cylinder through a pipeline, and a collecting port valve switch arranged on the pipeline; a raw mud collecting tank in communication with the extension cylinder through a pipeline, and a discharging port valve switch arranged on the pipeline; a hole-cleaning mud injection device comprising an injection pipe and a separation device arranged at the bottom of the injection pipe, wherein the separation device is sunk to the bottom of the casing and attached to the casing, and the separation device allows the mud in the upper and lower layers to be discharged separately, and when the amount of hole-cleaning mud injected in the lower layer of the separation device increases, the separation device rises, the mud in the upper layer is discharged into the raw mud collecting tank, the raw mud in the casing is replaced by hole-cleaning mud, and different muds are collected separately; when hole-cleaning mud is injected, the hole-cleaning mud is injected into the bottom of the casing, and as the amount of hole-cleaning mud in the bottom of the casing increases, the separation device rises, the mud in the upper part is squeezed into the mud transition chamber of the extension cylinder, and the discharging port valve switch is opened to allow the raw mud to be discharged into the raw mud collecting tank; when concrete is poured, the concrete is sunk into the casing, and as the amount of concrete in the casing increases, the hole-cleaning mud is squeezed into the mud transition chamber of the extension cylinder, and the collecting port valve switch is opened to allow the hole-cleaning mud to be discharged into the hole-cleaning mud collecting tank.
2. A slurry isolation and recollection device for hole-making casting according to claim 1, characterized in that: A sealing air bag is arranged between the casing and the extension cylinder, and the sealing air bag is tightly attached to the casing and the extension cylinder.
3. A slurry isolation and recollection device for hole-making casting according to claim 2, characterized in that: An open flange is arranged at the upper part of the casing, and the open flange is tightly attached to the sealing air bag.
4. A slurry isolation and recollection device for cased hole cementing according to claim 1, wherein: The separation device is a box or a film belt.
5. A slurry isolation and recollection device for hole-making casting according to claim 1, characterized in that: The separation device is a piston structure arranged at the bottom of the injection pipe.
6. A slurry isolation and recirculation collection device for hole- making placement according to claim 1, wherein: The casing extends to the bottom of the hole.