Temporary water utilization system for high-rise building
By pre-embedding water supply pipes within shear walls and fixing them to the reinforcing steel using tee joints and junction boxes, the problem of pipe damage in temporary water supply systems for high-rise buildings was solved, achieving stable water supply and improved construction progress.
Patent Information
- Application Number
- CN202520524385.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-25
- Publication Date
- 2026-02-13
- Estimated Expiration
- 2035-03-25
AI Technical Summary
Temporary water systems in high-rise buildings are prone to bursting in the summer and freezing in the winter, which can damage pipes, affect construction progress and normal water use.
The water supply pipes are pre-embedded in the shear wall and fixed to the pre-embedded steel bars through tee joints and junction boxes. The pipes are fixed by hot-melt welding and combined with a snap-fit structure to achieve rapid installation and positioning, avoiding external water pipes and ensuring that the pipes are not affected by the weather.
It has achieved a stable water supply for the temporary water system of high-rise buildings, avoided pipeline damage, and improved the construction progress and water reliability.
Smart Images

Figure CN223907593U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the field of building construction, in particular to a temporary water system for high-rise building. BACKGROUND
[0002] The temporary water of building refers to the water supply system set up in the process of building engineering construction to meet the needs of on-site production (such as concrete mixing, maintenance, dust fall, etc.) and life (such as workers drinking water, toilet water, etc.).
[0003] The current temporary water of high-rise building is usually traditional externally hung, which is easy to be sun-blasted in summer and frost heaving and cracked in winter, resulting in pipeline damage, thereby affecting the normal water use of high-rise and delaying the construction progress, and needs to be improved. UTILITY MODEL CONTENT
[0004] In view of the defects in the prior art, the utility model aims at providing a temporary water system for high-rise building, which can avoid pipeline damage and ensure normal water supply.
[0005] The above technical purpose of the utility model is realized by the following technical scheme: a temporary water system for high-rise building, comprising:
[0006] A junction box is arranged in the wallboard, and two junction boxes are arranged on the lowermost wallboard;
[0007] A tee joint is arranged in the junction box, and the upper and lower ends of the tee joint penetrate the junction box;
[0008] A water supply pipe is arranged in the adjacent two tee joints and located inside the wallboard;
[0009] A water pump is connected to the lowermost tee joint.
[0010] In a preferred example, the utility model can be further configured as follows: the back side of the junction box is provided with a clamping clip, and the clamping clip is provided with a clamping groove for embedding the embedded steel bar.
[0011] In a preferred example, the utility model can be further configured as follows: the junction box comprises a back plate and an outer cover, the outer cover is provided with a clamping hook for clamping the back plate, the upper and lower ends of the back plate are both provided with a mounting plate arranged horizontally, the upper and lower ends of the outer cover are both provided with a mounting groove for inserting the mounting plate, and the mounting plate and the mounting groove form a containing groove for embedding the tee joint.
[0012] In a preferred example, the utility model can be further configured as follows: the back plate is provided with a pair of fixed clips arranged horizontally and vertically, and the fixed clips are provided with a fixed groove for embedding the upper and lower ends of the tee joint.
[0013] The utility model discloses in a preferable example can be further configured as: the three -way joint is provided with the locating block, the fixed clamp is provided with the locating hole for the locating block inserts.
[0014] The utility model discloses in a preferable example can be further configured as: the both sides inner wall of the outer cover all is provided with the pull ring.
[0015] The utility model discloses in a preferable example can be further configured as: the wallboard of the uppermost layer is provided with two junction boxes, and the three -way joint in the junction box of the uppermost end is provided with an exhaust valve.
[0016] Summarized above, the utility model has following beneficial effect:
[0017] 1. by the pipeline of temporary water is pre -buried and is arranged in the shear wall, and the water supply of each floor is realized to the three -way joint of direct connection in the room, makes the layout process of temporary water system more convenient, need not the later period and sets up the water pipe of external hanging, prevents the pipeline damage, guarantees the normal water of high -rise,
[0018] 2. by setting up the junction box of clamping fixed, the junction box is fixed in the pre -buried steel bar, realizes the quick installation fixed of junction box, adopts the three -way joint of card embedding simultaneously, realizes the quick installation positioning of three -way joint, improves the construction progress. BRIEF DESCRIPTION OF DRAWINGS
[0019] Figure 1 It is structural schematic diagram of example;
[0020] Figure 2 It is internal structure schematic diagram of example;
[0021] Figure 3 It is back side structure schematic diagram of junction box of example;
[0022] Figure 4 It is the positive structure schematic diagram of junction box of example.
[0023] Fig. 1 is the junction box, 11 is backboard, 12 is outer cover, 13 is clasp, 14 is pull ring, 15 is mounting plate, 16 is installation slot, 17 is fixed clamp, 171 is locating hole, 18 is fixed groove, 19 is locating block, 2 is three -way joint, 3 is water supply pipe, 4 is water pump, 5 is clamping, 51 is card slot, 6 is exhaust valve. DETAILED DESCRIPTION
[0024] The utility model discloses in a preferable example can be further configured as: the both sides inner wall of the outer cover all is provided with the pull ring.
[0025] As Figure 1 , Figure 2 A temporary water system for high-rise building, as shown in the drawings, junction box 1, three -way joint 2, water supply pipe 3 and water pump 4.
[0026] As Figure 1 , Figure 2 , Figure 3 shown, the junction box 1 is embedded in the wallboard, and the opening faces outward, wherein two junction boxes 1 are provided on the lowermost and uppermost wallboards. The back side of the junction box 1 is provided with a clamping clip 5, and the clamping clip 5 is provided with a clamping groove 51 for embedding the embedded steel bar, realizing the quick fixing of the junction box 1.
[0027] As Figure 1 , Figure 2 shown, the tee joint 2 is arranged in the junction box 1, and the upper and lower ends penetrate the junction box 1. The water supply pipe 3 is arranged in the adjacent two tee joints 2 and located inside the wallboard. The water supply pipe 3 is fixed by hot melt welding, improving the installation efficiency of the water supply pipe 3.
[0028] As Figure 1 , Figure 2 shown, the water pump 4 is arranged in the lowermost layer and connected with the tee joint 2 of the lowermost layer. The tee joint 2 in the junction box 1 at the uppermost end is provided with an exhaust valve 6 for emptying the air in the pipeline, ensuring the large flow supply of water flow.
[0029] When constructing, the tee joint 2 is installed into the junction box 1, and then the junction box 1 is placed in the steel bar frame, so that the steel bar is embedded in the clamping clip 5 on the back side of the junction box 1, and the junction box 1 is installed and fixed on the steel bar frame. Then the water supply pipe 3 is installed and fixed on the adjacent tee joints 2, and the plugging cap is used to close the interface position of all tee joints 2.
[0030] Finally, the pouring of concrete is carried out, and the entire water supply system is poured in the shear wall to avoid summer sun exposure and winter frost heaving cracking, thereby ensuring the normal water use of high-rise buildings.
[0031] When the building is completed, the plugging cap on the tee joint 2 is removed, and then the water faucet of each layer is connected with the tee joint 2, and the water pump 4 and the exhaust valve 6 are connected with the tee joint 2 of the lowermost and uppermost layers respectively, realizing the supply of water source and the exhaust of air, and realizing the temporary water supply of high-rise buildings.
[0032] When the temporary water supply system is used up, the water pump 4, the exhaust valve 6 and the water faucet are disassembled, then the concrete is poured into the water supply pipe 3, and the junction box 1 position is plugged by using cement mortar, realizing the coverage of temporary water use and ensuring the subsequent construction of the building.
[0033] As Figure 3 , Figure 4 shown, the junction box 1 includes a back plate 11 and an outer cover 12, the outer cover 12 is provided with a clamping hook 13 for hooking the back plate 11, and the inner walls of the two sides of the outer cover 12 are provided with a pull ring 14.
[0034] As Figure 3 , Figure 4 shown, the upper and lower ends of the back plate 11 are horizontally provided with mounting plates 15, the upper and lower ends of the cover 12 are provided with mounting grooves 16 for the mounting plates 15 to be inserted, and the mounting plates 15 and the mounting grooves 16 form accommodating grooves for the tee joint 2 to be embedded.
[0035] As Figure 3 , Figure 4 shown, the inner side of the back plate 11 is horizontally provided with a pair of fixing clamps 17 arranged in an up-down manner, and the fixing clamps 17 are provided with fixing grooves 18 for the upper and lower ends of the tee joint 2 to be embedded. The tee joint 2 is provided with positioning blocks 19, and the fixing clamps 17 are provided with positioning holes 171 for the positioning blocks 19 to be embedded.
[0036] When the junction box 1 is installed, the back plate 11 is first fixed on the embedded steel bars, and then the upper and lower ends of the tee joint 2 are clamped and embedded on the pair of fixing clamps 17, and the positioning blocks 19 are embedded in the positioning holes 171, and at the same time, the mounting plates 15 support the tee joint 2.
[0037] Then the cover 12 is buckled on the back plate 11, and the clamping hooks 13 are hooked tightly on the back plate 11, and at the same time, the mounting plates 15 are inserted into the mounting grooves 16, so as to achieve clamping and fixing of the tee joint 2, and complete installation and fixing of the tee joint 2 and the junction box 1. When the junction box 1 is sealed later, the pull ring 14 can be pulled to drive the cover 12 to move outward, and the cover 12 is pulled out, so as to achieve fastening and sealing of the position of the junction box 1.
[0038] The specific embodiments are only an explanation of the utility model, and are not a limitation of the utility model. Those skilled in the art can make modifications to the embodiments without creative contribution after reading the specification, but as long as the modifications are within the scope of the claims of the utility model, they are protected by the patent law.
Claims
1. A temporary water system for high-rise buildings, characterized by: Including: The junction box (1) is arranged in the wallboard, and two are arranged on the lowermost wallboard; Three-way joint (2) is arranged in the junction box (1), and the upper and lower ends penetrate the junction box (1); Water supply pipe (3) is arranged in the adjacent two three-way joints (2), and is located inside the wallboard; The water pump (4) is connected to the lowermost three-way joint (2).
2. A temporary water system for high-rise buildings according to claim 1, characterized in that: The back side of the junction box (1) is provided with a clamp (5), and the clamp (5) is provided with a clamping groove (51) for embedding the embedded steel bar.
3. A temporary water system for high-rise buildings according to claim 2, characterized in that: The junction box (1) includes a back plate (11) and a cover (12), the cover (12) is provided with a clamping hook (13) for clamping the back plate (11), the upper and lower ends of the back plate (11) are both provided with a mounting plate (15), the upper and lower ends of the cover (12) are both provided with a mounting groove (16) for inserting the mounting plate (15), and the mounting plate (15) and the mounting groove (16) form a containing groove for embedding the three-way joint (2).
4. A temporary water system for high-rise buildings according to claim 3, characterized in that: The back plate (11) is provided with a pair of fixed clamps (17) arranged in the upper and lower sides, and the fixed clamps (17) are provided with fixed grooves (18) for embedding the upper and lower ends of the three-way joint (2).
5. A temporary water system for high-rise buildings according to claim 4, characterized in that: The three-way joint (2) is provided with a positioning block (19), and the fixed clamp (17) is provided with a positioning hole (171) for embedding the positioning block (19).
6. A temporary water system for high-rise buildings according to claim 5, characterized in that: The two side walls of the cover (12) are both provided with a pull ring (14).
7. A temporary water system for high-rise buildings as claimed in claim 1 wherein: The uppermost wallboard is provided with two junction boxes (1), and the three-way joint (2) in the uppermost junction box (1) is provided with an exhaust valve (6).