Installation device of chemical tail gas washing tower

By using an installation device consisting of a base plate, a support frame, and a positioning plate, the problems of vertical accuracy and stability during the installation of chemical tail gas scrubbing towers have been solved, achieving efficient and convenient tower installation and expanding the scope of application.

CN223931045UActive Publication Date: 2026-02-24SHAANXI YUNENG CHEM MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520556590.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-03-27
Publication Date
2026-02-24
Estimated Expiration
2035-03-27

AI Technical Summary

Technical Problem

The existing installation method of chemical tail gas scrubbing towers makes it difficult to guarantee the vertical accuracy of the tower installation, results in poor stability, and is complicated in the installation process, affecting the overall quality and efficiency.

Method used

The installation device, consisting of components such as a base plate, support frame, positioning plate, and fastening screws, ensures the vertical installation accuracy and stability of the tower body through pre-embedded fixing and clamping positioning by the positioning plate, combined with concrete pouring.

Benefits of technology

This has enabled efficient and convenient installation of the water washing tower, improved installation accuracy and stability, expanded the applicability of the device, and enhanced installation quality and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223931045U_ABST
    Figure CN223931045U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of chemical tail gas treatment, in particular to an installation device of a chemical tail gas washing tower, and aims to solve the problems that in the installation process of the chemical tail gas treatment washing tower at present, the washing tower is generally installed in a concrete direct pouring and welding mode; generally, the installation process of the water washing tower is complicated, the installation precision is poor, the installation stability is poor, and finally the overall installation quality and efficiency of the water washing tower are low. The device is mainly composed of a base plate, a supporting frame, a positioning plate, a clamping cambered surface, a supporting plate, a pouring opening and the like, the base plate is fixed in an installation foundation pit in advance, the water washing tower is clamped and positioned through the positioning plate in the supporting frame, fastening and positioning of a fastening screw are matched, the vertical installation precision of a tower body is effectively ensured, and the service life of the tower body is prolonged. And through pouring of concrete in the pouring opening, efficient and convenient installation of the water washing tower is finally achieved, the installation precision and stability of the water washing tower are further improved, and the overall installation quality and efficiency of the water washing tower are guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of chemical tail gas technology, specifically to an installation device for a chemical tail gas scrubbing tower. Background Technology

[0002] In chemical production processes, a large amount of exhaust gas is typically generated. If this exhaust gas is not treated promptly and effectively, it will cause serious environmental pollution. Therefore, water washing towers are commonly used to treat coal-to-oil exhaust gas. The installation accuracy and stability of the water washing tower are crucial for the efficient and smooth implementation of coal-to-oil exhaust gas washing treatment. Currently, the commonly used installation method for water washing towers is to hoist the entire tower into a pre-embedded foundation pit, and then directly pour concrete and weld the tower body and fasteners together. However, this installation method often suffers from problems such as difficulty in ensuring the vertical accuracy of the tower installation, poor tower installation stability, and complicated installation steps, resulting in time-consuming and labor-intensive operations. Ultimately, this leads to low overall installation quality and efficiency of the water washing tower and significantly affects its overall safety during use. Utility Model Content

[0003] This utility model provides an installation device for a chemical tail gas scrubbing tower to solve the problems mentioned above.

[0004] To achieve the above objectives, the present invention adopts the following technical solution:

[0005] An installation device for a chemical tail gas scrubbing tower includes a base plate, a support frame on the top of the base plate, first positioning plates symmetrically and slidably mounted on both sides of the top of the support frame, third support plates movably mounted on both side walls of the support frame near the first positioning plates, and the third support plates are close to the first positioning plates. Fastening screws connect the side walls of the support frame near the first positioning plates and the third support plates. Second positioning plates are provided on both sides of the top of the support frame corresponding to the first positioning plates, and clamping arc surfaces are provided on the corresponding sides of the first and second positioning plates. Multiple casting ports are also provided on the second positioning plates.

[0006] Furthermore, a pre-embedded post is provided at the center of the bottom of the substrate, and multiple first support plates are provided on both sides of the pre-embedded post and at the bottom of the substrate.

[0007] Furthermore, multiple positioning rods are symmetrically arranged on both sides of the support frame, and each of the first positioning plates has an elongated hole that matches the positioning rod, and the first positioning plates are all sleeved on the positioning rod through the elongated hole.

[0008] Furthermore, each of the first positioning plates is also vertically provided with a second support plate, and the third support plate is closely connected to the first positioning plate through the second support plate.

[0009] Furthermore, the third support plate is provided with a connecting plate on the side away from the second support plate, and the connecting plate and the support frame are connected by the fastening screw.

[0010] Furthermore, mounting holes are provided on both sides of the support frame near the first positioning plate, and the third support plate is slidably disposed inside the mounting holes.

[0011] Furthermore, the connecting plate covers the side of the support frame and the second positioning plate, and the connecting plate is also provided with a handle, while the second positioning plate is also provided with multiple lifting lugs.

[0012] This utility model has the following beneficial effects:

[0013] This utility model provides an installation device for a chemical tail gas scrubbing tower, mainly composed of a base plate, a support frame, a positioning plate, a clamping arc surface, and a pouring port. By pre-fixing the base plate in the installation pit, clamping and positioning the scrubbing tower through the positioning plate in the support frame, and tightening the positioning with matching fastening screws, the vertical installation accuracy of the tower body is effectively ensured. Then, by pouring concrete in the pouring port, the efficient and convenient installation of the scrubbing tower is finally achieved, further improving its installation accuracy and stability, ensuring the overall installation quality and efficiency of the scrubbing tower. This solves the problem that in the current installation process of scrubbing towers for coal-to-oil tail gas treatment, the common practice of directly pouring concrete and welding the scrubbing towers usually results in a complicated installation process, poor installation accuracy, poor installation stability, and ultimately low overall installation quality and efficiency of the scrubbing tower.

[0014] The design of the long hole and positioning rod in this utility model, along with the pushing and fastening screws of the third support plate, and the clamping and positioning of the tower body by the appropriately sized second positioning plate, allows the first positioning plate to be reasonably adjusted according to the tower body of different specifications of water washing towers. This effectively expands the applicability of the installation device to water washing towers of different specifications and further enhances the overall practicality of the device.

[0015] In this invention, the connecting plate covers the side of the support frame and the second positioning plate, and the fastening action of the fastening screws ensures that the tower body can be stably and accurately installed in the support frame, effectively ensuring the accuracy and quality of the tower body installation. Attached Figure Description

[0016] Figure 1 This is a schematic diagram of the overall structure of this utility model.

[0017] Figure 2 This is a schematic diagram of the overall structure of the transverse cross section of this utility model.

[0018] Figure 3This is a schematic diagram of the overall structure of the longitudinal section of this utility model.

[0019] The meanings of the reference numerals in the attached figures are as follows:

[0020] 1. Embedded column; 2. First support plate; 3. Base plate; 4. Support frame; 5. Positioning rod; 6. Mounting hole; 7. First positioning plate; 8. Elongated hole; 9. Clamping arc surface; 10. Second support plate; 11. Third support plate; 12. Connecting plate; 13. Handle; 14. Fastening connecting rod; 15. Second positioning plate; 16. Lifting lug; 17. Pouring port; 18. Tower body. Detailed Implementation

[0021] The present invention will be further described below with reference to the accompanying drawings and specific embodiments.

[0022] like Figure 1-3 As shown, an installation device for a chemical tail gas scrubbing tower includes a base plate 3. A pre-embedded column 1 is welded to the center of the bottom of the base plate 3. A set of first support plates 2 are provided on both sides of the pre-embedded column 1 and located at the bottom of the base plate 3. A support frame 4 is welded and fixed to the center of the top of the base plate 3. Two sets of positioning rods 5 are symmetrically and vertically welded to both sides of the support frame 4. Each of the first positioning plates 7 has elongated holes 8 that match the positioning rods 5, and the first positioning plates 7 are fitted onto the positioning rods 5 through the elongated holes 8. Third support plates 11 are slidably installed on both side walls of the support frame 4 near the first positioning plates 7 through mounting holes 6. The third support plates 11 and the first positioning plates 7 are tightly connected by second support plates 10. A connecting plate 12 is vertically welded to the side of the third support plate 11 away from the second support plate 10. A handle 13 is also welded to the connecting plate 12, and the connecting plate 12 and the support frame 4 are connected by fastening screws 14. Second positioning plates 15 are installed on the top two sides of the support frame 4, corresponding to the first positioning plate 7. The connecting plate 12 covers the sides of the support frame 4 and the second positioning plate 15. Clamping arc surfaces 9 are machined on the corresponding sides of the first positioning plate 7 and the second positioning plate 15. Multiple pouring ports 17 are opened on the second positioning plate 15, and multiple lifting lugs 16 are also welded on the second positioning plate 15.

[0023] In practical application, the present invention is first assembled into an integral component consisting of a pre-embedded column 1, a first support plate 2, a base plate 3, and a support frame 4, and then hoisted into the pre-embedded foundation pit of the washing tower body 18 and cast and tightened. After checking that the casting is stable, the tower body 18 is hoisted to the center position inside the support frame. After checking that the tower body 18 is vertical, the first positioning plate 7 is fitted onto the positioning rod 5 through the elongated hole 8, ensuring that the first positioning plate 7 slides flexibly. Then, the second positioning plate 15 is hoisted to the top of the support frame 4 and clamped on both sides of the tower body 18. After adjusting the first positioning plate 7 and the second positioning plate 15 to be aligned and clamping the tower body 18, the third support plate 11 and the connecting plate 12 are then assembled into a single unit. Insert the third support plate 11 into the support frame 4 through the mounting hole 6, ensuring that one end of the third support plate 11 pushes the second support plate 10 and moves the first positioning plate 7 and the second positioning plate 15. After ensuring that the clamping arc surface 9 is completely close to the tower body 18, tighten and lock the first positioning plate 7 and the second positioning plate 15 with the fastening screw 14. After ensuring that the overall verticality and dimensions of the tower body 18 are qualified, concrete can be poured into the support frame 4 through the pouring port 17. This completes the convenient and accurate installation of the water washing tower body 18, effectively improving the installation accuracy and stability of the tower body 18, and further improving the overall installation quality and efficiency of the water washing tower body 18. Therefore, this device has good practicality.

Claims

1. An installation device for a chemical tail gas scrubbing tower, characterized in that: The system includes a base plate (3), a support frame (4) on the top of the base plate (3), a first positioning plate (7) symmetrically sliding on both sides of the top of the support frame (4), a third support plate (11) movably passing through both sides of the support frame (4) near the first positioning plate (7), and the third support plate (11) and the first positioning plate (7) are close together. A fastening screw (14) is connected between the two sides of the support frame (4) near the first positioning plate (7) and the third support plate (11). A second positioning plate (15) is provided on both sides of the top of the support frame (4) and the first positioning plate (7) respectively. A clamping arc surface (9) is provided on both sides of the first positioning plate (7) and the second positioning plate (15). Multiple pouring ports (17) are also provided on the second positioning plate (15).

2. The installation device for a chemical tail gas scrubbing tower according to claim 1, characterized in that: The substrate (3) has a pre-embedded column (1) at the center of its bottom, and a plurality of first support plates (2) are provided on both sides of the pre-embedded column (1) and at the bottom of the substrate (3).

3. The installation device for a chemical tail gas scrubbing tower according to claim 1, characterized in that: The support frame (4) is symmetrically provided with multiple positioning rods (5) on both sides. The first positioning plate (7) is provided with elongated holes (8) that match the positioning rods (5), and the first positioning plate (7) is sleeved on the positioning rods (5) through the elongated holes (8).

4. The installation device for a chemical tail gas scrubbing tower according to claim 3, characterized in that: Each of the first positioning plates (7) is also vertically provided with a second support plate (10), and the third support plate (11) is closely connected to the first positioning plate (7) through the second support plate (10).

5. The installation device for a chemical tail gas scrubbing tower according to claim 4, characterized in that: The third support plate (11) is provided with a connecting plate (12) on the side away from the second support plate (10), and the connecting plate (12) and the support frame (4) are connected by the fastening screw (14).

6. The installation device for a chemical tail gas scrubbing tower according to claim 5, characterized in that: The support frame (4) has mounting holes (6) on both sides of the first positioning plate (7), and the third support plate (11) is slidably disposed inside the mounting holes (6).

7. The installation device for a chemical tail gas scrubbing tower according to claim 6, characterized in that: The connecting plate (12) covers the side of the support frame (4) and the second positioning plate (15). The connecting plate (12) is also provided with a handle (13), and the second positioning plate (15) is also provided with multiple lifting lugs (16).