PPH pipeline locking tool
By using the support components and pressure devices of the PPH pipeline locking fixture, the problem of ensuring the perpendicularity of the PPH pipeline and pipeline joint is solved, achieving high-precision connection and safe locking, and preventing burns.
Patent Information
- Application Number
- CN202520588393.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-31
- Publication Date
- 2026-02-27
- Estimated Expiration
- 2035-03-31
AI Technical Summary
In existing technologies, it is difficult to ensure the perpendicularity of PPH pipes when connecting pipe joints, which leads to connection difficulties and makes workers prone to burns.
The PPH pipe locking fixture includes a frame, support, pressure device and welder. The support clamps the outer wall of the PPH pipe and abuts its end face. The pressure device applies pressure to the end face of the pipe joint to ensure verticality and prevent burns.
It achieves vertical docking and locking between PPH pipes and pipe joints, improving the accuracy and safety of the connection and preventing workers from being burned.
Smart Images

Figure CN223948552U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to pipeline connection technical field especially, relate to a PPH pipeline locking tool. BACKGROUND
[0002] PPH (homopolymerization polypropylene) pipeline needs to be locked with pipeline joint butt joint, and the existing technology needs staff to manually insert PPH pipeline into pipeline joint and realizes locking by manual welding, and the perpendicularity tolerance of PPH pipeline and pipeline joint butt joint is difficult to guarantee, which leads to subsequent pipeline connection difficulty, and staff is easily scalded, and the safety is poor. UTILITY MODEL CONTENT
[0003] The utility model aims at providing a PPH pipeline locking tool, which can butt joint and lock PPH pipeline and pipeline joint, ensure the vertical precision of PPH pipeline and pipeline joint butt joint, and prevent staff from being scalded.
[0004] To achieve this purpose, the utility model adopts the following technical scheme:
[0005] A PPH pipeline locking tool is provided, and PPH pipeline is inserted into pipeline joint, and the PPH pipeline locking tool comprises:
[0006] A rack;
[0007] A support is placed on the rack, and the support has a clamping part for clamping the outer wall of the PPH pipeline and an abutting part for abutting the end face of the end of the PPH pipeline away from the pipeline joint;
[0008] A pressure device is fixedly connected to the rack, and the pressure device can apply pressure to the end face of the pipeline joint;
[0009] A fusion splicer can heat the PPH pipeline and the pipeline joint.
[0010] Preferably, the clamping part is an arc-shaped clamping surface, the arc-shaped clamping surface surrounds to form a clamping space for clamping the outer wall of the PPH pipeline, and the arc-shaped clamping surface can be fitted with the outer wall of the PPH pipeline.
[0011] Preferably, the PPH pipeline locking tool comprises at least two supports, the radii of the arc-shaped clamping surfaces of each support are different, and one of the supports is selectively placed on the rack.
[0012] Preferably, the support further has a mounting part, a first hoop part and a second hoop part, the first hoop part and the second hoop part are correspondingly and spacedly arranged, the first hoop part and the second hoop part are fixedly connected to the mounting part respectively, and the first hoop part and the second hoop part form the arc-shaped clamping surface on the side surface of the outer wall of the PPH pipeline.
[0013] Preferably, the PPH pipeline locking tool further comprises a locking member fixedly connected to the support member and capable of adjusting the distance between the first and second hoop portions to adjust the size of the clamping space.
[0014] Preferably, the support member further has a first connecting hole, and the rack has a first fixing hole corresponding to the first connecting hole, and the support member is fixed to the rack by a locking member penetrating through the first connecting hole and the first fixing hole.
[0015] Preferably, the pressure device comprises a driver and a pressure plate, the output end of the driver is fixedly connected to the pressure plate, the pressure plate faces the end surface of the pipeline joint, and the driver is capable of driving the pressure plate to move and press against the end surface of the pipeline joint.
[0016] Preferably, the driver comprises a mounting bracket, a pressing member and an operating member, the mounting bracket is fixedly connected to the rack, the pressing member is slidingly connected to the mounting bracket, one end of the pressing member is fixedly connected to the pressure plate, and the operating member is fixedly connected to the pressing member and used to drive the pressing member to drive the pressure plate to move and press against the end surface of the pipeline joint.
[0017] Preferably, the PPH pipeline has a connecting pipe end at the end away from the pipeline joint, and the abutting portion has a profiling surface matching the outer contour of the connecting pipe end, and when the pressure device applies pressure to the end surface of the pipeline joint, the connecting pipe end abuts against the profiling surface.
[0018] The PPH pipeline locking tool has the following beneficial effects:
[0019] The PPH pipeline locking tool can clamp the outer wall of the PPH pipeline and abut against the end surface of the end of the PPH pipeline away from the pipeline joint after the PPH pipeline is inserted into the pipeline joint, the staff member holds the support member to heat the PPH pipeline and the pipeline joint by the fusion device, the pressure device applies pressure to the end surface of the pipeline joint to realize the butt locking of the PPH pipeline and the pipeline joint, and the perpendicularity of the PPH pipeline and the pipeline joint is ensured, and the staff member is prevented from being scalded. BRIEF DESCRIPTION OF DRAWINGS
[0020] Figure 1 is a structural schematic view of the PPH pipeline locking tool provided by the utility model;
[0021] Figure 2 is a sectional view of the PPH pipeline locking tool provided by the utility model.
[0022] In the drawings:
[0023] 100, PPH pipeline; 101, connecting pipe end; 200, pipeline joint;
[0024] 1, rack; 11, first fixing hole;
[0025] 2, support; 21, mounting portion; 22, first hoop portion; 23, second hoop portion; 24, first connecting hole; 25, abutting portion; 251, profiling surface;
[0026] 3, pressure device; 31, driver; 311, mounting bracket; 312, pressure piece; 313, operating piece; 32, pressure plate;
[0027] 4, locking member. DETAILED DESCRIPTION
[0028] The utility model will be described in further detail below in combination with the drawings and examples. It can be understood that the specific examples described herein are only used to explain the utility model and are not limited to the utility model. In addition, it should be noted that only the parts related to the utility model are shown in the drawings for ease of description, not all structures.
[0029] In the description of the utility model, unless otherwise explicitly specified and limited, the terms "connected", "connected", "fixed" should be understood broadly, for example, it can be fixedly connected, or it can be detachably connected, or it can be integrated; it can be mechanically connected, or it can be electrically connected; it can be directly connected, or it can be indirectly connected through an intermediate medium; it can be the internal communication of two elements or the interaction relationship between two elements. For ordinary skilled in the art, the specific meaning of the above terms in the utility model can be understood according to the specific circumstances.
[0030] In the utility model, unless otherwise explicitly specified and limited, the "upper" or "lower" of the first feature to the second feature can include the direct contact of the first and second features, or it can include the contact of the first and second features through another feature between them. Moreover, the "upper", "upper" and "upper" of the first feature to the second feature include the vertical and inclined upward of the first feature above the second feature, or only indicate that the horizontal height of the first feature is higher than that of the second feature. The "below", "below" and "below" of the first feature to the second feature include the vertical and inclined downward of the first feature below the second feature, or only indicate that the horizontal height of the first feature is less than that of the second feature.
[0031] In the description of the embodiment, the terms "upper", "lower", "right", etc. orientation or position relationship is based on the orientation or position relationship shown in the drawings, only for the convenience of description and simplification of operation, and does not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, therefore it cannot be understood as a limitation on the utility model. In addition, the terms "first", "second" are only used to distinguish in the description, and have no special meaning.
[0032] The PPH pipeline needs to be connected and locked with the pipeline joint to be normally used, in the prior art, the staff needs to manually insert the PPH pipeline into the pipeline joint and manually weld to realize the locking, the perpendicularity tolerance of the PPH pipeline and the pipeline joint in the connection is difficult to guarantee, leading to the difficulty in the subsequent pipeline connection, and the staff is easily scalded, and the safety is poor, and the manual welding is difficult to guarantee the perpendicularity of the PPH pipeline and the pipeline joint in the connection, which is a direct reason why the staff is easily scalded, therefore, avoiding the manual welding is the key to solve the above technical problems. The PPH pipeline locking tool is introduced in detail below. Figures 1 to 2 The PPH pipeline locking tool is introduced in detail below.
[0033] Figure 1 The structure schematic diagram of the PPH pipeline locking tool is shown. As shown in the figure, Figure 1 The PPH pipeline locking tool provided by the embodiment, the PPH pipeline 100 is inserted into the pipeline joint 200, the PPH pipeline locking tool comprises a rack 1, a supporting piece 2, a pressure device 3 and a fusion device (not shown in the figure), the supporting piece 2 is placed on the rack 1, the supporting piece 2 has a clamping part for clamping the outer wall of the PPH pipeline 100 and an abutting part 25 for abutting the end face of the end of the PPH pipeline away from the pipeline joint 200, the pressure device 3 is fixedly connected to the rack 1, the pressure device 3 can apply pressure to the end face of the pipeline joint 200, and the fusion device can heat the PPH pipeline 100 and the pipeline joint 200.
[0034] The PPH pipeline locking tool in the embodiment can support the outer wall of the PPH pipeline 100 and abut the end face of the end of the PPH pipeline 100 away from the pipeline joint 200 after the PPH pipeline 100 is inserted into the pipeline joint 200 through the clamping part and the abutting part 25 of the supporting piece 2, the staff holds the supporting piece 2 so that the PPH pipeline 100 and the pipeline joint 200 are heated by the fusion device, the pressure device 3 applies pressure to the end face of the pipeline joint 200 to realize the connection and locking of the PPH pipeline 100 and the pipeline joint 200, the perpendicularity of the PPH pipeline 100 and the pipeline joint 200 is ensured, and the staff is prevented from being scalded.
[0035] As shown in the figure, Figure 1 The clamping part is an arc-shaped clamping surface, the arc-shaped clamping surface surrounds to form a clamping space for clamping the outer wall of the PPH pipeline 100, the arc-shaped clamping surface can be fitted with the outer wall of the PPH pipeline 100, so that the supporting piece 2 can more stably clamp the PPH pipeline 100, the PPH pipeline 100 is prevented from moving in the radial direction when the pressure device 3 applies pressure to the end face of the pipeline joint 200, and the perpendicularity of the PPH pipeline 100 and the pipeline joint 200 in the connection and locking is ensured.
[0036] Preferably, the different specifications of PPH pipelines 100 have different outer diameters, and all need to be connected and locked with the pipeline joint 200 to be normally used. In order to make the PPH pipeline locking tool applicable to PPH pipelines 100 of various specifications, the PPH pipeline locking tool comprises at least two supporting members 2, the arc-shaped clamping surfaces of each supporting member 2 are different in curvature, and one of the supporting members 2 is placed on the rack 1, so that one set of PPH pipeline locking tool can be used for PPH pipelines 100 of different specifications, thereby improving the versatility of the PPH pipeline locking tool. It should be noted that the number of supporting members 2 is not limited, and can be 2, 3, 4, or even more, as long as the arc-shaped clamping surface of the supporting member 2 is in close contact with the outer wall of the PPH pipeline 100. It can be understood that one supporting member 2 can only be applicable to one outer diameter specification of PPH pipeline 100.
[0037] As shown in FIG. 1, the PPH pipeline locking tool comprises a rack 1 and a supporting member 2, the supporting member 2 is fixedly connected to the rack 1, and the supporting member 2 has an arc-shaped clamping surface, the arc-shaped clamping surface is formed on the side surface of the supporting member 2 facing the outer wall of the PPH pipeline 100, and the arc-shaped clamping surface is in close contact with the outer wall of the PPH pipeline 100. Figure 1 As shown in FIG. 1, the PPH pipeline locking tool comprises a rack 1 and a supporting member 2, the supporting member 2 is fixedly connected to the rack 1, and the supporting member 2 has an arc-shaped clamping surface, the arc-shaped clamping surface is formed on the side surface of the supporting member 2 facing the outer wall of the PPH pipeline 100, and the arc-shaped clamping surface is in close contact with the outer wall of the PPH pipeline 100.
[0038] In some embodiments, the PPH pipeline locking tool further comprises a locking member 4, the locking member 4 is fixedly connected to the supporting member 2 and can adjust the distance between the first hoop portion 22 and the second hoop portion 23 to adjust the size of the clamping space, so that the first hoop portion 22 and the second hoop portion 23 can clamp the PPH pipeline 100, thereby preventing rotation in the axial direction when the pressure device 3 applies pressure to the end surface of the pipeline joint 200, thereby ensuring the perpendicularity of the PPH pipeline 100 and the pipeline joint 200. Specifically, the first hoop portion 22 has a second fixed hole, the second hoop portion 23 has a second connecting hole, the locking member 4 is a bolt, the bolt passes through the second connecting hole and is connected with the second fixed hole, so that the bolt can be screwed to make the first hoop portion 22 and the second hoop portion 23 locally deform and approach each other, thereby adjusting the size of the clamping space to clamp the PPH pipeline 100.
[0039] Figure 2This diagram shows a cross-sectional view of the PPH pipe locking fixture provided in this embodiment. When the pressure device 3 applies pressure to the end face of the pipe connector 200, if the support member 2 is placed directly on the frame 1, uneven force on the end face of the pipe connector 200 may cause the support member 2 to tip over, resulting in the PPH pipe 100 and the pipe connector 200 failing to properly connect and lock. To solve the above technical problem, such as... Figures 1 to 2 As shown, the support member 2 also has a first connecting hole 24, and the frame 1 has a first fixing hole 11 corresponding to the first connecting hole 24. A locking element passes through the first connecting hole 24 and engages with the first fixing hole 11 to fix the support member 2 to the frame 1. This ensures that even when the end face of the pipe connector 200 is subjected to uneven force, the PPH pipe 100 and the pipe connector 200 can still be locked normally. Specifically, the locking element is a bolt, which passes through the first connecting hole 24 and engages with the first fixing hole 11 to fix the support member 2 to the frame 1.
[0040] Continue as Figures 1 to 2 As shown, the pressure device 3 includes a driver 31 and a pressure plate 32. The output end of the driver 31 is fixedly connected to the pressure plate 32. The pressure plate 32 faces the end face of the pipe connector 200. The driver 31 can drive the pressure plate 32 to move and press against the end face of the pipe connector 200, thereby applying pressure to the end face of the pipe connector 200 to achieve locking between the PPH pipe 100 and the pipe connector 200. Specifically, the driver 31 can be a pneumatic cylinder, an electric cylinder, or a hydraulic cylinder, which is not limited here, as long as it can drive the pressure plate 32 to move linearly and press against the end face of the pipe connector 200.
[0041] In some embodiments, the driver 31 includes a mounting bracket 311, a pressing member 312, and an operating member 313. The mounting bracket 311 is fixedly connected to the frame 1, the pressing member 312 is slidably connected to the mounting bracket 311, one end of the pressing member 312 is fixedly connected to the pressure plate 32, and the operating member 313 is fixedly connected to the pressing member 312. The operating member 313 is used to drive the pressing member 312 to move the pressure plate 32 and press against the end face of the pipe connector 200, so that the operator can manually lock the PPH pipe 100 and the pipe connector 200, simplifying the structure of the PPH pipe 100 locking fixture. Specifically, the operating member 313 is a first connecting rod, and the pressing members 312 are all sliders. A rocker-slider mechanism is formed between the first connecting rod and the sliders, so that the first connecting rod can be rotated to move the sliders and drive the pressure plate 32 to move to press against the end face of the pipe connector 200.
[0042] In actual use of the PPH pipe 100, the PPH pipe 100 can be connected with another PPH pipe 100 as a main pipe by fusion, and the end of the PPH pipe 100 needs to be cut into a connecting pipe end 101 in the form of a line of intersection, so that the PPH pipe 100 can be connected with another PPH pipe 100 by fusion with less PPH material, thereby reducing the fusion time of the main pipe and the branch pipe and improving the fusion effect. When the PPH pipe 100 is connected with the pipe joint 200 at one end and is fused with another PPH pipe 100 at the other end, if the abutting portion 25 abuts against the connecting pipe end 101 when the PPH pipe 100 is connected with the pipe joint 200, the connecting pipe end 101 is easily damaged by external force, and more PPH material needs to be fused to realize the fusion of the main pipe and the branch pipe. To solve the above technical problems, the abutting portion 25 is provided with a profiling surface 251 matched with the outer contour of the connecting pipe end 101, and when the pressure device 3 applies pressure to the end face of the pipe joint 200, the connecting pipe end 101 abuts against the profiling surface 251, so that the pressure borne by the connecting pipe end 101 is uniformly distributed to the profiling surface 251, and the deformation of the connecting pipe end 101 is prevented. Figures 1 to 2
[0043] The embodiment also provides a PPH pipe locking method based on the PPH pipe locking tool.
[0044] The PPH pipe 100 is inserted into the pipe joint 200, the outer wall of the pipe joint 200 is placed in the clamping space of the support 2, the support 2 clamps the pipe joint 200, the fusion device heats the PPH pipe 100 and the pipe joint 200, the support 2 is placed on the rack 1, and the pressure device 3 applies pressure to the end face of the pipe joint 200 to realize the butt locking of the PPH pipe 100 and the pipe joint 200.
[0045] Obviously, the above embodiments of the utility model are only examples for clearly illustrating the utility model, and are not a limitation on the embodiments of the utility model. For ordinary skilled persons in the art, various obvious changes, re-adjustments and replacements can be made without departing from the protection scope of the utility model. Here, all the embodiments need not and cannot be exhausted. Any modification, equivalent replacement and improvement made within the spirit and principle of the utility model should be included in the protection scope of the utility model claim.
Claims
1. A PPH pipe locking tool, a PPH pipe (100) is inserted into a pipe joint (200), characterized in that, The PPH pipeline locking tool comprises: a rack (1); a support (2) placed on the rack (1), the support (2) having a clamping portion for clamping the outer wall of the PPH pipeline (100) and an abutting portion (25) for abutting against the end face of the end of the PPH pipeline (100) away from the pipeline joint (200); a pressure device (3) fixedly connected to the rack (1), the pressure device (3) being capable of applying pressure to the end face of the pipeline joint (200); a fusion device capable of heating the PPH pipeline (100) and the pipeline joint (200).
2. The PPH tubing lock tool of claim 1, wherein, The clamping portion is an arc-shaped clamping surface, which forms a clamping space for clamping the outer wall of the PPH pipeline (100), and the arc-shaped clamping surface can be fitted to the outer wall of the PPH pipeline (100).
3. The PPH tubing lock tool of claim 2, wherein, The PPH pipeline locking tool comprises at least two supports (2), the radii of the arc-shaped clamping surfaces of each of the supports (2) are different, and one of the supports (2) is selectively placed on the rack (1).
4. The PPH tubing lock tool of claim 2, wherein, The support (2) further has a mounting portion (21), a first hoop portion (22) and a second hoop portion (23), the first hoop portion (22) and the second hoop portion (23) are correspondingly and spacedly arranged, the first hoop portion (22) and the second hoop portion (23) are fixedly connected to the mounting portion (21), and the first hoop portion (22) and the second hoop portion (23) form the arc-shaped clamping surface towards the side surface of the outer wall of the PPH pipeline (100).
5. The PPH tubing lock tool of claim 4, wherein, The PPH pipeline locking tool further comprises a locking member (4) fixedly connected to the support (2) and capable of adjusting the distance between the first hoop portion (22) and the second hoop portion (23) to adjust the size of the clamping space.
6. The PPH tubing lock tool of claim 1, wherein, The support (2) further has a first connecting hole (24), the rack (1) has a first fixing hole (11) correspondingly arranged with the first connecting hole (24), and the support (2) is fixed to the rack (1) by a locking member penetrating through the first connecting hole (24) and the first fixing hole (11) to be connected.
7. The PPH tubing lock tool of claim 1, wherein, The pressure device (3) comprises a driver (31) and a pressure plate (32), the output end of the driver (31) is fixedly connected to the pressure plate (32), the pressure plate (32) is opposite to the end face of the pipeline joint (200), and the driver (31) is capable of driving the pressure plate (32) to move and press against the end face of the pipeline joint (200).
8. The PPH tubing lock tool of claim 7, wherein, The driver (31) comprises a mounting bracket (311), a pressing piece (312) and an operating piece (313), the mounting bracket (311) is fixedly connected to the rack (1), the pressing piece (312) is slidingly connected to the mounting bracket (311), one end of the pressing piece (312) is fixedly connected with the pressure plate (32), the operating piece (313) is fixedly connected with the pressing piece (312), and the operating piece (313) is used for driving the pressing piece (312) to drive the pressure plate (32) to move and press against the end face of the pipeline joint (200).
9. The PPH tube locking tool according to any one of claims 1 to 8, wherein The PPH pipeline (100) is provided with a connecting pipe end (101) away from one end of the pipeline joint (200), the abutting portion (25) is provided with a profiling surface (251) matched with the outer contour of the connecting pipe end (101), and when the pressure device (3) applies pressure to the end face of the pipeline joint (200), the connecting pipe end (101) abuts against the profiling surface (251).