Light storage and charging integrated prefabricated stadium structure
The design of the assembly and positioning mechanisms solves the problems of long assembly time and inconvenient solar panel installation in prefabricated venues, achieving rapid assembly and convenient positioning.
Patent Information
- Application Number
- CN202520428660.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-12
- Publication Date
- 2026-02-27
- Estimated Expiration
- 2035-03-12
AI Technical Summary
Prefabricated stadium structures take a long time to assemble, and the installation of solar panels is inconvenient.
The system employs an assembly mechanism and a positioning mechanism to achieve rapid assembly and convenient positioning through assembly components and positioning components. The assembly components consist of connecting pieces, nuts, expansion studs, and sealing gaskets, while the positioning mechanism consists of a lower limit frame, an upper limit frame, and mounting holes.
It enables rapid assembly of the venue structure and convenient installation of solar panels, improving assembly efficiency and the ease of solar panel positioning.
Smart Images

Figure CN223952340U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the technical field of venue structure, concretely is light storage and fills integrated prefabricated venue structure. BACKGROUND
[0002] Prefabricated structure is also called prefabricated assembly type structure, that is, the prefabricated component product of the industrialized way of assembly building houses by using assembly line production products, and the present light storage and filling integrated venue usually adopts prefabricated structure.
[0003] The connecting piece of the prefabricated venue is generally separately arranged during assembly, the connecting piece is connected with the main piece first, and then the connecting pieces are connected during assembly, which is relatively cumbersome and takes a long time to assemble; the top of the venue structure is generally paved with solar panels for light storage, and the solar panels are not easy to be quickly positioned and placed during paving, thereby reducing the convenience degree of paving the solar panels on the venue structure. UTILITY MODEL CONTENT
[0004] The utility model discloses a light storage and filling integrated prefabricated venue structure to solve the problem of long assembly time and low convenience degree of paving solar panels when the venue structure is used.
[0005] To achieve the above object, the utility model provides the following technical scheme: light storage and filling integrated prefabricated venue structure, including venue main part, the venue main part is composed of support pile, end plate, connecting plate, main plate and middle plate, both ends of the venue main part are provided with end plate, the bottom of end plate is provided with equidistant support pile, the inside of support pile is fixed with steel bar, the steel bar is crossed and arranged, one side of end plate is provided with main plate, the main plate is inclined structure, the connecting plate is arranged between main plate and end plate, the connecting plate is inclined structure, the height of connecting plate is higher than end plate and lower than main plate, the middle plate is arranged between main plate, the height of middle plate is higher than main plate, the venue main part is connected through the disassembly and assembly of assembly mechanism, the inside of assembly mechanism includes assembly component and reinforcing rib, the surface of main plate is provided with positioning mechanism, the inside of positioning mechanism includes lower limit position, upper limit position, mounting hole and drain hole.
[0006] Preferably, the two ends of the surface of the support pile, the end plate, the connecting plate, the main plate and the middle plate are welded with equidistant reinforcing ribs, and the reinforcing ribs are provided with assembly components on one side.
[0007] Preferably, the assembly component is composed of a connecting piece, a nut, an expansion stud and a sealing gasket, and the surface of the two ends of the support pile, the end plate, the connecting plate, the main plate and the middle plate is welded with the connecting piece, and the surface of the connecting piece is welded and fixed with the surface of the reinforcing rib.
[0008] Preferably, one side of the connecting piece is adhered with a sealing gasket, and the adjacent sealing gaskets are tightly fitted.
[0009] Preferably, the surface of the connecting piece is provided with equidistant expansion bolts on both sides, one end of the expansion bolts penetrates the connecting piece and the sealing gasket in sequence and is sleeved with a nut, the surface of the nut is tightly fitted with the surface of the connecting piece, and the nut is threadedly matched with the expansion bolt.
[0010] Preferably, the surface of the main plate is welded with a lower limiting frame, the lower limiting frame is in L-shaped structure, and the lower limiting frame is located at the lower part of the main plate.
[0011] Preferably, an upper limiting frame is arranged above the lower limiting frame, the upper limiting frame is welded on the surface of the main plate, and the upper limiting frame is in L-shaped structure.
[0012] Preferably, equidistant mounting holes are formed in the surfaces of the upper limiting frame and the lower limiting frame, and equidistant drainage holes are formed in the bottom position of the lower limiting frame.
[0013] Compared with the prior art, the photovoltaic storage and charging integrated prefabricated venue structure not only saves the time required for assembling the venue structure, but also improves the convenience degree of positioning and laying the solar panels on the venue structure.
[0014] 1. By setting the assembling mechanism, the connecting plate is placed on one side of the end plate, the connecting pieces are aligned and placed, then one end of the expansion bolt is inserted into the through hole in the surface of the connecting piece, then the nut is sleeved on one end of the expansion bolt, then the nut is rotated, and the two connecting pieces are fixed through the thread cooperation between the nut and the expansion bolt, so that the end plate and the connecting plate are quickly assembled, then the connecting plate, the main plate and the middle plate are assembled in the same way, and are sealed and waterproofed under the action of the sealing gasket, then the end plate and the supporting pile are assembled, the supporting pile is fixed through the ground anchor, and the strength of the supporting pile is higher under the action of the steel bar, so that the venue structure is more stable, thereby realizing the function of quickly assembling the venue structure, and saving the time required for assembling the venue structure.
[0015] 2. By setting the positioning mechanism, the surface of the venue structure is generally positioned and laid with solar panels for photovoltaic storage and charging, when laying, the solar panels can be inserted between the lower limiting frame and the upper limiting frame, the solar panels are conveniently positioned under the action of the lower limiting frame and the upper limiting frame, then the solar panels are fixed through the cooperation of the mounting holes and the screws, and rainwater is conveniently discharged under the action of the drainage holes in rainy days, thereby realizing the function that the venue structure is convenient for positioning and laying the solar panels, and improving the convenience degree of positioning and laying the solar panels on the venue structure. BRIEF DESCRIPTION OF DRAWINGS
[0016] Figure 1The utility model discloses a three -dimensional appearance structure schematic diagram of the utility model discloses a main view cross section structure schematic diagram of the utility model discloses an assembly mechanism amplification structure schematic diagram of the utility model discloses a positioning mechanism amplification structure schematic diagram.
[0017] Figure 2 The utility model discloses a main view cross section structure schematic diagram of the utility model discloses an assembly mechanism amplification structure schematic diagram of the utility model discloses a positioning mechanism amplification structure schematic diagram.
[0018] Figure 3 The utility model discloses a main view cross section structure schematic diagram of the utility model discloses an assembly mechanism amplification structure schematic diagram of the utility model discloses a positioning mechanism amplification structure schematic diagram.
[0019] Figure 4 The utility model discloses a main view cross section structure schematic diagram of the utility model discloses an assembly mechanism amplification structure schematic diagram of the utility model discloses a positioning mechanism amplification structure schematic diagram.
[0020] In the drawing: 1, venue main body;11, support pile;111, reinforcing steel bar;12, end plate;13, connecting plate;14, main plate;15, middle plate;2, assembly mechanism;21, assembly component;211, connecting piece;212, nut;213, expansion stud;214, sealing gasket;22, reinforcing rib;3, positioning mechanism;31, lower limit frame;32, upper limit frame;33, mounting hole;34, drainage hole. Specific implementation
[0021] The technical scheme in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model, obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments, and besides, the terms "first", "second", "third", "upper", "lower", "left", "right" are only for the purpose of description, and cannot be understood as indicating or implying relative importance. Meanwhile, in the description of the utility model, unless otherwise explicitly specified and limited, the terms "connected", "connection" should be understood broadly, for example, can be fixed connection, can also be detachable connection, or integrally connected;Can be mechanical connection, can also be electrical connection;Can be directly connected, can also be indirectly connected through an intermediate medium, based on the embodiments in the utility model, all other embodiments obtained by the ordinary skilled in the art without making creative labor belong to the scope of protection of the utility model.
[0022] The structure of the light storage and charging integrated prefabricated venue structure provided by the utility model is as shown in Figure 1 And Figure 2 As shown in the drawing, including venue main body 1, the venue main body 1 is composed of support pile 11, end plate 12, connecting plate 13, main plate 14 and middle plate 15, and the both ends of the venue main body 1 are provided with end plate 12, the bottom of end plate 12 is provided with equidistant support pile 11, the inside of support pile 11 is fixed with reinforcing steel bar 111, reinforcing steel bar 111 is cross arranged, one side of end plate 12 is provided with main plate 14, main plate 14 is inclined structure, connecting plate 13 is arranged between main plate 14 and end plate 12, connecting plate 13 is inclined structure, the height of connecting plate 13 is higher than end plate 12 and lower than main plate 14, middle plate 15 is arranged between main plate 14, and the height of middle plate 15 is higher than main plate 14.
[0023] Further, as shown in Figure 3 The venue main body 1 is connected and disconnected through the assembly mechanism 2, the inside of the assembly mechanism 2 comprises assembly components 21 and reinforcing ribs 22, the surfaces of the support pile 11, the end plate 12, the connecting plate 13, the main plate 14 and the middle plate 15 are welded with reinforcing ribs 22 at both ends, the assembly components 21 are arranged on one side of the reinforcing ribs 22, the assembly components 21 are composed of connecting pieces 211, nuts 212, expansion bolts 213 and sealing pads 214, the surfaces of the support pile 11, the end plate 12, the connecting plate 13, the main plate 14 and the middle plate 15 are welded with connecting pieces 211 at both ends, the surfaces of the connecting pieces 211 are welded and fixed with the surfaces of the reinforcing ribs 22, the sealing pads 214 are adhered on one side of the connecting pieces 211, the adjacent sealing pads 214 are tightly fitted, the expansion bolts 213 are arranged at equal intervals on both sides of the surface of the connecting piece 211, one end of the expansion bolt 213 penetrates the connecting piece 211 and the sealing pad 214 in sequence and is sleeved with the nut 212, the surface of the nut 212 is tightly fitted with the surface of the connecting piece 211, and the nut 212 is threadedly connected with the expansion bolt 213.
[0024] In use, the connecting plate 13 is placed on one side of the end plate 12, the connecting pieces 211 are aligned and placed, then one end of the expansion bolt 213 is inserted into the through hole in the surface of the connecting piece 211, the nut 212 is sleeved on one end of the expansion bolt 213, then the nut 212 is rotated, the two connecting pieces 211 are fixed under the thread cooperation between the nut 212 and the expansion bolt 213, thereby quickly assembling the end plate 12 and the connecting plate 13, then the connecting plate 13, the main plate 14 and the middle plate 15 are assembled in the same way, and are sealed and waterproofed under the action of the sealing pad 214, then the end plate 12 and the support pile 11 are assembled, the support pile 11 is fixed by the ground anchor, the strength of the support pile 11 is higher under the action of the steel bar 111, the venue structure is more stable, and the function of quickly assembling the venue structure is realized.
[0025] Further, as shown in Figure 4 The surface of the main plate 14 is provided with a positioning mechanism 3, the inside of the positioning mechanism 3 comprises lower limit racks 31, upper limit racks 32, mounting holes 33 and drainage holes 34, the surface of the main plate 14 is welded with the lower limit racks 31, the structure of the lower limit rack 31 is L-shaped structure, the lower limit rack 31 is located at the lower part of the main plate 14, the upper limit rack 32 is arranged above the lower limit rack 31, the upper limit rack 32 is welded on the surface of the main plate 14, the upper limit rack 32 is L-shaped structure, the surfaces of the upper limit rack 32 and the lower limit rack 31 are provided with mounting holes 33 at equal intervals, and the bottom position of the lower limit rack 31 is provided with drainage holes 34 at equal intervals.
[0026] When in use, the venue structure surface is generally charged by laying solar panels, when laying, the solar panels can be inserted between the lower limiting frame 31 and the upper limiting frame 32, and the solar panels are conveniently positioned under the action of the lower limiting frame 31 and the upper limiting frame 32, then the solar panels can be fixed through the cooperation of the mounting hole 33 and the screw, and rainwater is conveniently discharged under the action of the drain hole 34 in rainy days, so as to realize the function that the venue structure is convenient for positioning and laying solar panels.
[0027] Working principle: when in use, first, the connecting plate 13 is placed on one side of the end plate 12, the connecting piece 211 is aligned and placed, then one end of the expansion stud 213 is inserted into the through hole on the surface of the connecting piece 211, the nut 212 is then sleeved on one end of the expansion stud 213, then the nut 212 is rotated, and the two connecting pieces 211 are fixed under the cooperation of the threads of the nut 212 and the expansion stud 213, so as to quickly assemble the end plate 12 and the connecting plate 13, then the connecting plate 13, the main plate 14 and the middle plate 15 are assembled in the same way, and are sealed and waterproofed under the action of the sealing gasket 214, then the end plate 12 and the support pile 11 are assembled, the support pile 11 is fixed through the ground anchor, and the support pile 11 has higher strength under the action of the steel bar 111, so that the venue structure is more stable, so as to realize the function that the venue structure is quickly assembled, thereby saving the time required for assembling the venue structure.
[0028] The venue structure surface is generally charged by laying solar panels, when laying, the solar panels can be inserted between the lower limiting frame 31 and the upper limiting frame 32, and the solar panels are conveniently positioned under the action of the lower limiting frame 31 and the upper limiting frame 32, then the solar panels can be fixed through the cooperation of the mounting hole 33 and the screw, and rainwater is conveniently discharged under the action of the drain hole 34 in rainy days, so as to realize the function that the venue structure is convenient for positioning and laying solar panels, thereby improving the convenience degree when the venue structure positions and lays solar panels, and finally completing the use of the venue structure.
[0029] It is apparent for those skilled in the art that the present application is not limited to the details of the foregoing exemplary embodiments, and the present application can be implemented in other concrete forms without departing from the spirit or essential characteristics of the present application. Therefore, the foregoing embodiments should be regarded as exemplary and non-limiting, and the scope of the present application is defined by the appended claims rather than the foregoing description, and all changes falling within the meaning and range of equivalent elements of the claims are intended to be embraced in the present application. Any reference signs in the claims should not be regarded as limiting the claims to which they relate.
Claims
1. A prefabricated light storage and charging integrated venue structure, comprising a venue main body (1), characterized in that: The venue main body (1) is composed of support piles (11), end plates (12), connecting plates (13), main plates (14) and middle plates (15), both ends of the venue main body (1) are provided with end plates (12), the bottom of the end plate (12) is provided with equidistant support piles (11), the inside of the support pile (11) is fixed with a steel bar (111), the steel bars (111) are arranged in cross, one side of the end plate (12) is provided with a main plate (14), the main plate (14) is an inclined structure, a connecting plate (13) is arranged between the main plate (14) and the end plate (12), the connecting plate (13) is an inclined structure, the height of the connecting plate (13) is higher than that of the end plate (12) and lower than that of the main plate (14), a middle plate (15) is arranged between the main plates (14), the height of the middle plate (15) is higher than that of the main plate (14), the venue main body (1) is connected and disassembled through an assembling mechanism (2), the inside of the assembling mechanism (2) comprises assembling members (21) and reinforcing ribs (22), the surface of the main plate (14) is provided with a positioning mechanism (3), the inside of the positioning mechanism (3) comprises lower limit racks (31), upper limit racks (32), mounting holes (33) and drainage holes (34).
2. The light storage and charging integrated prefabricated venue structure according to claim 1, characterized in that: The surfaces of the support piles (11), the end plates (12), the connecting plates (13), the main plates (14) and the middle plates (15) are welded with equidistant reinforcing ribs (22) at both ends, one side of the reinforcing rib (22) is provided with an assembling member (21).
3. The light storage and charging integrated prefabricated venue structure according to claim 2, characterized in that: The assembling member (21) is composed of connecting sheets (211), nuts (212), expansion studs (213) and sealing gaskets (214), the surfaces of both ends of the support piles (11), the end plates (12), the connecting plates (13), the main plates (14) and the middle plates (15) are welded with connecting sheets (211), the surface of the connecting sheet (211) is welded and fixed with the surface of the reinforcing rib (22).
4. The light storage and charging integrated prefabricated venue structure according to claim 3, characterized in that: One side of the connecting sheet (211) is adhered with a sealing gasket (214), the adjacent sealing gaskets (214) are tightly fitted.
5. The light storage and charging integrated prefabricated venue structure according to claim 4, characterized in that: Both sides of the surface of the connecting sheet (211) are provided with equidistant expansion studs (213), one end of the expansion stud (213) penetrates the connecting sheet (211) and the sealing gasket (214) in sequence and is sleeved with a nut (212), the surface of the nut (212) is tightly fitted with the surface of the connecting sheet (211), the nut (212) is threadedly matched with the expansion stud (213).
6. The light storage and charging integrated prefabricated venue structure according to claim 1, characterized in that: The surface of the main plate (14) is welded with a lower limit rack (31), the structure of the lower limit rack (31) is L-shaped structure, the lower limit rack (31) is located at the lower part of the main plate (14).
7. The light storage and charging integrated prefabricated venue structure according to claim 6, characterized in that: An upper limit rack (32) is arranged above the lower limit rack (31), the upper limit rack (32) is welded on the surface of the main plate (14), the upper limit rack (32) is L-shaped structure.
8. The light storage and charging integrated prefabricated venue structure according to claim 7, characterized in that: The upper limiting frame (32) and the lower limiting frame (31) are provided with equidistant mounting holes (33) on the surfaces thereof, and the lower limiting frame (31) is provided with equidistant drainage holes (34) at the bottom position thereof.