Electronic information engineering communication tower mounting structure

The modular design and high-strength bolt connection of the communication tower structure solve the problem of low installation efficiency of traditional angle steel communication towers, and achieve rapid installation and stable connection.

CN223952363UActive Publication Date: 2026-02-27SHANDONG POST & TELECOM ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520623006.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-04-03
Publication Date
2026-02-27
Estimated Expiration
2035-04-03

AI Technical Summary

Technical Problem

Traditional angle steel communication towers require multiple angle steel truss sections to be welded on-site during installation, resulting in low installation efficiency.

Method used

The communication tower structure adopts a modular design. The tower body is assembled from the tower base, tower sections, and tower top using high-strength bolts and locking nuts. It utilizes positioning rods and positioning slots for quick docking, and auxiliary fixing components enhance connection stability through sliding grooves and slots.

Benefits of technology

It improves installation efficiency and overall tower stability, reduces on-site welding time, and enhances the connection stability of the tower.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223952363U_ABST
    Figure CN223952363U_ABST
Patent Text Reader

Abstract

The utility model discloses an electronic information engineering communication tower mounting structure, and relates to the technical field of communication towers. The tower comprises a base, a tower body and a connecting assembly, the tower body is installed on the base through the connecting assembly, the base comprises a concrete bearing platform and a pile foundation, the tower body is conical and comprises a tower base, a tower section and a tower top, the tower base, the tower section and the tower top are assembled into the tower body through the connecting assembly, and the connecting assembly comprises a plurality of high-strength bolts. The tower base, the tower sections and the tower top are installed and connected through cooperation of high-strength bolts and locking nuts, foundation bolts are embedded in the four corners of the concrete bearing platform, installation lugs are fixedly installed at the four corners of the bottom end of the tower base, the foundation bolts can be inserted into the corresponding installation lugs, and positioning rods are fixedly installed at the four corners of the bottom ends of the tower base, the tower sections and the tower top. Positioning grooves are formed in the four corners of the top end of the tower base and the four corners of the top end of the tower section correspondingly, and the positioning rods can be inserted into the corresponding positioning grooves.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to communication tower technical field, concretely is a kind of electronic information engineering communication tower installation structure. BACKGROUND

[0002] Communication tower belongs to one kind of signal transmitting tower, also called signal transmitting tower or signal tower, main function supports signal, and supports signal transmitting antenna, is used to mobile, communication, telecommunication, traffic satellite positioning system (GPS) etc.

[0003] Angle steel communication tower is the tower body structure composed of multiple angle steel trusses, and the traditional angle steel tower needs to be welded together on site in multiple angle steel trusses when installing, and the installation construction efficiency is lower. UTILITY MODEL CONTENT

[0004] In order to solve the problem that the traditional angle steel communication tower needs to be welded together on site in multiple angle steel trusses when installing, and the installation construction efficiency is lower, the utility model aims to provide a kind of electronic information engineering communication tower installation structure.

[0005] In order to solve the above technical problems, the utility model adopts the following technical scheme: a kind of electronic information engineering communication tower installation structure, including base, tower body, connecting component, tower body is installed on base by connecting component, base includes concrete pile cap and pile foundation, tower body is conical setting, tower body includes tower seat, tower section, tower top, and tower seat, tower section, tower top are assembled into tower body by connecting component, connecting component includes multiple high-strength bolts, and tower seat, tower section, tower top are installed and connected by high-strength bolt cooperation lock nut, and the four corners of concrete pile cap are all embedded with anchor bolt, and anchor bolt is threadedly installed with lock nut, the bottom end four corners of tower seat are all fixedly installed with mounting lug, and anchor bolt can be inserted in corresponding mounting lug, the bottom end four corners of tower seat, tower section, tower top are all fixedly installed with positioning rod, the top end four corners of tower seat, tower section are all provided with positioning slot, and positioning rod can be inserted in corresponding positioning slot.

[0006] Preferably, auxiliary fixing assembly is detachably installed on tower body, auxiliary fixing assembly includes sliding groove, mirror image distribution two clamping grooves are slidably installed in sliding groove, and clamping groove can be clamped on corresponding reinforcing rib on tower seat, tower section, two-way screw rod is rotatably installed in sliding groove, and two-way screw rod is threadedly inserted in one end of two clamping grooves, and the bottom end of two-way screw rod is fixedly installed with knob.

[0007] Compared with the prior art, the utility model has the beneficial effects that:

[0008] 1、 The utility model discloses a connecting assembly is set up, can butt joint assembly to the tower body through the connecting assembly, and installs the tower body on the base through the connecting assembly, compared with traditional on -the -spot welding installation, the installation efficiency is improved greatly,

[0009] 2、 The utility model discloses an auxiliary fixing assembly is set up, after the tower body installation is completed, can utilize the auxiliary fixing assembly and the two modules of adjacent tower body to carry out the auxiliary fixing, can improve the connection stability of the two modules of adjacent tower body, and then the overall stability of the tower body is strengthened. BRIEF DESCRIPTION OF DRAWINGS

[0010] In order to more clearly illustrate the technical scheme in the embodiment of the utility model or prior art, the following will briefly introduce the drawing needed to be used in the embodiment or prior art description, obviously, the drawing in the following description is only some embodiments of the utility model, and for those skilled in the art, other drawings can also be obtained according to these drawings without creating labor.

[0011] Figure 1 It is the overall structure schematic diagram of the utility model;

[0012] Figure 2 It is the overall split structure schematic diagram of the utility model;

[0013] Figure 3 It is the utility model Figure 2 The enlarged schematic diagram of structure in A place in the utility model;

[0014] Figure 4 It is the sliding chute section structure schematic diagram of the utility model.

[0015] In the drawing: 1, base;101, concrete pile cap;102, pile foundation;2, tower body;201, tower base;2011, mounting lug;202, tower section;203, tower top;204, installation platform;3, auxiliary fixing assembly;301, sliding chute;302, clamping groove;303, bidirectional screw;304, knob;4, connecting assembly;401, anchor bolt;402, positioning rod;403, positioning groove;404, high-strength bolt;5, reinforcing rib;6, bolt hole. DETAILED DESCRIPTION

[0016] The technical scheme in the embodiment of the utility model will be described clearly and completely in the following by combining the drawings in the embodiment of the utility model, obviously, the described embodiment is only a part of the embodiment of the utility model, not all the embodiments. Based on the embodiment in the utility model, all other embodiments obtained by those skilled in the art without creating labor belong to the scope of the utility model protection.

[0017] Example: Figures 1-4 As shown, this utility model provides an installation structure for an electronic information engineering communication tower, including a base 1, a tower body 2, and a connecting assembly 4. The tower body 2 is installed on the base 1 via the connecting assembly 4. The base 1 includes a concrete foundation 101 and a pile foundation 102. The tower body 2 is tapered and modular, including a tower base 201, a tower section 202, and a tower top 203. The tower base 201, tower section 202, and tower top 203 are assembled into the tower body 2 via the connecting assembly 4. The tower base 201, tower section 202, and tower top 203 are prefabricated in the factory. The number of tower sections 202 in the fabricated angle steel truss can be customized according to the height of the tower body 2. The connecting component 4 includes multiple high-strength bolts 404, and the tower base 201, tower section 202, and tower top 203 are connected by high-strength bolts 404 and locking nuts. Anchor bolts 401 are pre-embedded in the four corners of the concrete foundation 101, and locking nuts are threaded on the anchor bolts 401. Mounting ears 2011 are fixedly installed at the four corners of the bottom end of the tower base 201, and the anchor bolts 401 can be inserted into the corresponding mounting ears 2011. Positioning rods 402 are fixedly installed at the four corners of the bottom of the base 201, tower section 202, and tower top 203. Positioning slots 403 are provided at the four corners of the top of the base 201 and tower section 202, and the positioning rods 402 can be inserted into the corresponding positioning slots 403. When installing the tower body 2, first install the base 201 on the concrete foundation 101, insert the anchor bolts 401 on the concrete foundation 101 into the corresponding mounting ears 2011 at the bottom of the base 201, and tighten the locking nuts to secure it. Then install the tower section 203... The positioning rod 402 at the bottom of tower 202 is inserted into the positioning groove 403 at the top of tower base 201. Tower section 202 is then installed on tower base 201 and secured with high-strength bolts 404 and lock nuts. Next, the positioning rod 402 at the bottom of tower top 203 is inserted into the positioning groove 403 at the top of tower section 202. Tower top 203 is then installed on tower section 202 and secured with high-strength bolts 404 and lock nuts. By setting the positioning rod 402 and positioning groove 403, tower body 2 can be quickly installed.

[0018] The pile foundation 102 is inserted into the ground, and the concrete foundation 101 is set on the top of the pile foundation 102. The upper surface of the concrete foundation 101 has positioning grooves 403 at the four corners, and the positioning rod 402 at the bottom of the tower base 201 can be inserted into the corresponding positioning groove 403 on the concrete foundation 101. During installation, the positioning rod 402 at the bottom of the tower base 201 is first inserted into the corresponding positioning groove 403 on the concrete foundation 101, and then the tower base 201 is installed on the concrete foundation 101.

[0019] The inner wall of the tower base 201 and the tower section 202 is welded with a reinforcing rib 5, which improves the strength of the tower body 2.

[0020] The top end of the tower base 201, the upper and lower ends of the tower section 202, and the bottom end of the tower top 203 are provided with bolt holes 6 corresponding to the number of high-strength bolts 404, and the high-strength bolts 404 are inserted into the corresponding bolt holes 6.

[0021] The tower body 2 is detachably provided with an auxiliary fixing assembly 3, which comprises a sliding groove 301, two mirror-image distributed clamping grooves 302 slidably installed in the sliding groove 301, and the clamping grooves 302 can be clamped on the corresponding reinforcing ribs 5 of the tower base 201 and the tower section 202. A bidirectional screw rod 303 is rotatably installed in the sliding groove 301, and the bidirectional screw rod 303 is threadedly inserted into one end of the two clamping grooves 302. A knob 304 is fixedly installed at the bottom end of the bidirectional screw rod 303. After the tower body 2 is installed, the clamping grooves 302 can be clamped on the corresponding reinforcing ribs 5 of the adjacent two modules of the tower body 2. Then, the knob 304 is rotated by using a tool, the knob 304 drives the bidirectional screw rod 303 to rotate, and the bidirectional screw rod 303 drives the two clamping grooves 302 to slide towards each other along the sliding groove 301, which can improve the connection stability of the adjacent two modules of the tower body 2, and further enhance the overall stability of the tower body 2.

[0022] The top end of the tower top 203 is fixedly installed with a mounting platform 204, on which other adaptive electrical elements of the communication tower can be installed.

[0023] Working principle: when installing the tower body 2, first, the positioning rod 402 at the bottom end of the tower base 201 is inserted into the corresponding positioning groove 403 on the concrete support 101. At this time, the foundation bolt 401 on the concrete support 101 is inserted into the corresponding mounting lug 2011 at the bottom end of the tower base 201, and is fixed by tightening the lock nut. Then, the positioning rod 402 at the bottom end of the tower section 202 is inserted into the corresponding positioning groove 403 at the top end of the tower base 201, the tower section 202 is butt-jointed and installed on the tower base 201, and is fixed by using the high-strength bolt 404 in cooperation with the lock nut. Then, the positioning rod 402 at the bottom end of the tower top 203 is inserted into the corresponding positioning groove 403 at the top end of the tower section 202, the tower top 203 is butt-jointed and installed on the tower section 202, and is fixed by using the high-strength bolt 404 in cooperation with the lock nut. By arranging the positioning rod 402 and the positioning groove 403, the tower body 2 can be quickly butt-jointed and installed.

[0024] After the tower body 2 is installed, the clamping grooves 302 can be clamped on the corresponding reinforcing ribs 5 of the two adjacent modules on the tower body 2, then a tool is used to rotate the knobs 304, the knobs 304 drive the bidirectional lead screws 303 to rotate, the bidirectional lead screws 303 drive the two clamping grooves 302 to slide towards each other along the sliding grooves 301, the connection stability of the two adjacent modules on the tower body 2 can be improved, and the overall stability of the tower body 2 is further enhanced.

[0025] The standard parts used in the present application can be purchased from the market, the special-shaped parts can be ordered according to the description and the drawings, the specific connection mode of each part adopts the conventional means such as bolts, rivets and welding in the prior art, the machinery, parts and equipment adopt the conventional types in the prior art, and the circuit connection adopts the conventional connection mode in the prior art, which will not be described in detail here.

[0026] Obviously, those skilled in the art can make various modifications and variations to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application belong to the scope of the claims of the present application and the equivalent technology, the present application also intends to include these modifications and variations.

Claims

1. An electronic information engineering communication tower installation structure, comprising a base (1), a tower body (2), and a connecting assembly (4), characterized in that: The tower body (2) is installed on the base (1) through the connecting assembly (4), the base (1) comprises a concrete support platform (101) and a pile foundation (102), the tower body (2) is conical, the tower body (2) comprises a tower base (201), a tower section (202) and a tower top (203), and the tower base (201), the tower section (202) and the tower top (203) are assembled into the tower body (2) through the connecting assembly (4), the connecting assembly (4) comprises a plurality of high-strength bolts (404), and the tower base (201), the tower section (202) and the tower top (203) are connected and installed through the high-strength bolts (404) and locking nuts, the concrete support platform (101) is provided with foundation bolts (401) embedded in the four corners, and the foundation bolts (401) are provided with locking nuts screwed thereon, the tower base (201) is provided with mounting ears (2011) fixedly installed at the four corners of the bottom end, and the foundation bolts (401) can be inserted into the corresponding mounting ears (2011), the tower base (201), the tower section (202) and the tower top (203) are provided with positioning rods (402) fixedly installed at the four corners of the bottom end, and the tower base (201) and the tower section (202) are provided with positioning grooves (403) formed at the four corners of the top end, and the positioning rods (402) can be inserted into the corresponding positioning grooves (403).

2. An electronic information engineering communication tower mounting structure as claimed in claim 1, wherein, The pile foundation (102) is inserted into the ground, and the concrete support platform (101) is arranged at the top end of the pile foundation (102).

3. An electronic information engineering communication tower mounting structure as claimed in claim 1, wherein, The concrete support platform (101) is provided with positioning grooves (403) formed at the four corners of the upper surface, and the positioning rods (402) at the bottom end of the tower base (201) can be inserted into the corresponding positioning grooves (403) of the concrete support platform (101).

4. An electronic information engineering communication tower mounting structure as claimed in claim 1, wherein, The tower base (201) and the tower section (202) are provided with reinforcing ribs (5) welded on the inner walls.

5. An electronic information engineering communication tower mounting structure as claimed in claim 1, wherein, The tower base (201), the tower section (202) and the tower top (203) are provided with bolt holes (6) corresponding in number to the high-strength bolts (404), and the high-strength bolts (404) are inserted into the corresponding bolt holes (6).

6. An electronic information engineering communication tower mounting structure as claimed in claim 1, wherein, The auxiliary fixing assembly (3) is detachably installed on the tower body (2), the auxiliary fixing assembly (3) comprises a sliding groove (301), the sliding groove (301) is slidably provided with two mirror-symmetrical clamping grooves (302), and the clamping grooves (302) can be clamped on the corresponding reinforcing ribs (5) of the tower base (201) and the tower section (202).

7. An electronic information engineering communication tower mounting structure as claimed in claim 6, wherein, The sliding groove (301) is rotatably provided with a bidirectional screw rod (303), and the bidirectional screw rod (303) is screwed into one end of the two clamping grooves (302), and the bottom end of the bidirectional screw rod (303) is fixedly provided with a knob (304).