Detachable ALC partition wall integrated mounting device
The integrated installation device for ALC partition walls, which uses a steel pipe frame to erect a high-altitude work platform, solves the efficiency and safety issues of hoisting ALC partition walls in factory buildings with a height of 6m or more, and achieves an efficient and safe installation process.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-28
- Publication Date
- 2026-03-27
AI Technical Summary
When hoisting ALC partition walls in factory buildings that are 6m or higher, conventional methods are time-consuming, laborious, pose significant safety hazards, and make it difficult to guarantee installation speed and quality.
The ALC partition wall integrated installation device is adopted, and a high-altitude working platform is erected using steel pipe frame. Combined with casters, winches, fixed pulleys and telescopic supports, the positioning and installation of ALC partition walls can be realized.
It improves installation efficiency, reduces safety risks, ensures installation quality, and has strong applicability and low cost.
Smart Images

Figure CN224048711U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model belongs to the technical field of building engineering construction, and particularly relates to an installation device of an ALC partition wall. BACKGROUND
[0002] The autoclaved lightweight concrete partition wall plate is referred to as ALC (Autoclaved Lightweight Concrete) plate. The ALC wall plate is a multi-porous concrete product made of silica sand, cement and lime as main raw materials, reinforced by rust-proof treated steel bars, and cured by high temperature, high pressure and steam. The ALC wall plate has good sound insulation and sound absorption performance, and has good heat preservation and insulation performance. The lightweight property is 0.5, which is 1 / 4 of the common concrete, thereby greatly reducing the weight of the wall and the cost of the building foundation. The product includes outer wall plate, inner wall plate, floor plate and roof plate.
[0003] At present, when hoisting the ALC partition wall of a plant higher than 6m, the conventional method is to use a simple hoisting device to cooperate with a crowbar for positioning, the joint of the plate is treated by extruding ALC special mortar and fixed by using a pipe clamp at a high position and structure by a cannon pin, the method is time-consuming and troublesome, has low work efficiency, has great safety hazards, and has the risk of overturning of the ALC partition wall, the plate is prone to breakage during the positioning process of the crowbar, and it is difficult to guarantee the installation rate and installation quality of the ALC partition wall. UTILITY MODEL CONTENTS
[0004] In order to overcome the defects of the prior art, the purpose of the utility model is to provide a detachable ALC partition wall integrated installation device, the main frame is made of steel pipes, and the whole is detachable; the device has the functions of positioning and installing the ALC partition wall and a high-position operation platform, and has high safety and high work efficiency.
[0005] A detachable ALC partition wall integrated installation device, comprising: universal wheels, a winch, a steel pipe frame, a shaped ladder, a shaped footboard, a controller, a fixed pulley, a telescopic support, a lifting belt and a steel wire rope with a lifting hook; wherein the universal wheels are arranged at the bottom of the steel pipe frame; one or more shaped footboards are arranged above the steel pipe frame as a high-position operation platform for installing the ALC partition wall; the fixed pulley is arranged on the side of the steel pipe frame; one end of the steel wire rope is used for lifting the ALC partition wall, the other end of the steel wire rope is connected to the winch after changing the traction direction by passing through the fixed pulley; the winch is fixed on the shaped footboard at the bottom of the steel pipe frame, and the controller is connected to the winch to control the operation of the winch.
[0006] The detachable ALC partition wall integrated installation device, the telescopic support is fixed at one end of the shaped footboard and extends out of the steel pipe frame, provides horizontal pressure to the ALC partition wall, and realizes the positioning of the ALC partition wall; the controller is connected to the telescopic support to control the operation of the telescopic support.
[0007] The telescopic support is provided with two groups in the vertical direction and is fixed on the upper and lower shaped scaffolding boards.
[0008] The fixed pulley is provided with two groups and is arranged on the top and middle part of the side of the steel pipe frame.
[0009] The steel pipe frame is provided with a shaped ladder on one side, and the operator reaches the shaped scaffolding board to work through the shaped ladder.
[0010] The top of the side frame body of the steel pipe frame is outwardly extended, and the position for installing the fixed pulley is outwardly extended.
[0011] Advantages: the utility model has the following advantages relative to the prior art:
[0012] 1) the device saves the process of positioning the ALC partition wall by the conventional manual crowbar and saves the labor cost.
[0013] 2) the collapse and overturning risk in the installation process of the partition wall is effectively solved, and the safety problem in the installation process is improved.
[0014] 3) the device provides a high work platform, and the quality of the plate joint extrusion and the efficiency of the gun nail in the high place are effectively improved.
[0015] 4) the device body is made of steel pipes and is adjusted according to the actual environment, has higher applicability, saves the cost, and has better effect of large-area promotion on the site. DRAWINGS
[0016] Figure 1 It is a perspective view of the utility model;
[0017] Figure 2 It is a left view of the utility model;
[0018] Figure 3 It is a right view of the utility model;
[0019] Figure 4 It is a right view of the utility model;
[0020] Figure 5 It is a front view of the utility model.
[0021] Explanation of the main reference numerals: 1-Wheel, 2-Wind, 3-Steel pipe frame, 4-Standardized ladder, 5-Standardized scaffold board, 6-Controller, 7-Pulley I, 11-Pulley II, 8-Extendable support, 9-Lifting strap, 10-Wire rope with hook. Detailed Implementation
[0022] The technical solution of this utility model will be described in detail below with reference to the embodiments and accompanying drawings: Example
[0023] like Figures 1 to 5 As shown, a simple ALC partition wall installation device mainly includes casters 1, winch 2, steel pipe frame 3, standardized ladder 4, standardized scaffolding board 5, controller 6, fixed pulley 7, telescopic support 8, lifting strap 9, and wire rope with hook 10.
[0024] Six casters 1 are installed at the bottom of the steel pipe frame, with one set symmetrically arranged at each end and the middle. The casters are equipped with a locking function, and are locked during use, but can be released for movement.
[0025] A steel pipe frame is horizontally erected with one or more standardized scaffold boards 5, which serve as a high-altitude work platform for the installation of ALC partition walls. A standardized ladder 4 is provided on one side of the steel pipe frame, and operators can reach the standardized scaffold board 5 through the standardized ladder 4 to carry out their work.
[0026] One end of the telescopic support 8 is fixed to the upper and lower layers of standardized scaffold boards 5, and the other end extends out of the steel pipe frame to provide horizontal pressure on the lifted ALC partition wall, thereby positioning the ALC partition wall. The controller connects the telescopic support 8 to the winch 2 and controls the operation of both the telescopic support 8 and the winch 2. The top of the steel pipe frame on the same side as the telescopic support 8 extends outward, with one fixed pulley I located at the top and a second fixed pulley II located in the middle of the side of the steel pipe frame. The wire rope 10 passes around the fixed pulleys at the top and middle, changing the traction direction through the two fixed pulleys. The other end of the wire rope 10 is connected to the winch 2.
[0027] The winch 2 is fixed to the fixed scaffold board 5 at the bottom of the steel pipe frame, and one end of the wire rope 10 is connected to the winch 2. The ALC partition wall is fixed at 2 / 3 of the height of the board with the lifting strap 9. The hook of the wire rope 10 is connected to the lifting strap. With the help of the winch 2 providing power and the fixed pulley changing the traction direction, the ALC partition wall can be lifted, and the travel is saved.
[0028] Before the partition wall is installed, a lifting belt is fixed at 2 / 3 height of the plate as a lifting point, a lifting hook is connected with the lifting belt, a winch is started to lift the plate by means of a steel wire rope 10 and a fixed pulley, the device is moved to a wall installation position, the universal wheel is locked, the final lifting height of the plate is adjusted again, and the wall is positioned by adjusting the telescopic support through the controller. Another person needs to go to an upper operation platform through a shaped ladder to perform nailing and plate joint extrusion work, after the partition wall is installed stably, the steel wire rope fixed on the partition wall is released, and the installation of the partition wall is completed.
[0029] The preferred embodiments disclosed above are only used to help explain the utility model. The preferred embodiments do not describe all the details and limit the utility model to the specific implementation. Obviously, according to the content of the specification, many modifications and changes can be made. The specification selects and specifically describes these embodiments in order to better explain the principle and practical application of the utility model, so that the person skilled in the art can well understand and use the utility model. The utility model is limited by the claims and the whole scope and equivalents.
Claims
1. A detachable ALC partition wall integrated installation device, characterized in that, include:
1. Casters (1), winch (2), steel pipe frame (3), standardized ladder (4), standardized scaffold board (5), controller (6), fixed pulley (7), telescopic support (8), lifting strap (9), wire rope with hook (10). Among them, casters are installed at the bottom of the steel pipe frame; a layer or more of standardized scaffolding boards (5) are erected on the top of the steel pipe frame as a high-altitude work platform for the installation of ALC partition walls; fixed pulleys are provided on the side frame of the steel pipe frame (3); one end of the wire rope (10) is used to lift the ALC partition wall, and after passing around the fixed pulley to change the traction direction, the other end is connected to the winch (2); the winch (2) is fixed on the standardized scaffolding board (5) at the bottom of the steel pipe frame, and the controller is connected to the winch (2) to control the operation of the winch (2).
2. The detachable ALC partition wall integrated installation device according to claim 1, characterized in that, One end of the telescopic support (8) is fixed on the standardized scaffold board (5), and the other end extends out of the steel pipe frame to provide horizontal pressure to the ALC partition wall and realize the positioning of the ALC partition wall; the controller is connected to the telescopic support (8) to control the operation of the telescopic support (8).
3. The detachable ALC partition wall integrated installation device according to claim 2, characterized in that, The telescopic support (8) has two sets in the vertical direction, which are fixed on the upper and lower layers of standardized scaffold boards (5).
4. The detachable ALC partition wall integrated installation device according to claim 2, characterized in that, Two sets of fixed pulleys are provided, which are respectively set on the top side and the middle of the steel pipe frame (3).
5. The detachable ALC partition wall integrated installation device according to claim 1, characterized in that, A standardized ladder (4) is provided on one side of the steel pipe frame. Operators can use the standardized ladder (4) to reach the standardized scaffolding (5) to carry out their work.
6. The detachable ALC partition wall integrated installation device according to claim 1, characterized in that, The top of the side frame of the steel pipe frame (3) extends outwards from the part used to install the fixed pulley.