Deep foundation pit leaking stoppage device for constructional engineering
By combining baffles, embedded plates, and grouting components, the problem of fixing existing devices in loose soil is solved, achieving efficient plugging of large seepage points with high stability and low cost.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-27
- Publication Date
- 2026-03-31
AI Technical Summary
Existing deep foundation pit sealing devices for building construction are only suitable for small leaks and are difficult to fix in loose soil, thus failing to effectively solve large-scale seepage problems.
The design employs a combination of baffles, embedded plates, and grouting components. Fixed anchor rods are used to penetrate the embedded plates to fix the baffles, and grouting components are used to seal leaks. Combined with drainage pipes and limiting cones for fixation, the stability of the baffles is ensured.
It achieves stable fixation of the baffle in soil with high water content, ensuring the leak-stopping effect. It is suitable for large seepage points and has high stability and low cost.
Smart Images

Figure CN224063490U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to building engineering technical field especially relates to a building engineering deep foundation pit leaking stoppage device. BACKGROUND
[0002] The foundation pit is the soil pit that is excavated according to the foundation design position according to the foundation elevation and the foundation plane size. Before excavation, according to the geological hydrological data, the building situation near the scene is combined, the excavation scheme is decided, and the waterproof drainage work is well done. The soil slope is stabilized by the method of putting the slope for the excavation not deep, and the size of the slope is determined according to the relevant construction regulations.
[0003] In the building engineering deep foundation pit leaking stoppage device disclosed in the utility model patent CN217480260U, the device is installed near the water seepage point, and then grouting is carried out to realize leaking stoppage, but this design can only be applied to small leakage points, and the soil near the water seepage point is relatively loose, so it is difficult to use the expansion bolt fixer, therefore, we propose a building engineering deep foundation pit leaking stoppage device to solve the above problems. CONTENT OF UTILITY MODEL
[0004] The utility model aims at solving the problems in the prior art and provides a building engineering deep foundation pit leaking stoppage device.
[0005] In order to achieve the above purpose, the utility model adopts the following technical scheme:
[0006] A building engineering deep foundation pit leaking stoppage device, comprising a baffle and a pre-buried plate, a plurality of mounting holes are arranged on the baffle, and a fixed anchor rod is arranged in the mounting hole, the fixed anchor rod penetrates through the pre-buried plate and is arranged, and a grouting assembly is arranged on the baffle.
[0007] The grouting assembly comprises an extension pipe fixedly connected with the baffle, a drainage pipe is arranged on the side of the baffle away from the extension pipe, a threaded sleeve is fixedly connected to one end of the drainage pipe close to the baffle, a plurality of annular grooves are formed in the inner wall of the drainage pipe close to the threaded sleeve, a limiting cone is fixedly connected to one end of the drainage pipe away from the baffle, and a plurality of barbs are arranged on the side wall of the limiting cone.
[0008] Preferably, the fixed anchor rod comprises an outer pipe, a retaining ring is threadedly connected to the outer pipe, a sharp cone is fixedly connected to one end of the outer pipe away from the retaining ring, a spiral blade is arranged on one end of the outer pipe close to the sharp cone, a strip-shaped groove is formed in the side wall of the outer pipe, and a stop block is rotatably connected to the inner wall of the strip-shaped groove. A driving rod for moving the stop block is further slidably connected in the outer pipe.
[0009] Preferably, the pre-buried plate comprises an outer frame, a conical block is fixedly connected to the lower end of the outer frame, a knocking plate is fixedly connected to the upper end of the outer frame, and a carpenter plate is arranged in the outer frame.
[0010] Preferably, a plurality of grooves are formed on the wood board, and a steel cable is arranged in the grooves, and two ends of the steel cable are fixedly connected with the outer frame.
[0011] Preferably, the length of the steel cable is greater than the width of the outer frame.
[0012] Preferably, the baffle is fixedly connected with an inner lining plate through bolts, and the drainage pipe is fixedly connected with the inner lining plate.
[0013] Compared with the prior art, the building engineering deep foundation pit leakage stopping device has the advantages that:
[0014] The building engineering deep foundation pit leakage stopping device has the advantages that: the limiting cone is inserted into the soil at the leakage point, the drainage pipe is used to drain the seepage water, then the baffle is fixed near the leakage point, and then the grouting operation is performed on the leakage point through the extension pipe, so that the leakage stopping operation on the foundation pit is finally realized.
[0015] The building engineering deep foundation pit leakage stopping device has the advantages that: the limiting cone is inserted into the soil at the leakage point, the drainage pipe is used to drain the seepage water, then the baffle is fixed near the leakage point, and then the grouting operation is performed on the leakage point through the extension pipe, so that the leakage stopping operation on the foundation pit is finally realized. BRIEF DESCRIPTION OF DRAWINGS
[0016] Figure 1 A construction state structure schematic view of the building engineering deep foundation pit leakage stopping device is provided.
[0017] Figure 2 A side view structure schematic view of the building engineering deep foundation pit leakage stopping device is provided.
[0018] Figure 3 A partial structure schematic view of the building engineering deep foundation pit leakage stopping device is provided.
[0019] Figure 4 A pre-embedded plate structure schematic view of the building engineering deep foundation pit leakage stopping device is provided.
[0020] Figure 5 A fixed anchor rod structure schematic view of the building engineering deep foundation pit leakage stopping device is provided.
[0021] In the figure: 1, baffle; 2, pre-embedded plate; 21, outer frame; 22, tapered block; 23, knocking plate; 24, woodworking plate; 25, steel cable; 3, fixed anchor rod; 31, outer tube; 32, retaining ring; 33, sharp cone; 34, spiral blade; 35, stop block; 36, driving rod; 4, extension pipe; 5, drainage pipe; 6, threaded sleeve; 7, annular groove; 8, limiting cone; 9, barb; 10, inner lining plate; 11, soil layer. DETAILED DESCRIPTION
[0022] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments.
[0023] Reference Figures 1-5 A building engineering deep foundation pit leakage stopping device, including baffle 1 and pre-embedded plate 2, baffle 1 is provided with a plurality of mounting holes, and fixed anchor rod 3 is arranged in mounting hole, fixed anchor rod 3 is arranged through pre-embedded plate 2, baffle 1 is provided with grouting assembly;
[0024] Pre-embedded plate 2 includes outer frame 21, the lower end of outer frame 21 is fixedly connected with tapered block 22, and the upper end of outer frame 21 is fixedly connected with knocking plate 23, woodworking plate 24 is arranged in outer frame 21;
[0025] Pre-embedded plate 2 is used to cooperate fixed anchor rod 3 to fix baffle 1, pre-embedded plate 2 is inserted into the vicinity of leakage point by knocking knocking plate 23 from the periphery of foundation pit, if the depth of foundation pit is deeper, pre-embedded plate 2 can also be inserted into the pit dug, outer frame 21, tapered block 22 and knocking plate 23 are metal materials, ensure that the strength of pre-embedded plate 2 outside can meet the insertion into the soil, and the woodworking plate 24 arranged inside is convenient for fixed anchor rod 3 to penetrate woodworking plate 24, it needs to be explained that the double-block cement used in the present foundation pit leakage stopping has the ability of quick condensation and quick hardening, the whole leakage stopping operation time is short, so it is not necessary to consider the durability, and the woodworking plate 24 with low use cost can meet the demand;
[0026] The grouting assembly includes extension pipe 4 fixedly connected with baffle 1, drainage pipe 5 is arranged on the side, away from extension pipe 4, of baffle 1, drainage pipe 5 is arranged through baffle 1, one end of drainage pipe 5, close to baffle 1, is fixedly connected with threaded sleeve 6, threaded sleeve 6 is arranged inside drainage pipe 5, close to baffle 1, and a plurality of annular grooves 7 are formed in the inner wall of drainage pipe 5, close to threaded sleeve 6, one end of drainage pipe 5, away from baffle 1, is fixedly connected with limiting cone 8, and a plurality of barbs 9 are arranged on the side wall of limiting cone 8;
[0027] Based on the above design, when carrying out the plugging operation, the construction personnel first excavates the leakage point according to the process, can integrate multiple leakage points into a single large leakage point or trace the leakage point, and also excavate a space for grouting in the soil layer, then the user inserts the limiting cone 8 into the leakage point position, fixes it by using the barb 9, and guides the water outflowing from the leakage point out through the drainage pipe 5, then moves the baffle 1 to the area, fixes the baffle 1 near the excavated area by using the fixed anchor rod 3, then inserts the pipeline of the grouting equipment into the extension pipe 4 for grouting operation, waits for the grouting operation to be completed, pulls out the pipeline of the grouting equipment, according to the cement grouting amount and actual demand, can use the common rain cloth waste, cement woven bag and other objects in the production site to cover the extension pipe 4, and use the rope to tie, realize the plugging of the extension pipe 4;
[0028] After the grouting operation is completed, the drainage pipe 5 still maintains the state of outward drainage until the cement hardens and takes effect, then the drainage pipe 5 is plugged, and the cement is grouted into the drainage pipe 5, the position is completely plugged, and the whole leakage point plugging operation is finally completed;
[0029] It should be noted that the drainage pipe 5 includes a hard pipe section with a large outer diameter and a rigid material, and a soft pipe section with a metal ring embedded inside, the threaded sleeve 6 and the annular groove 7 are arranged in the hard pipe section, and the soft pipe section can be bent within a certain range, which is convenient for users to operate, and will not be crushed by the cement slurry pressure after grouting, causing the water to seep into the cement and affecting the hardening of the cement. On this basis, the threaded sleeve 6 is arranged to facilitate the user to connect the pipeline by using the threaded sleeve 6, and after the cement slurry hardens and takes effect, the external pipeline is taken out, and the user can further screw the plug into the threaded sleeve 6, and then grout the cement slurry into the place. The annular groove 7 can ensure that the cement block cannot be separated after the cement slurry solidifies into a cement block, and finally realize the plugging of the drainage pipe 5.
[0030] Further, the fixed anchor rod 3 includes an outer pipe 31, part of the outer wall of the outer pipe 31 is provided with external threads, the outer pipe 31 is threadedly connected with a blocking ring 32, and the end of the outer pipe 31 away from the blocking ring 32 is fixedly connected with a sharp cone 33. The sharp cone 33 blocks the opening of the outer pipe 31, and the end of the outer pipe 31 close to the sharp cone 33 is provided with a spiral blade 34. The side wall of the outer pipe 31 is provided with a strip-shaped groove, and the inner wall of the strip-shaped groove is rotatably connected with a blocking block 35. The outer pipe 31 is also slidably connected with a driving rod 36 for moving the blocking block 35;
[0031] In the design, the outer diameter of the blocking ring 32 is larger than the hole diameter of the mounting hole. During the fixing of the baffle 1, the construction personnel first inserts the embedded plate 2 into the soil near the leakage point, then aligns the marking with the embedded point position, adjusts the installation position of the baffle 1, ensures that the fixed anchor rod 3 can stably penetrate the embedded plate 2, sets the sharp cone 33 in cooperation with the spiral blade 34, which can improve the passability of the outer tube 31 when inserted into the soil. Because the soil and the embedded plate 2 can provide different force feedback during penetration, the construction personnel can ensure that the outer tube 31 has penetrated the embedded plate 2 according to the insertion depth of the outer tube 31. Then the construction personnel inserts the driving rod 36 into the outer tube 31. After the driving rod 36 abuts against the blocking piece 35, the driving rod 36 drives the blocking piece 35 to rotate, so that the blocking piece 35 pushes away the soil nearby and extends to the outside of the outer tube 31. At this time, the blocking piece 35 abuts against the embedded plate 2 (even if it is not tightly abutted, the construction personnel can adjust it by rotating the blocking ring 32, so that the fixed anchor rod 3 can better fix the baffle 1 even if it retreats).
[0032] Further, a plurality of grooves are formed in the wood board 24, and a steel cable 25 is arranged in the grooves. The two ends of the steel cable 25 are fixedly connected with the outer frame 21. This design is used for the case that the water pressure of the leakage point is large or the pit after excavation is large, and a large amount of cement slurry needs to be injected. The steel cable 25 can better hang the blocking piece 35, and the fixed anchor rod 3 can better fix the baffle 1. The wood board 24 ensures that the entire embedded plate 2 will not be displaced in the soil under stress.
[0033] The length of the steel cable 25 is greater than the width of the outer frame 21, and the steel cable 25 is arranged transversely. The length of the steel cable 25 is greater than the length of the outer frame 21. After the fixed anchor rod 3 directly abuts against the steel cable 25, the steel cable 25 can be pushed by the anchor rod, avoiding blocking the movement of the fixed anchor rod 3. It should be noted that based on this design, the outer tube 31 is also provided with an indicating rod perpendicular to the outer tube 31, which is used to facilitate the construction personnel to confirm the position of the strip-shaped groove, so that the blocking piece 35 can cooperate with the steel cable 25 after the driving rod 36 is inserted.
[0034] Further, the baffle 1 is fixedly connected with an inner lining plate 10 through bolts. The drainage pipe 5 is fixedly connected with the inner lining plate 10.
[0035] In this design, the inner lining plate 10 is used to facilitate the user to recycle part of the equipment in the leakage stopping device. The outer tube 31 and the drainage pipe 5 are covered by the cement slurry and cannot be taken out. The setting of the inner lining plate 10 can also take down the baffle 1, which is convenient for the user to recycle.
[0036] The above merely describes a preferred embodiment of the present application, and the protection scope of the present application is not limited thereto, and any skilled person in the art, according to the technical scheme and the inventive concept of the present application, makes equivalent replacement or change within the technical range disclosed by the present application, which should be covered within the protection scope of the present application.
Claims
1. A construction engineering deep foundation pit plugging device, comprising a baffle (1) and a pre-embedded plate (2), characterized in that, The baffle (1) is provided with a plurality of mounting holes, and a fixed anchor rod (3) is arranged in the mounting hole, the fixed anchor rod (3) is arranged through a pre-buried plate (2), and the baffle (1) is provided with a grouting assembly; The grouting assembly comprises an extension pipe (4) fixedly connected with the baffle (1), one side of the baffle (1) away from the extension pipe (4) is provided with a drainage pipe (5), one end of the drainage pipe (5) close to the baffle (1) is fixedly connected with a threaded sleeve (6), a plurality of annular grooves (7) are formed in the inner wall of the drainage pipe (5) close to the threaded sleeve (6), and a limiting cone (8) is fixedly connected to the end of the drainage pipe (5) away from the baffle (1), and a plurality of barbs (9) are arranged on the side wall of the limiting cone (8).
2. A construction engineering deep foundation pit leaking stoppage device according to claim 1, characterized in that, The fixed anchor rod (3) comprises an outer pipe (31), a stop ring (32) is threadedly connected to the outer pipe (31), a sharp cone (33) is fixedly connected to the end of the outer pipe (31) away from the stop ring (32), a spiral blade (34) is arranged on the end of the outer pipe (31) close to the sharp cone (33), a strip-shaped groove is formed in the side wall of the outer pipe (31), and a stop block (35) is rotatably connected to the inner wall of the strip-shaped groove, and a driving rod (36) for driving the stop block (35) to move is further slidably connected in the outer pipe (31).
3. The construction engineering deep foundation pit leaking stoppage device according to claim 1, characterized in that, The pre-buried plate (2) comprises an outer frame (21), a tapered block (22) is fixedly connected to the lower end of the outer frame (21), and a knocking plate (23) is fixedly connected to the upper end of the outer frame (21), and a woodworking plate (24) is arranged in the outer frame (21).
4. The construction engineering deep foundation pit leaking stoppage device according to claim 3, characterized in that, A plurality of grooves are formed in the woodworking plate (24), and a steel cable (25) is arranged in the groove, and the two ends of the steel cable (25) are fixedly connected with the outer frame (21).
5. A construction engineering deep foundation pit plugging device according to claim 4, characterized in that, The length of the steel cable (25) is greater than the width of the outer frame (21).
6. The construction engineering deep foundation pit leaking stoppage device according to claim 1, characterized in that, The baffle (1) is fixedly connected with an inner lining plate (10) through a bolt, and the drainage pipe (5) is fixedly connected with the inner lining plate (10).
Citation Information
Patent Citations
Deep foundation pit leaking stoppage device for constructional engineering
CN217480260U