Steel structure foundation bolt positioning device
The steel structure anchor bolt positioning device, which combines guide rails and sliding rods, solves the problem of poor versatility of existing positioning discs, enabling flexible adjustment and precise positioning of anchor bolt installation, reducing costs and improving adaptability.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-28
- Publication Date
- 2026-03-31
AI Technical Summary
The existing positioning plates are customized according to the number and size of the anchor bolts, and the hole positions are fixed and cannot be adjusted, resulting in poor device versatility. They need to be processed separately for each layout, which increases costs and time.
A steel structure anchor bolt positioning device consisting of two parallel guide rails and a sliding rod is adopted. Through the combination of sliding and positioning components, the hole position can be flexibly adjusted. The pre-drilled hole in the middle of the sliding rod and the mounting sleeves at both ends provide precise positioning. Combined with the adjustment of the threaded rod, it can meet the installation requirements of different anchor bolt layouts.
It improves the versatility and adaptability of the device, reduces the cost of use, ensures the accuracy and reliability of the anchor bolt installation and position, and adapts to different anchor bolt layouts without the need for separate processing.
Smart Images

Figure CN224063961U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model belongs to the field of steel structure construction, specifically relates to a steel structure foundation bolt positioning device. BACKGROUND
[0002] At present, the foundation engineering operation in chemical plant and workshop structure is more and more, and the foundation adopts reinforced concrete independent foundation or combined foundation, the top surface of the foundation is provided with embedded foundation bolt as the connecting piece of steel column and foundation, how to safely and efficiently complete the installation construction of embedded foundation bolt on the top surface of the foundation is more and more difficult problem in front of people.
[0003] For example, Chinese patent CN214786137U discloses a pipe gallery foundation foundation bolt pre-buried template positioning disc, which comprises a supporting block, the supporting block is fixedly connected with a positioning disc, a plurality of through holes are formed in the positioning disc, and a hole is formed in the center of the positioning disc, a longitudinal center line is formed in the positioning disc, and the longitudinal center line is perpendicular to the transverse center line.
[0004] The positioning disc is customized and processed according to the number and size of the foundation bolt, the hole position is fixed, and the hole position cannot be adjusted, when the number and arrangement spacing of the foundation bolt in the foundation engineering change, the positioning disc with fixed hole position cannot be reused, and needs to be individually processed for each layout, thereby limiting the universality of the device.
[0005] Therefore, the steel structure foundation bolt positioning device is proposed to solve the above problems. CONTENT OF THE UTILITY MODEL
[0006] In view of the problem that the positioning disc is customized and processed according to the number and size of the foundation bolt, the hole position is fixed, and the hole position cannot be adjusted, the utility model provides a steel structure foundation bolt positioning device.
[0007] The utility model adopts the scheme to solve the technical problem: a steel structure foundation bolt positioning device, including two parallelly arranged guide rails and at least two sliding rods, at least two sliding pieces are arranged on the guide rail, the sliding piece can slide along the guide rail, and a detachable positioning piece is arranged between the sliding piece and the guide rail, which is used for fixing the position of the sliding piece after moving.
[0008] The sliding rod is arranged above the two guide rails, the bottom of the sliding rod is fixedly connected with the sliding piece, the middle part of the sliding rod is provided with a reserved hole for inserting the foundation bolt, and the two ends of the sliding rod are respectively provided with mounting sleeves for inserting the foundation bolt.
[0009] Preferably, the guide rail is made of square tube, and the sliding piece is a U-shaped seat or a rectangular sliding sleeve.
[0010] Preferably, a plurality of positioning holes are formed in the side surface of the guide rail, and a threaded hole is formed in the side of the sliding piece close to the positioning hole.
[0011] Preferably, the positioning element is a positioning bolt, with the end of the positioning bolt passing through a threaded hole and inserted into the corresponding positioning hole.
[0012] Preferably, the sliding rod is hollow inside, and fixing nuts are installed at both ends.
[0013] Preferably, the fixing nut is internally threaded with a threaded rod, one end of which is fixedly connected to the mounting sleeve.
[0014] Compared with the prior art, the beneficial effects of this utility model are:
[0015] 1. This utility model adjusts the position of the sliding component on the guide rail, and at the same time adjusts the position of the sliding rod, the reserved hole and the mounting sleeve. Then, the hole position of the anchor bolt can be flexibly adjusted according to actual needs. There is no need to process the positioning plate separately for each anchor bolt layout, which greatly improves the versatility and adaptability of the device and reduces the cost of use.
[0016] 2. This utility model has multiple positioning holes on the side of the guide rail, and the sliding component is fixed to the guide rail by positioning bolts, which ensures that the position of the sliding component and the sliding rod is accurate and reliable after movement.
[0017] 3. The pre-drilled hole in the middle of the sliding rod and the mounting sleeves at both ends of this utility model provide precise positioning for the insertion of anchor bolts, ensuring the accuracy of anchor bolt installation.
[0018] 4. This utility model allows for precise adjustment of the mounting sleeve position by rotating the threaded rod, thus meeting the installation requirements of anchor bolts during foundation construction and further improving the applicability of the device. Attached Figure Description
[0019] Figure 1 This is a three-dimensional structural diagram of the present invention;
[0020] Figure 2 This is a top view of the structure of this utility model in use.
[0021] In the diagram: 1 guide rail, 11 positioning hole, 21 sliding component, 22 positioning bolt, 3 sliding rod, 31 reserved hole, 32 fixing nut, 4 threaded rod, 5 mounting sleeve, 6 anchor bolt, 7 foundation outer formwork. Detailed Implementation
[0022] The present invention will be further described below with reference to the accompanying drawings and embodiments.
[0023] Please see Figures 1-2 This utility model provides a technical solution for a steel structure anchor bolt positioning device:
[0024] Example 1:
[0025] according to Figure 1 and Figure 2 As shown, it includes two parallel guide rails 1 and at least two sliding rods 3. In this embodiment, there are three sliding rods 3. The number of sliding rods 3 can also be two, four or five. The specific number can be adjusted according to the actual construction needs. The guide rails 1 are made of square or rectangular tubes, and multiple positioning holes 11 are opened on the side of the guide rails 1.
[0026] At least two sliding parts 21 are provided on the guide rail 1. In this embodiment, three sliding parts 21 are provided on one guide rail 1. The specific number of sliding parts 21 is adjusted according to the number of sliding rods 3. The sliding part 21 is a U-shaped seat or a rectangular sliding sleeve. A threaded hole is opened on the side of the sliding part 21 near the positioning hole 11. The sliding part 21 can slide along the guide rail 1. A detachable positioning part is provided between the sliding part 21 and the guide rail 1. The positioning part is a positioning bolt 22. The end of the positioning bolt 22 passes through the threaded hole and is inserted into the corresponding positioning hole 11 to fix the position of the sliding part 21 after it moves, ensuring that the position of the sliding part 21 and the sliding rod 3 after they move is accurate and reliable.
[0027] The sliding rod 3 is positioned above the two guide rails 1, and its bottom is fixedly connected to the sliding component 21, allowing the sliding rod 3 to move with the sliding component 21. A reserved hole 31 for inserting the anchor bolt 6 is provided in the middle of the sliding rod 3, and mounting sleeves 5 for inserting the anchor bolt 6 are provided at both ends of the sliding rod 3. The reserved hole 31 in the middle of the sliding rod 3 and the mounting sleeves 5 at both ends provide precise positioning for the insertion of the anchor bolt 6, ensuring the installation accuracy of the anchor bolt 6.
[0028] In practical use, the steel structure anchor bolt positioning device of this utility model first slides the sliding rod 3 one by one according to the number and arrangement of the anchor bolts 6 in the foundation construction, adjusts the position of the sliding rod 3, and after adjusting the sliding rod 3 to a suitable position, the end of the positioning bolt 22 passes through the threaded hole and is inserted into the corresponding positioning hole 11 to fix the position of the sliding part 21 and the sliding rod 3 after movement.
[0029] Then, place the two guide rails 1 on top of the foundation outer formwork 7, and use fasteners to temporarily fix the guide rails 1 to prevent them from shifting. Then, for the anchor bolts 6 that need to be inserted into the reserved holes 31, insert the anchor bolts 6 into the reserved holes 31, insert the anchor bolts 6 into the mounting sleeves 5, and fix the anchor bolts 6.
[0030] Finally, the foundation concrete is poured. After the concrete has initially set, the device is removed for subsequent use.
[0031] Example 2:
[0032] Based on Example 1, the differences are as follows: Figure 1 As shown, the sliding rod 3 has a hollow interior, with fixing nuts 32 installed at both ends. The fixing nuts 32 are internally threaded with threaded rods 4. One end of the threaded rod 4 is fixedly connected to the mounting sleeve 5. By rotating the threaded rod 4, the position of the mounting sleeve 5 can be precisely adjusted to meet the installation requirements of the anchor bolts 6 in the foundation project, further improving the applicability of the device.
Claims
1. A steel structure anchor bolt positioning device, comprising two parallel guide rails and at least two sliding rods, characterized in that: At least two sliding members are arranged on the guide rail, the sliding members can slide along the guide rail, and a detachable positioning member is arranged between the sliding member and the guide rail to fix the position of the sliding member after movement. The sliding rod is arranged above the two guide rails, the bottom of the sliding rod is fixedly connected with the sliding member, the middle part of the sliding rod is provided with a reserved hole for inserting the foundation bolt, and the two ends of the sliding rod are respectively provided with a mounting sleeve for inserting the foundation bolt.
2. The steel structural anchor bolt positioning device according to claim 1, wherein: The guide rail is made of a square tube, and the sliding member is a U-shaped seat or a rectangular sliding sleeve.
3. The steel construction anchor bolt positioning device according to claim 2, characterized in that: A plurality of positioning holes are arranged on the side surface of the guide rail, and a threaded hole is arranged on the side of the sliding member close to the positioning hole.
4. The steel construction anchor bolt positioning device according to claim 3, characterized in that: The positioning member is a positioning bolt, the end of the positioning bolt passes through the threaded hole and is inserted into the corresponding positioning hole.
5. The steel construction anchor bolt positioning device according to claim 1, characterized in that: The inside of the sliding rod is hollow, and the two ends of the sliding rod are respectively provided with a fixed nut.
6. The steel structural anchor bolt positioning device according to claim 5, wherein: A threaded rod is threadedly connected in the fixed nut, and one end of the threaded rod is fixedly connected with the mounting sleeve.
Citation Information
Patent Citations
Template positioning disc for embedding foundation bolts of pipe gallery foundation
CN214786137U