Simple assembly type tunnel sliding trolley
The simplified prefabricated tunnel sliding trolley, with its detachable and movable design, solves the safety hazards and construction impacts of traditional leak sealing methods, achieving efficient, safe, and energy-saving tunnel leak treatment, and promoting resource conservation and improved construction efficiency.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-17
- Publication Date
- 2026-03-31
AI Technical Summary
The existing prefabricated shield tunneling leak-sealing trolley support has received little attention in tunnel construction, resulting in inefficient handling of tunnel leakage problems and potential safety hazards. Furthermore, traditional leak-sealing methods affect subsequent construction.
Design a simple prefabricated tunnel sliding trolley with a detachable and movable structure. Equipped with storage baskets and prefabricated guardrails, it can be quickly installed and adjusted by bolt connection. It is equipped with pulleys and brakes for easy movement and support, meeting various construction needs.
It improves the efficiency and safety of tunnel sealing construction, reduces the environmental impact of construction, promotes resource conservation and reuse, and enhances construction efficiency and quality. It is applicable to a variety of tunnel construction projects.
Smart Images

Figure CN224064372U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of building construction equipment, specifically relating to a simple prefabricated tunnel sliding trolley. Background Technology
[0002] With my country's rapid economic and social development, its population is also growing rapidly, making surface space increasingly crowded. Urban underground tunnels have seen significant development due to their advantages, such as resistance to severe weather and ability to alleviate surface traffic congestion. Underground tunnels are crucial in urban construction, relieving surface congestion by building a three-dimensional transportation network, efficiently utilizing underground space to release surface resources, and integrating municipal infrastructure to improve management efficiency. Tunnels also enhance cities' disaster prevention and mitigation capabilities, such as flood control, drainage, and emergency evacuation, while reducing environmental pollution and supporting sustainable development. Furthermore, tunnel construction drives economic growth, enhances urban competitiveness, and promotes engineering progress and intelligent operation and maintenance through technological innovation. Overall, underground tunnels are a key support for the efficient, safe, and green development of modern cities.
[0003] Leakage sealing is a common problem during tunnel construction. Because tunnels are underground structures, leakage can occur under the pressure of groundwater and soil, significantly impacting their usability and safety. Therefore, leakage sealing technology is particularly important in tunnel construction. In recent years, prefabricated tunnel construction technology has been widely used, becoming a major technology in modern tunnel construction due to its high efficiency, safety, and energy saving. However, prefabricated shield tunneling leakage sealing trolley supports have received relatively little attention, even though this technology is an indispensable part of tunnel leakage sealing techniques. Utility Model Content
[0004] The purpose of this utility model is to overcome the defects in the existing technology and provide a simple assembled tunnel sliding trolley.
[0005] To achieve the above objectives, this utility model adopts the following technical solution:
[0006] A simple prefabricated tunnel sliding trolley includes a bottom mounting frame and a mounting platform mounted on the mounting frame; the bottom mounting frame consists of two symmetrically arranged support frames; each support frame includes three parallel vertical rods and a horizontal rod assembled with the vertical rods; the horizontal rods include at least two vertically arranged in the middle and one at the bottom.
[0007] The upper middle section has a first horizontal bar, the lower middle section has a second horizontal bar, and the bottom section has a third horizontal bar. The first horizontal bar is connected to the mounting platform via a first diagonal bar. The second horizontal bar is connected to one side of the lower platform support plate. The other side of the lower platform support plate is connected to the third horizontal bar.
[0008] Storage baskets are provided on the front and rear sides of the lower platform support plate; the storage baskets are located between the second and third crossbars.
[0009] The vertical pole is a telescopic pole; each vertical pole includes an inner pole and an outer pole; the inner pole and the outer pole are provided with multiple bolt holes; the height of the vertical pole is adjusted by connecting bolt holes of different heights.
[0010] The bottom of the vertical rod is equipped with a pulley with a brake.
[0011] The installation platform includes a support plate and a fence installed on the front and rear sides of the support plate; the fence is assembled with the support plate.
[0012] The support plate is a rectangular plate; the side of the rectangular plate along its length is assembled with the vertical rod, and the side of the rectangular plate along its width is assembled with the first diagonal rod.
[0013] The fence consists of multiple spaced-apart railings; adjacent railings are connected by steel wire ropes.
[0014] Compared with the prior art, the beneficial effects of this utility model are:
[0015] This invention provides a highly efficient, safe, and energy-saving prefabricated sliding tunnel trolley (hereinafter referred to as the trolley) for tunnel construction. This trolley is both detachable and mobile, making it suitable for various tunnel construction projects. Compared to traditional leak-sealing methods, the trolley can be moved to the leak location. It also features a storage basket at the bottom for storing leak-sealing devices and materials, facilitating immediate commencement of construction. The prefabricated design facilitates disassembly and installation, and the prefabricated guardrails ensure worker safety. The trolley is equipped with an upper support plate and a lower platform support plate, meeting the needs of all-around tunnel construction. Attached Figure Description
[0016] Figure 1 This is a schematic diagram of the overall structure of the simplified assembled tunnel sliding trolley of this utility model;
[0017] Figure 2 This is a side view of the simplified assembled tunnel sliding trolley of this utility model;
[0018] Figure 3 This is a bottom view of the simple assembled tunnel sliding trolley of this utility model. Detailed Implementation
[0019] To enable those skilled in the art to better understand the technical solution of this utility model, the present utility model will be further described in detail below with reference to the accompanying drawings and preferred embodiments.
[0020] It should be noted that, unless otherwise specified, all assembly connections in this application are bolted connections.
[0021] Figure 1-3 A simple prefabricated tunnel sliding trolley is shown, including a bottom mounting frame and a mounting platform 5 disposed on the mounting frame;
[0022] The bottom mounting frame consists of two symmetrically arranged support frames. As one embodiment of this invention, the distance between the two sets of vertical support frames is 3m, allowing electric vehicles to pass through. Each support frame includes three parallel vertical rods 1 and a horizontal rod 2 assembled with the vertical rods 1. The horizontal rods include at least two arranged vertically in the middle and one arranged at the bottom.
[0023] The upper middle section has a first horizontal bar 21, the lower middle section has a second horizontal bar 22, and the bottom section has a third horizontal bar 23. The first horizontal bar is connected to the mounting platform 5 via a first diagonal bar 31. The second horizontal bar 22 is connected to one side of the lower platform support plate 7 via a second diagonal bar 32. The other side of the lower platform support plate 7 is connected to the third horizontal bar 23. As one embodiment of this application, to ensure the stability of the support frame, each support frame has two first and two diagonal bars. The first and second diagonal bars strengthen the frame and prevent instability, increasing its load-bearing capacity and rigidity, while also enhancing its anti-overturning ability.
[0024] Storage baskets 6 are provided on the front and rear sides of the lower platform support plate 7; the storage baskets 6 are located between the second crossbar 22 and the third crossbar 23.
[0025] The vertical rod 1 is a telescopic rod; each vertical rod includes an inner rod 12 and an outer rod 11; the inner rod and the outer rod are respectively provided with multiple bolt holes; the height of the vertical rod is adjusted by connecting bolt holes of different heights.
[0026] The bottom of the vertical rod 1 is equipped with a pulley 8 with a brake.
[0027] The installation platform 5 includes a support plate and railings 51 installed on the front and rear sides of the support plate. The support plate is rectangular; the length side of the rectangular plate is assembled with vertical bars, and the width side of the rectangular plate is assembled with first diagonal bars 31. The support plate is 6m long and 3m wide, providing space for workers and storage for construction equipment. The railings include multiple spaced guardrails; adjacent guardrails are connected by steel wire ropes to form a unified protective structure.
[0028] When constructing a simple prefabricated tunnel sliding trolley, steel rails are first laid. The trolley is then pre-assembled according to the site conditions and placed on the rails using pulleys at the bottom. After preparation, the trolley support is moved to the construction site along the rails. The pulleys are locked, and the trolley is then mounted on the installation platform using an external detachable climbing frame. During segment assembly, leaks can be sealed in the gaps and areas without interference. A fast-curing sealing material is selected and used to fill these gaps and areas without interference. After completion, the trolley can be moved without affecting subsequent construction. Furthermore, because the trolley is equipped with a lower platform and storage baskets, it can be used as an auxiliary platform for other construction work in the future.
[0029] In summary, the simplified prefabricated tunnel sliding trolley of this utility model has the following characteristics:
[0030] First, it improves expandability, controllability, and operability. All components of the simple prefabricated tunnel sliding trolley are connected only by bolts, and it is equipped with pulleys and storage baskets, allowing the trolley to be quickly moved to the location of leakage to begin construction. The height of the vertical rod is adjustable by bolts, and the trolley is equipped with upper and lower platforms, making it suitable for various construction requirements.
[0031] Secondly, it promotes the concepts of resource conservation and environmental protection. The simple prefabricated tunnel sliding trolley uses environmentally friendly materials and can be disassembled and reused, which saves resources, reduces the impact on the environment, greatly reduces the amount of construction waste, and increases the reuse rate of materials.
[0032] Third, it promotes the standardization and industrialization of engineering construction. The standardized production and assembly of the simplified prefabricated tunnel sliding trolley lays the foundation for improved production efficiency. At the same time, the use of bolts for connection can also improve installation speed and precise control of installation quality, thereby improving overall construction efficiency and shortening the construction period.
[0033] In summary, the purpose of the simplified prefabricated tunnel sliding trolley is to address the safety hazards of temporary structures used in traditional leak-sealing construction, improve construction quality and efficiency, and promote resource conservation and environmental protection. Its mission is to enhance controllability and operability, thereby promoting resource conservation and environmental protection, and facilitating the standardization and industrialization of engineering construction.
[0034] The above description is only a preferred embodiment of this utility model. For those skilled in the art, there will be changes in the specific implementation method and application scope based on the idea of this utility model. The content of this specification should not be construed as a limitation of this utility model.
Claims
1. A simply assembled tunnel sliding trolley, characterized in that, The utility model provides a kind of installation platform, including bottom mounting bracket and installation platform being arranged on the bottom mounting bracket;The bottom mounting bracket is made of two symmetrically arranged support frames;Each support frame includes three parallel vertical rods and transverse rod connected with vertical rod;The transverse rod includes at least two upper and lower middle transverse rods and one bottom transverse rod.
2. The simply assembled tunnel sliding trolley according to claim 1, characterized in that, The upper middle transverse rod is the first transverse rod, the lower middle transverse rod is the second transverse rod, and the bottom transverse rod is the third transverse rod;The first transverse rod is connected with the installation platform through the first inclined rod;The second transverse rod is connected with one side of the lower platform support plate;The other side of the lower platform support plate is connected with the third transverse rod.
3. The simply assembled tunnel sliding trolley according to claim 2, characterized in that, The front and rear sides of the lower platform support plate are provided with storage baskets;The storage baskets are arranged between the second transverse rod and the third transverse rod.
4. The simply assembled tunnel sliding trolley according to claim 1, wherein, The vertical rod is a telescopic rod;Each vertical rod includes an inner rod and an outer rod;A plurality of bolt holes are arranged on the inner rod and the outer rod correspondingly;The height of the vertical rod is adjusted by connecting bolt holes of different heights.
5. The simply assembled tunnel sliding trolley according to claim 1, wherein, The bottom of the vertical rod is provided with a pulley with a brake.
6. The simply assembled tunnel sliding trolley according to claim 1, wherein, The installation platform includes a support plate and a fence arranged on the front and rear sides of the support plate.
7. The simply assembled tunnel sliding trolley according to claim 6, characterized in that, The support plate is a rectangular plate;The length direction side of the rectangular plate is assembled with the vertical rod, and the width direction side of the rectangular plate is assembled with the first inclined rod.
8. The simply assembled tunnel sliding trolley according to claim 6, characterized in that, The fence includes a plurality of spaced guardrails;Steel wire ropes are used to connect adjacent guardrails.